ML19281B398: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 2: Line 2:
| number = ML19281B398
| number = ML19281B398
| issue date = 10/10/2019
| issue date = 10/10/2019
| title = Summary of September 23, 2019 - Public Teleconference on Nuscale Chapter 4
| title = Summary of September 23, 2019 - Public Teleconference on NuScale Chapter 4
| author name = Bavol B
| author name = Bavol B
| author affiliation = NRC/NRO/DLSE/LB1
| author affiliation = NRC/NRO/DLSE/LB1
Line 32: Line 32:


ML19281B398        *via email            NRO-002 OFFICE      DLSE/LB1:PM DLSE/LB1:LA  DSRA/SRSB:BC DLSE/LB1:PM NAME        BBavol      MMoore*      RKaras*      BBavol (signed)
ML19281B398        *via email            NRO-002 OFFICE      DLSE/LB1:PM DLSE/LB1:LA  DSRA/SRSB:BC DLSE/LB1:PM NAME        BBavol      MMoore*      RKaras*      BBavol (signed)
DATE        10/08/2019  10/03/2019    10/10/2019  10/10/2019
DATE        10/08/2019  10/03/2019    10/10/2019  10/10/2019 U.S. NUCLEAR REGULATORY COMMISSION CATEGORY 1 PUBLIC TELECONFERENCE TO DISCUSS CHAPTER 4, REACTOR, AND THE REACTOR FUEL DESIGN CHANGE PROCESS MEETING AGENDA September 23, 2019 Time                    Topic                  Speaker Introductions and identification of 1:00-1:05                                          NRC topics 1:05-1:40      (Public Portion) Reactor Fuel    NRC/NuScale 1:40-1:55        Questions from the public        Public 1:55-2:30            Closed Portion            NRC/NuScale 2:30                Adjourn Call              NRC/NuScale Enclosure 1
 
U.S. NUCLEAR REGULATORY COMMISSION CATEGORY 1 PUBLIC TELECONFERENCE TO DISCUSS CHAPTER 4, REACTOR, AND THE REACTOR FUEL DESIGN CHANGE PROCESS MEETING AGENDA September 23, 2019 Time                    Topic                  Speaker Introductions and identification of 1:00-1:05                                          NRC topics 1:05-1:40      (Public Portion) Reactor Fuel    NRC/NuScale 1:40-1:55        Questions from the public        Public 1:55-2:30            Closed Portion            NRC/NuScale 2:30                Adjourn Call              NRC/NuScale Enclosure 1


U.S. NUCLEAR REGULATORY COMMISSION CATEGORY 1 PUBLIC TELECONFERENCE TO DISCUSS CHAPTER 4, REACTOR, AND THE REACTOR FUEL DESIGN CHANGE PROCESS LIST OF ATTENDEES September 23, 2019 Name                              Organization Bruce Bavol              U.S. Nuclear Regulatory Commission (NRC)
U.S. NUCLEAR REGULATORY COMMISSION CATEGORY 1 PUBLIC TELECONFERENCE TO DISCUSS CHAPTER 4, REACTOR, AND THE REACTOR FUEL DESIGN CHANGE PROCESS LIST OF ATTENDEES September 23, 2019 Name                              Organization Bruce Bavol              U.S. Nuclear Regulatory Commission (NRC)

Latest revision as of 17:40, 1 February 2020

Summary of September 23, 2019 - Public Teleconference on NuScale Chapter 4
ML19281B398
Person / Time
Site: NuScale
Issue date: 10/10/2019
From: Bavol B
NRC/NRO/DLSE/LB1
To: Samson Lee
NRC/NRO/DLSE/LB1
Bavol B / 415-6715
References
Download: ML19281B398 (5)


Text

October 10, 2019 MEMORANDUM TO: Samuel S. Lee, Chief Licensing Branch 1 Division of Licensing, Siting, and Environmental Analysis Office of New Reactors FROM: Bruce M. Bavol, Project Manager /RA/

Licensing Branch 1 Division of Licensing, Siting, and Environmental Analysis Office of New Reactors

SUBJECT:

SUMMARY

OF THE SEPTEMBER 23, 2019, CATEGORY 1, PUBLIC TELECONFERENCE TO DISCUSS CHAPTER 4, REACTOR, AND THE REACTOR FUEL DESIGN CHANGE PROCESS The U.S. Nuclear Regulatory Commission (NRC) held a Category 1 public teleconference on September 23, 2019, to discuss the NuScale Power, LLC (NuScale) Chapter 4, Reactor, and the reactor fuel design change process. One member of the general public participated via Bridgeline during the meeting.

The public meeting notice dated September 23, 2019, can be found in the NRCs Agencywide Documents Access and Management Systems under Accession No. ML19260F829. This meeting notice was also posted on the NRC public website.

Enclosed is the meeting agenda (Enclosure 1), list of participants (Enclosures 2), and overview (Enclosure 3).

Docket No.52-048

Enclosures:

1. Meeting Agenda
2. List of Attendees
3. Meeting Overview cc w/encl.: DC NuScale Power CONTACT: Bruce M. Bavol, NRO/DLSE 301-415-6715

ML19281B398 *via email NRO-002 OFFICE DLSE/LB1:PM DLSE/LB1:LA DSRA/SRSB:BC DLSE/LB1:PM NAME BBavol MMoore* RKaras* BBavol (signed)

DATE 10/08/2019 10/03/2019 10/10/2019 10/10/2019 U.S. NUCLEAR REGULATORY COMMISSION CATEGORY 1 PUBLIC TELECONFERENCE TO DISCUSS CHAPTER 4, REACTOR, AND THE REACTOR FUEL DESIGN CHANGE PROCESS MEETING AGENDA September 23, 2019 Time Topic Speaker Introductions and identification of 1:00-1:05 NRC topics 1:05-1:40 (Public Portion) Reactor Fuel NRC/NuScale 1:40-1:55 Questions from the public Public 1:55-2:30 Closed Portion NRC/NuScale 2:30 Adjourn Call NRC/NuScale Enclosure 1

U.S. NUCLEAR REGULATORY COMMISSION CATEGORY 1 PUBLIC TELECONFERENCE TO DISCUSS CHAPTER 4, REACTOR, AND THE REACTOR FUEL DESIGN CHANGE PROCESS LIST OF ATTENDEES September 23, 2019 Name Organization Bruce Bavol U.S. Nuclear Regulatory Commission (NRC)

Rebecca Karas NRC Chris Van Wert NRC Ken Geelhood Pacific Northwest National Lab Matthew Presson NuScale Power, LLC (NuScale)

John Fields NuScale Larry Linik NuScale Ken Rooks NuScale Allyson Callaway NuScale Andy Lingenfelter NuScale Glen Thomas Framatome Nathan Hottle Framatome Sarah Fields Public Enclosure 2

U.S. NUCLEAR REGULATORY COMMISSION CATEGORY 1 PUBLIC TELECONFERENCE TO DISCUSS CHAPTER 4, REACTOR, AND THE REACTOR FUEL DESIGN CHANGE PROCESS September 23, 2019 The U.S. Nuclear Regulatory Commission (NRC) held a Category 1 public teleconference on September 23, 2019, to discuss the NuScale Power, LLC (NuScale) Chapter 4, Reactor, and the reactor fuel design change process. One member of the general public participated via Bridgeline during the meeting.

During the meeting, NRC and NuScale staff discussed the technical report (TR)-0816-51127, NuFuel-HTP2TM Fuel and Control Rod Assembly Designs, Section 7. NuScale provided conditions, which must be met for any design change to be made without requiring NRC review and approval. They also identified applicable locations within Chapter 4, Reactor, and referenced topical and technical reports to find the fuel design criteria for the NuFuel-HTP2TM design and the approved methodologies by which compliance with these criteria are evaluated.

At the conclusion, NRC staff opened up the meeting to questions from the general public. The one member of the public responded that they did not have any questions for staff.

Enclosure 3