ML17347B494: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:ACCELERATED D UTION DEMON TION SYSIHM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)01020124 DOC.DATE: 89/12/20 NOTARIZED:
{{#Wiki_filter:ACCELERATED D                         UTION DEMON                 TION SYSIHM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
NO DOCKET I rkey Point Plant, Unit 3, Florida Power and Light C 05000250 rke Point, Plant Unit 4 Florida Power and Li ht C 05000251 ACCESSION NBR:90 FACIL:50-250 Tu 50-251 Tu y g AUTH.NAME AUTHOR AFFILIATION HARRIS,K.N.
ACCESSION NBR:90 01020124             DOC.DATE:   89/12/20   NOTARIZED: NO           DOCKET I FACIL:50-250 Tu rkey Point Plant, Unit 3, Florida Power and Light C 05000250 50-251 Tu rke y Point, Plant Unit 4 Florida Power and Lig ht C 05000251 AUTH. NAME           AUTHOR AFFILIATION HARRIS,K.N.           Florida Power 6 Light Co.
Florida Power 6 Light Co.RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)NOTES:
RECIP.NAME           RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)


==SUBJECT:==
==SUBJECT:==
Provides Nov 1989 progress summary of select sys assessment.
Provides Nov 1989 progress summary of select sys assessment.
DISTRIBUTION CODE: A001D COPIES RECEIVED:LTR ENCL SIZE: TITLE: OR Submittal:
DISTRIBUTION CODE: A001D COPIES RECEIVED:LTR                   ENCL       SIZE:
General Distribution RECIPIENT ID CODE/NAME PD2-2 LA EDISON,G INTERNAL: NRR/DET/ECMB 9H NRR/DST 8E2 NRR/DST/SICB 7E NUDOCS-ABSTRACT OGC/HDS2 RES/DSIR/EIB EXTERNAL: LPDR NSIC COPIES LTTR ENCL 1 1 5 5 1 1 1 1 1 1 1 1 1 0 1 1 1 1 1 1 RECIPIENT ID CODE/NAME PD2-2 PD NRR/DOEA/OTS B1 1 NRR/DST/SELB 8D NRR/DST/SRXB 8E NRC PDR COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 0 1 1 I t I~I NOTE TO ALL"RIDS" RECIPIENTS:
TITLE: OR Submittal: General Distribution NOTES:
PLEASE HELP US TO REDUCE WASIEI CONTACT THE.DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT.20079)TO ELIMINATE, YOUR NAME FROM DISTRIBUTION LISIS FOR DOCUMENTS YOU DON'T NEEDl TOTAL NUMBER OF COPIES REQUIRED: LTTR 21 ENCL 19 P rr t,~I P.O.Box14000, Juno Beach, FL 33408-0420 DEC 20 1989 L-89-453 U.S.Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C.20555 Gentlemen:
RECIPIENT              COPIES            RECIPIENT         COPIES ID CODE/NAME           LTTR ENCL        ID  CODE/NAME      LTTR ENCL PD2-2 LA                     1      1      PD2-2 PD              1    1 EDISON,G                     5    5 INTERNAL: NRR/DET/ECMB 9H               1      1      NRR/DOEA/OTS B1 1     1   1 NRR/DST        8E2          1     1     NRR/DST/SELB 8D        1    1 NRR/DST/SICB 7E              1      1      NRR/DST/SRXB 8E       1    1 NUDOCS-ABSTRACT              1      1                             1   0 OGC/HDS2                    1     0                              1   1 RES/DSIR/EIB                1     1 EXTERNAL: LPDR                          1     1       NRC PDR NSIC                        1     1 I
Re: Turkey Point Units 3 and 4 Docket Nos.50-250 and 50-251 Select S stem Assessment Pro ress Summar Pursuant to the Nuclear Regulatory Commission Order dated August 12, 1986, the attachment to this letter provides the November 1989 progress summary of the Select System Assessment.
t I ~I NOTE TO ALL "RIDS" RECIPIENTS:
Should there be any questions regarding this information, please contact us.Very truly yours, Vice Harris resident Turkey Point Nuclear Plant KNH/TCG/gp Attachment cc: Stewart D.Ebneter, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant 9001020i24 89i220 PDR ADOCK 05000250 R PDC an FPL Group company  
PLEASE HELP US TO REDUCE WASIEI CONTACT THE. DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATE,YOUR NAME FROM DISTRIBUTION LISIS FOR DOCUMENTS YOU DON'T NEEDl TOTAL NUMBER OF COPIES REQUIRED: LTTR               21   ENCL   19
'<".', tJ~,)gb SELECT SYSTEM REVIEW NOVEMBER 1989 STATUS ORIGINAL 15 SYSTEMS WALKDOWN AS BUILT RECORDS Breaker List (IS Mod 1265)-Scheduled to be completed January 22, 1991 PAID's (IS Mod 1098)-Scheduled to be completed December 29, 1989 MISCELLANEOUS ITEMS Unit 3 RHR 887 Valve Replacement (IS Mod 519)-Scheduled completion during the next Unit 3 Refueling Outage Unit 4 Outage Related Modifications RHR 887 Valve Replacement (IS Mod 565)-Scheduled completion deferred until the next Unit 4 Refueling Outage EDG Redundant Set of Air Start Motors (IS Mod 576)Scheduled completion deferred to coincide with the Emergency Power System Upgrade Project Outage currently scheduled to begin in 1991 ADDITIONAL SYSTEMS ARMS PRMS NCC WALKDOWNS P 6 ID's (IS Mod 1042)-Scheduled for completion during next Unit 3 Refueling Outage P&ID Update Schedule to be determined following walkdowns  
 
/e~%~i I t}}
P r
r t,
        ~ I
 
P.O. Box14000, Juno Beach, FL 33408-0420 DEC   20   1989 L-89-453 U. S. Nuclear Regulatory Commission Attn:   Document Control Desk Washington, D. C. 20555 Gentlemen:
Re:   Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Select     S   stem Assessment   Pro ress Summar Pursuant to the Nuclear Regulatory Commission Order dated August 12, 1986, the attachment to this letter provides the November 1989 progress summary of the Select System Assessment.
Should there be any questions regarding this information, please contact us.
Very truly yours, Harris Vice resident Turkey Point Nuclear Plant KNH/TCG/gp Attachment cc:   Stewart D. Ebneter, Regional Administrator, Region II,                         USNRC Senior Resident Inspector, USNRC, Turkey Point Plant 9001020i24 89i220 05000250 PDR     ADOCK R                 PDC an FPL Group company
 
<".', tJ ~,)gb
 
SELECT SYSTEM REVIEW NOVEMBER 1989 STATUS ORIGINAL 15 SYSTEMS WALKDOWN AS BUILT   RECORDS Breaker List (IS Mod 1265) Scheduled   to be completed January 22, 1991 PAID's (IS   Mod 1098) Scheduled   to be completed December 29, 1989 MISCELLANEOUS ITEMS Unit 3 RHR 887   Valve Replacement (IS Mod 519) Scheduled completion during the next Unit 3 Refueling Outage Unit 4 Outage Related   Modifications RHR 887 Valve Replacement       (IS Mod 565)     Scheduled completion deferred until the next Unit         4 Refueling Outage EDG Redundant Set of Air Start Motors (IS Mod 576)
Scheduled completion deferred to coincide with the Emergency Power System Upgrade Project Outage currently scheduled to begin in 1991 ADDITIONAL SYSTEMS     ARMS   PRMS NCC WALKDOWNS P 6 ID's   (IS Mod 1042) Scheduled   for completion during next Unit 3 Refueling Outage P & ID Update Schedule   to be determined   following walkdowns
 
      /
e
~ %~i t
I}}

Latest revision as of 22:57, 3 February 2020

Provides Nov 1989 Progress Summary of Select Sys Assessment
ML17347B494
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 12/20/1989
From: Harris K
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-89-453, NUDOCS 9001020124
Download: ML17347B494 (6)


Text

ACCELERATED D UTION DEMON TION SYSIHM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:90 01020124 DOC.DATE: 89/12/20 NOTARIZED: NO DOCKET I FACIL:50-250 Tu rkey Point Plant, Unit 3, Florida Power and Light C 05000250 50-251 Tu rke y Point, Plant Unit 4 Florida Power and Lig ht C 05000251 AUTH. NAME AUTHOR AFFILIATION HARRIS,K.N. Florida Power 6 Light Co.

RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Provides Nov 1989 progress summary of select sys assessment.

DISTRIBUTION CODE: A001D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: OR Submittal: General Distribution NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-2 LA 1 1 PD2-2 PD 1 1 EDISON,G 5 5 INTERNAL: NRR/DET/ECMB 9H 1 1 NRR/DOEA/OTS B1 1 1 1 NRR/DST 8E2 1 1 NRR/DST/SELB 8D 1 1 NRR/DST/SICB 7E 1 1 NRR/DST/SRXB 8E 1 1 NUDOCS-ABSTRACT 1 1 1 0 OGC/HDS2 1 0 1 1 RES/DSIR/EIB 1 1 EXTERNAL: LPDR 1 1 NRC PDR NSIC 1 1 I

t I ~I NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASIEI CONTACT THE. DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATE,YOUR NAME FROM DISTRIBUTION LISIS FOR DOCUMENTS YOU DON'T NEEDl TOTAL NUMBER OF COPIES REQUIRED: LTTR 21 ENCL 19

P r

r t,

~ I

P.O. Box14000, Juno Beach, FL 33408-0420 DEC 20 1989 L-89-453 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Gentlemen:

Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Select S stem Assessment Pro ress Summar Pursuant to the Nuclear Regulatory Commission Order dated August 12, 1986, the attachment to this letter provides the November 1989 progress summary of the Select System Assessment.

Should there be any questions regarding this information, please contact us.

Very truly yours, Harris Vice resident Turkey Point Nuclear Plant KNH/TCG/gp Attachment cc: Stewart D. Ebneter, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant 9001020i24 89i220 05000250 PDR ADOCK R PDC an FPL Group company

<".', tJ ~,)gb

SELECT SYSTEM REVIEW NOVEMBER 1989 STATUS ORIGINAL 15 SYSTEMS WALKDOWN AS BUILT RECORDS Breaker List (IS Mod 1265) Scheduled to be completed January 22, 1991 PAID's (IS Mod 1098) Scheduled to be completed December 29, 1989 MISCELLANEOUS ITEMS Unit 3 RHR 887 Valve Replacement (IS Mod 519) Scheduled completion during the next Unit 3 Refueling Outage Unit 4 Outage Related Modifications RHR 887 Valve Replacement (IS Mod 565) Scheduled completion deferred until the next Unit 4 Refueling Outage EDG Redundant Set of Air Start Motors (IS Mod 576)

Scheduled completion deferred to coincide with the Emergency Power System Upgrade Project Outage currently scheduled to begin in 1991 ADDITIONAL SYSTEMS ARMS PRMS NCC WALKDOWNS P 6 ID's (IS Mod 1042) Scheduled for completion during next Unit 3 Refueling Outage P & ID Update Schedule to be determined following walkdowns

/