ML19343C393: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
Line 20: Line 20:
PART 21 IDENTIFICATION NO. 9/- 375- o e c                              C& PAW RVE_hA A4 e4_-
PART 21 IDENTIFICATION NO. 9/- 375- o e c                              C& PAW RVE_hA A4 e4_-
IMIE OF LER            Kd/N                      DCCET i0,        f r    an /W /
IMIE OF LER            Kd/N                      DCCET i0,        f r    an /W /
                                          '
ORIGIIML REPORT_            SlFFiEFENTARY      v DATE DISTRIBUIE DISTRIBlITION:
ORIGIIML REPORT_            SlFFiEFENTARY      v DATE DISTRIBUIE
                                                            "        '
DISTRIBlITION:
FUEL CYCLE &                      SAFEGUARDS (S) _
FUEL CYCLE &                      SAFEGUARDS (S) _
EACTOR (R) [
EACTOR (R) [
      .
IEFILES                                [RTERIALS (PD                      IEFILES
IEFILES                                [RTERIALS (PD                      IEFILES
                                                                                 ~
                                                                                 ~
Line 33: Line 29:
                           -                    .        AD/FRSI                            AD/ROI EGIGE I,II,III,IV,V                    EGIONS I,II,III,IV,V                EGIG6 I,II,III,IV,V VE?OJR BR. R-IV                        V5NDOR BR. R-IV                    VENDOR BR. R-IV
                           -                    .        AD/FRSI                            AD/ROI EGIGE I,II,III,IV,V                    EGIONS I,II,III,IV,V                EGIG6 I,II,III,IV,V VE?OJR BR. R-IV                        V5NDOR BR. R-IV                    VENDOR BR. R-IV
                               ~
                               ~
LCEB / PPA FIG 5715                    M'ES/FCFS        SS-393            NRR/ DOL
LCEB / PPA FIG 5715                    M'ES/FCFS        SS-393            NRR/ DOL EDD            fig 7602                  LCEB/FFA      I,iG 5715            tg.SS./ SG SS-S81 fGR/ DOE                              AE00          tiB 7602            LOE3 / PPA        FIG 5715 NRR/DSI                                hSLEP EM      450                  AEOD              FIG 7602 N                          - '        SAP /SF fig-7210A                  ASGP          EM 450 -
                                    '
        '
EDD            fig 7602                  LCEB/FFA      I,iG 5715            tg.SS./ SG SS-S81 fGR/ DOE                              AE00          tiB 7602            LOE3 / PPA        FIG 5715
                                              ,
NRR/DSI                                hSLEP EM      450                  AEOD              FIG 7602
            .
                                                      .-
  '
                -
N                          - '        SAP /SF fig-7210A                  ASGP          EM 450 -
                                      -
NER/ DOL                                      .
NER/ DOL                                      .
CENTPAL FIES        016          CENTPAL FILES          016
CENTPAL FIES        016          CENTPAL FILES          016
                 # NE ~                                  CENIPAL FILES ( GRON)            CEhTPAL FILES        (GR0fD CENTPAL FILES          SS-395 M                '
                 # NE ~                                  CENIPAL FILES ( GRON)            CEhTPAL FILES        (GR0fD CENTPAL FILES          SS-395 M                '
PDR LPDR                            PDR CENTPAL FILES (GFDD
PDR LPDR                            PDR CENTPAL FILES (GFDD
                                        '        '
                                                                   +'        '    s        LPDR PDR                                          lERA LPDR j[,(              g t    lERA 3'
                                                                   +'        '    s        LPDR PDR                                          lERA
                                                                                                          '
LPDR
                            -
                                                    ,    ,
j[,(              g t    lERA 3'
IS% -                                                                      .
IS% -                                                                      .
ACTI0th
ACTI0th i-  v.I''b'N            S 1987%[. 3          '
                                                  '
i-  v.I''b'N            S 1987%[. 3          '
                                                                                                                -
:                                                              h'4>.                #                .
:                                                              h'4>.                #                .
PREl_IMINARY EVALUATION OF TIE ATTACHED '                  t I,      aTES. LEAD RESPCNSIBILITY FCR
PREl_IMINARY EVALUATION OF TIE ATTACHED '                  t I,      aTES. LEAD RESPCNSIBILITY FCR FOLLCWUP AS S W BELCW:
                                                                                              -
FOLLCWUP AS S W BELCW:
                                                                                                        -
IE    _
IE    _
                                                     .            NRR _]                          ffSS                  Gil!ER [
                                                     .            NRR _]                          ffSS                  Gil!ER [
_
EES 8103240GM                                                  ,-                      .                      EV,8g2j s                              .-.a                                                      , a ,.
EES 8103240GM                                                  ,-                      .                      EV,8g2j s                              .-.a                                                      , a ,.


    .    .
YANu s \db  us l'
        ,
            .
YANu s \db  us
                              '
l'
                                    '
MISSISSIPPI POWER & LIGHT COMPANY
MISSISSIPPI POWER & LIGHT COMPANY
                         -'{  :A                        Helping B uild Mississippi
                         -'{  :A                        Helping B uild Mississippi P. O. B O X 16 4 0, J A C K S O N, MISSISSIPPI 39205 I
                      "            "
P. O. B O X 16 4 0, J A C K S O N, MISSISSIPPI 39205 I
auts p. uccAv.emee.
auts p. uccAv.emee.
answavica. osv n a                                                  f / .- 3 'I b 0 ILirch 2, 1981 Office of Inspection & Enforcement U. S. Nuclear Regulatory Ccenission Region II 101 Marietta Str_eet, W.W.        .
answavica. osv n a                                                  f / .- 3 'I b 0 ILirch 2, 1981 Office of Inspection & Enforcement U. S. Nuclear Regulatory Ccenission Region II 101 Marietta Str_eet, W.W.        .
Line 88: Line 52:
==Dear Mr. O'Reilly:==
==Dear Mr. O'Reilly:==


                                      .
SU3 JECT: Grand Gulf Nuclear Station Units 1 and 2 Docket Nos. 50-416/417 File 0260/15525/15526 PRD-80/65, Final Report, Defective Recirculation Pu=p Hanger Co:ponents
SU3 JECT: Grand Gulf Nuclear Station Units 1 and 2 Docket Nos. 50-416/417 File 0260/15525/15526 PRD-80/65, Final Report, Defective Recirculation Pu=p Hanger Co:ponents
* AECM-81/87 On October 27, 1981, Mississippi Power & I.ight Company notified' Mr. J.
* AECM-81/87 On October 27, 1981, Mississippi Power & I.ight Company notified' Mr. J.
Rausch, of your office, of a Potentially Reportable Deficiency (PRD) at the Grand Gulf Nuclear Station (GGNS) construction site. The deficiency concerns loose threads which exceeded the vendor's tolerances as evaluated by an IT'"
Rausch, of your office, of a Potentially Reportable Deficiency (PRD) at the Grand Gulf Nuclear Station (GGNS) construction site. The deficiency concerns loose threads which exceeded the vendor's tolerances as evaluated by an IT'"
      ,
Grinnell representative. These threaded ite=s are on components of the recirculation pump hangers.
Grinnell representative. These threaded ite=s are on components of the recirculation pump hangers.
As a result of our investigation, we have determined that this deficiency is not reportable under 10CFR50.55(e) or 10CFR21.          Our final report is
As a result of our investigation, we have determined that this deficiency is not reportable under 10CFR50.55(e) or 10CFR21.          Our final report is attached. This is our final response on this ite=.
,
attached. This is our final response on this ite=.
Please note that our last response, AECM-SO/293, 11/24/80, contained an error in the attachment. The heading should read " Status Report For PRD-80/65" vice " Final Report For PRD-80/65". We sincerely regret any inconvenience that this error may have caused.
Please note that our last response, AECM-SO/293, 11/24/80, contained an error in the attachment. The heading should read " Status Report For PRD-80/65" vice " Final Report For PRD-80/65". We sincerely regret any inconvenience that this error may have caused.
Yours truly, gpr    J. P. McGaughy, Jr.
Yours truly, gpr    J. P. McGaughy, Jr.
l CWE:=t AT~ACHMEhi ec: See page 2 Member Middle South Utilities System
l CWE:=t AT~ACHMEhi ec: See page 2 Member Middle South Utilities System


    ,  . .
MISSISSIPPI POWER & LIGHT COMPANY Mr. J. P. O'Reilly              '
MISSISSIPPI POWER & LIGHT COMPANY Mr. J. P. O'Reilly              '
AECM-81/87 NRC                                        Page 2 cc:  Mr. N. L. Stampley Mr. R. B. McGehee Mr. T. B. Conner Mr. Victor Stello, Director Division of Inspection & Enforcement
AECM-81/87 NRC                                        Page 2 cc:  Mr. N. L. Stampley Mr. R. B. McGehee Mr. T. B. Conner Mr. Victor Stello, Director Division of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D.C. 20555 Mr. G. B. Taylor South Miss. Electric Power Association P. O. Box 1589 Hattiesburg, MS 39401 e
<
U. S. Nuclear Regulatory Commission
                      .
Washington, D.C. 20555
                                ,      ,
                                            ,
Mr. G. B. Taylor South Miss. Electric Power Association P. O. Box 1589 Hattiesburg, MS 39401
                                                                          '
                                  .
e e
e e
                    %
e
  ' t 1                                                                        9
  ' t 1                                                                        9
       ~
       ~
                                                                      .
  '
                      .
D L
D L
m.
m.


_
           ~
           ~
, ~ .
, ~ .
          ..
Attachment to AECM-81/87 Page 1 of 1 FINAL REPORT FOR PP3-80/65 I. Description of the Deficiency The Grand Gulf Nuclear Station uses reactor recirculation pumps supplied by ITT Grinnell. An inspection performed by this vendor revealed that certain hanger components they supplied with the Unit I reactor recirculation pumps had loose threads exceeding tolerances. These components and associated part numbers were as follows:
              &
Attachment to AECM-81/87 Page 1 of 1 FINAL REPORT FOR PP3-80/65 I. Description of the Deficiency The Grand Gulf Nuclear Station uses reactor recirculation pumps supplied by ITT Grinnell. An inspection performed by this vendor revealed that
* certain hanger components they supplied with the Unit I reactor recirculation pumps had loose threads exceeding tolerances. These components and associated part numbers were as follows:
_
: a. Clevis, four (4) each: Q1333G002H301A, H3013, H3023, R304B
: a. Clevis, four (4) each: Q1333G002H301A, H3013, H3023, R304B
: b. Coupling (Turnbuckle), one (1) each: Q1333G002H302A
: b. Coupling (Turnbuckle), one (1) each: Q1333G002H302A
: c.  -Large Rods, 2 1/2" X 5'8 1/2", two (2) each: Q1333G002H302A, R3023
: c.  -Large Rods, 2 1/2" X 5'8 1/2", two (2) each: Q1333G002H302A, R3023
: d. . Constant Sapport Springs, three (3)' each: Q1333G002H301A, H301B,'
: d. . Constant Sapport Springs, three (3)' each: Q1333G002H301A, H301B,'
'
             ,              H303A This deficiency is applicable only to Unit I, and is confined to the ITT recirculation pu=ps.
             ,              H303A This deficiency is applicable only to Unit I, and is confined to the ITT recirculation pu=ps.
                       ' 10CFR21 is not applicable .as there is no i= pact on safety.
                       ' 10CFR21 is not applicable .as there is no i= pact on safety.
                 . II. Safety-Implications
                 . II. Safety-Implications
                       .The NSSS supplier, working with the vendor, has determined that the deficiency, were it to remain uncorrected, would have no impact on safety during the life of the plant. The vendor has provided a stress report verifying the adequacy of' the noted deficient hardware.
                       .The NSSS supplier, working with the vendor, has determined that the deficiency, were it to remain uncorrected, would have no impact on safety during the life of the plant. The vendor has provided a stress report verifying the adequacy of' the noted deficient hardware.
        .                                                                        .      .
               - III. Corrective Actions
               - III. Corrective Actions
* Due to the above investigation, corrective action will be to use the equipment "as is".
* Due to the above investigation, corrective action will be to use the equipment "as is".
                                                    ,
l t
l t
                                                            .
4 I
4 I
l
l f
.
f
                                          #'
r                  p          ,                                  . - - ,      -}}
r                  p          ,                                  . - - ,      -}}

Latest revision as of 08:10, 31 January 2020

Final Part 21 Rept Re Defective Recirculation Pump Hanger Components Supplied by Itt Grinnell,Initially Reported 801027.Equipment Will Be Used in Present Condition.Condition Not Reportable Per 10CFR50.55(e) or Part 21
ML19343C393
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 03/02/1981
From: Mcgaughy J
MISSISSIPPI POWER & LIGHT CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
REF-PT21-81-375-000 10CFR-50.55E, AECM-81-87, PT21-81-375, PT21-81-375-000, NUDOCS 8103240021
Download: ML19343C393 (3)


Text

- .

PART 21 IDENTIFICATION NO. 9/- 375- o e c C& PAW RVE_hA A4 e4_-

IMIE OF LER Kd/N DCCET i0, f r an /W /

ORIGIIML REPORT_ SlFFiEFENTARY v DATE DISTRIBUIE DISTRIBlITION:

FUEL CYCLE & SAFEGUARDS (S) _

EACTOR (R) [

IEFILES [RTERIALS (PD IEFILES

~

EES- Y ' -

IEFILES AD/SG

- . AD/FRSI AD/ROI EGIGE I,II,III,IV,V EGIONS I,II,III,IV,V EGIG6 I,II,III,IV,V VE?OJR BR. R-IV V5NDOR BR. R-IV VENDOR BR. R-IV

~

LCEB / PPA FIG 5715 M'ES/FCFS SS-393 NRR/ DOL EDD fig 7602 LCEB/FFA I,iG 5715 tg.SS./ SG SS-S81 fGR/ DOE AE00 tiB 7602 LOE3 / PPA FIG 5715 NRR/DSI hSLEP EM 450 AEOD FIG 7602 N - ' SAP /SF fig-7210A ASGP EM 450 -

NER/ DOL .

CENTPAL FIES 016 CENTPAL FILES 016

  1. NE ~ CENIPAL FILES ( GRON) CEhTPAL FILES (GR0fD CENTPAL FILES SS-395 M '

PDR LPDR PDR CENTPAL FILES (GFDD

+' ' s LPDR PDR lERA LPDR j[,( g t lERA 3'

IS% - .

ACTI0th i- v.Ib'N S 1987%[. 3 '

h'4>. # .

PREl_IMINARY EVALUATION OF TIE ATTACHED ' t I, aTES. LEAD RESPCNSIBILITY FCR FOLLCWUP AS S W BELCW:

IE _

. NRR _] ffSS Gil!ER [

EES 8103240GM ,- . EV,8g2j s .-.a , a ,.

YANu s \db us l'

MISSISSIPPI POWER & LIGHT COMPANY

-'{ :A Helping B uild Mississippi P. O. B O X 16 4 0, J A C K S O N, MISSISSIPPI 39205 I

auts p. uccAv.emee.

answavica. osv n a f / .- 3 'I b 0 ILirch 2, 1981 Office of Inspection & Enforcement U. S. Nuclear Regulatory Ccenission Region II 101 Marietta Str_eet, W.W. .

Suite. 3100 Atlanta, Georgia 30303 Attention: Mr. Js P. O'Reilly, Director

Dear Mr. O'Reilly:

SU3 JECT: Grand Gulf Nuclear Station Units 1 and 2 Docket Nos. 50-416/417 File 0260/15525/15526 PRD-80/65, Final Report, Defective Recirculation Pu=p Hanger Co:ponents

Rausch, of your office, of a Potentially Reportable Deficiency (PRD) at the Grand Gulf Nuclear Station (GGNS) construction site. The deficiency concerns loose threads which exceeded the vendor's tolerances as evaluated by an IT'"

Grinnell representative. These threaded ite=s are on components of the recirculation pump hangers.

As a result of our investigation, we have determined that this deficiency is not reportable under 10CFR50.55(e) or 10CFR21. Our final report is attached. This is our final response on this ite=.

Please note that our last response, AECM-SO/293, 11/24/80, contained an error in the attachment. The heading should read " Status Report For PRD-80/65" vice " Final Report For PRD-80/65". We sincerely regret any inconvenience that this error may have caused.

Yours truly, gpr J. P. McGaughy, Jr.

l CWE:=t AT~ACHMEhi ec: See page 2 Member Middle South Utilities System

MISSISSIPPI POWER & LIGHT COMPANY Mr. J. P. O'Reilly '

AECM-81/87 NRC Page 2 cc: Mr. N. L. Stampley Mr. R. B. McGehee Mr. T. B. Conner Mr. Victor Stello, Director Division of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D.C. 20555 Mr. G. B. Taylor South Miss. Electric Power Association P. O. Box 1589 Hattiesburg, MS 39401 e

e e

' t 1 9

~

D L

m.

~

, ~ .

Attachment to AECM-81/87 Page 1 of 1 FINAL REPORT FOR PP3-80/65 I. Description of the Deficiency The Grand Gulf Nuclear Station uses reactor recirculation pumps supplied by ITT Grinnell. An inspection performed by this vendor revealed that certain hanger components they supplied with the Unit I reactor recirculation pumps had loose threads exceeding tolerances. These components and associated part numbers were as follows:

a. Clevis, four (4) each: Q1333G002H301A, H3013, H3023, R304B
b. Coupling (Turnbuckle), one (1) each: Q1333G002H302A
c. -Large Rods, 2 1/2" X 5'8 1/2", two (2) each: Q1333G002H302A, R3023
d. . Constant Sapport Springs, three (3)' each: Q1333G002H301A, H301B,'

, H303A This deficiency is applicable only to Unit I, and is confined to the ITT recirculation pu=ps.

' 10CFR21 is not applicable .as there is no i= pact on safety.

. II. Safety-Implications

.The NSSS supplier, working with the vendor, has determined that the deficiency, were it to remain uncorrected, would have no impact on safety during the life of the plant. The vendor has provided a stress report verifying the adequacy of' the noted deficient hardware.

- III. Corrective Actions

  • Due to the above investigation, corrective action will be to use the equipment "as is".

l t

4 I

l f

r p , . - - , -