IR 05000400/2008501: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 04/30/2008
| issue date = 04/30/2008
| title = IR 05000400-08-501, on 04/07/2008 - 4/10/2008, Shearon Harris Nuclear Power Plant, Baseline Inspection
| title = IR 05000400-08-501, on 04/07/2008 - 4/10/2008, Shearon Harris Nuclear Power Plant, Baseline Inspection
| author name = Bonser B R
| author name = Bonser B
| author affiliation = NRC/RGN-II/DRS/PSB1
| author affiliation = NRC/RGN-II/DRS/PSB1
| addressee name = Duncan R J
| addressee name = Duncan R
| addressee affiliation = Carolina Power & Light Co
| addressee affiliation = Carolina Power & Light Co
| docket = 05000400
| docket = 05000400
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter:ril 30, 2008
[[Issue date::April 30, 2008]]


Carolina Power and Light Company ATTN: Mr. Robert J. Duncan, II Vice President - Harris Plant Shearon Harris Nuclear Power Plant P. O. Box 165, Mail Code: Zone 1 New Hill, North Carolina 27562-0165
==SUBJECT:==
 
SHEARON HARRIS NUCLEAR POWER PLANT - NRC EMERGENCY PREPAREDNESS INSPECTION REPORT 05000400/2008501
SUBJECT: SHEARON HARRIS NUCLEAR POWER PLANT - NRC EMERGENCY PREPAREDNESS INSPECTION REPORT 05000400/2008501


==Dear Mr. Duncan:==
==Dear Mr. Duncan:==
Line 30: Line 28:
Burton and other members of your staff.
Burton and other members of your staff.


The inspection examined activities conducted under your license as they relate to safety and compliance with the Commission
The inspection examined activities conducted under your license as they relate to safety and compliance with the Commission=s rules and regulations and with the conditions of your license.
=s rules and regulations and with the conditions of your license. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel. Based on the results of this inspection, no findings of significance were identified.


In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public ins pection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading- rm/adams.html (the Public Electronic Reading Room).
The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel. Based on the results of this inspection, no findings of significance were identified.


Sincerely,/RA/ Brian R. Bonser, Chief Plant Support Branch 1 Division of Reactor Safety
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).


Docket Nos. 50-400 License Nos. NPF-63  
Sincerely,
/RA/
Brian R. Bonser, Chief Plant Support Branch 1 Division of Reactor Safety Docket Nos. 50-400 License Nos. NPF-63


===Enclosure:===
===Enclosure:===
NRC Inspection Report No. 05000400/2008501 W
NRC Inspection Report No. 05000400/2008501 W/Attachment: Supplemental Information (
 
===/Attachment:===
Supplemental Information  
 
(cc w/encl: page 2)
 
_______________________ OFFICE RII: DRS RII:DRP RII:DRS RII:DRP RII:DRP SIGNATURE /RA/ /RA/ /RA/ /RA/ NAME L. Miller R. Musser B. Bonser Eric Riggs Dan Rich DATE 4/25/2008 04/25/08 04/30/08 4/25/2008 4/25/2008 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO
 
CP&L 2 cc w/encl: Paul Fulford Manager Performance Evaluation and Regulatory Affairs PEB5 Carolina Power & Light Company Electronic Mail Distribution
 
Chris L. Burton Director Site Operations Carolina Power & Light Company Shearon Harris Nuclear Power Plant Electronic Mail Distribution
 
J. Wayne Guganious Training Manager Harris Progress Energy Carolinas, Inc.
 
Electronic Mail Distribution
 
Thomas J. Natale Manager Support Services Shearon Harris Nuclear Power Plant Electronic Mail Distribution
 
David H. Corlett Supervisor Licensing/Regulatory Programs Carolina Power & Light Company Electronic Mail Distribution
 
David T. Conley Associate General Counsel Legal Dept.
 
Progress Energy Service Company, LLC Electronic Mail Distribution
 
John H. O'Neill, Jr.
 
Shaw, Pittman, Potts & Trowbridge 2300 N. Street, NW Washington, DC 20037-1128
 
Beverly Hall Chief Radiation Protection Section N.C. Department of Environmental Commerce & Natural Resources Electronic Mail Distribution
 
Public Service Commission State of South Carolina P.O. Box 11649 Columbia, SC 29211
 
Chairman North Carolina Utilities Commission Electronic Mail Distribution
 
Robert P. Gruber Executive Director Public Staff - NCUC 4326 Mail Service Center Raleigh, NC 27699-4326
 
Herb Council Chair Board of County Commissioners of Wake County P.O. Box 550 Raleigh, NC 27602
 
Tommy Emerson Chair Board of County Commissioners of Chatham County 186 Emerson Road Siler City, NC 27344
 
Kelvin Henderson Plant General Manager Carolina Power and Light Company Shearon Harris Nuclear Power Plant Electronic Mail Distribution
 
Senior Resident Inspector Carolina Power and Light Company Shearon Harris Nuclear Power Plant U.S. NRC 5421 Shearon Harris Rd New Hill, NC 27562-9998


CP&L 3 Letter to Robert J. Duncan, II from Brian Bonser dated April 30, 2008
REGION II==
 
Docket Nos: 50-400 License Nos: NPF-63 Report Nos: 05000400/2008501 Licensee: Carolina Power and Light Company Facility: Shearon Harris Nuclear Power Plant, Unit 1 Location: New Hill, NC Dates: April 07-10, 2008 Inspector: Lee Miller, Senior Emergency Preparedness Inspector Approved by: Brian R. Bonser, Chief Plant Support Branch 1 Division of Reactor Safety
SUBJECT: SHEARON HARRIS NUCLEAR POWER PLANT - NRC EMERGENCY PREPAREDNESS INSPECTION REPORT 05000400/2008501
 
Distribution w/encl:
RIDSNRRDIRS PUBLIC M. Vaaler, NRR (PM - Harris)
U. S. NUCLEAR REGULATORY COMMISSION REGION II  
 
Docket Nos: 50-400  
 
License Nos: NPF-63  
 
Report Nos: 05000400/2008501  
 
Licensee: Carolina Power and Light Company  
 
Facility: Shearon Harris Nuclear Power Plant, Unit 1  
 
Location: New Hill, NC  
 
Dates: April 07-10, 2008  
 
Inspector: Lee Miller, Senior Emergency Prepar edness Inspector  
 
Approved by: Brian R. Bonser, Chief Plant Support Branch 1 Division of Reactor Safety  


=SUMMARY OF FINDINGS=
=SUMMARY OF FINDINGS=
IR 05000400/2008-501; 04/07/2008 - 4/10/2008; Shearon Harris Nuclear Power Plant; Baseline  
IR 05000400/2008-501; 04/07/2008 - 4/10/2008; Shearon Harris Nuclear Power Plant; Baseline


Inspection.
Inspection.


The report covered an announced inspection by one emergency preparedness inspector. The  
The report covered an announced inspection by one emergency preparedness inspector. The NRC=s program for overseeing the safe operation of commercial nuclear power reactors is described in NUREG-1649, AReactor Oversight Process.@
 
NRC=s program for overseeing the safe operation of commercial nuclear power reactors is described in NUREG-1649, AReactor Oversight Process.


===NRC-Identified and Self-Revealing Findings===
 
===A. NRC-Identified and Self-Revealing Findings===


No findings of significance were identified.
No findings of significance were identified.


===B. Licensee-Identified Violations===
===Licensee-Identified Violations===
.
.
None
None
Line 134: Line 63:
==REACTOR SAFETY==
==REACTOR SAFETY==


===Cornerstone:===
===Cornerstone: Emergency Preparedness===
Emergency Preparedness


1EP2   Alert and Notification System Testing
1EP2 Alert and Notification System Testing


====a. Inspection Scope====
====a. Inspection Scope====
The inspector evaluated the adequacy of licensee
The inspector evaluated the adequacy of licensee=s methods for testing the alert and notification system in accordance with NRC Inspection Procedure 71114, Attachment 02, AAlert and Notification System Evaluation@. The applicable planning standard 10 CFR Part 50.47(b)(5) and its related 10 CFR Part 50, Appendix E, Section IV.D requirements were used as reference criteria. The criteria contained in NUREG-0654, ACriteria for Preparation and Evaluation of Radiological Emergency Response Plans and Preparedness in Support of Nuclear Power Plants,@ Revision 1, was also used as a reference.
=s methods for testing the alert and notification system in accordance with NRC Inspection Procedure 71114, Attachment 02, AAlert and Notification System Evaluation
@. The applicable planning standard 10 CFR Part 50.47(b)(5) and its related 10 CFR Part 50, Appendix E, Section IV.D requirements were used as reference criteria. The criteria contained in NUREG-0654, ACriteria for Preparation and Evaluation of Radiological Emergency Response Plans and Preparedness in Support of Nuclear Power Plants,@ Revision 1, was also used as a reference.


The inspector reviewed various documents which are listed in the Attachment to this report. This inspection activity satisfied one inspection sample for the alert and notification system on an biennial basis.
The inspector reviewed various documents which are listed in the Attachment to this report. This inspection activity satisfied one inspection sample for the alert and notification system on an biennial basis.
Line 148: Line 74:
====b. Findings====
====b. Findings====
No findings of significance were identified.
No findings of significance were identified.
 
1EP3 Emergency Response Organization Augmentation
1EP3   Emergency Response Organization Augmentation


====a. Inspection Scope====
====a. Inspection Scope====
The inspector reviewed the licensee
The inspector reviewed the licensee=s Emergency Response Organization (ERO)augmentation staffing requirements and process for notifying the ERO to ensure the readiness of key staff for responding to an event and timely facility activation. The qualification records of key position ERO personnel were reviewed to ensure all ERO qualifications were current. A sample of problems identified from augmentation drills or system tests performed since the last inspection were reviewed to assess the effectiveness of corrective actions.
=s Emergency Response Organization (ERO) augmentation staffing requirements and process for notifying the ERO to ensure the readiness of key staff for responding to an event and timely facility activation. The qualification records of key position ERO personnel were reviewed to ensure all ERO qualifications were current. A sample of problems identified from augment ation drills or system tests performed since the last inspection were reviewed to assess the effectiveness of corrective actions.


The inspection was conducted in accordance with NRC Inspection Procedure 71114, 03, AEmergency Response Organization Staffing and Augmentation System.
The inspection was conducted in accordance with NRC Inspection Procedure 71114, 03, AEmergency Response Organization Staffing and Augmentation System.@
 
The applicable planning standard, 10 CFR 50.47(b)(2) and its related 10 CFR 50, Appendix E requirements were used as reference criteria.
@ The applicable planning standard, 10 CFR 50.47(b)(2) and its related 10 CFR 50, Appendix E requirements were used as reference criteria.


The inspector reviewed various documents which are listed in the Attachment to this report. This inspection activity satisfied one inspection sample for the ERO staffing and augmentation system on a biennial basis.
The inspector reviewed various documents which are listed in the Attachment to this report. This inspection activity satisfied one inspection sample for the ERO staffing and augmentation system on a biennial basis.
Line 163: Line 86:
====b. Findings====
====b. Findings====
No findings of significance were identified.
No findings of significance were identified.
 
1EP4 Emergency Action Level and Emergency Plan Changes
1EP4   Emergency Action Level and Emergency Plan Changes


====a. Inspection Scope====
====a. Inspection Scope====
The inspector
The inspector=s review of revisions to the emergency plan, implementing procedures, and Emergency Action Level (EAL) changes was performed to determine that changes had not decreased the effectiveness of the plan. The inspector evaluated the associated 10 CFR 50.54(q) reviews associated with non-administrative emergency plan, implementing procedures, and EAL changes. The inspector reviewed Shearon Harris Emergency Plan revision 46 and changes to the implementing procedures from February 2007 to February 2008.
=s review of revisions to the emergency plan, implementing procedures, and Emergency Action Level (EAL) changes was performed to determine that changes had not decreased the effectiveness of the plan. The inspector evaluated the associated 10 CFR 50.54(q) reviews associated with non-administrative emergency plan, implementing procedures, and EAL changes. The inspector reviewed Shearon Harris Emergency Plan revision 46 and changes to the implementing procedures from February 2007 to February 2008.
 
The inspection was conducted in accordance with NRC Inspection Procedure 71114, 04, AEmergency Action Level and Emergency Plan Changes.


@ The applicable planning standard (PS), 10 CFR 50.47(b)(4) and its related 10 CFR 50, Appendix E requirements were used as reference criteria.
The inspection was conducted in accordance with NRC Inspection Procedure 71114, 04, AEmergency Action Level and Emergency Plan Changes.@ The applicable planning standard (PS), 10 CFR 50.47(b)(4) and its related 10 CFR 50, Appendix E requirements were used as reference criteria.


The inspector reviewed various documents which are listed in the Attachment to this report. This inspection activity satisfied one inspection sample for the EAL and emergency plan changes on an annual basis.
The inspector reviewed various documents which are listed in the Attachment to this report. This inspection activity satisfied one inspection sample for the EAL and emergency plan changes on an annual basis.
Line 178: Line 97:
====b. Findings====
====b. Findings====
No findings of significance were identified.
No findings of significance were identified.
 
1EP5 Correction of Emergency Preparedness Weaknesses and Deficiencies
1EP5   Correction of Emergency Preparedness Weaknesses and Deficiencies


====a. Inspection Scope====
====a. Inspection Scope====
The inspector reviewed the corrective actions identified through the EP program to determine the significance of the issues and to determine if repeat problems were occurring. The facility
The inspector reviewed the corrective actions identified through the EP program to determine the significance of the issues and to determine if repeat problems were occurring. The facility=s self-assessments and audits were reviewed to assess the licensee=s ability to be self-critical, thus avoiding complacency and degradation of their EP program. In addition, inspector reviewed licensee=s self-assessments and audits to assess the completeness and effectiveness of all EP-related corrective actions.
=s self-assessments and audits were reviewed to assess the licensee=s ability to be self-critical, thus avoiding complacency and degradation of their EP program. In addition, inspector reviewed licensee
=s self-assessments and audits to assess the completeness and effectiveness of all EP-related corrective actions.


The inspection was conducted in accordance with NRC Inspection Procedure 71114, 05, ACorrection of Emergency Preparedness Weaknesses.
The inspection was conducted in accordance with NRC Inspection Procedure 71114, 05, ACorrection of Emergency Preparedness Weaknesses.@ The applicable planning standard, 10 CFR 50.47(b)(14) and its related 10 CFR 50, Appendix E requirements were used as reference criteria.
 
@ The applicable planning standard, 10 CFR 50.47(b)(14) and its related 10 CFR 50, Appendix E requirements were used as reference criteria.


The inspector reviewed various documents which are listed in the Attachment to this report. This inspection activity satisfied one inspection sample for the correction of emergency preparedness weaknesses on a biennial basis.
The inspector reviewed various documents which are listed in the Attachment to this report. This inspection activity satisfied one inspection sample for the correction of emergency preparedness weaknesses on a biennial basis.


Findings No findings of significance were identified.
Findings No findings of significance were identified.


==OTHER ACTIVITIES==
==OTHER ACTIVITIES==
Line 199: Line 113:


====a. Inspection Scope====
====a. Inspection Scope====
===Cornerstone:===
===Cornerstone: Emergency Preparedness===
Emergency Preparedness


The inspector sampled licensee submittals for three Performance Indicators (PI) listed below. For each of the submittals reviewed, the inspector reviewed the period from January 2007 through December 2007. To verify the accuracy of the PI data reported during that period, PI definitions and guidance contained in Nuclear Energy Institute (NEI) 99-02, ARegulatory Assessment Indicator Guideline,@ Revision 5, were used to verify the basis in reporting for each data element.
The inspector sampled licensee submittals for three Performance Indicators (PI) listed below. For each of the submittals reviewed, the inspector reviewed the period from January 2007 through December 2007. To verify the accuracy of the PI data reported during that period, PI definitions and guidance contained in Nuclear Energy Institute (NEI) 99-02, ARegulatory Assessment Indicator Guideline,@ Revision 5, were used to verify the basis in reporting for each data element.


$ Emergency Response Organization Drill/Exercise Performance (DEP)  
    $ Emergency Response Organization Drill/Exercise Performance (DEP)
$ Emergency Response Organization Readiness (ERO)  
    $ Emergency Response Organization Readiness (ERO)
$ Alert and Notification System Reliability (ANS)
    $ Alert and Notification System Reliability (ANS)
The inspectors reviewed portions of the raw PI data developed from monthly performance indicator reports and discussed the methods for comp iling and repor ting the PIs with cognizant emergency preparedness personnel. The inspector also independently screened drill and exercise opportunity evaluations, drill participation reports, and drill evaluati ons. Selected reported values were calculated to verify their accuracy. The inspectors compared graphical representations from the most recent PI report to the raw data to verify that the data was correctly reflected in the report.
The inspectors reviewed portions of the raw PI data developed from monthly performance indicator reports and discussed the methods for compiling and reporting the PIs with cognizant emergency preparedness personnel. The inspector also independently screened drill and exercise opportunity evaluations, drill participation reports, and drill evaluations. Selected reported values were calculated to verify their accuracy. The inspectors compared graphical representations from the most recent PI report to the raw data to verify that the data was correctly reflected in the report.


Reviewed documents are listed in the Attachment to this report.
Reviewed documents are listed in the Attachment to this report.
Line 213: Line 126:
====b. Findings====
====b. Findings====
No findings of significance were identified.
No findings of significance were identified.
 
{{a|4OA6}}
{{a|4OA6}}
==4OA6 Meetings, including Exit==
==4OA6 Meetings, including Exit==


Line 226: Line 138:


===Licensee personnel===
===Licensee personnel===
 
C. Burton       Director Site Operations
C. Burton Director Site Operations
K. Henderson   Plant General Manager
K. Henderson Plant General Manager
P. Mentel       Manager Site Support Services (Acting)
P. Mentel Manager Site Support Services (Acting)
C. Kamilaris   Manager Nuclear Assessment
C. Kamilaris Manager Nuclear Assessment
T. Pilo         Fleet Coordinator - Emergency Preparedness
T. Pilo   Fleet Coordinator - Emergency Preparedness
J. Overly       Emergency Preparedness Supervisor
J. Overly Emergency Preparedness Supervisor
D. McGee       Manager Shift Operations
D. McGee Manager Shift Operations
M. Wallace     Senior Specialist - Licensing
M. Wallace Senior Specialist - Licensing  


==LIST OF DOCUMENTS REVIEWED==
==LIST OF DOCUMENTS REVIEWED==
1EP2 Alert and Notification System Testing
===Procedures===
and Documentation
: Public Warning System Operator Guide, March 27, 2008
: WPS-29900 Series High Power Voice & Siren System Installation Manual
: WPS-29900 Series High Power Voice & Siren System Operating and Troubleshooting manual
: EPM-400, Public Notification and Alerting System Tone Alert Weather Radio Survey, November 16, 2007
: Tone Alert Weather Radio Survey, April 23, 2007
: Tone Alert Weather Radio Survey, May 8, 2006
: Harris Nuclear Plant Media Information Guide, 2007
: Harris Plant Tone Alert Radios, 2007
: Harris Nuclear Plant Safety Information Student Safety Information, 2007
: Corrective Actions - Action Request (AR)
: 274232, Siren system maintenance inadequate
: 274194, 2007 siren system full volume test results
: Records and Data
: Documentation for Siren testing and maintenance, January 2006 - December 2007
==1EP3 Emergency Response Organization Augmentation==
===Procedures===
: EPM-100, EP Program Administration, Rev. 7
: Attachment
: PEP-310, Notifications and Communications, Rev. 22
: EPM-602, Routine Maintenance and Testing of the Dialogic System, Rev. 1
: Records and Data
: ERO Roster, April 7, 2008
: Emergency Response Organization Duty Roster, 04/07/08 - 04/14/08
: Quarterly ERO Pager Test for 1
st , 2 nd , 3 rd and 4 th quarters 2006 Quarterly ERO Pager Test for 1
st and 2 nd quarters 2007
: Unannounced Augmentati on/Response drill conducted October
: 17, 2006 at 1845
: 07-04 Drill Critique Report December 4, 2007, Rev. 1 EP File #4.4, July 25, 2006 Fu ll Scale EP Drill Critique Report EP File #4.4, November 7, 2006
: Full Scale EP Drill Critique Report EP File #4.4, January 30, 2007 Full Sc ale EP Drill Critique Report, Rev. 1
: EP File #4.4, April 10, 2007 Full Sc ale EP Drill Critique Report, Rev. 1
: EP File #4.4, August 7, 2007 Full Sc ale EP Drill Critique Report, Rev. 1
: EP File #4.4, December 4, 2007 Full Scale EP Drill Critique Report, Rev. 1
: Corrective Actions - Condition Report (CR)
: 274441, Dialogic Paging System Testing not adequate
==1EP4 Emergency Action Level and Emergency Plan Changes==
===Procedures===
: PLP-201, Emergency Plan, Rev. 52
: E-Plan Changes
: PLP-201, Emergency Plan, Rev. 53 change package
: PEP-230, Control Room Operations, Rev. 15 and 16
: PEP-240, Activation and Operation of the Technical Support Center, Rev. 10


==1EP5 Correction of Emergency Preparedness Weaknesses and Deficiencies==
: EPM-100, EP Program Administration, Rev. 7
: EPM-200 ERO Training Program, Rev. 9
: EPM-210 EP Drill and Exercise Program, Rev. 12
: Audits and Self-Assessments
: HNAS 06-073, Harris NAS Emergency Preparedness Mid-Cycle Review (Report H-EP-06-01)
: HNAS-07-115, Harris Emergency Preparedness Assessment (Report H-EP-07-01)
: 247129, Root Cause Emergency Preparedness drill and objective tr acking not bei ng maintained
: 177632, Formal Benchmark Report
: 176147, ERO Training Program Effectiveness
: 216600, Emergency Plan Effectiveness Based on Post 9/11 Security Changes
: Attachment Corrective Actions - Action Request (AR)
: 2196, Alternate control room communication method needed
: 2364, HNP communications long term reliability
: 264164, Siren loss of communications
: 264876, Siren communication problems
: 265488, Inadequate procedure and training on backup phone system
: 274041, Items missing from ENMON kits during quarterly inventory
: 197858, Tone Alert Radio never received
: 206206, Missed ENS monthly phone test
: 214336, Siren losses due to power failures during storms
: 235314, Tone Alert Radio annual test failure 64.4%
: 207332, Emerging trend in full-scale drill PAR classification
: 219331, EP EALs
: OA1 Performance Indicator Verification
: REG-NGGC-0009, NRC Performance Indicators and Monthly Operating Report Data, Rev. 8
: Records and Data
: Documentation of DEP opportunities packages for 01/01/2007 - 12/31/2007
: Documentation of ANS tests, 01/01/2007 - 12/31/2007
: Documentation of drill and exercise par ticipation, 01/
: 01/2007 - 12/31/2007
: Corrective Actions - Condition Report (CR)
: 274596, EP December 2007 NRC Drill and Exercise PI Inaccurate
: 274194, 2007 Siren system full volume test results
==LIST OF ACRONYMS==
: [[ANS]] [[Alert and Notification System (]]
: [[ANS]] [[) Testing]]
: [[DEP]] [[Emergency Response Organization Drill/Exercise Performance]]
: [[EAL]] [[Emergency Action Level]]
: [[ERO]] [[Emergency Response Organization]]
: [[NEI]] [[Nuclear Energy Institute]]
: [[PI]] [[Performance Indicator]]
: [[PS]] [[Planning Standard]]
}}
}}

Latest revision as of 05:21, 22 December 2019

IR 05000400-08-501, on 04/07/2008 - 4/10/2008, Shearon Harris Nuclear Power Plant, Baseline Inspection
ML081210690
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 04/30/2008
From: Brian Bonser
NRC/RGN-II/DRS/PSB1
To: Duncan R
Carolina Power & Light Co
References
IR-08-501
Download: ML081210690 (10)


Text

ril 30, 2008

SUBJECT:

SHEARON HARRIS NUCLEAR POWER PLANT - NRC EMERGENCY PREPAREDNESS INSPECTION REPORT 05000400/2008501

Dear Mr. Duncan:

On April 10, 2008, the U.S. Nuclear Regulatory Commission (NRC) completed an Emergency Preparedness inspection at Shearon Harris Nuclear Power Plant. The enclosed inspection report documents the inspection results, which were discussed on April 10, 2008, with Mr. C.

Burton and other members of your staff.

The inspection examined activities conducted under your license as they relate to safety and compliance with the Commission=s rules and regulations and with the conditions of your license.

The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel. Based on the results of this inspection, no findings of significance were identified.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Brian R. Bonser, Chief Plant Support Branch 1 Division of Reactor Safety Docket Nos. 50-400 License Nos. NPF-63

Enclosure:

NRC Inspection Report No. 05000400/2008501 W/Attachment: Supplemental Information (

REGION II==

Docket Nos: 50-400 License Nos: NPF-63 Report Nos: 05000400/2008501 Licensee: Carolina Power and Light Company Facility: Shearon Harris Nuclear Power Plant, Unit 1 Location: New Hill, NC Dates: April 07-10, 2008 Inspector: Lee Miller, Senior Emergency Preparedness Inspector Approved by: Brian R. Bonser, Chief Plant Support Branch 1 Division of Reactor Safety

SUMMARY OF FINDINGS

IR 05000400/2008-501; 04/07/2008 - 4/10/2008; Shearon Harris Nuclear Power Plant; Baseline

Inspection.

The report covered an announced inspection by one emergency preparedness inspector. The NRC=s program for overseeing the safe operation of commercial nuclear power reactors is described in NUREG-1649, AReactor Oversight Process.@

NRC-Identified and Self-Revealing Findings

No findings of significance were identified.

Licensee-Identified Violations

.

None

REPORT DETAILS

REACTOR SAFETY

Cornerstone: Emergency Preparedness

1EP2 Alert and Notification System Testing

a. Inspection Scope

The inspector evaluated the adequacy of licensee=s methods for testing the alert and notification system in accordance with NRC Inspection Procedure 71114, Attachment 02, AAlert and Notification System Evaluation@. The applicable planning standard 10 CFR Part 50.47(b)(5) and its related 10 CFR Part 50, Appendix E, Section IV.D requirements were used as reference criteria. The criteria contained in NUREG-0654, ACriteria for Preparation and Evaluation of Radiological Emergency Response Plans and Preparedness in Support of Nuclear Power Plants,@ Revision 1, was also used as a reference.

The inspector reviewed various documents which are listed in the Attachment to this report. This inspection activity satisfied one inspection sample for the alert and notification system on an biennial basis.

b. Findings

No findings of significance were identified.

1EP3 Emergency Response Organization Augmentation

a. Inspection Scope

The inspector reviewed the licensee=s Emergency Response Organization (ERO)augmentation staffing requirements and process for notifying the ERO to ensure the readiness of key staff for responding to an event and timely facility activation. The qualification records of key position ERO personnel were reviewed to ensure all ERO qualifications were current. A sample of problems identified from augmentation drills or system tests performed since the last inspection were reviewed to assess the effectiveness of corrective actions.

The inspection was conducted in accordance with NRC Inspection Procedure 71114, 03, AEmergency Response Organization Staffing and Augmentation System.@

The applicable planning standard, 10 CFR 50.47(b)(2) and its related 10 CFR 50, Appendix E requirements were used as reference criteria.

The inspector reviewed various documents which are listed in the Attachment to this report. This inspection activity satisfied one inspection sample for the ERO staffing and augmentation system on a biennial basis.

b. Findings

No findings of significance were identified.

1EP4 Emergency Action Level and Emergency Plan Changes

a. Inspection Scope

The inspector=s review of revisions to the emergency plan, implementing procedures, and Emergency Action Level (EAL) changes was performed to determine that changes had not decreased the effectiveness of the plan. The inspector evaluated the associated 10 CFR 50.54(q) reviews associated with non-administrative emergency plan, implementing procedures, and EAL changes. The inspector reviewed Shearon Harris Emergency Plan revision 46 and changes to the implementing procedures from February 2007 to February 2008.

The inspection was conducted in accordance with NRC Inspection Procedure 71114, 04, AEmergency Action Level and Emergency Plan Changes.@ The applicable planning standard (PS), 10 CFR 50.47(b)(4) and its related 10 CFR 50, Appendix E requirements were used as reference criteria.

The inspector reviewed various documents which are listed in the Attachment to this report. This inspection activity satisfied one inspection sample for the EAL and emergency plan changes on an annual basis.

b. Findings

No findings of significance were identified.

1EP5 Correction of Emergency Preparedness Weaknesses and Deficiencies

a. Inspection Scope

The inspector reviewed the corrective actions identified through the EP program to determine the significance of the issues and to determine if repeat problems were occurring. The facility=s self-assessments and audits were reviewed to assess the licensee=s ability to be self-critical, thus avoiding complacency and degradation of their EP program. In addition, inspector reviewed licensee=s self-assessments and audits to assess the completeness and effectiveness of all EP-related corrective actions.

The inspection was conducted in accordance with NRC Inspection Procedure 71114, 05, ACorrection of Emergency Preparedness Weaknesses.@ The applicable planning standard, 10 CFR 50.47(b)(14) and its related 10 CFR 50, Appendix E requirements were used as reference criteria.

The inspector reviewed various documents which are listed in the Attachment to this report. This inspection activity satisfied one inspection sample for the correction of emergency preparedness weaknesses on a biennial basis.

Findings No findings of significance were identified.

OTHER ACTIVITIES

4OA1 Performance Indicator Verification

a. Inspection Scope

Cornerstone: Emergency Preparedness

The inspector sampled licensee submittals for three Performance Indicators (PI) listed below. For each of the submittals reviewed, the inspector reviewed the period from January 2007 through December 2007. To verify the accuracy of the PI data reported during that period, PI definitions and guidance contained in Nuclear Energy Institute (NEI) 99-02, ARegulatory Assessment Indicator Guideline,@ Revision 5, were used to verify the basis in reporting for each data element.

$ Emergency Response Organization Drill/Exercise Performance (DEP)

$ Emergency Response Organization Readiness (ERO)

$ Alert and Notification System Reliability (ANS)

The inspectors reviewed portions of the raw PI data developed from monthly performance indicator reports and discussed the methods for compiling and reporting the PIs with cognizant emergency preparedness personnel. The inspector also independently screened drill and exercise opportunity evaluations, drill participation reports, and drill evaluations. Selected reported values were calculated to verify their accuracy. The inspectors compared graphical representations from the most recent PI report to the raw data to verify that the data was correctly reflected in the report.

Reviewed documents are listed in the Attachment to this report.

b. Findings

No findings of significance were identified.

4OA6 Meetings, including Exit

On April 10, 2008, the lead inspector presented the inspection results to Mr. C. Burton and other members of your staff. The inspector confirmed that proprietary information was not provided during the inspection.

ATTACHMENT:

SUPPLEMENTAL INFORMATION

KEY POINTS OF CONTACT

Licensee personnel

C. Burton Director Site Operations

K. Henderson Plant General Manager

P. Mentel Manager Site Support Services (Acting)

C. Kamilaris Manager Nuclear Assessment

T. Pilo Fleet Coordinator - Emergency Preparedness

J. Overly Emergency Preparedness Supervisor

D. McGee Manager Shift Operations

M. Wallace Senior Specialist - Licensing

LIST OF DOCUMENTS REVIEWED