ML18106A557: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(3 intermediate revisions by the same user not shown)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:"' "04/16/9&3 .IC SER'i'.7I'CE ELECTRIC &
{{#Wiki_filter:. I C SER'i'.7I'CE ELECTRIC & GA~MPANY "04/16/9&3                      DOCUMENT DISTRIBUTION NO~E                  PAGE   1 OF 1 TRANSMITTAL: PDG 0029986 TO: NRC - WASHINGTON                                                     *002.9986*
DOCUMENT DISTRIBUTION PAGE 1 OF 1 TO: NRC -WASHINGTON DOCUMENT' CONTROL DESK WASHINGTON, DC 20555 TRANSMITTAL:
DOCUMENT' CONTROL DESK                COPYHOLDER: SECGOlOl WASHINGTON, DC 20555                  DESCRIPTION: SECG UPDATES PLEASE INSERT THE FOLLOWING DOCUMENTS INTO YOUR CONTROLLED FILE/MANUAL,
PDG 0029986 *002.9986*
    . SUPERCEDED DOCUMENTS MUST BE SO MARKED AND PHYSICALLY REMOVED OR:~J>ESTROYED.
COPYHOLDER:
SHT/
SECGOlOl DESCRIPTION:
CLASS   DOCUMENT ID                         VOL INST REV STAT   TYPE   FO~T      QTY PROC     ECG-SECG-TOC                                   010 A    SECG      H        001 PROC    ECG-SECT.III Ul                               021 A    SECG      H        001 9804220026 980416 PDR ADOCK. 05000272 F               PDR THIS ACKNOWLEDGEMENT RECEIPT MUST BE RETURNED WITHIN 5 WOR~ING D~YS TO:
SECG UPDATES PLEASE INSERT THE FOLLOWING DOCUMENTS INTO YOUR CONTROLLED FILE/MANUAL, . SUPERCEDED DOCUMENTS MUST BE SO MARKED AND PHYSICALLY REMOVED SHT/ CLASS DOCUMENT ID VOL INST REV STAT TYPE QTY ------------------------------------
PSE&G DMG/MC N04 PO BOX 236 HANCOCKS BRIDGE, NJ 08038.
------------PROC PROC ECG-SECG-TOC ECG-SECT.III Ul 9804220026 980416 PDR ADOCK. 05000272 F PDR 010 021 *-A SECG H 001 A SECG H 001 THIS ACKNOWLEDGEMENT RECEIPT MUST BE RETURNED WITHIN 5 TO: PSE&G DMG/MC N04 PO BOX 236 HANCOCKS BRIDGE, NJ 08038. YOUR SIGNATURE BELOW VERIFIES THAT (1) THE ABOVE DOCUMENTS HAVE AND SUPERSEDED DOCUMENTS HAVE BEEN REMOVED AND DESTROYED OR AS OBSOLETE (2) THE MAILING ADDRESS AND COPYHOLDER INFORMATION ARE OR CORRECTIONS HAVE BEEN IDENTIFIED ON THIS TRANSMITTAL.
YOUR SIGNATURE BELOW VERIFIES THAT (1) THE ABOVE DOCUMENTS HAVE a~EN FI~ED AND SUPERSEDED DOCUMENTS HAVE BEEN REMOVED AND DESTROYED OR CLEAR,~Y MAR~ED AS OBSOLETE (2) THE MAILING ADDRESS AND COPYHOLDER INFORMATION ARE CORR~CT OR CORRECTIONS HAVE BEEN IDENTIFIED ON THIS TRANSMITTAL.
SEE MY INSTRUCTIONS ABOVE CHANGE COPYHOLDER INFORMATION REMOVE FROM DISTRIBUTION (DOCUMENTS MUST BE RETURNED)
SEE MY INSTRUCTIONS ABOVE           CHANGE COPYHOLDER INFORMATION REMOVE FROM DISTRIBUTION (DOCUMENTS MUST BE RETURNED)
COPYHOLDER SIGNATURE:
COPYHOLDER SIGNATURE:                                               DATE:
DATE:  
* SALEM GENERATING STATION EVENT CLASSIFICATION GUIDE April 16, 1998 CHANGE PAGES FOR REVISION #10 The Table of Contents forms a general guide to the current revision of each section and attachment of the Salem ECG.       The changes that are made in this TOC Revision #10 are shown below.
.. 
: 1. Check that your revision packet is complete.
. ... * *
: 2. Add the revised documents.
* SALEM GENERATING STATION EVENT CLASSIFICATION GUIDE April 16, 1998 CHANGE PAGES FOR REVISION #10 The Table of Contents forms a general guide to the current revision of each section and attachment of the Salem ECG. The changes that are made in this TOC Revision #10 are shown below. 1. Check that your revision packet is complete.  
: 3. Remove and recycle the outdated material iisted below.
: 2. Add the revised documents.  
ADD                                 REMOVE Pages       Description     Rev.       Pages   Description     Rev.
: 3. Remove and recycle the outdated material iisted below. ADD REMOVE Pages Description Rev. Pages Description Rev. ALL TOC 10 ALL TOC 9 Unit
ALL         TOC               10       ALL       TOC             9 ALL        Unit 1 CFSTs
* Unit
* 21       All   Unit 1 CFS Ts
* ALL 1 CFSTs 21 All 1 CFS Ts 20
* 20
* CFS Ts Critical Function Status Trees Salem-ECG 1 of 1
* CFS Ts Critical Function Status Trees
* *
* Salem-ECG                         1 of 1
* ECG T.O.C.
lof4 SALEM EVENT
# 0 I D \ TABLE OF CONTENTS/SIGNATURE PAGE
*. PAGES /D/ATE// SECTION TITLE REV # , . T.O.C.
Contents/Signature Page 09 4 /'03113/98 i
and Usage 00 lg/ 01/21/97 n Acronyms & Abbreviations 00 /6 01/21/97 m Critical Status Trees (CFSTs), Unit 1 20 6 02/27/98 Critical Function Status Trees (CFSTs), Unit 2 23 / 6 08/19/97 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0 SGS Fuel Clad 00 // 1 01/21/97 RCS Challenge\ 1 01/21/97 Fission Product Barriers (Table) )10 1 01/21/97 EC Discretion
\ / 00 1 01/21/97 Failure to TRIP ./ 00 1 01/21/97 Radiological
// 6.1 Gaseous Effiuent
// 6.2 Liquid Effiuent 6.3 In Plant Radiation


===6.4 Irradiated===
ECG T.O.C.
                                                                                  ~Pg. lof4 SALEM EVENT CLASSIFICATI~~qrl¥>E          #
0      ID \
TABLE OF CONTENTS/SIGNATURE PAGE              ----'=--'--'='--'--~
SECTION*.                      TITLE                        REV #        PAGES      ,/D/ATE//
T.O.C.        *~of Contents/Signature Page                      09        4 /'03113/98 Intro~ction and Usage i
n m
Glossa~of Acronyms & Abbreviations Critical Fu~ction Status Trees (CFSTs), Unit 1 00 00 20
                                                                          /6 lg/
6 01/21/97 01/21/97 02/27/98 Critical Function Status Trees (CFSTs), Unit 2        23    /    6      08/19/97 1.0      Fuel Clad C~Ienge                                      00 / /      1      01/21/97 2.0      RCS Challenge\                                        O~          1      01/21/97 3.0      Fission Product Barriers (Table)                      )10          1    01/21/97 4.0      EC Discretion        \                              / 00          1    01/21/97 5.0      Failure to TRIP                                  ./ 00            1    01/21/97 6.0      Radiological Releases/~rences                //
6.1        Gaseous Effiuent R~lease      //          00        4      01/21/97 6.2        Liquid Effiuent Rele~.se                  00        1      01/21/97 6.3        In Plant Radiation Oc~rrenoes              00        1      01/21/97 6.4         Irradiated Fuel Event    \X_l              00        2      01/21/97 7.0      Electrical Power                  / \
7.1        Loss of AC Power c;/pabilitie\            00        2      01/21/97 7.2        Loss of DC Powe~1Capabilities \            00        1      01/21/97 I              \
8.0      System Malfunction;t                          \
8.1        Loss ofHeat emoval Capability              00        2      01/21/97 8.2        Loss of Ov. head Annunciators              00        1      01/21/97 8.3        Loss of c;.ommunications Capability \      00        1      01/21/97 8.4        ControyRoom Evacuation                , 00          1      01/21/97 8.5        Technical Specifications                \ 00          I      01/21/97 9.0      Hazards - Intlrnal/External                          \\
9.1        iecurity Threats                          OO\        1      01/21/97 9.2        Fire                                      00 \      1      01/21/97 9.3        Explosion                                  00        1      01/21/97 9.4        Toxic/Flammable Gases                      00        2      01/21/97
: 9. 5        Seismic Event                              00        1      01/21/97
: 9.          High Winds                                00        1      01/21/97
            * .7        Flooding                                  00                01/21/97 9.8        Turbine Failure/Vehicle Crash/            00        1      01/21/97 Missile Impact 9.9        River Level                                00        1\    01/21/97
                                                                                  \
* SGS                                                                                          Rev. 09


Fuel Event \X_l Electrical Power / \ 7.1 Loss of AC Power c;/pabilitie\
ECG T.O.C.
7.2 Loss of DC
Pg. 2of4 SALEM EVENT CLASSIFICATION GUIDE TABLE OF CONTENTS/SIGNATURE PAGE SECTION                   TITLE                     REV#   PAGES   DATE 10.0   Reserved for future use                       NIA 11.0   Reportable Action Levels (RALs) 11.1       Technical Specifications           00     3   01/21/97 11.2     Design Basis/ Unanalyzed Condition 00     2   01/21/97 11.3     Engineered Safety Features (ESF)   01     1   08/28/97 11.4     Personnel Safety/Overexposure       00     2   01/21/97 11.5     Environmental                       00     1   01/21/97 11.6     After-the-Fact                     00     1   01/21/97 11.7     Security/Emergency Response         01     1   03/13/97 Capabilities 11.8     Public Interest                     00     I   01/21/97 11.9     Accidental Criticality/             00     2   01/21/97 Special Nuclear Material/
\ I \ 00 00 00 00 00 00 8.1 Loss ofHeat emoval Capability 00 System Malfunction;t
Rad Material Shipments - Releases 11.10     Voluntary Notifications             00     1   01/21/97 WC                 Salem ECG Charts (Located In ERFs)
\ 8.2 Loss of Ov. head Annunciators 00 8.3 Loss of c;.ommunications Capability
* SGS                                                                         Rev. 09
\ 00 8.4 ControyRoom Evacuation , 00 8.5 Technical Specifications
 
\ 00 Hazards -Intlrnal/External
ECG T.O.C.
\\ 9 .1 iecurity Threats OO\ 9.2 Fire 00 \ 9.3 Explosion 00 9.4 Toxic/Flammable Gases 00 9. 5 Seismic Event 00 9. High Winds 00 * . 7 Flooding 00 9.8 Turbine Failure/Vehicle Crash/ 00 9.9 Missile Impact River Level 00 4 1 1 2 2 1 2 1 1 1 I 1 1 1 2 1 1 01/21/97 01/21/97 01/21/97 01/21/97 01/21/97 01/21/97 01/21/97 01/21/97 01/21/97 01/21/97 01/21/97 01/21/97 01/21/97 01/21/97 01/21/97 01/21/97 01/21/97 01/21/97 1 01/21/97 1 \ 01/21/97 \ Rev. 09 ECG T.O.C. Pg. 2of4
Pg. 3of4
* SALEM EVENT CLASSIFICATION GUIDE TABLE OF CONTENTS/SIGNATURE PAGE SECTION TITLE REV# PAGES DATE 10.0 Reserved for future use NIA 11.0 Reportable Action Levels (RALs) 11.1 Technical Specifications 00 3 01/21/97 11.2 Design Basis/ Unanalyzed Condition 00 2 01/21/97 11.3 Engineered Safety Features (ESF) 01 1 08/28/97 11.4 Personnel Safety/Overexposure 00 2 01/21/97 11.5 Environmental 00 1 01/21/97 11.6 After-the-Fact 00 1 01/21/97 11.7 Security/Emergency Response 01 1 03/13/97 Capabilities 11.8 Public Interest 00 I 01/21/97 11.9 Accidental Criticality/
*ATTACHMENT 1
00 2 01/21/97 Special Nuclear Material/
TITLE UNUSUAL EVENT SALEM EVENT CLASSIFICATION GUIDE TABLE OF CONTENTS/SIGNATURE PAGE REV#
Rad Material Shipments  
00 PAGES 9
-Releases 11.10 Voluntary Notifications 00 1 01/21/97
DATE 01/21/97 2     ALERT                                         01     5 02/27/98 3     SITE AREA EMERGENCY                           01     6 02/27/98 4     GENERAL EMERGENCY                             02     8 03/13/98 5     NRC Data Sheet Completion Reference           00     7 01/21/97 6     Primary Communicator Log                       04     9 12/04/97 7     Primary Communicator Log (GE)                 04     8 12/04/97 8     Secondary Communicator Log                     01     8 02/27/98 9     Non-Emergency Notifications Reference         05     3 01/22/98 10   1 Hr Report - NRC Regional Office             00     3 01/21/97 11   1 Hr Report (Common Site) Security/Safeguards 00     3 01/21/97 12   I Hr Report - NRC Operations                   00     3 01/21/97 13   4 Hr Report - Contaminated Events Outside     00     7 01/21/97 Of The RCA 14   4 Hr Report - NRC Operations                   00     3 01/21/97 15   Environmental Protection Plan                 01     3 03/13/97 Spill I Discharge Reporting 16                                                  00     7 01/21/97 17   4 Hr Report - Fatality or Medical             00     4 01/21/97 Emergency 18   4 Hr Report - Radiological                     01     4 05/12/97 Transportation Accident 19   24 Hr Report - 'Fitness For Duty (FFD)         01     3 05/12/97 Program Events 20     24 Hr Report - NRC Regional Office             00     3 01/21/97 21     Reportable Event - LAC/ Memorandum Of         00     2 01/21/97 Understanding (M.0.U.)
* WC Salem ECG Charts (Located In ERFs)
22     TIS Required Engineering Evaluation           00     2 01/21/97 23     Reserved 24     UNUSUAL EVENT (Common Site)                   01   10 05/12/97 25     1 Hr Report (Common Site) -                   00     3 01/21/97 Major Loss of Emergency Assessment, Offsite Response, OR Communications Capability
* SGS Rev. 09 ECG T.O.C. Pg. 3of4
* SGS                                                                       Rev. 09}}
* SALEM EVENT CLASSIFICATION GUIDE TABLE OF CONTENTS/SIGNATURE PAGE ATTACHMENT TITLE REV# PAGES DATE 1 UNUSUAL EVENT 00 9 01/21/97 2 ALERT 01 5 02/27/98 3 SITE AREA EMERGENCY 01 6 02/27/98 4 GENERAL EMERGENCY 02 8 03/13/98 5 NRC Data Sheet Completion Reference 00 7 01/21/97 6 Primary Communicator Log 04 9 12/04/97 7 Primary Communicator Log (GE) 04 8 12/04/97 8 Secondary Communicator Log 01 8 02/27/98 9 Non-Emergency Notifications Reference 05 3 01/22/98 10 1 Hr Report -NRC Regional Office 00 3 01/21/97 11 1 Hr Report (Common Site) Security/Safeguards 00 3 01/21/97 12 I Hr Report -NRC Operations 00 3 01/21/97 13 4 Hr Report -Contaminated Events Outside 00 7 01/21/97 Of The RCA 14 4 Hr Report -NRC Operations 00 3 01/21/97 15 Environmental Protection Plan 01 3 03/13/97 16 Spill I Discharge Reporting 00 7 01/21/97
* 17 4 Hr Report -Fatality or Medical 00 4 01/21/97 Emergency 18 4 Hr Report -Radiological 01 4 05/12/97 Transportation Accident 19 24 Hr Report -'Fitness For Duty (FFD) 01 3 05/12/97 Program Events 20 24 Hr Report -NRC Regional Office 00 3 01/21/97 21 Reportable Event -LAC/ Memorandum Of 00 2 01/21/97 Understanding (M.0.U.) 22 TIS Required Engineering Evaluation 00 2 01/21/97 23 Reserved 24 UNUSUAL EVENT (Common Site) 01 10 05/12/97 25 1 Hr Report (Common Site) -00 3 01/21/97 Major Loss of Emergency Assessment, Offsite Response, OR Communications Capability
* SGS Rev. 09}}

Latest revision as of 03:56, 3 February 2020

Rev 21 to EOP-CFST-1, Shutdown Margin Status Tree & Rev 10 to Table of Contents
ML18106A557
Person / Time
Site: Salem  PSEG icon.png
Issue date: 04/16/1998
From:
Public Service Enterprise Group
To:
References
PROC-980416, NUDOCS 9804220026
Download: ML18106A557 (5)


Text

. I C SER'i'.7I'CE ELECTRIC & GA~MPANY "04/16/9&3 DOCUMENT DISTRIBUTION NO~E PAGE 1 OF 1 TRANSMITTAL: PDG 0029986 TO: NRC - WASHINGTON *002.9986*

DOCUMENT' CONTROL DESK COPYHOLDER: SECGOlOl WASHINGTON, DC 20555 DESCRIPTION: SECG UPDATES PLEASE INSERT THE FOLLOWING DOCUMENTS INTO YOUR CONTROLLED FILE/MANUAL,

. SUPERCEDED DOCUMENTS MUST BE SO MARKED AND PHYSICALLY REMOVED OR:~J>ESTROYED.

SHT/

CLASS DOCUMENT ID VOL INST REV STAT TYPE FO~T QTY PROC ECG-SECG-TOC 010 A SECG H 001 PROC ECG-SECT.III Ul 021 A SECG H 001 9804220026 980416 PDR ADOCK. 05000272 F PDR THIS ACKNOWLEDGEMENT RECEIPT MUST BE RETURNED WITHIN 5 WOR~ING D~YS TO:

PSE&G DMG/MC N04 PO BOX 236 HANCOCKS BRIDGE, NJ 08038.

YOUR SIGNATURE BELOW VERIFIES THAT (1) THE ABOVE DOCUMENTS HAVE a~EN FI~ED AND SUPERSEDED DOCUMENTS HAVE BEEN REMOVED AND DESTROYED OR CLEAR,~Y MAR~ED AS OBSOLETE (2) THE MAILING ADDRESS AND COPYHOLDER INFORMATION ARE CORR~CT OR CORRECTIONS HAVE BEEN IDENTIFIED ON THIS TRANSMITTAL.

SEE MY INSTRUCTIONS ABOVE CHANGE COPYHOLDER INFORMATION REMOVE FROM DISTRIBUTION (DOCUMENTS MUST BE RETURNED)

COPYHOLDER SIGNATURE: DATE:

  • SALEM GENERATING STATION EVENT CLASSIFICATION GUIDE April 16, 1998 CHANGE PAGES FOR REVISION #10 The Table of Contents forms a general guide to the current revision of each section and attachment of the Salem ECG. The changes that are made in this TOC Revision #10 are shown below.
1. Check that your revision packet is complete.
2. Add the revised documents.
3. Remove and recycle the outdated material iisted below.

ADD REMOVE Pages Description Rev. Pages Description Rev.

ALL TOC 10 ALL TOC 9 ALL Unit 1 CFSTs

  • 21 All Unit 1 CFS Ts
  • 20
  • CFS Ts Critical Function Status Trees
  • Salem-ECG 1 of 1

ECG T.O.C.

~Pg. lof4 SALEM EVENT CLASSIFICATI~~qrl¥>E #

0 ID \

TABLE OF CONTENTS/SIGNATURE PAGE ----'=--'--'='--'--~

SECTION*. TITLE REV # PAGES ,/D/ATE//

T.O.C. *~of Contents/Signature Page 09 4 /'03113/98 Intro~ction and Usage i

n m

Glossa~of Acronyms & Abbreviations Critical Fu~ction Status Trees (CFSTs), Unit 1 00 00 20

/6 lg/

6 01/21/97 01/21/97 02/27/98 Critical Function Status Trees (CFSTs), Unit 2 23 / 6 08/19/97 1.0 Fuel Clad C~Ienge 00 / / 1 01/21/97 2.0 RCS Challenge\ O~ 1 01/21/97 3.0 Fission Product Barriers (Table) )10 1 01/21/97 4.0 EC Discretion \ / 00 1 01/21/97 5.0 Failure to TRIP ./ 00 1 01/21/97 6.0 Radiological Releases/~rences //

6.1 Gaseous Effiuent R~lease // 00 4 01/21/97 6.2 Liquid Effiuent Rele~.se 00 1 01/21/97 6.3 In Plant Radiation Oc~rrenoes 00 1 01/21/97 6.4 Irradiated Fuel Event \X_l 00 2 01/21/97 7.0 Electrical Power / \

7.1 Loss of AC Power c;/pabilitie\ 00 2 01/21/97 7.2 Loss of DC Powe~1Capabilities \ 00 1 01/21/97 I \

8.0 System Malfunction;t \

8.1 Loss ofHeat emoval Capability 00 2 01/21/97 8.2 Loss of Ov. head Annunciators 00 1 01/21/97 8.3 Loss of c;.ommunications Capability \ 00 1 01/21/97 8.4 ControyRoom Evacuation , 00 1 01/21/97 8.5 Technical Specifications \ 00 I 01/21/97 9.0 Hazards - Intlrnal/External \\

9.1 iecurity Threats OO\ 1 01/21/97 9.2 Fire 00 \ 1 01/21/97 9.3 Explosion 00 1 01/21/97 9.4 Toxic/Flammable Gases 00 2 01/21/97

9. 5 Seismic Event 00 1 01/21/97
9. High Winds 00 1 01/21/97
  • .7 Flooding 00 01/21/97 9.8 Turbine Failure/Vehicle Crash/ 00 1 01/21/97 Missile Impact 9.9 River Level 00 1\ 01/21/97

\

  • SGS Rev. 09

ECG T.O.C.

Pg. 2of4 SALEM EVENT CLASSIFICATION GUIDE TABLE OF CONTENTS/SIGNATURE PAGE SECTION TITLE REV# PAGES DATE 10.0 Reserved for future use NIA 11.0 Reportable Action Levels (RALs) 11.1 Technical Specifications 00 3 01/21/97 11.2 Design Basis/ Unanalyzed Condition 00 2 01/21/97 11.3 Engineered Safety Features (ESF) 01 1 08/28/97 11.4 Personnel Safety/Overexposure 00 2 01/21/97 11.5 Environmental 00 1 01/21/97 11.6 After-the-Fact 00 1 01/21/97 11.7 Security/Emergency Response 01 1 03/13/97 Capabilities 11.8 Public Interest 00 I 01/21/97 11.9 Accidental Criticality/ 00 2 01/21/97 Special Nuclear Material/

Rad Material Shipments - Releases 11.10 Voluntary Notifications 00 1 01/21/97 WC Salem ECG Charts (Located In ERFs)

  • SGS Rev. 09

ECG T.O.C.

Pg. 3of4

  • ATTACHMENT 1

TITLE UNUSUAL EVENT SALEM EVENT CLASSIFICATION GUIDE TABLE OF CONTENTS/SIGNATURE PAGE REV#

00 PAGES 9

DATE 01/21/97 2 ALERT 01 5 02/27/98 3 SITE AREA EMERGENCY 01 6 02/27/98 4 GENERAL EMERGENCY 02 8 03/13/98 5 NRC Data Sheet Completion Reference 00 7 01/21/97 6 Primary Communicator Log 04 9 12/04/97 7 Primary Communicator Log (GE) 04 8 12/04/97 8 Secondary Communicator Log 01 8 02/27/98 9 Non-Emergency Notifications Reference 05 3 01/22/98 10 1 Hr Report - NRC Regional Office 00 3 01/21/97 11 1 Hr Report (Common Site) Security/Safeguards 00 3 01/21/97 12 I Hr Report - NRC Operations 00 3 01/21/97 13 4 Hr Report - Contaminated Events Outside 00 7 01/21/97 Of The RCA 14 4 Hr Report - NRC Operations 00 3 01/21/97 15 Environmental Protection Plan 01 3 03/13/97 Spill I Discharge Reporting 16 00 7 01/21/97 17 4 Hr Report - Fatality or Medical 00 4 01/21/97 Emergency 18 4 Hr Report - Radiological 01 4 05/12/97 Transportation Accident 19 24 Hr Report - 'Fitness For Duty (FFD) 01 3 05/12/97 Program Events 20 24 Hr Report - NRC Regional Office 00 3 01/21/97 21 Reportable Event - LAC/ Memorandum Of 00 2 01/21/97 Understanding (M.0.U.)

22 TIS Required Engineering Evaluation 00 2 01/21/97 23 Reserved 24 UNUSUAL EVENT (Common Site) 01 10 05/12/97 25 1 Hr Report (Common Site) - 00 3 01/21/97 Major Loss of Emergency Assessment, Offsite Response, OR Communications Capability

  • SGS Rev. 09