ML18026A394: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(7 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 09/01/1990
| issue date = 09/01/1990
| title = Requests Waiver of Compliance from Tech Spec 3.8.1.1 to Evaluate Increase in Action from 72 H to 15 Days Re Ac Sources Based on 900829 Borescopic Insp of Emergency Diesel Generator
| title = Requests Waiver of Compliance from Tech Spec 3.8.1.1 to Evaluate Increase in Action from 72 H to 15 Days Re Ac Sources Based on 900829 Borescopic Insp of Emergency Diesel Generator
| author name = KEISER H W
| author name = Keiser H
| author affiliation = PENNSYLVANIA POWER & LIGHT CO.
| author affiliation = PENNSYLVANIA POWER & LIGHT CO.
| addressee name = MARTIN T T
| addressee name = Martin T
| addressee affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
| addressee affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
| docket = 05000387, 05000388
| docket = 05000387, 05000388
Line 14: Line 14:
| page count = 7
| page count = 7
}}
}}
=Text=
{{#Wiki_filter:,
ACCELERATED DISTRIBUTION DEMONSTRATION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR: 9009100349                DOC. DATE: 90/09/01  NOTARIZED: NO          DOCKET FACIL:50-387 Susquehanna          Steam    Electric Station, Unit    1, Pennsylva  05000387 50-388 Susquehanna          Steam    Electric Station, Unit    2, Pennsylva  05000388 AUTH. NAME            AUTHOR    AFFILIATION KEISER,H.W.          Pennsylvania Power & Light Co.
RECIP.NAME            RECIPIENT AFFILIATION MARTIN,T.T.          Region 1 (Post 820201)
==SUBJECT:==
Requests waiver of compliance from TS 3.8.1.1.
DISTRIBUTION CODE: A001D            COPIES RECEIVED LTR        ENCL      SIZE-              D TITLE:  OR  Submittal: General Distribution                                                  S NOTES:LPDR 1 cy Transcripts.                                                        05000387 LPDR 1 cy Transcripts.                                                      05000388 RECIPIENT                COPIES          RECIPIENT          COPIES ID  CODE/NAME            LTTR ENCL      ID  CODE/NAME      LTTR ENCL          D PD1-2 LA                                  PD1-2 PD THADANI,M                                                                          D INTERNAL: ACRS                                        NRR/DET/ECMB 9H NRR/DOEA/OTS B 1 1                        NRR/DST      8E2 NRR/DST/SELB 8D                            NRR/DST/SICB 7E NRR/DST/SRXB 8E                            NUDOCS-ABSTRACT OGC/HDS2 EG  FILE        01                    RES/DSIR/EIB EXTERNAL: NRC PDR                                      NSIC NOTES D
D D
NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE,WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM P 1-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED: LTTR                25  ENCL
Pennsylvania Power                8  Light Company Two North Ninth Street ~ Allentown, PA18101-1179 ~ 215/770-5151 Harold W. Keiser Senior Vice President-Nucfear 21 5i770-4194 September      1, 1990 Mr. Thomas T. Martin, Administrator U.S. Nuclear Regulatory Commission Region I 475    Allendale Road King of Prussia, PA              19406 SUSQUEHANNA STEAM ELECTRIC STATION REQUEST FOR WAIVER OF COMPLIANCE                                              Docket Nos. 50-387 PLA-3438                    FILES A17-2 R4 1-2                                                & 50-388
==Dear Mr.      Martin:==
The purpose of this letter is,to request a waiver of compliance from Technical Specification 3.8.1.1 (A.C. Sources-Operating)
Action b. This 72-hour action was entered at 1200 hours (i.e.,
noon) on August 30, 1990. This submittal,evaluates an increase in the action time from 72 hours to 15 days.
it  is requested that the waiver increase the action time by 4 days
                                                                        't    this time, however, (from 72 hours to 7 days). This time will be utilized to prepare an emergency Technical Specification change request that will represent PP&L's formal request for the full extension to 15 days.
Descri tion of Condition On August 29,1990, during a borescopic inspection of Emergency Diesel Generator OG501D, heavy scoring of. the cylinder liners on five engine cylinders was observed. Further inspection revealed damage to several additional cylinder liners and the presence of aluminum oxide in the engine. The aluminum oxide was introduced to the engine as residual material from sandblasting performed on the engine intercoolers during a recent maintenance activity. Intake air, passing through the intercoolers, picked up this residual material and introduced              it  to the engine. Once in the engine, the aluminum oxide became an abrasive acting between the engine cylinders and cylinder liners, resulting in the heavy scoring observed on the cylinder liners.
A review of recent engine lube oil samples taken on OG501D revealed the presence of increased levels of chrome.                                          The source and significance of this condition was not immediately recognized but coupled with the inspection results noted above, we now know the source of the chrome to be from the scored cylinder liners.
9009100349 90090k                                                                        ,ok PDR    ADOCK 05000387 Q                    PDC
Mr. Thomas T. Martin                                          Page 2 Files A17-2/R41-2, PLA-3438 September 1, 1990 The  maintenance  overhaul  which lead to the    introduction    of aluminum oxide into OG501D was similar to overhauls performed on Emergency Diesel Generators OG501A,B, and C over the past six months. As such, the potential for a similar condition on these three engines exists. The results of our investigation of this potential are as follows.
Investi ation Results The source of the aluminum oxide in OG501D has been confirmed to be the intercoolers installed in that engine. These intercoolers had previously been installed in OG501A. During the overhaul evolution they had been removed from OG501A, inspected and cleaned, (including sandblasting the tube side of the cooler with aluminum oxide) and then reinstalled in OG501D.        Precautions against introduction of aluminum oxide to the shell side of the cooler were inadequate. The sequence of the engine overhauls was:
: 1. OG501C
: 2. OG501A
: 3. OG501D
: 4. OG501B similar sequence of intercooler removal, cleaning and reinstallation existed for each engine except for OG501C. Since it A
was the first engine to undergo its overhaul, new intercoolers delivered from the vendor were reinstalled in it. As a result we have high confidence that this condition does not exist. in OG501C.
The intercoolers that were removed from OG501C were reinstalled in OG501A. The boroscopic inspection that revealed the scoring of the cylinder liners on OG501D has already been completed on OG501A.
These inspections revealed no visible damage.          During this inspection period, the air intake manifold was removed from OG501A to support installation of an engine modification. No evidence of aluminum oxide was present.      Xn addition, two recent lube oil samples taken on OG501A were reviewed.      Unlike the sample for OG501D, the level of chrome present in the lube oil was normal.
The damage from introduction of aluminum oxide manifests itself quickly. OG501D has only 20 hours of run time since completion of its maintenance overhaul. Conversely, OG501A has 43 hours of run time since its maintenance overhaul which we believe is adequate to result in cylinder liner scoring in the presence of even small quantities of aluminum oxide. For these reasons we have a high confidence level that OG501A does not have this condition. The intercoolers that. were removed from OG501D were reinstalled in OG501B.      This engine has yet to undergo its post overhaul inspection. A review of recent lube oil samples was performed and
Mr. Thomas T. Martin                                              Page 3 Files A17-2/R41-2,    PLA-3438 September  1, 1990 an increased  level of chrome was observed. As a  result,  OG501B was declared inoperable at 1200 on August 30,1990 and Tech Spec Action 3.8.1.l.b was entered on both units. An immediate inspection was performed and evidence of aluminum oxide was found in the air intake manifold, confirming the existence of the condition on OG501B.
OG501E,  the spare diesel generator at Susquehanna, is presently substituting for OG501D. It was not part of the recent overhauls.
Its intercoolers have not been recently removed and sandblasted.
A review of lube oil samples on this engine shows normal levels of chrome. Based on this information, a similar condition does not exist on OG501E.
Re  irements  for which Waiver  is Re  ested It  is requested that the LCO Action time for Tech Spec Action 3.8.1.1.b on both units be extended from 72 hours to 7 days to allow continued operation of Unit 1 and 2. This extension will provide us with sufficient time to prepare, submit, and allow NRC review of an emergency Technical Specification change that will justify the additional time necessary to finish performing a thorough inspection, cleaning, and restoration of OG501B.
Com ensato    Actions We have confirmed that the three aligned Diesel Generators do not have the degraded condition experienced by OG501B and D. As such, their reliability during this period of time is not impaired. As noted above, Diesel Generators OG501A and C have recently undergone a rigorous maintenance overhaul and installation of modifications to improve their reliability.
The following additional compensatory measures          will also be performed in support of the extended action time:
The spray pond bypass valve on each division will be maintained open to assure availability of Diesel Generator Cooling.
: 2. Per Technical  Specification 3.8.1.1, Action B.2., we are required    to    perform    Surveillance      Requirement 4.8.1.1.2.a.4 within 24 hours. It is proposed that this surveillance be performed every 72 hours thereafter for the duration of the extended action time. This will serve to provide additional assurance of the reliability of the three operable diesel generators.
Mr. Thomas T. Martin                                                  Page 4 Files A17-2/R41-2,    PLA-3438 September    1, 1990
: 3. To  further reduce the risk of challenges to the offsite power supply, discretionary power changes on both Units 1 and 2 will be avoided.
4 ~    No discretionary maintenance or modification work will be performed on the following systems: ECCS (including the support functions provided by ESW and RHRSW), RCIC, CRD system, DC power systems, and AC Power Distribution
                                              ~
systems.
Safet    Si nificance and Conse        ences  of .Pro  osed Re est The  proposed request is not a significant safety concern as described above. We have already identified the unique cause of this condition and confirmed the three aligned Diesel Generators are operable.      The additional time is needed to assure thorough inspection, cleaning and restoration of OG501B. The compensatory actions outlined above further reduce the probability of any safety consequences from this request.
PP&L has performed a risk evaluation of a 12-day extension to the 72-hour action time.          This evaluation is based upon the 1986 Individual Plant Evaluation for SSES that has been submitted to the NRC. The equation used to quantify the estimated increase in total plant  damage  is:
Annual"'isk      (1 ~ 4 x 10  ) f~ + (7 ~ 0 x 10  ) kg where f> =    annual fraction when the A, B, C and D diesel generators are in service and the E diesel generator is available to be put in service (normal configuration),
and fz =    annual    fraction when only three diesel generators are operable, and one of the three is the E diesel generator                  (current configuration).
The value of 1.4 x 10 /year is based on the IPE evaluation of the affect of opening the spray pond bypass valve for both divisions.
The value of 7.0 x 10 /year is based on the IPE evaluation of the current diesel generator configuration. The evaluation of this equation for the 72-hour action time results in an annual risk for total plant damage of 1.45 x 10 . For 15 days, the result is 1.63 x 10 . This yields an increase of 13%. This evaluation assumed that the aforementioned compensatory actions 1. and 4. are implemented.
Mr. Thomas T. Martin                                                                Page 5 Files A17-2/R41-2,      PLA-3438 September    1, 1990 PPGL does    not believe that this increase is significant for the following reasons:
: 1. The result is lower than the total plant damage frequency submitted to the NRC in the original (1986) IPE (2.1 x 10 ~/year), and 2 ~  The percentage    increase is lower than what was accepted by the NRC in their safety evaluation of PP&L's submittal to extend the same action times in support of tying in the 'E'iesel generator            334 (
==Reference:==
Amendment Nos. 51 and 19, dated December 3, 1985).
No  Si  nificant  Hazards Considerations 1~    This proposal does not involve      a significant increase in the probability or      consequences    of  an accident    previously evaluated. The  three remaining Diesel Generators will be operable. Therefore Susquehanna will be in a configuration that is bounded by prior deterministic analysis, assuming a single failure has occurred. Furthermore, as described above, the risk of total plant damage on an annual basis has increased, but    it  is not considered significant because:
: a. it  is lower than the total plant damage frequency in the original  IPE, and
: b. the percentage increase is lower than what was accepted by the NRC in a prior safety evaluation to extend the same action times in order to tie in the 'E'iesel generator.
: 2. This problem does not create the possibility of a new or different kind of accident from any accident The evolution involved is one of restoration to previously'valuated.
acceptable standards. No change in the operation or function of the Diesel Generators is proposed.
: 3. This change does not involve a significant reduction in a margin of safety.      If an emergency iswere existing LCO or the extension,      it          to arise during the possible to address the safe operation of both units with the three remaining operable Diesel Generators. Furthermore, compensatory actions have been proposed to assure the reliability of these diesels and other safety systems which mitigate the risk of an event should one occur. This does not represent a significant reduction in a margin of safety.
Mr. Thomas T. Martin                                          Page 6 Files A17-2/R41-2,    PLA- 3438 September  1, 1990 Environmental Conse      ences As  stated above, anticipated  ~
that for the duration of the Susquehanna    will  be proposed waiver in  a it condition that is functionally meets the design basis (assuming a single failure has occurred). Therefore, no environmental consequences that have not been previously considered are anticipated.
Conclusion Both  units at Susquehanna SES are currently in a 72-hour LCO on the B  Diesel Generator due to the introduction of a foreign material (aluminum oxide) into the engine.        A waiver of compliance is requested to allow a 4-day extension of this LCO. This extension will be used to ensure sufficient time to prepare, submit, and allow NRC review of an emergency Technical Specification change that will justify the additional time necessary to restore the B Diesel Generator to operable status.        It  is proposed that this waiver be approved immediately with the following conditions:
: 1. The  waiver  will become  effective at    1200  hours  on September 2, 1990.                                  t
: 2. The  waiver will expire upon declaring the        B  Diesel Generator operable, but not to exceed 4 days.
Any questions on this request should be    directed to Mr. J. M. Kenny at (215) 770-7904.
Very  truly yours, H. W. Keiser cc:  NRC  Document  Control Desk .(original)>
Dr. W. R. Butler  NRR  OWFN Mr. G. Scott Barber, NRC Sr. Resident Inspector        SSES Mr. T. M. Gerusky  Pennsylvania DER}}

Latest revision as of 16:44, 3 February 2020

Requests Waiver of Compliance from Tech Spec 3.8.1.1 to Evaluate Increase in Action from 72 H to 15 Days Re Ac Sources Based on 900829 Borescopic Insp of Emergency Diesel Generator
ML18026A394
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 09/01/1990
From: Keiser H
PENNSYLVANIA POWER & LIGHT CO.
To: Martin T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
PLA-3438, NUDOCS 9009100349
Download: ML18026A394 (7)


Text

,

ACCELERATED DISTRIBUTION DEMONSTRATION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR: 9009100349 DOC. DATE: 90/09/01 NOTARIZED: NO DOCKET FACIL:50-387 Susquehanna Steam Electric Station, Unit 1, Pennsylva 05000387 50-388 Susquehanna Steam Electric Station, Unit 2, Pennsylva 05000388 AUTH. NAME AUTHOR AFFILIATION KEISER,H.W. Pennsylvania Power & Light Co.

RECIP.NAME RECIPIENT AFFILIATION MARTIN,T.T. Region 1 (Post 820201)

SUBJECT:

Requests waiver of compliance from TS 3.8.1.1.

DISTRIBUTION CODE: A001D COPIES RECEIVED LTR ENCL SIZE- D TITLE: OR Submittal: General Distribution S NOTES:LPDR 1 cy Transcripts. 05000387 LPDR 1 cy Transcripts. 05000388 RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL D PD1-2 LA PD1-2 PD THADANI,M D INTERNAL: ACRS NRR/DET/ECMB 9H NRR/DOEA/OTS B 1 1 NRR/DST 8E2 NRR/DST/SELB 8D NRR/DST/SICB 7E NRR/DST/SRXB 8E NUDOCS-ABSTRACT OGC/HDS2 EG FILE 01 RES/DSIR/EIB EXTERNAL: NRC PDR NSIC NOTES D

D D

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE,WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM P 1-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 25 ENCL

Pennsylvania Power 8 Light Company Two North Ninth Street ~ Allentown, PA18101-1179 ~ 215/770-5151 Harold W. Keiser Senior Vice President-Nucfear 21 5i770-4194 September 1, 1990 Mr. Thomas T. Martin, Administrator U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406 SUSQUEHANNA STEAM ELECTRIC STATION REQUEST FOR WAIVER OF COMPLIANCE Docket Nos. 50-387 PLA-3438 FILES A17-2 R4 1-2 & 50-388

Dear Mr. Martin:

The purpose of this letter is,to request a waiver of compliance from Technical Specification 3.8.1.1 (A.C. Sources-Operating)

Action b. This 72-hour action was entered at 1200 hours0.0139 days <br />0.333 hours <br />0.00198 weeks <br />4.566e-4 months <br /> (i.e.,

noon) on August 30, 1990. This submittal,evaluates an increase in the action time from 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> to 15 days.

it is requested that the waiver increase the action time by 4 days

't this time, however, (from 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> to 7 days). This time will be utilized to prepare an emergency Technical Specification change request that will represent PP&L's formal request for the full extension to 15 days.

Descri tion of Condition On August 29,1990, during a borescopic inspection of Emergency Diesel Generator OG501D, heavy scoring of. the cylinder liners on five engine cylinders was observed. Further inspection revealed damage to several additional cylinder liners and the presence of aluminum oxide in the engine. The aluminum oxide was introduced to the engine as residual material from sandblasting performed on the engine intercoolers during a recent maintenance activity. Intake air, passing through the intercoolers, picked up this residual material and introduced it to the engine. Once in the engine, the aluminum oxide became an abrasive acting between the engine cylinders and cylinder liners, resulting in the heavy scoring observed on the cylinder liners.

A review of recent engine lube oil samples taken on OG501D revealed the presence of increased levels of chrome. The source and significance of this condition was not immediately recognized but coupled with the inspection results noted above, we now know the source of the chrome to be from the scored cylinder liners.

9009100349 90090k ,ok PDR ADOCK 05000387 Q PDC

Mr. Thomas T. Martin Page 2 Files A17-2/R41-2, PLA-3438 September 1, 1990 The maintenance overhaul which lead to the introduction of aluminum oxide into OG501D was similar to overhauls performed on Emergency Diesel Generators OG501A,B, and C over the past six months. As such, the potential for a similar condition on these three engines exists. The results of our investigation of this potential are as follows.

Investi ation Results The source of the aluminum oxide in OG501D has been confirmed to be the intercoolers installed in that engine. These intercoolers had previously been installed in OG501A. During the overhaul evolution they had been removed from OG501A, inspected and cleaned, (including sandblasting the tube side of the cooler with aluminum oxide) and then reinstalled in OG501D. Precautions against introduction of aluminum oxide to the shell side of the cooler were inadequate. The sequence of the engine overhauls was:

1. OG501C
2. OG501A
3. OG501D
4. OG501B similar sequence of intercooler removal, cleaning and reinstallation existed for each engine except for OG501C. Since it A

was the first engine to undergo its overhaul, new intercoolers delivered from the vendor were reinstalled in it. As a result we have high confidence that this condition does not exist. in OG501C.

The intercoolers that were removed from OG501C were reinstalled in OG501A. The boroscopic inspection that revealed the scoring of the cylinder liners on OG501D has already been completed on OG501A.

These inspections revealed no visible damage. During this inspection period, the air intake manifold was removed from OG501A to support installation of an engine modification. No evidence of aluminum oxide was present. Xn addition, two recent lube oil samples taken on OG501A were reviewed. Unlike the sample for OG501D, the level of chrome present in the lube oil was normal.

The damage from introduction of aluminum oxide manifests itself quickly. OG501D has only 20 hours2.314815e-4 days <br />0.00556 hours <br />3.306878e-5 weeks <br />7.61e-6 months <br /> of run time since completion of its maintenance overhaul. Conversely, OG501A has 43 hours4.976852e-4 days <br />0.0119 hours <br />7.109788e-5 weeks <br />1.63615e-5 months <br /> of run time since its maintenance overhaul which we believe is adequate to result in cylinder liner scoring in the presence of even small quantities of aluminum oxide. For these reasons we have a high confidence level that OG501A does not have this condition. The intercoolers that. were removed from OG501D were reinstalled in OG501B. This engine has yet to undergo its post overhaul inspection. A review of recent lube oil samples was performed and

Mr. Thomas T. Martin Page 3 Files A17-2/R41-2, PLA-3438 September 1, 1990 an increased level of chrome was observed. As a result, OG501B was declared inoperable at 1200 on August 30,1990 and Tech Spec Action 3.8.1.l.b was entered on both units. An immediate inspection was performed and evidence of aluminum oxide was found in the air intake manifold, confirming the existence of the condition on OG501B.

OG501E, the spare diesel generator at Susquehanna, is presently substituting for OG501D. It was not part of the recent overhauls.

Its intercoolers have not been recently removed and sandblasted.

A review of lube oil samples on this engine shows normal levels of chrome. Based on this information, a similar condition does not exist on OG501E.

Re irements for which Waiver is Re ested It is requested that the LCO Action time for Tech Spec Action 3.8.1.1.b on both units be extended from 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> to 7 days to allow continued operation of Unit 1 and 2. This extension will provide us with sufficient time to prepare, submit, and allow NRC review of an emergency Technical Specification change that will justify the additional time necessary to finish performing a thorough inspection, cleaning, and restoration of OG501B.

Com ensato Actions We have confirmed that the three aligned Diesel Generators do not have the degraded condition experienced by OG501B and D. As such, their reliability during this period of time is not impaired. As noted above, Diesel Generators OG501A and C have recently undergone a rigorous maintenance overhaul and installation of modifications to improve their reliability.

The following additional compensatory measures will also be performed in support of the extended action time:

The spray pond bypass valve on each division will be maintained open to assure availability of Diesel Generator Cooling.

2. Per Technical Specification 3.8.1.1, Action B.2., we are required to perform Surveillance Requirement 4.8.1.1.2.a.4 within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. It is proposed that this surveillance be performed every 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> thereafter for the duration of the extended action time. This will serve to provide additional assurance of the reliability of the three operable diesel generators.

Mr. Thomas T. Martin Page 4 Files A17-2/R41-2, PLA-3438 September 1, 1990

3. To further reduce the risk of challenges to the offsite power supply, discretionary power changes on both Units 1 and 2 will be avoided.

4 ~ No discretionary maintenance or modification work will be performed on the following systems: ECCS (including the support functions provided by ESW and RHRSW), RCIC, CRD system, DC power systems, and AC Power Distribution

~

systems.

Safet Si nificance and Conse ences of .Pro osed Re est The proposed request is not a significant safety concern as described above. We have already identified the unique cause of this condition and confirmed the three aligned Diesel Generators are operable. The additional time is needed to assure thorough inspection, cleaning and restoration of OG501B. The compensatory actions outlined above further reduce the probability of any safety consequences from this request.

PP&L has performed a risk evaluation of a 12-day extension to the 72-hour action time. This evaluation is based upon the 1986 Individual Plant Evaluation for SSES that has been submitted to the NRC. The equation used to quantify the estimated increase in total plant damage is:

Annual"'isk (1 ~ 4 x 10 ) f~ + (7 ~ 0 x 10 ) kg where f> = annual fraction when the A, B, C and D diesel generators are in service and the E diesel generator is available to be put in service (normal configuration),

and fz = annual fraction when only three diesel generators are operable, and one of the three is the E diesel generator (current configuration).

The value of 1.4 x 10 /year is based on the IPE evaluation of the affect of opening the spray pond bypass valve for both divisions.

The value of 7.0 x 10 /year is based on the IPE evaluation of the current diesel generator configuration. The evaluation of this equation for the 72-hour action time results in an annual risk for total plant damage of 1.45 x 10 . For 15 days, the result is 1.63 x 10 . This yields an increase of 13%. This evaluation assumed that the aforementioned compensatory actions 1. and 4. are implemented.

Mr. Thomas T. Martin Page 5 Files A17-2/R41-2, PLA-3438 September 1, 1990 PPGL does not believe that this increase is significant for the following reasons:

1. The result is lower than the total plant damage frequency submitted to the NRC in the original (1986) IPE (2.1 x 10 ~/year), and 2 ~ The percentage increase is lower than what was accepted by the NRC in their safety evaluation of PP&L's submittal to extend the same action times in support of tying in the 'E'iesel generator 334 (

Reference:

Amendment Nos. 51 and 19, dated December 3, 1985).

No Si nificant Hazards Considerations 1~ This proposal does not involve a significant increase in the probability or consequences of an accident previously evaluated. The three remaining Diesel Generators will be operable. Therefore Susquehanna will be in a configuration that is bounded by prior deterministic analysis, assuming a single failure has occurred. Furthermore, as described above, the risk of total plant damage on an annual basis has increased, but it is not considered significant because:

a. it is lower than the total plant damage frequency in the original IPE, and
b. the percentage increase is lower than what was accepted by the NRC in a prior safety evaluation to extend the same action times in order to tie in the 'E'iesel generator.
2. This problem does not create the possibility of a new or different kind of accident from any accident The evolution involved is one of restoration to previously'valuated.

acceptable standards. No change in the operation or function of the Diesel Generators is proposed.

3. This change does not involve a significant reduction in a margin of safety. If an emergency iswere existing LCO or the extension, it to arise during the possible to address the safe operation of both units with the three remaining operable Diesel Generators. Furthermore, compensatory actions have been proposed to assure the reliability of these diesels and other safety systems which mitigate the risk of an event should one occur. This does not represent a significant reduction in a margin of safety.

Mr. Thomas T. Martin Page 6 Files A17-2/R41-2, PLA- 3438 September 1, 1990 Environmental Conse ences As stated above, anticipated ~

that for the duration of the Susquehanna will be proposed waiver in a it condition that is functionally meets the design basis (assuming a single failure has occurred). Therefore, no environmental consequences that have not been previously considered are anticipated.

Conclusion Both units at Susquehanna SES are currently in a 72-hour LCO on the B Diesel Generator due to the introduction of a foreign material (aluminum oxide) into the engine. A waiver of compliance is requested to allow a 4-day extension of this LCO. This extension will be used to ensure sufficient time to prepare, submit, and allow NRC review of an emergency Technical Specification change that will justify the additional time necessary to restore the B Diesel Generator to operable status. It is proposed that this waiver be approved immediately with the following conditions:

1. The waiver will become effective at 1200 hours on September 2, 1990. t
2. The waiver will expire upon declaring the B Diesel Generator operable, but not to exceed 4 days.

Any questions on this request should be directed to Mr. J. M. Kenny at (215) 770-7904.

Very truly yours, H. W. Keiser cc: NRC Document Control Desk .(original)>

Dr. W. R. Butler NRR OWFN Mr. G. Scott Barber, NRC Sr. Resident Inspector SSES Mr. T. M. Gerusky Pennsylvania DER