March 27, 2020

SUBJECT:

SHEARON HARRIS NUCLEAR PLANT - SECURITY BASELINE INSPECTION REPORT 05000400/2020402

Dear Mr. Faulk:

On February 27, 2020, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Shearon Harris Nuclear Plant and discussed the results of this inspection with Ms.

Kim Maza and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

/RA/

James C. Shehee, Chief Plant Support Branch Division of Reactor Safety

Docket No. 05000400 License No. NPF-63

Enclosure:

As stated

REGION II==

INSPECTION REPORT

Enclosure Docket Number:

05000400

License Number:

NPF-63

Report Number:

05000400/2020402

Enterprise Identifier: I-2020-402-0010

Licensee:

Duke Energy

Facility:

Shearon Harris Nuclear Plant

Location:

New Hill, NC

Inspection Dates:

February 24, 2020 to February 27, 2020

Inspectors:

J. Brown, Physical Security Inspector

R. Patterson, Physical Security Inspector

J. Tornow, Physical Security Inspector

Approved By:

James C. Shehee, Chief Plant Support Branch Division of Reactor Safety

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Shearon Harris Nuclear Plant, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Unless otherwise noted, baseline security inspections were conducted in accordance with the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards. Publicly available IPs are located at:

http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html.

SAFEGUARDS

71130.05 - Protective Strategy Evaluation

Protective Strategy Evaluation (2 Samples)

(1)

  • Tier I: All Requirements

(2)

  • Tier II: 14 Requirements 02.05(a), 02.06(a), (d), (f), (g), (h), (I), (j), (m), (n),02.07(a), (b), (c), and (e)
  • Tier III: 4 Requirements 02.08, 02.09(a),
(b) and 02.11(a)

71130.09 - Security Plan Changes

The inspector evaluated the security plan changes through completion of the following procedure elements: Security Plan Revision(s) completed 12/21/19 were implemented based on your determination, in accordance with 10 CFR 50.54(p)(2), that the changes resulted in no decrease in safeguards effectiveness of the security plan, and that the revised security plan changed continues to meet the requirements of 10 CFR 73.55(b). We conducted a review of the security plan changes to evaluate for potential decreases in safeguards effectiveness of the security plan. However, this review does not constitute formal NRC approval of the changes.

Therefore, these changes remain subject to future NRC inspection in their entirety.

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors confirmed that proprietary information was controlled to protect from public disclosure.

  • On February 27, 2020, the inspectors presented the security baseline inspection results to Ms. Kim Maza and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71130.05

Corrective Action

Documents

19-02258764

Condition Report

19-02261431

Condition Report

19-02291781

Condition Report

Procedures

AD-SY-ALL-0250

SECURITY EVENTS

REVISION 2

AD-SY-ALL-0560

SECURITY DRILL AND EXERCISE PROGRAM

REVISION 6

Self-Assessments 2259348

NOS Audit

71130.09

Corrective Action

Documents

19-02253819

Condition Report

19-02258999

Condition Report

19-02260053

Condition Report

Procedures

AD-SY-ALL-0101

Security Plan Revision Process,

REVISION

003

AD-SY-ALL-0130

DEVELOPMENT AND MAINTENANCE OF TARGET SETS

REVISION 2

AD-SY-ALL-620

Safety/Security Interface Program

REVISION 2

AD-SY-HNP-0205 Early Warning Assessment System (EWAS) Additional

Measures

REVISION 2