ML17313A957
| ML17313A957 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 05/26/1999 |
| From: | ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| To: | |
| Shared Package | |
| ML17313A956 | List: |
| References | |
| NUDOCS 9906040021 | |
| Download: ML17313A957 (6) | |
Text
~ G.
REVISED TECHNICALSPECIFICATIONS PAGES Units 1, 2, and 3:
Page 3.3.1-9 H.
RETYPED TECHNICALSPECIFICATION PAGES Units 1, 2, and 3:
Page 3.3.1-9 990604002i 990526 PDR ADQCK 05000528 P
A 1
RPS rumentation -Operating 3.3.1 Table 3.3.1-1 (page 2 of 3)
Reactor Protective System Instrtsaentation FUNCTION APPLICABLE HOOES OR OTHER SPECIFIEO CONDIT IOHS SURVEILLANCE REOUIREHEHTS ALLOMABLE VALUE 8.
¹1 Level Low 1,2 SR 3.3.1.1 SR 3.3.1.7 SR 3.3.1.9 SR 3.3.1.13 a 43.7%
9.
Steam Generator ¹2 Level Low 1,2 SR 3.3.1.1 SR 3.3.1.7 SR 3.3.1.9 SR 3.3.1.13
> 43.7/
10.
¹1 Level High 1,2 SR 3.3.1.1 SR 3.3.1.7 SR 3.3.1.9 SR 3.3.1.13 s 91.5%
11.
Steam Generator ¹2 Level High 1,2 SR 3.3.1.1 SR 3.3.1.7 SR 3.3.1.9 SR 3.3.1.13 s 91.5%
12.
Reactor Coolant Flow, Steam Generator
¹1 ~ Low 1,2 SR 3.3.1.1 SR 3.3.1.7 SR 3.3.1.9 SR 3.3.1.13 Ramp:
< 0.11 psid/sec.
Floor:
11 psid Step:
s 10 psid 13.
Reactor Coolant Flow, Steam Generator
¹2-Low 1,2 SR 3.3.1.1 SR 3.3. 1.7 SR 3.3.1.9 SR 3.3.1.13 Ramp:
s 0.
8 psid/sec.
Floor: >
1.7 psid Step:
s 0.2 psid (continued) j Ramp:
5 0.1 15 psld/scc.
Floor:
2.12.49 psld Step:
6 17.2 psld PALO VERDE UNITS 1,2,3 3.3.1-9 AMENDMENT NO.
117
0 C
'S I
~ )
II H
'1
0 RPS Instrumentation Operating 3.3.1 Table 3.3.1-1 (page 2 of 3)
Reactor Protective System Instrunentation FUNCTION APPLICABLE NODES OR OTHER SPECIFIED CONDITIONS SURVEILLANCE REQUIREHENTS ALLONABLE VALUE 8.
¹1 Level Low 1,2 SR 3.3.1.1 SR 3.3.1.7 SR 3.3.1.9 SR 3.3.1.13 i 43.7X 9.
Steam Generator ¹2 Level Low I g2 SR 3.3.1.1 SR 3.3.1.7 SR 3.3.1.9 SR 3.3.1.13
> 43.7X 10'team Generator
¹1 Level High 1,2 SR 3.3.1.1 SR 3.3.1.7 SR 3.3.1.9 SR 3.3 ~ 1.13 s 91.5X 11.
Steam Generator ¹2 Level High 1.2 SR 3.3.1.1 SR 3.3.1.7 SR 3.3.1.9 SR 3.3.1.13
< 91 ~ 5X 12.
Reactor Coolant Flow, Steam Generator
¹1-Low
~
1I2 SR 3.3.1.1 SR 3.3.1.7 SR 3.3.1.9 SR 3.3.1.13 Ramp:
s 0.'l15 psid/sec.
Floor: > 12.49 psid Step:
s 17.2 psid 13.
Reactor Coolant Flow, Steam Generator
¹2-Low 1,2 SR 3.3.1.1 SR 3.3.1.7 SR 3.3.1.9 SR 3.3.1.13 Ramp:
s 0.115 psid/sec.
Floor: i 12.49 psid Step:
s 17.2 psid (continued)
PALO VERDE UNITS 1.2,3 3.3.1-9 AMENDMENT NO. 447,
0 l
t~
I l
'tl