ML19340C183: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
Line 18: Line 18:
=Text=
=Text=
{{#Wiki_filter:-
{{#Wiki_filter:-
      -
F=)f1 D    MISSISSIPPI POWER & LIGHT COMPANY E                      Helping Build Mississippi M      P. O. B O X 16 4 0. J A C K S O N, MIS SIS SIP PI 39205 J AMES P McGAUGHY,,R.                            -
    .
        .
F=)f1
                          -
                                    '
D    MISSISSIPPI POWER & LIGHT COMPANY E                      Helping Build Mississippi M      P. O. B O X 16 4 0. J A C K S O N, MIS SIS SIP PI 39205
                                                                                                            -
                                                                                            .
J AMES P McGAUGHY,,R.                            -
A$5 57 ANT V41 P#ElictNT                                    November 6' 1980
A$5 57 ANT V41 P#ElictNT                                    November 6' 1980
                                                                                                         ~I2 Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, 2."4 Suite 3100 Atlanta, Georgia 30303 Attention:            Mr. J. P. O'Reilly, Director
                                                                                                         ~I2 Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, 2."4 Suite 3100 Atlanta, Georgia 30303 Attention:            Mr. J. P. O'Reilly, Director
Line 38: Line 29:
We have noc yet completed cur review of this condition. An interim status report is attached. We estimate that our final report will be aubmitted by March 25, 1981.
We have noc yet completed cur review of this condition. An interim status report is attached. We estimate that our final report will be aubmitted by March 25, 1981.
Yours trulv, f          f f/ / J. P. McGaughy, Jr.
Yours trulv, f          f f/ / J. P. McGaughy, Jr.
EWC:mt Attachment cc:      Mr. N. L. Stampley                      Mr. Victor Stello, Directo Mr. R. B. McGehee                      Division of Inspection & Enforcement Mr. T. B. Conner
EWC:mt Attachment cc:      Mr. N. L. Stampley                      Mr. Victor Stello, Directo Mr. R. B. McGehee                      Division of Inspection & Enforcement Mr. T. B. Conner U. S. Nuclear Regulatory Commission Washington, D.C. 20555 l
                                        .
U. S. Nuclear Regulatory Commission Washington, D.C. 20555 l
'
30/7 S
30/7 S
                                                                                                       /
                                                                                                       /
Line 53: Line 41:
V. Projected Completion Date A final report will be provided by March 25, 1981.
V. Projected Completion Date A final report will be provided by March 25, 1981.
l l
l l
                                                                                .
h
h
   .}}
   .}}

Latest revision as of 10:57, 31 January 2020

Second Interim Deficiency Rept Re Linear Indications on Guyon Alloys,Inc Couplings Used in Class I & II Applications,Originally Reported on 800811.Plant Can Still Operate Safely
ML19340C183
Person / Time
Site: Grand Gulf  Entergy icon.png
Issue date: 11/06/1980
From: Mcgaughy J
MISSISSIPPI POWER & LIGHT CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
REF-PT21-80-327-001 AECM-80-277, NUDOCS 8011140111
Download: ML19340C183 (2)


Text

-

F=)f1 D MISSISSIPPI POWER & LIGHT COMPANY E Helping Build Mississippi M P. O. B O X 16 4 0. J A C K S O N, MIS SIS SIP PI 39205 J AMES P McGAUGHY,,R. -

A$5 57 ANT V41 P#ElictNT November 6' 1980

~I2 Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, 2."4 Suite 3100 Atlanta, Georgia 30303 Attention: Mr. J. P. O'Reilly, Director

Dear Mr. O'Reilly:

SUBJECT:

Grand Gulf Nuclear Station Units 1 and 2 Docket Nos. 50-416/417 PRD-80/49, Guyon Coupling Linear Indications, Interim Status Report No. 2 AECM-80/277 On August 11, 1980, Mississippi Powe. & Light Company notified Mr. M. Hunt of your office of a Potent 1'lif Reportable Deficiency (PRD) at the Grand Gulf Nuclear Station (GCNS). The deficiency concerns indications on couplings supplied by Guyon Alloys, Inc.

for use in nuclear Class I & II applications.

We have noc yet completed cur review of this condition. An interim status report is attached. We estimate that our final report will be aubmitted by March 25, 1981.

Yours trulv, f f f/ / J. P. McGaughy, Jr.

EWC:mt Attachment cc: Mr. N. L. Stampley Mr. Victor Stello, Directo Mr. R. B. McGehee Division of Inspection & Enforcement Mr. T. B. Conner U. S. Nuclear Regulatory Commission Washington, D.C. 20555 l

30/7 S

/

. 0011140lj, 3 u.--_,.~,..,,,,m....~,,_

' Attachment to AECM-80/277 Page 1 of 1 INTERIM STATUS REPORT FOR PRD-80/49 I. Description of Deficiency Linear indications were found in four nuclear Class II and two nuclear Class I, three quarter inch (3/4") stainless steel 304L couplings. The linear indications were in the face and along the body of the fittings. These couplings were supplied by Guyon Alloys, Inc. The heat code and heat number for these couplings were QE and A17130, respectively.

II. Resolution of the Deficiency The six couplings described in the " Description of the Deficiency" were determined to be in the sensing lines on the Reactor Pres-sure Vessel instrumentation piping. An investigation determined that loss of the sensing lines in which these six couplings were located would result in automatic shutdown of the reactor.

However, MP&L has determined that many other similar Guyon couplings having the same heat number have been shipped to the GGNS site. The Constructor is presently in the process of locating these couplings and performing a non-destructive examination of them.

III. Status Although couplings have been identified as used in safety-related systems, it has been determined that their failure would not adversely affect the safety of operations of the plant. However, until the location of all the received couplings has been determined, the potential exists for their use in a safety system where their failure could adversely affect the safety of plant operations.

IV. Reasons for Delay in Final Report This deficiency is still under investigation.

V. Projected Completion Date A final report will be provided by March 25, 1981.

l l

h

.