ML19262F302: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
Line 20: Line 20:
600 North 18th street Post Office Box 2641 k*
600 North 18th street Post Office Box 2641 k*
gf e.g      Birmingham. Alabama 35291 Telephone 205 250-1000 hko*,Ve" ife"eni m
gf e.g      Birmingham. Alabama 35291 Telephone 205 250-1000 hko*,Ve" ife"eni m
  ,
Alabama Power the soumem eectre sntem October 30, 1980 Docket No. 50-364          ,
Alabama Power the soumem eectre sntem October 30, 1980 Docket No. 50-364          ,
Director of Nuclear Reactor Regulation U. S. Nuclear Regulatory Comission Phillips Building, Room 116 7920 Norfolk Avenue Washington, D. C. 20555 Attention: Mr. A. Schwencer Gentlemen:
Director of Nuclear Reactor Regulation U. S. Nuclear Regulatory Comission Phillips Building, Room 116 7920 Norfolk Avenue Washington, D. C. 20555 Attention: Mr. A. Schwencer Gentlemen:
JOSEPH M. FARLEY NUCLEAR PLANT - UNIT 2 ENVIRONMENTAL QUALIFICATION REVIEW Enclosed is additional infonnation on Farley Nuclear Plant Unit 2 concerning environmental qualification of electrical equipment. This
JOSEPH M. FARLEY NUCLEAR PLANT - UNIT 2 ENVIRONMENTAL QUALIFICATION REVIEW Enclosed is additional infonnation on Farley Nuclear Plant Unit 2 concerning environmental qualification of electrical equipment. This report is supplemental to the response to NUREG 0588 dated September 12, 1980 and the infonnation transmitted by letter of October 10, 1980.
          '
report is supplemental to the response to NUREG 0588 dated September 12, 1980 and the infonnation transmitted by letter of October 10, 1980.
Specifically, this submittal includes the following:
Specifically, this submittal includes the following:
                       - Acceptability of equipment qualification inside containment in light of the revised steam line break analysis for Farley.
                       - Acceptability of equipment qualification inside containment in light of the revised steam line break analysis for Farley.
Line 36: Line 33:
A      s021040 9 s
A      s021040 9 s


                        *
Director of Nuclear Reactor Regulation                October 30, 1980 U. S. Nuclear Regulatory Comissicn                    Page 2 If you have any questions, please advise.
        . . . .          .
Yours truly, f fAm ' bY F.L.Clayton,fr.
                . . .
. . . _
Director of Nuclear Reactor Regulation                October 30, 1980 U. S. Nuclear Regulatory Comissicn                    Page 2
        .
If you have any questions, please advise.
Yours truly,
                                                  '
f fAm ' bY F.L.Clayton,fr.
                                                                                                -
TLC:de Enclosure                                  SWORN TO AND SUSSCRIBED BEFORE ME THIS S f 4 %    DAY OF cc:  Mr. R. A. Thomas                        Cef,'h                1980.
TLC:de Enclosure                                  SWORN TO AND SUSSCRIBED BEFORE ME THIS S f 4 %    DAY OF cc:  Mr. R. A. Thomas                        Cef,'h                1980.
Mr. G. F. Trowbridge Mr. W. H. Bradford br'.2. s to z                                .
Mr. G. F. Trowbridge Mr. W. H. Bradford br'.2. s to z                                .

Latest revision as of 21:01, 1 February 2020

Forwards Addl Info Re Environ Qualification of Electrical Equipment,In Response to NUREG-0588
ML19262F302
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 10/30/1980
From: Clayton F
ALABAMA POWER CO.
To: Schwencer A
Office of Nuclear Reactor Regulation
References
RTR-NUREG-0588, RTR-NUREG-588 NUDOCS 8011040308
Download: ML19262F302 (35)


Text

    • 1*

600 North 18th street Post Office Box 2641 k*

gf e.g Birmingham. Alabama 35291 Telephone 205 250-1000 hko*,Ve" ife"eni m

Alabama Power the soumem eectre sntem October 30, 1980 Docket No. 50-364 ,

Director of Nuclear Reactor Regulation U. S. Nuclear Regulatory Comission Phillips Building, Room 116 7920 Norfolk Avenue Washington, D. C. 20555 Attention: Mr. A. Schwencer Gentlemen:

JOSEPH M. FARLEY NUCLEAR PLANT - UNIT 2 ENVIRONMENTAL QUALIFICATION REVIEW Enclosed is additional infonnation on Farley Nuclear Plant Unit 2 concerning environmental qualification of electrical equipment. This report is supplemental to the response to NUREG 0588 dated September 12, 1980 and the infonnation transmitted by letter of October 10, 1980.

Specifically, this submittal includes the following:

- Acceptability of equipment qualification inside containment in light of the revised steam line break analysis for Farley.

- Corrections to a number of master list sheets and component worksheets.

- The information requested at the NUREG 0588 Audit exit meeting at Plant Farley on September 24, 1980, including the compiled responses to questions 3, 4, and 5 wnich were not available for the October 10 submittal.

The enclosed package constitutes a revision to the September 12 submittal and the pages are to be inserted in accordance with the t instructions provided with the enclosure.

Mis--

S

//

A s021040 9 s

Director of Nuclear Reactor Regulation October 30, 1980 U. S. Nuclear Regulatory Comissicn Page 2 If you have any questions, please advise.

Yours truly, f fAm ' bY F.L.Clayton,fr.

TLC:de Enclosure SWORN TO AND SUSSCRIBED BEFORE ME THIS S f 4 % DAY OF cc: Mr. R. A. Thomas Cef,'h 1980.

Mr. G. F. Trowbridge Mr. W. H. Bradford br'.2. s to z .

Aa -J A otary Public My Comission Expires:

2.- /T- S2 t

4