December 23, 2022 Sarah McDaniel Sr. Nuclear Engineer Shearon Harris Nuclear Power Plant Mail Code HNP03 5413 Shearon Harris Rd.

New Hill, NC 27562-9300

SUBJECT:

SHEARON HARRIS NUCLEAR PLANT - INFORMATION REQUEST FOR THE CYBER-SECURITY BASELINE INSPECTION, NOTIFICATION TO PERFORM INSPECTION 05000400/2023404

Dear Ms. McDaniel:

On March 20, 2023, the U.S. Nuclear Regulatory Commission (NRC) will begin a baseline inspection in accordance with Inspection Procedure (IP) 71130.10 Cyber-Security, Revision 0 at your Shearon Harris Nuclear Plant. The inspection will be performed to evaluate and verify your ability to provide assurance that your digital computer and communication systems and networks associated with safety, security, or emergency preparedness (SSEP) functions are adequately protected against cyber-attacks in accordance with Title 10 of the Code of Federal Regulations (10 CFR) 73.54 and the U.S. Nuclear Regulatory Commission (NRC) approved cyber security plan (CSP). The onsite portion of the inspection will take place during the week of March 20th, 2023.

Experience has shown that baseline inspections are extremely resource intensive, both for the NRC inspectors and the licensee staff. To minimize the inspection impact on the site and to ensure a productive inspection for both parties, we have enclosed a request for documents needed for the inspection. These documents have been divided into four groups.

The first group specifies information necessary to assist the inspection team in choosing the focus areas (i.e., sample set) to be inspected by the cyber-security IP. This information should be made available electronically no later than January 20, 2023. The inspection team will review this information and, by February 3, 2023, will request the specific items that should be provided for review. This second group of additional requested documents will assist the inspection team in the evaluation of the critical systems and critical digital assets (CSs/CDAs),

defensive architecture, and the areas of the licensees CSP selected for the cyber-security inspection. We request that the information provided from the second RFI be made available to the regional office prior to the inspection by March 10, 2022 The third group of requested documents consists of those items that the inspection team will review, or need access to, during the inspection. Please have this information available by the first day of the onsite inspection, March 20, 2022.

S. Daniel 2 The fourth group of information is necessary to aid the inspection team in tracking issues identified as a result of the inspection. It is requested that this information be provided to the lead inspector as the information is generated during the inspection. It is important that all these documents are up to date and complete in order to minimize the number of additional documents requested during the preparation and/or the onsite portions of the inspection.

The lead inspector for this inspection is Jonathan Montgomery. We understand that you are our regulatory contact for this inspection. If there are any questions about the inspection or the material requested, please contact the lead inspector at (404) 997-4880 or via e-mail at Jonathan.montgomery@nrc.gov.

This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, control number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control number.

In accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely, Signed by McCoy, Gerald on 12/23/22 Gerald McCoy, Branch Chief Engineering Branch 2 Division of Reactor Safety Docket Nos. 50-400 License Nos. NPF-63

Enclosure:

Shearon Harris Nuclear Plant Cyber-Security Inspection Document Request cc w/encl: Distribution via LISTSERV

S. Daniel 3

SUBJECT:

SHEARON HARRIS NUCLEAR PLANT - INFORMATION REQUEST FOR THE CYBER-SECURITY BASELINE INSPECTION, NOTIFICATION TO PERFORM INSPECTION 05000400/2023404 DATED DECEMBER 23, 2022 DISTRIBUTION:

J. Montgomery, RII W. Monk, RII G. McCoy, RII M. Fannon, RII J. Seat, RII A. Wilson, RII P. Boguszewski, RII ADAMS ML# 22355A506 OFFICE RII/DRS RII/DRS NAME J. Montgomery G. McCoy DATE 12/ 20 /2022 12/23 /2022 OFFICIAL RECORD COPY

SHEARON HARRIS NUCLEAR PLANT CYBER-SECURITY INSPECTION DOCUMENT REQUEST Inspection Report: 05000400/2023404 Inspection Dates: March 20-24, 2023 Inspection Procedure: IP 71130.10, Cyber-Security, Revision 0 (Effective: 01/01/2022)

Reference:

Guidance Document for Development of the Request for Information (RFI) and Notification Letter for Full-Implementation of the Cyber-Security Inspection, Rev. 2 (Issued: 11/22/2021)

NRC Inspectors: Jonathan Montgomery, Lead William Monk 404-997-4880 404-997-4579 jonathan.montgomery@nrc.gov david.strickland@nrc.gov NRC Contractors: Alan Konkal Trace Coleman 561-989-0210 301-415-7000 alan.konkal@nrc.gov trace.coleman@nrc.gov Enclosure

I. Information Requested for In-Office Preparation The initial request for information (i.e., first RFI) concentrates on providing the inspection team with the general information necessary to select appropriate components and CSP elements to develop a site-specific inspection plan. The first RFI is used to identify the list of critical systems and critical digital assets (CSs/CDAs) plus operational and management (O&M) security control portions of the CSP to be chosen as the sample set required to be inspected by the cyber-security IP. The first RFIs requested information is specified below in Table RFI #1. The Table RFI #1 information is requested to be provided to the regional office by January 20, 2023, or sooner, to facilitate the selection of the specific items that will be reviewed during the onsite inspection weeks.

The inspection team will examine the returned documentation from the first RFI and identify/select specific systems and equipment (e.g., CSs/CDAs) to provide a more focused follow-up request to develop the second RFI. The inspection team will submit the specific systems and equipment list to your staff by February 3, 2023, which will identify the specific systems and equipment that will be utilized to evaluate the CSs/CDAs, defensive architecture, and the areas of the licensees CSP selected for the cyber-security inspection.

We request that the additional information provided from the second RFI be made available to the regional office prior to the inspection by March 10, 2022. All requests for information shall follow the guidance document U.S. NRC - Guidance Document for Development of the Request for Information (RFI) and Notification Letter for Full Implementation of the Cyber-Security Inspection, referenced above.

2

SHEARON HARRIS NUCLEAR PLANT CYBER-SECURITY INSPECTION DOCUMENT REQUEST The required Table RFI 1 information shall be provided electronically to the lead inspector by January 20, 2023. The preferred file format for all lists is a searchable Excel spreadsheet file. The information should be indexed and hyper-linked to facilitate ease of use. If you have any questions regarding this information, please call the inspection team leader as soon as possible.

Table RFI #1 Paragraph Number/Title: IP Ref A list of all Identified Critical Systems and Critical Digital Assets, -

highlight/note any additions, deletions, reclassifications due to new 1 Overall guidance from white papers, changes to NEI 10-04, 13-10, etc. since the last cyber security inspection.

A list of EP and Security onsite and offsite digital communication 2 Overall systems.

Network Topology Diagrams to include information and data flow for 3 Overall critical systems in levels 2, 3, and 4 (If available).

4 Ongoing Monitoring and Assessment program documentation. 03.01(a) 5 The most recent effectiveness analysis of the Cyber Security Program. 03.01(b) 6 Vulnerability screening/assessment and scan program documentation. 03.01(c)

Cyber Security Incident Response documentation, including incident detection, response, and recovery documentation as well as 03.02(a) 7 contingency plan development, implementation, and including any and program documentation that requires testing of security boundary 03.04(b) device functionality.

8 Device Access and Key Control documentation. 03.02(c) 9 Password/Authenticator documentation. 03.02(c) 10 User Account/Credential and Authentication documentation. 03.02(d)

Portable Media and Mobile Device control documentation, including 11 03.02(e) kiosk security control assessment/documentation.

Design change/ modification program documentation and a list of all design changes completed since the last cyber security inspection, 12 03.03(a) including either a summary of the design change or the 50.59 documentation for the change.

Supply Chain Management documentation including any security 03.03(a),

13 impact analysis for new acquisitions. (b) and (c) 3

Table RFI #1 Paragraph Number/Title: IP Ref Configuration Management documentation including any security 03.03(a) 14 impact analysis performed due to configuration changes since the last and (b) cyber inspection.

Cyber Security Plan and any 50.54(p) analysis to support changes to 15 03.04(a) the plan since the last inspection.

16 Cyber Security Performance Metrics tracked (if applicable). 03.06(b)

Provide documentation describing any cyber security changes to the 17 Overall access authorization program since the last cyber security inspection.

Provide a list of all procedures and policies provided to the NRC with 18 Overall their descriptive name and associated number (if available).

19 Performance testing report (if applicable). 03.06(a)

In addition to the above information, please provide the following:

(1) Electronic copy of the UFSAR and technical specifications.

(2) Name(s) and phone numbers for the regulatory and technical contacts.

(3) Current management and engineering organizational charts.

Based on this information, the inspection team will identify and select specific systems and equipment (e.g., CSs/CDAs) from the information requested by Table RFI #1 and submit a list of specific systems and equipment to your staff by February 3, 2023 for the second RFI (i.e., RFI #2).

II. Additional Information Requested to be Available Prior to Inspection.

As stated in Section I above, the inspection team will examine the returned documentation requested from Table RFI #1 and submit the list of specific systems and equipment to your staff by February 3, 2023, for the second RFI (i.e., RFI #2). The second RFI will request additional information required to evaluate the CSs/CDAs, defensive architecture, and the areas of the licensees CSP selected for the cyber-security inspection. The additional information requested for the specific systems and equipment is identified in Table RFI #2. All requested information shall follow the guidance document referenced above.

The Table RFI 2 information shall be provided to the lead inspector by March 10, 2022.

The preferred file format for all lists is a searchable Excel spreadsheet. The information should be indexed and hyper-linked to facilitate ease of use. If you have any questions regarding this information, please call the inspection team leader as soon as possible.

4

SHEARON HARRIS NUCLEAR PLANT CYBER-SECURITY INSPECTION DOCUMENT REQUEST Table RFI #2 Paragraph Number/Title: Items For the system(s) chosen for inspection provide:

Ongoing Monitoring and Assessment activity performed on the 1 03.01(a) system(s).

2 All Security Control Assessments for the selected system(s). 03.01(a)

All vulnerability screenings/assessments associated with or scans 3 performed on the selected system(s) since the last cyber security 03.01(c) inspection.

Documentation (including configuration files and rules sets) for Network-based Intrusion Detection/Protection Systems (NIDS/NIPS),

4 Host-based Intrusion Detection Systems (HIDS), and Security 03.02(b)

Information and Event Management (SIEM) systems for system(s) chosen for inspection).

Documentation (including configuration files and rule sets) for intra-5 security level firewalls and boundary devices used to protect the 03.02(c) selected system(s).

Copies of all periodic reviews of the access authorization list for the 6 03.02(d) selected systems since the last cyber inspection.

7 Baseline configuration data sheets for the selected CDAs. 03.03(a)

Documentation on any changes, including Security Impact Analyses, 8 03.03(b) performed on the selected system(s) since the last inspection.

Copies of the purchase order documentation for any new equipment 9 03.03(c) purchased for the selected systems since the last inspection.

Copies of any reports/assessment for cyber security drills performed 03.02(a) 10 since the last inspection. 03.04(b)

Copy of the individual recovery plan(s) for the selected system(s) 03.02(a) 11 including documentation of the results the last time the backups were executed. 03.04(b)

Corrective actions taken as a result of cyber security incidents/issues 12 to include previous NRC violations and Licensee Identified Violations 03.05 since the last cyber security inspection.

5

III. Information Requested to be Available on First Day of Inspection For the specific systems and equipment identified in Section II above, provide the following RFI (i.e., Table Week Onsite) to the team by March 20, 2022, the first day of the inspection. All requested information shall follow the guidance document referenced above.

The preferred file format for all lists is a searchable Excel spreadsheet file. The information should be indexed and hyper-linked to facilitate ease of use. If you have any questions regarding this information, please call the inspection team leader as soon as possible.

Table Week Onsite Paragraph Number/Title: Items Any cyber security event reports submitted in accordance with 10 1 03.04(a)

CFR 73.77 since the last cyber security inspection.

Updated copies of corrective actions taken as a result of cyber security incidents/issues, to include previous NRC violations and 2 03.05 Licensee Identified Violations since the last cyber security inspection, as well as vulnerability-related corrective actions.

In addition to the above information please provide the following:

(1) Copies of the following documents do not need to be solely available to the inspection team as long as the inspectors have easy and unrestrained access to them.

a. Updated Final Safety Analysis Report (UFSAR), if not previously provided;
b. Original FSAR Volumes;
c. Original SER and Supplements;
d. FSAR Question and Answers;
e. Quality Assurance Plan;
f. Technical Specifications, if not previously provided;
g. Latest IPE/PRA Report; and 6

SHEARON HARRIS NUCLEAR PLANT CYBER-SECURITY INSPECTION DOCUMENT REQUEST (2) Vendor Manuals, Assessment and Corrective Actions:

a. The most recent Cyber-Security Quality Assurance (QA) audit and/or self-assessment; and
b. Corrective action documents (e.g., condition reports, including status of corrective actions) generate as a result of the most recent Cyber-Security Quality Assurance (QA) audit and/or self-assessment.

IV. Information Requested to Be Provided Throughout the Inspection (1) Copies of any corrective action documents generated as a result of the inspection teams questions or queries during the inspection.

(2) Copies of the list of questions submitted by the inspection team members and the status/resolution of the information requested (provided daily during the inspection to each inspection team member).

If you have any questions regarding the information requested, please contact the inspection team leader.

7