ML17341B445: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:REGULA'TORY ORMAT ION DISTRIBUTION SYS (RIDS)ACCESSION NBR:8211020449 DOC~DATE: 82/10/27 NOTAR1'ZED:
{{#Wiki_filter:REGULA'TORY     ORMAT ION DISTRIBUTION SYS         (RIDS)
NO FACIL."50 250 Turkey Point Planti Unit 3i Florida Power and Light C 50-251 Turkey Point~Planti Unit 4i Florida Power and Light C AUTH BYNAME AUTHOR AFFILIATION UHRIGiR,ED Florida Power 8 Light Co,'REC IP, tlAtlE RECIPIENT AFFILIATION VARGAiS~AD Operating Reactors Branch 1 ,
ACCESSION NBR:8211020449             DOC DATE: 82/10/27
                                          ~                  NOTAR1'ZED: NO FACIL."50 250 Turkey       Point Planti Unit 3i Florida Power and Light C       05000250 50-251 Turkey Point ~Planti Unit 4i Florida Power and Light C BYNAME                                                                      05000251 AUTH                   AUTHOR AFFILIATION UHRIGiR,ED             Florida Power 8 Light Co, NOTES'OCKET
    'REC IP, tlAtlE         RECIPIENT AFFILIATION VARGAiS ~ AD               Operating Reactors Branch 1


==SUBJECT:==
==SUBJECT:==
Forwards r evised pump 8 valve inser vice test program for Unit 3iapplicable for period 821214 to 921014~Revised inservice test program for Unit 4 will be submitted by 830307e~~e M~~.%@~loz~Pcs'ISTRIBUTION CODE: A047S'COPIES RECEIVED:LTR ENCL l SIZE TITLE: OR Submittal:
Forwards r evised pump 8 valve inser vice test program for Unit 3iapplicable for period 821214 to 921014 Revised  ~
Inservice Inspection/Testing NOTES'OCKET 05000250 05000251 RECIPIENT ID CODE/NAVE NRR ORB1 BC 01 INTERNALS ELD/HDS4 NRR/DE/MTEB 14 RGN2 COPIES LTTR ENCL 7 7 0 1 1 1 1 RECIPIENT ID CODE/NAME NRR TAMiP N 8 15 G F ILE"'4 COPIES LTTR ENCL 1 0 1 1 1 1 EXTERNAL: ACRS NRC PDR NTIS 16 10 10 OZ 1 1 1 LPDR NSIC 03 05 TOTAL NUMBER OF COPIES REQUIRED: LTTR 27 ENCL 25 gf 4 f ,'iiT 4 J>>ii id i.L'IT''l ,t ii)diI HTC~j,jJA'~-'."2 idI l~~ii JJ, i~l 4JIJ d~Jl"~1.4~, (p g F-1 d 4d,'a I h H EJ'd r''.v'~<: t.'li<<44,r f rl T~A l)T, j'H'J Jfr,'A',I J'll" dj'Ji 1,'ld iH i,.l i)d<<rH)~'44f P.OX 14000, JUNO BEACH, FL 3340B FLORIDA POWER&LIGHT COMPANY October 27, 1982 L-82-456 Office of Nuclear Reactor Regulation Attention:
inservice test program for Unit 4 will be submitted by 830307e
Mr.Steven A.Varga, Chief Operating Reactors Branch gl Division of Licensing.U.S.Nuclear Regulatory Commission Washington, D.C.20555
                      ~~e   M~~. %@~loz~ Pcs
'ISTRIBUTION CODE: A047S 'COPIES RECEIVED:LTR                   ENCL     l SIZE TITLE: OR Submittal: Inservice Inspection/Testing RECIPIENT         COPIES            RECIPIENT            COPIES ID CODE/NAVE         LTTR ENCL        ID CODE/NAME          LTTR ENCL NRR ORB1   BC 01     7    7      NRR  TAMiP                1    0 INTERNALS ELD/HDS4 NRR/DE/MTEB     14     1 0
1 N
G F ILE 8
                                                                  "'415      1 1
1 1
RGN2                    1     1 EXTERNAL: ACRS                 16     10   10     LPDR            03 NRC PDR        OZ     1           NSIC            05 NTIS                    1     1 TOTAL NUMBER OF COPIES         REQUIRED: LTTR     27   ENCL     25


==Dear Mr.Varga:==
gf 4 4
Re: Turkey Point Units 3 8 4 Docket Nos.50-250 8 50-251 Pump 5 Valve Inservice.
HTC          ~  j,jJA J>>ii                                      '~- '."2                  idI l~~  ii id JJ,      i
Test-Program Please find attached the revised pump and valve Inservice Test Program for Unit 3.The program shall be conducted in accordance with the 1980 Edition of the ASME Boiler and Pressure Vessel Code (through winter 1980 Addenda)except for specific relief requested in accordance with 10 CFR 50.55 a (g)(5)(iii).The program is applicable for the period December 14, 1982 to December 14, 1992.Attachment A of thi s submittal is intended to replace the previous program described in Attachment B of our Technical.
                                                                                        ~      l  4JIJ f                          i .L d ~    Jl"
Specification Amendment r equest submitted in L-79-52, dated March 6, 1979.The revised Inservice Test Program for Unit 4 will be submitted by March 7, 1983.This program has been reviewed by the Turkey Point Plant Nuclear Safety Committee and'the Florida Power 5 Light Company Nuclear review board.Very trul yours, Robert E.Uhrig Vice President Advanced Systems 8 Technology REU/JEM/mvt Attachment cc: J.P.O'Reilly, Region II Harold F.Reis, Esquire 8211020449 821027 PDR ADOCK 05000250 P PDR PEOPLE...SERVING PEOPLE 1 P P 1}}
    'iiT                          IT''l
                            ,t  ii)  diI                          ~    1.4
                                                                            ~, (
p g      F-1  d 4d,'a            h                      'd r''      .v '~        <    :    t '  .
li<<
I                  H  EJ                                  44,r  f rl T                          l    )T, j'H  'J
                        ~A Jfr,'A',I                                                    'Ji  1,'
J'll"  dj ld  iH      i,. l        i)      d<<rH)                        ~      '44f
 
P. OX 14000, JUNO BEACH, FL 3340B FLORIDA POWER & LIGHT COMPANY October 27, 1982 L-82-456 Office of Nuclear Reactor Regulation Attention: Mr. Steven A. Varga, Chief Operating Reactors Branch gl Division of Licensing
  .U.S. Nuclear Regulatory Commission Washington, D.C. 20555
 
==Dear Mr. Varga:==
 
Re:   Turkey Point Units 3 8 4 Docket Nos. 50-250 8 50-251 Pump 5 Valve Inservice. Test-Program Please   find attached the revised pump and valve Inservice Test Program for Unit 3. The program shall be conducted in accordance with the 1980 Edition of the ASME Boiler and Pressure Vessel Code (through winter 1980 Addenda) except for specific relief requested in accordance with 10 CFR 50.55 a (g) (5)
(iii). The program is applicable for the period December 14, 1982theto previous    December 14, 1992. Attachment A of thi s     submittal is   intended to replace program described in Attachment B of our Technical. Specification Amendment r equest   submitted in L-79-52, dated March 6, 1979.
The revised Inservice Test Program   for Unit 4 will be submitted by March 7, 1983.
This program has been reviewed by the Turkey Point Plant Nuclear Safety Committee and 'the Florida Power 5 Light Company Nuclear review board.
Very trul yours, Robert E. Uhrig Vice President Advanced Systems     8 Technology REU/JEM/mvt Attachment cc:   J.P. O'Reilly, Region II Harold F. Reis, Esquire 8211020449 821027 PDR ADOCK 05000250 P                   PDR PEOPLE... SERVING PEOPLE
 
1 P
P 1}}

Latest revision as of 22:49, 3 February 2020

Forwards Revised Pump & Valve Inservice Test Program for Unit 3,applicable for 821214 to 921214.Revised Inservice Test Program for Unit 4 Will Be Submitted by 830307
ML17341B445
Person / Time
Site: Turkey Point NextEra Energy icon.png
Issue date: 10/27/1982
From: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
To: Varga S
Office of Nuclear Reactor Regulation
Shared Package
ML17341B446 List:
References
L-82-456, NUDOCS 8211020449
Download: ML17341B445 (4)


Text

REGULA'TORY ORMAT ION DISTRIBUTION SYS (RIDS)

ACCESSION NBR:8211020449 DOC DATE: 82/10/27

~ NOTAR1'ZED: NO FACIL."50 250 Turkey Point Planti Unit 3i Florida Power and Light C 05000250 50-251 Turkey Point ~Planti Unit 4i Florida Power and Light C BYNAME 05000251 AUTH AUTHOR AFFILIATION UHRIGiR,ED Florida Power 8 Light Co, NOTES'OCKET

'REC IP, tlAtlE RECIPIENT AFFILIATION VARGAiS ~ AD Operating Reactors Branch 1

SUBJECT:

Forwards r evised pump 8 valve inser vice test program for Unit 3iapplicable for period 821214 to 921014 Revised ~

inservice test program for Unit 4 will be submitted by 830307e

~~e M~~. %@~loz~ Pcs

'ISTRIBUTION CODE: A047S 'COPIES RECEIVED:LTR ENCL l SIZE TITLE: OR Submittal: Inservice Inspection/Testing RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAVE LTTR ENCL ID CODE/NAME LTTR ENCL NRR ORB1 BC 01 7 7 NRR TAMiP 1 0 INTERNALS ELD/HDS4 NRR/DE/MTEB 14 1 0

1 N

G F ILE 8

"'415 1 1

1 1

RGN2 1 1 EXTERNAL: ACRS 16 10 10 LPDR 03 NRC PDR OZ 1 NSIC 05 NTIS 1 1 TOTAL NUMBER OF COPIES REQUIRED: LTTR 27 ENCL 25

gf 4 4

HTC ~ j,jJA J>>ii '~- '."2 idI l~~ ii id JJ, i

~ l 4JIJ f i .L d ~ Jl"

'iiT ITl

,t ii) diI ~ 1.4

~, (

p g F-1 d 4d,'a h 'd r .v '~ <  : t ' .

li<<

I H EJ 44,r f rl T l )T, j'H 'J

~A Jfr,'A',I 'Ji 1,'

J'll" dj ld iH i,. l i) d<<rH) ~ '44f

P. OX 14000, JUNO BEACH, FL 3340B FLORIDA POWER & LIGHT COMPANY October 27, 1982 L-82-456 Office of Nuclear Reactor Regulation Attention: Mr. Steven A. Varga, Chief Operating Reactors Branch gl Division of Licensing

.U.S. Nuclear Regulatory Commission Washington, D.C. 20555

Dear Mr. Varga:

Re: Turkey Point Units 3 8 4 Docket Nos. 50-250 8 50-251 Pump 5 Valve Inservice. Test-Program Please find attached the revised pump and valve Inservice Test Program for Unit 3. The program shall be conducted in accordance with the 1980 Edition of the ASME Boiler and Pressure Vessel Code (through winter 1980 Addenda) except for specific relief requested in accordance with 10 CFR 50.55 a (g) (5)

(iii). The program is applicable for the period December 14, 1982theto previous December 14, 1992. Attachment A of thi s submittal is intended to replace program described in Attachment B of our Technical. Specification Amendment r equest submitted in L-79-52, dated March 6, 1979.

The revised Inservice Test Program for Unit 4 will be submitted by March 7, 1983.

This program has been reviewed by the Turkey Point Plant Nuclear Safety Committee and 'the Florida Power 5 Light Company Nuclear review board.

Very trul yours, Robert E. Uhrig Vice President Advanced Systems 8 Technology REU/JEM/mvt Attachment cc: J.P. O'Reilly, Region II Harold F. Reis, Esquire 8211020449 821027 PDR ADOCK 05000250 P PDR PEOPLE... SERVING PEOPLE

1 P

P 1