IR 05000369/2018003: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(4 intermediate revisions by the same user not shown) | |||
Line 3: | Line 3: | ||
| issue date = 11/07/2018 | | issue date = 11/07/2018 | ||
| title = Nuclear Regulatory Commission Integrated Inspection Report 05000369/2018003 and 05000370/2018003 | | title = Nuclear Regulatory Commission Integrated Inspection Report 05000369/2018003 and 05000370/2018003 | ||
| author name = Ehrhardt F | | author name = Ehrhardt F | ||
| author affiliation = NRC/RGN-II/DRP/RPB1 | | author affiliation = NRC/RGN-II/DRP/RPB1 | ||
| addressee name = Ray T | | addressee name = Ray T | ||
| addressee affiliation = Duke Energy Carolinas, LLC | | addressee affiliation = Duke Energy Carolinas, LLC | ||
| docket = 05000369, 05000370 | | docket = 05000369, 05000370 | ||
Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:UNITED STATES ember 7, 2018 | ||
==SUBJECT:== | |||
MCGUIRE NUCLEAR STATION - NUCLEAR REGULATORY COMMISSION INTEGRATED INSPECTION REPORT 05000369/2018003 AND 05000370/2018003 | |||
==Dear Mr. Ray:== | |||
On September 30, 2018, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your McGuire Nuclear Station Units 1 and 2. On October 10, 2018, the NRC inspectors discussed the results of this inspection with you and other members of your staff. | |||
The results of this inspection are documented in the enclosed report. | |||
NRC inspectors documented one Severity Level IV violation with no associated finding. The NRC is treating this violation as a non-cited violation (NCV) consistent with Section 2.3.2.a of the Enforcement Policy. If you contest the violation or significance of the NCVs, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region II; the Director, Office of Enforcement; and the NRC resident inspector at the McGuire Nuclear Station. | |||
** | This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding. | ||
Sincerely, | |||
/RA/ | |||
Frank J. Ehrhardt, Chief Reactor Projects Branch 1 Division of Reactor Projects Docket Nos.: 50-369, 50-370 License Nos.: NPF-9, NPF-17 | |||
===Enclosure:=== | |||
IR 05000369/2018003 and 05000370/2018003 | |||
==Inspection Report== | |||
Docket Numbers: 50-369, 50-370 License Numbers: NPF-9, NPF-17 Report Numbers: 05000369/2018003; and 05000370/2018003 Enterprise Identifier: I-2018-003-0041 Licensee: Duke Energy Carolinas, LLC Facility: McGuire Nuclear Station, Units 1 and 2 Location: Huntersville, NC Inspection Dates: July 1, 2018 to September 30, 2018 Inspectors: A. Hutto, Senior Resident Inspector R. Cureton, Resident Inspector S. Downey, Senior Reactor Inspector B. Collins, Reactor Inspector C. Fontana, Emergency Preparedness Inspector S. Sanchez, Senior Emergency Preparedness Inspector Approved By: Frank J. Ehrhardt, Chief Reactor Projects Branch 1 Division of Reactor Projects Enclosure | |||
=SUMMARY= | |||
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring licensees performance by conducting a quarterly baseline inspection at McGuire Nuclear Station Units 1 and 2 in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information. NRC and self-revealed findings, violations, and additional items are summarized in the table below. | |||
List of Findings and Violations Failure to Adequately Document the Basis for a Change to the Emergency Plan Cornerstone Severity Cross-cutting Report Section Aspect Not Severity Level IV (SL IV) Not 71114.04 - | |||
Applicable Non-Cited Violation (NCV)/05000369, Applicable Emergency Action 370/2018003-01 Level and Closed Emergency Plan Changes The inspectors identified a SL IV NCV of Title 10 of the Code of Federal Regulations (CFR), | |||
Part 50.54(q)(3), for changes made to the McGuire Nuclear Station (MNS) Radiological Emergency Plan (E-Plan) that failed to demonstrate the changes would not reduce the effectiveness of the E-Plan. Specifically, the licensee did not provide an adequate analysis to determine that the removal of specific procedure references was not a reduction in effectiveness of the MNS E-Plan. | |||
=PLANT STATUS= | |||
Unit 1 operated at or near 100 percent rated thermal power (RTP) for the entire inspection period. | |||
Unit 2 began the inspection period at or near 100 percent RTP. On September 15, 2018, the unit was shutdown for a scheduled refueling outage and ended the inspection period in Mode | |||
==INSPECTION SCOPES== | |||
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors performed plant status activities described in IMC 2515 Appendix D, Plant Status, and conducted routine reviews using IP 71152, Problem Identification and Resolution. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards. | |||
==REACTOR SAFETY== | |||
==71111.01 - Adverse Weather Protection Impending Severe Weather== | |||
{{IP sample|IP=IP 71111.01|count=1}} | |||
The inspectors evaluated readiness for impending adverse weather conditions for Hurricane Florence on September 10-15, 2018. | |||
==71111.04 - Equipment Alignment Partial Walkdown== | |||
{{IP sample|IP=IP 71111.04|count=4}} | |||
The inspectors evaluated system configurations during partial walkdowns of the following systems/trains: | |||
: (1) D and F instrument air (VI) compressors while the E VI compressor was out of service (OOS) for an overhaul on July 17, 2018 | |||
: (2) 2B auxiliary feedwater (CA) train while the 2A CA pump was OOS for suction relief valve replacement on July 24, 2018 | |||
: (3) 2A emergency diesel generator (EDG) while the 2B EDG was OOS for a diesel down day on August 7, 2018 | |||
: (4) 1A and 1B CA pumps while the Unit 1 turbine driven CA pump was OOS for planned maintenance on August 27, 2018 | |||
==71111.05AQ - Fire Protection Annual/Quarterly Quarterly Inspection== | |||
{{IP sample|IP=IP 71111.05AQ|count=5}} | |||
The inspectors evaluated fire protection program implementation in the following selected areas: | |||
: (1) Units 1 & 2 vital battery room (fire area 13) on September 18, 2018 | |||
: (2) control room (fire area 24) on September 19, 2018 | |||
: (3) 2A EDG room (fire area 7) on September 20, 2018 | |||
: (4) 2B EDG room (fire area 8) on September 20, 2018 | |||
: (5) auxiliary building 695 level (fire area 1) on September 20, 2018 | |||
==71111.07 - Heat Sink Performance Heat Sink== | |||
{{IP sample|IP=IP 71111.07|count=1}} | |||
The inspectors evaluated 2B component cooling water (KC) heat exchanger performance on September 24, 2018. | |||
==71111.08 - Inservice Inspection Activities== | |||
{{IP sample|IP=IP 71111.08|count=1}} | |||
The inspectors evaluated pressurized water reactor non-destructive testing by reviewing the following examinations from September 17, 2018, to September 26, 2018: | |||
: (1) Liquid Penetrant Examination a) Weld NC2FW103-13, pipe to valve weld, ASME Class 2. This included a review of associated welding activities b) Weld 2NC2FW24-3, elbow to pipe weld, ASME Class 2 c) Weld NC2FW45-5, pipe to nozzle weld, ASME Class 1. This included a review of associated welding activities | |||
: (2) Radiographic Examination a) Weld NC2FW45-5, pipe to nozzle weld, ASME Class 1. This included a review of associated welding activities | |||
: (3) Ultrasonic Examination a) Weld 2NC2FW24-3, elbow to pipe weld, ASME Class 2 b) Weld NC2FW45-5, pipe to nozzle weld, ASME Class 1. This included a review of associated welding activities. | |||
c) 2SGD-INLET, ASME Class 1 d) 2SGD-OUTLET, ASME Class 1 | |||
: (4) Visual Examination a) Reactor Vessel Head (per Code Case N-794-4) | |||
: (5) Metrology Scan a) CRDM thermal sleeves The inspectors evaluated the licensees boric acid control program performance. The inspectors also verified that no steam generator tube inspection activities were required for this refueling outage. | |||
==71111.11 - Licensed Operator Requalification Program and Licensed Operator Performance Operator Requalification== | |||
{{IP sample|IP=IP 71111.11|count=1}} | |||
The inspectors observed and evaluated two training exercises that were conducted in preparation for refueling outage M2R25. The two exercises were transient response with B train of solid state protection system (SSPS) in test and loss of residual heat removal. This evaluation was performed on August 8, 2018. | |||
===Operator Performance (1 Sample)=== | |||
The inspectors observed and evaluated Unit 2 reactor shutdown and cooldown for a refueling outage on September 15, 2018. | |||
==71111.12 - Maintenance Effectiveness Routine Maintenance Effectiveness== | |||
{{IP sample|IP=IP 71111.12|count=2}} | |||
The inspectors evaluated the effectiveness of routine maintenance activities associated with the following equipment and/or safety significant functions: | |||
: (1) Breaker 1ETA-6 closing springs not charged (1A containment spray pump), Nuclear condition report (NCR) 2225857 | |||
: (2) E instrument air (VI) compressor tripped multiple times during functional testing NCR | |||
===2221353 | |||
==71111.13 - Maintenance Risk Assessments and Emergent Work Control== | |||
{{IP sample|IP=IP 71111.13|count=6}} | |||
The inspectors evaluated the risk assessments for the following planned and emergent work activities: | |||
: (1) Equipment protection plan for the 1B charging (NV) pump OOS for planned maintenance, on July 10, 2018 | |||
: (2) Equipment protection plan for the 2A decay heat removal (ND) train OOS for 2ND-68A actuator replacement, on July 17, 2018 | |||
: (3) Equipment protection plan for the 2A nuclear service water train OOS for strainer maintenance, on July 24, 2018 | |||
: (4) Equipment protection plan for the 1B EDG OOS for diesel down day maintenance, on August 14, 2018 | |||
: (5) Equipment protection plan for the Unit 1 CA pump planned maintenance, on August 27, 2018 | |||
: (6) Equipment protection plan for the standby shutdown facility (SSF) diesel generator planned maintenance, on August 29-30, 2018 | |||
==71111.15 - Operability Determinations and Functionality Assessments== | |||
{{IP sample|IP=IP 71111.15|count=5}} | |||
The inspectors evaluated the following operability determinations and functionality assessments: | |||
: (1) 2A EDG BL relay in panel 2EQCPNDGP2A was missing one of four mounting screws (NCR 2216961), on July 11, 2018 | |||
: (2) Unqualified sealant used in containment (NCR 2220979), on July 30, 2018 | |||
: (3) Lack of temperature rating documentation for motor control centers in the diesel generator room (NCR 2223373), on August 13, 2018 | |||
: (4) 2B EDG governor oil leak at servo booster (NCR 2233366), on September 26, 2018 | |||
: (5) 1B containment spray pump vent piping leakage (NCR 2232463), on September 26, 2018 | |||
==71111.18 - Plant Modifications== | |||
{{IP sample|IP=IP 71111.18|count=1}} | |||
The inspectors evaluated the following permanent modification: | |||
: (1) Engineering change (EC) 112053, Electrical Supplemental Power System (ESPS)/Tie-in to Unit 2 Turbine Building Infrastructure MNS, on September 23, 2018 | |||
==71111.19 - Post Maintenance Testing== | |||
{{IP sample|IP=IP 71111.19|count=6}} | |||
The inspectors evaluated the following post maintenance tests: | |||
: (1) PT/1/A/4403/002 B, RN Train B Valve Stroke Timing -Quarterly, following mechanical and electrical preventive maintenance on 1RN-238, on July 11, 2018 | |||
: (2) PT/2/A/4204/002 A, ND Train A Valve Stroke Timing - Quarterly, following actuator replacement on 2ND-68, on July 17, 2018 | |||
: (3) PT/1/A/4350/002 B, Diesel Generator 1B Operability Test, following preventative maintenance, on August 14, 2018 | |||
: (4) PT/2/A/4350/002 B, Diesel Generator 2B Operability Test, following timer calibration on September 4, 2018 | |||
: (5) OP/2/A/6350/002, Diesel Generator, following outage maintenance activities on the 2B DG on September 25, 2018 | |||
: (6) TT/0/A/112501/002, Unit 2 ESPS Dynamic Testing, following tie-in of the ESPS diesels to the Unit 2 electrical distribution system on September 27, 2018 | |||
==71111.20 - Refueling and Other Outage Activities (1/2 Sample) | |||
The inspectors evaluated refueling outage M2R25 activities from September 15, 2018, to September 30, 2018. | |||
==71111.22 - Surveillance Testing The inspectors evaluated the following surveillance tests: Routine==== | |||
{{IP sample|IP=IP 71111.20|count=4}} | |||
: (1) PT/1/A/4350/002 A, Diesel Generator 1A Operability Test, on July 31, 2018 | |||
: (2) PT/1/A/4252/028 A, Slave Start CA Pump 1A, on August 1, 2018 | |||
: (3) PT/2/A/4350/036 B, 2B Diesel Generator 24 hour Run, on August 6, 2018 | |||
: (4) PT/2/A/4600/003 B, Daily Surveillance Items, on September 2, 2018 In-service === | |||
{{IP sample|IP=IP 22213|count=1}} | |||
: (1) PT/2/A/4252/001 B, 2B CA Pump Performance Test, on September 11, 2018 EMERGENCY PREPAREDNESS | |||
==71114.02 - Alert and Notification System Testing== | |||
{{IP sample|IP=IP 71114.02|count=1}} | |||
The inspectors evaluated the maintenance and testing of the alert and notification system during the week of August 27, 2018. | |||
==71114.03 - Emergency Response Organization Staffing and Augmentation System== | |||
{{IP sample|IP=IP 71114.03|count=1}} | |||
The inspectors evaluated the readiness of the Emergency Response Organization during the week of August 27, 2018. | |||
==71114.04 - Emergency Action Level and Emergency Plan Changes== | |||
{{IP sample|IP=IP 71114.04|count=1}} | |||
The inspectors evaluated submitted Emergency Action Level, Emergency Plan, and Emergency Plan Implementing Procedure changes during the week of August 27, 2018. | |||
This evaluation does not constitute NRC approval. | |||
==71114.05 - Maintenance of Emergency Preparedness== | |||
{{IP sample|IP=IP 71114.05|count=1}} | |||
The inspectors evaluated the maintenance of the emergency preparedness program during the week of August 27, | |||
==OTHER ACTIVITIES - BASELINE== | |||
===71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below for the period from July 2017, through June 2018. === | |||
{{IP sample|IP=IP 71151|count=9}} | |||
: (1) secondary heat removal | |||
: (2) residual heat removal | |||
: (3) cooling water | |||
: (4) drill and exercise performance | |||
: (5) emergency response organization drill participation | |||
: (6) alert and notification system reliability | |||
==71152 - Problem Identification and Resolution Annual Follow-up of Selected Issues== | |||
{{IP sample|IP=IP 71152|count=1}} | |||
The inspectors reviewed the licensees implementation of its corrective action program related to the following issue: | |||
: (1) 1B emergency diesel generator failed to maintain voltage during a slow start, NCR | |||
==OTHER ACTIVITIES== | |||
- TEMPORARY INSTRUCTIONS, INFREQUENT AND ABNORMAL 71003 - License Renewal Activities (Phase 1) | |||
The inspectors observed and reviewed the implementation of the following license renewal activities (listed by aging management program) from September 24 - 28, 2018: | |||
: (1) Inservice Inspection Program a) Ultrasonic examination of 6 safety injection system pipe-to-elbow and elbow-to-pipe welds 2NI2F446 and 2NI2F447 | |||
: (2) Liquid Waste System Inspection Program a) Visual inspection of 1 liquid waste system valve 2WL-385 internals | |||
: (3) Flow-Accelerated Corrosion Program a) UT inspection of 30 condensate system elbow 2CMEC0010 | |||
: (4) Refueling Water Storage Tank Internal Coating Inspection Program a) Ultrasonic examination of refueling water storage tank bottom, 2FWTK0001 b) Remote visual examination of refueling water storage tank bottom, 2FWTK0001 | |||
==INSPECTION RESULTS== | |||
Failure to Adequately Document the Basis for a Change to the Emergency Plan Cornerstone Severity Cross-cutting Aspect Report Section Emergency Severity Level IV (SL IV) Not Applicable | |||
==71114.04 - Preparedness Non-Cited Violation (NCV) Emergency Action | |||
== | |||
05000369,370/2018003-01 Level and Closed Emergency Plan Changes | |||
=====Introduction:===== | |||
The inspectors identified a SL IV NCV of Title 10 of the Code of Federal Regulations (CFR), Part 50.54(q)(3), for changes made to the McGuire Nuclear Station (MNS) | |||
Radiological Emergency Plan (E-Plan) that failed to demonstrate the changes would not reduce the effectiveness of the E-Plan. Specifically, the licensee did not provide an adequate analysis to determine that the removal of specific procedure references was not a reduction in effectiveness of the MNS E-Plan. | |||
=====Description:===== | |||
While performing a detailed review of a change to the MNS E-Plan, the inspectors identified multiple occurrences of specific references to emergency plan implementing procedures being removed. These references were replaced with generic language, e.g., replacing Emergency Planning Implementing Procedure, HP/0/B/1009/023 (Environmental Monitoring for Emergency Conditions) lists locations to a procedure lists locations, and HP/0/B/1009/003, Recovery Plan, provides a plan with A Recovery Plan will be developed, based on event, to provide a plan. The inspectors found in the 50.54(q) change documentation, that the licensee categorized these changes as administrative or editorial in nature. By categorizing the changes as administrative, an analysis to determine whether the changes were a reduction in effectiveness to the E-Plan was not conducted. The inspectors determined that these changes were more than administrative and therefore required an analysis be performed because the removal of specific procedural reference could delay the ERO in the performance of their duties. | |||
Corrective Action(s): The licensee entered the issue into the corrective action program. | |||
Corrective Action Reference: NCR 02228278 | |||
=====Performance Assessment:===== | |||
The licensees failure to provide an analysis demonstrating that changes to the emergency plan was not a reduction in effectiveness was determined to impede the NRCs ability to perform its regulatory function and is dispositioned using the Traditional Enforcement process. | |||
=====Enforcement:===== | |||
Severity: This finding is a violation of NRC requirements because it had the potential for impacting the NRCs ability to perform its regulatory function. Therefore, traditional enforcement is applicable, in accordance with Inspection Manual Chapter 0611 and 0612, Appendix B, Figure 2. This finding is determined to be a SL IV violation in accordance with Section 6.6.d.1 of the Enforcement Policy because it involves the licensees ability to meet or implement a regulatory requirement not related to assessment or notification such that the effectiveness of the emergency plan is reduced. | |||
Violation: Title 10 of the Code of Federal Regulations, Part 50.54(q)(3) states, in part, that a licensee may make changes to its emergency plan without NRC approval only if the licensee performs and retains an analysis demonstrating that the changes do not reduce the effectiveness of the plan and the plan, as changed, continues to meet the requirements in Appendix E to this part. | |||
Contrary to the above, as of August 31, 2018, the licensee failed to perform an analysis demonstrating that changes to their E-Plan did not reduce the effectiveness of the plan. | |||
Specifically, the licensee did not provide an analysis to determine whether the removal of specific procedure references was not a reduction in effectiveness of the approved MNS E-Plan. | |||
Disposition: This violation is being treated as an NCV, consistent with Section 2.3.2 of the Enforcement Policy. | |||
==EXIT MEETINGS AND DEBRIEFS== | |||
The inspectors verified no proprietary information was retained or documented in this report. | |||
The inspectors confirmed that proprietary information was controlled to protect from public disclosure. | |||
* On October 10, 2018, the inspector presented the inspection results to Mr. Thomas Ray, and other members of the licensee staff. | |||
* The emergency preparedness inspectors held a subsequent exit on October 24, 2018. | |||
=DOCUMENTS REVIEWED= | |||
71111.01: Adverse Weather Protection | |||
RP/0/B/5700/027, Severe Weather Preparation | |||
OP/0/B/6100/031, Response to Local Intense Precipitation (LIP) or Probable Maximum Flood | |||
(PMF) External Flooding Event | |||
71111.04: Equipment Alignment | |||
MCFD-2592-01.01, Unit 2, Flow Diagram of Auxiliary Feedwater System | |||
OP/2/A/6350/002, Diesel Generator | |||
OP/1/A/6250/002, Auxiliary Feedwater System | |||
MCFD-1592-01.01, Unit 1, Flow Diagram of Auxiliary Feedwater System | |||
71111.05AQ: Fire Protection Annual/Quarterly | |||
MCS-1465.00-00-0008, Design Basis Specification for Fire Protection | |||
MCS-1465.00-00-0022, Appendix R Safe Shutdown Analysis | |||
MCC-1435.00-00-0059, NFPA 805 - Appendix R Safe Shutdown Deterministic Analysis | |||
AD-EG-ALL-1520, Transient Combustible Control | |||
FS/2/B/9000/007, Unit 2 2A Diesel Generator Room Fire Strategy #7 | |||
FS/2/B/9000/008, Unit 2 2B Diesel Generator Room Fire Strategy #8 | |||
FS/0/B/9000/001, Auxiliary Building 695 Fire Strategy #1 | |||
MFSD-009, Unit 1 Electrical Penetration Room | |||
MFSD-007, Unit 2 2A Diesel Generator Room | |||
MFSD-008, Unit 2 2B Diesel Generator Room | |||
MFSD-001, Auxiliary Building 695 Level | |||
71111.07: Heat Sink Performance | |||
MP/0/A/7700/013, Component Cooling System (KC) Maintenance | |||
WO 20183878, Clean/Inspect/Eddy Current Test 2B KC Heat Exchanger | |||
MG-NDE-ET-002, 2B KC Heat Exchanger Eddy Current Report | |||
71111.08: Inservice Inspection Activities | |||
Procedures | |||
AD-EG-PWR-1611, Boric Acid Corrosion Control Program - Implementation, Revision 2 | |||
MP/0/A/7700/080, Inspection, Assessment, and Cleanup of Boric Acid on Plant Materials, | |||
Revision 022 | |||
NDE-10, General Radiography Procedure, Revision 26 | |||
NDE-NE-ALL-4101, Liquid Penetrant Examination, Revision 1 | |||
NDE-NE-ALL-6102, Utilization of PDI-UT-2 Generic Procedure for the Ultrasonic Examination | |||
of Austenitic Pipe Welds, Revision 1 | |||
NDE-NE-ALL-7202, Visual Examination of PWR Reactor Pressure Vessel Upper Head | |||
Penetrations, Revision 2 | |||
Calculations | |||
MCC-1201.01.00-0064, EDY and RIY Calculation to Determine Reactor Vessel Head | |||
Inspection Requirements, Revision 010 | |||
Drawings: | |||
MC-2414-03.20-0, Piping Layout, Reactor Coolant (NC) System Plan Quad 0-90o Reactor | |||
Building, Revision 24 | |||
ISO Drawing No. MCFI-2NC103, Revision 2 | |||
ISO Drawing No. MCFI-2NC45, Revision 12 | |||
NDE Examiner Qualifications: | |||
Day & Zimmerman Certification Record (McCray): Liquid Penetrant Level II, dated July 6, 2017 | |||
Duke Energy Certificate of Method Qualification (Sanders): Liquid Penetrant Level II, dated | |||
August 14, 2018 | |||
Duke Energy Certificate of Method Qualification (Sherrill): Liquid Penetrant Level II, dated June | |||
8, 2017 | |||
Duke Energy Certificate of Method Qualification (Jones): Radiographic Testing Level II, dated | |||
March 12, 2016 | |||
Duke Energy Certificate of Method Qualification (Gantt): Radiographic Testing Level II, dated | |||
September 15, 2015 | |||
Sonic Systems International Certificate of Method Qualification (Healey), Visual Testing Level | |||
III, dated August 8, 2018 | |||
Sonic Systems International Certificate of Method Qualification (Hill), Visual Testing Level II, | |||
dated August 8, 2018 | |||
Sonic Systems International Certificate of Method Qualification (Regan), Ultrasonic Level II, | |||
dated June 8, 2017 | |||
System One Certificate of Method Qualification (Williams), Ultrasonic Level II, dated September | |||
13, 2015 | |||
System One Certificate of Method Qualification (McDonnell), Radiographic Testing Level II, | |||
dated September 8, 2016 | |||
System One Certificate of Method Qualification (Harmon), Ultrasonic Level II, dated November | |||
18, 2015 | |||
Condition Reports | |||
NCRs: 02114069, 02116222, 02117180, 02118108, 02118551, 02121319, 02121803, | |||
2122329, 02123821, 02172332, 02219569, 02224655 | |||
Miscellaneous Documents | |||
EC412897, MNS U2 RVCH Thermal Sleeve Replacement, Revision 0 | |||
Focused Self-Assessment Report AR #01985576, Boric Acid Control Program - Implementation | |||
Procedure Effectiveness | |||
McGuire Unit 2 Steam Generators, M2R25 Skipped Inspection Cycle Outage Review, Revision | |||
MNS-2018-03-29-04, Reactor Vessel Closure Head (RVCH) Surface Visual (VE), Revision 0 | |||
Inspection Report No. PT-18-005, dated September 17, 2018 | |||
Inspection Report No. UT-17-011, dated April 26, 2017 | |||
Inspection Report No. UT-18-002, dated September 18, 2018 | |||
Inspection Report No. VT-17-041, dated April 14, 2017 | |||
Inspection Report No. DEM2_NCFW 45-5_2017-04-09, dated April 9, 2017 | |||
Welder Continuity Report for Welders: F7211, I8275, O8835 | |||
Welder Performance Qualification Test Records for Welders: F7211, I8275, O8835 | |||
Work Orders: 20151614, 20209068 | |||
71111.11: Licensed Operator Requalification Program and Licensed Operator | |||
Performance | |||
AD-OP-ALL-1000, Conduct of Operations | |||
NSD 509, Site Standards in Support of Operational Focus | |||
OMP 4.3, Use of Emergency and Abnormal Procedures and FLEX Support Guidelines | |||
SOMP 01-07, Control Room Oversight | |||
OP/2/A/6100/002, Controlling Procedure for Unit Shutdown | |||
OP/2/A/6100/SD-7, Cooldown to 200 Degrees F | |||
OP/2/A/6100/SD-6A, Placing train A ND in Service | |||
71111.12: Maintenance Effectiveness | |||
AD-EG-ALL-1204, Single Point Vulnerability Identification, Elimination and Mitigation | |||
AD-EG-ALL-1206, Equipment Reliability Classification | |||
AD-EG-ALL-1209, System, Component, and Program Health Reports and Notebooks | |||
AD-EG-ALL-1210, Maintenance Rule Program | |||
AD-EG-ALL-1211, System Performance Monitoring and Trending | |||
Duke Equipment Reliability Maintenance Rule Database | |||
71111.13: Maintenance Risk Assessments and Emergent Work Control | |||
NSD-213, Risk Management Process | |||
NSD-415, Operational Risk Management (Modes 1-3) per 10 CFR 50.65(a)(4) | |||
SOMP 02-02, Operations Roles in the Risk Management Process | |||
OMP 13-7, Operational Control of Protected Equipment | |||
AD-OP-ALL-0201, Protected Equipment | |||
71111.15: Operability Determinations and Functionality Assessments | |||
AD-OP-ALL-0102, Operability Decision Making | |||
AD-OP-ALL-0105, Operability Determinations and Functionality Assessment | |||
71111.18: Plant Modifications | |||
Engineering change EC 112053, Electrical Supplemental Power System (ESPS)/Tie-in to | |||
Unit 2 Turbine Building Infrastructure MNS | |||
TT/0/A/112501/002, Unit 2 ESPS Dynamic Testing | |||
AR 2021966, 10 CFR 50.59 Screen for EC 112503 | |||
71111.19: Post-Maintenance Testing | |||
AD-EG-ALL-1155, Post Modification Testing | |||
PT/1/A/4403/002 B, RN Train B Valve Stroke Timing -Quarterly | |||
PT/2/A/4204/002 A, ND Train A Valve Stroke Timing - Quarterly | |||
PT/1/A/4350/002 B, Diesel Generator 1B Operability Test | |||
PT/2/A/4350/002 B, Diesel Generator 2B Operability Test | |||
OP/2/A/6350/002, Diesel Generator | |||
TT/0/A/112501/002, Unit 2 ESPS Dynamic Testing | |||
71111.22: Surveillance Testing | |||
AD-EG-ALL-1202, Preventive Maintenance and Surveillance Testing Administration | |||
AD-WC-ALL-0250, Work Implementation and Completion | |||
AD-EG-ALL-1720, In-service Testing (IST) Program Implementation | |||
71114.02: Alert and Notification System Evaluation | |||
Procedures | |||
PT/0/A/4600/103A, Siren System Availability (Silent Test), Rev. 4 | |||
PT/0/A/4600/103B, Siren System Quarterly Test, Rev. 3 | |||
PT/0/A/4600/103C, Siren System Annual Preventive Maintenance Review, Rev. 2 | |||
FEMA Report - Analysis of the Prompt Alert and Notification System, dated 12/8/86 | |||
FEMA Back-up ANS letter, November 2012 | |||
CentrAlert Guardian User Manual, Rev. 2.0, July 2007 | |||
CentrAlert Guardian Administration Manual, Rev. 2.0, July 2007 | |||
Emergency Area Functional Area Manual, Section 3.3, Alert and Notification System (Siren | |||
Program), Rev. 16 | |||
Records and Data | |||
Siren System Annual Preventive Maintenance records for 2017 and 2018 | |||
Quarterly and Bi-weekly Activation Results from September 2017 through June 2018 | |||
Annual RTU and Battery Preventative Maintenance from 1/13/17 to 5/2/17 | |||
McGuire Nuclear Station 2017-2018 Emergency Preparedness School Visitors brochure | |||
McGuire Nuclear Station 2018 Emergency Preparedness Information Calendar | |||
Corrective Action Program Documents (Nuclear Condition Reports) | |||
NCR 02089244, Siren failed scheduled silent test 1/3/17 | |||
NCR 02091101, 1st Quarter 2017 Full Cycle siren test | |||
NCR 02116360, MNS 2nd Quarter 2017 Full Cycle siren test | |||
NCR 02131345, Siren #15 out of service | |||
NCR 02134444, Siren #15 reported failure on 6/13/17 test-retest | |||
NCR 02157435, Siren#1 reported failure during Quarterly test | |||
NCR 02181655, Siren#57 reported failure during 2/1/18 silent test | |||
NCR 02197892, MNS siren 52 failed Quarterly test | |||
NCR 02198099, Siren #52 out-of-service | |||
71114.03: Emergency Response Organization Staffing and Augmentation System | |||
Procedures | |||
AD-EP-ALL-0002, NRC Regulatory Assessment Performance Indicator Guideline Emergency | |||
Preparedness Cornerstone, Rev. 14 | |||
AD-EP-ALL-0500, Emergency Response Training, Rev. 1 | |||
AD-EP-ALL-0501, Emergency Preparedness Staff Training and Qualification, Rev. 02 | |||
Records and Data | |||
MNS Drill 17-05, Critique report, 12/06/2017 | |||
MNS Drill 17-06, Critique Report, 12/13/2017 | |||
MNS Drill 18-01, Critique Report, 2/27/2018 | |||
MNS Drill 18-02, Critique Report, for drill on 03/15/2018 | |||
Quick Cause Evaluation Report, 02060853-02, Emergency Preparedness Program | |||
MNS-OSSA-12212012, McGuire Nuclear Station On-Shift Staffing Analysis (OSSA) Report, | |||
Rev. 1, dated 12/13/125/22/2018 | |||
Various EP staff and ERO member training records | |||
Corrective Action Program Documents | |||
NCR 02060853, Adherence to standards and drill critique gaps identified | |||
NCR 02081894, Team ERO drill on 11-29-16 | |||
NCR 02091193, EOF ERO Performance issues critiqued for Oconee Graded Ex | |||
NCR 02097125, MNS ERO augmentation drill on 2-1-17 | |||
NCR 02097207, Activation of the JIC for ERO notification | |||
NCR 02100356, New ERO Member did not receive ERONS test | |||
NCR 02109724, ERO Training Expiration | |||
NCR 02122505, KPI for Drill and Exercise Performance changed to Yellow | |||
NCR 02142735, TSC equipment issues identified during NRC graded exercise | |||
NCR 02142932, MNS Exercise Off-site JIC FEMA, 8-8-17 | |||
NCR 02157833, Two EOF Drill Participants were not shows for RNP Drill | |||
NCR 02172808, Evaluate/Determine Required ERO Muster Meeting Attendees | |||
NCR 02188290, EP Agreement Letter Requirement Not Performed | |||
NCR 02213964, Internet outage affecting nuclear ERO applications | |||
NCR 02228278, NRC EP inspection issues related to Emergency Plan | |||
71114.04: Emergency Action Level and Emergency Plan Changes | |||
Procedures | |||
AD-EP-ALL-0501, Emergency Preparedness Staff Training & Qualifications, Rev. 1 | |||
AD-EP-ALL-0502, Emergency Preparedness 10 CFR 50.54(q) Training Requirements, Rev. 1 | |||
AD-EP-ALL-0602, Emergency Plan Change Screening & Effectiveness Evaluations 10 CFR | |||
50.54(q), Rev. 1 | |||
AD-EP-ALL-0602, Emergency Plan Change Screening & Effectiveness Evaluations 10 CFR | |||
50.54 (q), Rev. 5 | |||
McGuire Emergency Plan, Rev. 16-3, 16-4, & 16-5 | |||
RP/0/A/5700/000, Classification of Emergencies, Rev. 029 | |||
RP/0/A/5700/018, Notifications to the State & Counties from the TSC, Rev. 031 | |||
RP/0/B/5700/029, Notifications to Offsite Agencies from the Control Room, Rev. 022 | |||
Nuclear Policy Manual-Volume 2, Appendix B.110, Nomination Letter Format for Qualified | |||
Reviewers (for E-Plan reduction in effectiveness review process (50.54(q)) and associated | |||
training records for nominees | |||
Change Packages | |||
CFR 50.54(q) Screening Evaluation Form for RP/0/A/5700/000, Rev. 029, dated 6/1/17 | |||
Records and Data | |||
CFR 50.54(q) Screening Evaluation Form for MNS Emergency Plan Section N, Exercises | |||
and Drills, Rev. 17-1, dated 8/24/17 | |||
CFR 50.54(q) Screening Evaluation Form for MNS Emergency Plan Section O, Radiological | |||
Emergency Respirator Training, Rev. 17-1, dated 8/24/17 | |||
CFR 50.54(q) Screening Evaluation Form for MNS Emergency Plan Section P.9, dated | |||
9/6/17 | |||
CFR 50.54(q) Screening Evaluation Form for MNS Emergency Plan Section Q, Appendices, | |||
Rev. 17-1, dated 8/24/17 | |||
CFR 50.54(q) Screening Evaluation Form for MNS Emergency Plan Section F, Emergency | |||
Communicator, Rev. 17-1, dated 9/7/17 | |||
CFR 50.54(q) Screening Evaluation Form for MNS Emergency Plan Section H, Emergency | |||
Facilities and Equipment, dated 9/7/17 | |||
CFR 50.54(q) Screening Evaluation Form for MNS Emergency Plan Section I, Accident | |||
Assessment, Rev. 17-1, dated 8/24/17 | |||
CFR 50.54(q) Screening Evaluation Form for MNS Emergency Plan, ML-Administration - E- | |||
Plan-Manual, Rev. 18, dated 6/4/18 | |||
CFR 50.54(q) Screening Evaluation Form for MNS Emergency Plan Section ML- | |||
Administration- E-Plan-Manual, App. 1, dated 10/25/17 | |||
CFR 50.54(q) Effectiveness Evaluation Form for MNS Emergency Plan, ML-Administration - | |||
E-Plan-Manual, dated 10/25/17 | |||
CFR 50.54(q) Effectiveness Evaluation Form for MNS Emergency Plan, ML-Administration - | |||
E-Plan-Manual, Section I.1, dated 1/8/18 | |||
CFR 50.54(q) Effectiveness Evaluation Form for MNS Emergency Plan, ML-Administration - | |||
E-Plan-Manual, Section I.9, dated 1/10/18 | |||
CFR 50.54(q) Screening Evaluation Form for MNS Emergency Plan Section A, Rev. 18-2, | |||
Section A, Rev. Assignment of Responsibility, dated 5/14/18 | |||
CFR 50.54(q) Screening Evaluation Form for MNS Emergency Plan Section B, Transfer On- | |||
shift Dose Assessment to Operations, Rev. 18-2, dated 3/21/18 | |||
CFR 50.54(q) Effectiveness Evaluation Form for MNS Emergency Plan Section B, Transfer | |||
On-shift Dose Assessment to Operations, Rev. 18-2, dated 3/21/18 | |||
CFR 50.54(q) Screening Evaluation Form for MNS Emergency Plan Section G, Public | |||
Education and Information, Rev. 18-2, dated 5/13/18 | |||
CFR 50.54(q) Effectiveness Evaluation Form for MNS Emergency Plan Section G, Public | |||
Education and Information, Rev. 18-2, dated 5/14/18 | |||
CFR 50.54(q) Screening Evaluation Form for MNS Emergency Plan Section H, Emergency | |||
Facility and Equipment, Rev. 18-2, dated 5/14/18 | |||
CFR 50.54(q) Effectiveness Evaluation Form for MNS Emergency Plan Section H, | |||
Emergency Facility and Equipment, Rev. 18-2, dated 5/14/18 | |||
CFR 50.54(q) Screening Evaluation Form for MNS Emergency Plan Section I, Accident | |||
Assessment, Rev. 18-2, dated 5/14/18 | |||
CFR 50.54(q) Effectiveness Evaluation Form for MNS Emergency Plan Section I, Accident | |||
Assessment, Rev. 18-2, dated 5/17/18 | |||
CFR 50.54(q) Screening Evaluation Form for MNS Emergency Plan Section J, Protective | |||
Resp., Rev. 18-2, dated 5/17/18 | |||
CFR 50.54(q) Effectiveness Evaluation Form for MNS Emergency Plan Section J, Protective | |||
Resp., Rev. 18-2, dated 5/17/18 | |||
CFR 50.54(q) Screening Evaluation Form for MNS Emergency Plan Section L, Medical and | |||
Public Health Support, Rev. 18-2, dated 5/8/18 | |||
CFR 50.54(q) Screening Evaluation Form for MNS Emergency Plan Section M, .Recovery | |||
and Re-entry planning and Post Accident Operations, Rev. 18-2, dated 5/17/18 | |||
CFR 50.54(q) Screening Evaluation Form for MNS Emergency Plan Section Q, Appendix 6, | |||
dated 5/17/18, Rev. 18-2, dated 5/17/18 | |||
Corrective Action Program Documents | |||
NCR 02053399, NRC Baseline Inspection Minor Violation | |||
NCR 02069320, NEI 99-01R6 Emergency Action Level (EAL) upgrade | |||
NCR 02103672, Conflicting information in Emergency Plan | |||
NCR 02141070, EAL classification question - application of unisolable criteria | |||
NCR 02146235, OSC performed issues noted during MNS graded exercise | |||
NCR 02186884, Latest Emergency Plan revision does not contain correct SPCC Plan | |||
NCR 02187191, 50.54q evaluation not performed on MNS EP changes | |||
NCR 02204660, Emergency Plan update information from Revision 17-1 was omitted in | |||
Revision 18-1 | |||
71114.05: Maintenance of Emergency Preparedness | |||
AD-EP-ALL-0105, Activation & Operation of the Technical Support Center, Rev. 1 | |||
AD-EP-ALL-0106, Activation & Operation of the Operations Support Center, Rev. 1 | |||
AD-EP-ALL-0801, Design & Development of Drills and Exercises, Rev. 5 | |||
AD-EP-ALL-0802, Conducting Drills & Exercises, Rev. 4 | |||
AD-EP-ALL-0803, Evaluation & Critique of Drills and Exercises, Rev. 4 | |||
AD-EP-MNS-0105, MNS Site Specific TSC Support, Rev. 001 | |||
AD-EP-MNS-0106, MNS Site Specific OSC Support, Rev. 001 | |||
AD-NO-ALL-1001, Conduct of Audit, Rev. 5 | |||
AD-PI-ALL-0100, Corrective Action Program, Rev. 18 | |||
AD-PI-ALL-0300, Self-Assessment & Benchmark Programs, Rev. 4 | |||
PD-EP-ALL-0800, Drills & Exercises Program, Rev. 5 | |||
PT/0/A/4600/088, Functional Check of Emergency Vehicle & Equipment, Rev. 010 | |||
Records and Data | |||
2016-FLEET-EMP-PR-01, NOS Fleet Emergency Preparedness Performance Review, dated | |||
1/5/17 | |||
2017-MNS-EMP-PR-01, NOS - Audit McGuire Emergency Preparedness Performance, dated | |||
5/25/17 | |||
2018-MNS-EMP-01, NOS - Audit MNS Emergency Preparedness, dated 3/6/18 | |||
Critique Report for Drill 16-03, dated 9/1/16 | |||
Critique Report for Drill 16-04, dated 11/8/16 | |||
Critique Report for Drill 16-05, dated 1/17/17 | |||
Critique Report for Drill 17-01, dated 2/16/17 | |||
KLD TR-501, MNS Development of Evacuation Time Estimates Final Report, Rev. 1, Dec. 2012 | |||
KLD TR-961, MNS 2017 Population Update Analysis Final Report, Rev. 0, dated 10/16/17 | |||
McGuire Nuclear Station Agreement Letters | |||
McGuire Nuclear Station Drill 17-02 Critique Report, dated 6/20/17 | |||
McGuire Nuclear Station Drill 17-04 Critique Report, dated 8/31/17 | |||
McGuire Nuclear Station Drill 17-05 Critique Report, dated 12/14/17 | |||
McGuire Nuclear Station Drill 17-06 Critique Report, dated 1/11/18 | |||
PT/0/A/4600/088, Functional Check of Emergency Vehicle & Equipment, dated 12/21/17 | |||
PT/0/A/4600/088, Functional Check of Emergency Vehicle & Equipment, dated 2/12/18 | |||
PT/0/A/4600/088, Functional Check of Emergency Vehicle & Equipment, dated 3/5/18 | |||
PT/0/A/4600/088, Functional Check of Emergency Vehicle & Equipment, dated 4/19/18 | |||
PT/0/A/4600/088, Functional Check of Emergency Vehicle & Equipment, dated 6/18/18 | |||
Self-Assessment Report 02119506-05, 2017 Emergency Preparedness Graded Exercise | |||
Readiness Self-Assessment, dated 7/27/17 | |||
Self-Assessment Report 2157616, MNS EP Self-Assessment to Prepare for the NRC Program | |||
Audit, dated 5/31/18 | |||
Corrective Action Documents | |||
NCR 02124558, Changes to ERO Drill after validation | |||
NCR 02127108, NRC identified - simulator controller/evaluator performance | |||
NCR 02142733, 2017 MNS Graded Exercise - unsatisfactory demonstration criteria | |||
NCR 02142735, TSC equipment issues identified during NRC Graded Exercise | |||
NCR 02172626, Delay in emergency notification due to inadequate system | |||
NCR 02184867, EP Drill 2/14/18 failed Objective E04 NRC notification | |||
NCR 02188290, EP agreement letter requirement not performed | |||
NCR 02195944, MNS TSC declared non-functional due to planned HVAC modification | |||
NCR 02198818, Onsite TSC 0VHTK0015 dedicated power source | |||
71151: Performance Indicator (PI) Verification | |||
Procedures | |||
AD-LS-ALL-0004, NRC Performance Indicators and Monthly Operating Report | |||
AD-PI-ALL-0100, Corrective Action Program | |||
AD-EP-ALL-0002, NRC Regulatory Assessment Performance Indicator Guideline Emergency | |||
Preparedness Cornerstone, Rev. 3 | |||
Records and Data | |||
AD-BO-ALL-0002, Performance Measures Program, Rev. 5 | |||
AD-EP-ALL-0002, NRC Regulatory Assessment Performance Indicator Guideline Emergency | |||
Preparedness Cornerstone, Rev. 4 | |||
AD-EP-ALL-0801, Design and Development of Drills and Exercises, Rev. 5 | |||
DEP opportunities documentation for 3rd and 4th quarters 2017; 1st and 2nd quarters 2018 | |||
Siren test data for 3rd and 4th quarters 2017; 1st and 2nd quarters 2018 | |||
Drill and exercise participation records of ERO personnel for 3rd and 4th quarters 2017; 1st and | |||
2nd quarters 2018 | |||
Corrective Action Documents | |||
NCR 02119733, Error in September 2016 MNS DEP KPI data | |||
NCR 02122505, KPI for DEP changed to Yellow | |||
71152: Problem Identification and Resolution | |||
AD-PI-ALL-0100, Corrective Action Program | |||
AD-PI-ALL-0102, Apparent Cause Evaluation | |||
AD-PI-ALL-0103, Quick Cause Evaluation | |||
AD-PI-ALL-0104, Prompt Investigation Response Team | |||
AD-PI-ALL-0105, Effectiveness Reviews | |||
AD-LS-ALL-0006, Notification/Reportability Evaluation | |||
71003 - License Renewal Activities (Phase 1) | |||
Procedures | |||
NDEMAN-NDE-640, Ultrasonic Examination Using Longitudinal Wave and Shear Wave, | |||
Straight Beam Techniques, Rev. 5 | |||
NDEMAN-NDE-946, Ultrasonic Thickness Measurement, Rev. 2 | |||
NDE-NE-ALL-6102, Utilization of PDI-UT-2 Generic Procedure for the Ultrasonic Examination of | |||
Austenitic Pipe Welds, Rev. 002 | |||
Work Orders | |||
WO20077676, UT Inspection of Weld 2NI2F447, dated September 26, 2018 | |||
WO20077677, UT Inspection of Weld 2NI2F447, dated September 26, 2018 | |||
WO20163792, Visual Inspection of 2WL-385 Valve Internals, dated September 27, 2018 | |||
WO20175534, UT Inspection of Condensate Piping Elbow 2CMEC0010, dated September 25, | |||
2018 | |||
WO2147441, Examinations of Refueling Water Storage Tank Bottom (2FWTK0001), dated | |||
September 26, 2018 | |||
Condition Reports | |||
AR2234037, License Renewal Inspection Qualifications, dated September 29, 2018 | |||
NCR2234057, Boron Found in RCP Seal Area, dated September 26, 2018 | |||
Miscellaneous Documents | |||
Corrosion Inspection Form (2FWTK0001), dated September 26, 2018 | |||
Erosion Inspection Form (2CMEC0010), dated September 26, 2018 | |||
Sonic Systems International, Inc. Certificate of Qualification: UT LIIL (Hunter), dated August 3, | |||
2018 | |||
Sonic Systems International, Inc. Certificate of Qualification: UT LII (Steinbauer), dated | |||
February 27, 2018 | |||
Sonic Systems International, Inc. Vision Acuity Record (Hunter), dated September 7, 2018 | |||
Sonic Systems International, Inc. Vision Acuity Record (Steinbauer), dated September 5, 2018 | |||
UT-18-022, UT Calibration/Examination Record: 2NI2F446, dated September 26, 2018 | |||
UT-18-023, UT Calibration/Examination Record: 2NI2F447, dated September 26, 2018 | |||
19 | |||
}} | }} |
Latest revision as of 15:59, 18 December 2019
ML18313A221 | |
Person / Time | |
---|---|
Site: | McGuire, Mcguire |
Issue date: | 11/07/2018 |
From: | Frank Ehrhardt NRC/RGN-II/DRP/RPB1 |
To: | Teresa Ray Duke Energy Carolinas |
References | |
IR 2018003 | |
Download: ML18313A221 (21) | |
Text
UNITED STATES ember 7, 2018
SUBJECT:
MCGUIRE NUCLEAR STATION - NUCLEAR REGULATORY COMMISSION INTEGRATED INSPECTION REPORT 05000369/2018003 AND 05000370/2018003
Dear Mr. Ray:
On September 30, 2018, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your McGuire Nuclear Station Units 1 and 2. On October 10, 2018, the NRC inspectors discussed the results of this inspection with you and other members of your staff.
The results of this inspection are documented in the enclosed report.
NRC inspectors documented one Severity Level IV violation with no associated finding. The NRC is treating this violation as a non-cited violation (NCV) consistent with Section 2.3.2.a of the Enforcement Policy. If you contest the violation or significance of the NCVs, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region II; the Director, Office of Enforcement; and the NRC resident inspector at the McGuire Nuclear Station.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely,
/RA/
Frank J. Ehrhardt, Chief Reactor Projects Branch 1 Division of Reactor Projects Docket Nos.: 50-369, 50-370 License Nos.: NPF-9, NPF-17
Enclosure:
IR 05000369/2018003 and 05000370/2018003
Inspection Report
Docket Numbers: 50-369, 50-370 License Numbers: NPF-9, NPF-17 Report Numbers: 05000369/2018003; and 05000370/2018003 Enterprise Identifier: I-2018-003-0041 Licensee: Duke Energy Carolinas, LLC Facility: McGuire Nuclear Station, Units 1 and 2 Location: Huntersville, NC Inspection Dates: July 1, 2018 to September 30, 2018 Inspectors: A. Hutto, Senior Resident Inspector R. Cureton, Resident Inspector S. Downey, Senior Reactor Inspector B. Collins, Reactor Inspector C. Fontana, Emergency Preparedness Inspector S. Sanchez, Senior Emergency Preparedness Inspector Approved By: Frank J. Ehrhardt, Chief Reactor Projects Branch 1 Division of Reactor Projects Enclosure
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring licensees performance by conducting a quarterly baseline inspection at McGuire Nuclear Station Units 1 and 2 in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information. NRC and self-revealed findings, violations, and additional items are summarized in the table below.
List of Findings and Violations Failure to Adequately Document the Basis for a Change to the Emergency Plan Cornerstone Severity Cross-cutting Report Section Aspect Not Severity Level IV (SL IV) Not 71114.04 -
Applicable Non-Cited Violation (NCV)/05000369, Applicable Emergency Action 370/2018003-01 Level and Closed Emergency Plan Changes The inspectors identified a SL IV NCV of Title 10 of the Code of Federal Regulations (CFR),
Part 50.54(q)(3), for changes made to the McGuire Nuclear Station (MNS) Radiological Emergency Plan (E-Plan) that failed to demonstrate the changes would not reduce the effectiveness of the E-Plan. Specifically, the licensee did not provide an adequate analysis to determine that the removal of specific procedure references was not a reduction in effectiveness of the MNS E-Plan.
PLANT STATUS
Unit 1 operated at or near 100 percent rated thermal power (RTP) for the entire inspection period.
Unit 2 began the inspection period at or near 100 percent RTP. On September 15, 2018, the unit was shutdown for a scheduled refueling outage and ended the inspection period in Mode
INSPECTION SCOPES
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors performed plant status activities described in IMC 2515 Appendix D, Plant Status, and conducted routine reviews using IP 71152, Problem Identification and Resolution. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
REACTOR SAFETY
71111.01 - Adverse Weather Protection Impending Severe Weather
The inspectors evaluated readiness for impending adverse weather conditions for Hurricane Florence on September 10-15, 2018.
71111.04 - Equipment Alignment Partial Walkdown
The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:
- (1) D and F instrument air (VI) compressors while the E VI compressor was out of service (OOS) for an overhaul on July 17, 2018
- (2) 2B auxiliary feedwater (CA) train while the 2A CA pump was OOS for suction relief valve replacement on July 24, 2018
- (3) 2A emergency diesel generator (EDG) while the 2B EDG was OOS for a diesel down day on August 7, 2018
- (4) 1A and 1B CA pumps while the Unit 1 turbine driven CA pump was OOS for planned maintenance on August 27, 2018
71111.05AQ - Fire Protection Annual/Quarterly Quarterly Inspection
The inspectors evaluated fire protection program implementation in the following selected areas:
- (1) Units 1 & 2 vital battery room (fire area 13) on September 18, 2018
- (2) control room (fire area 24) on September 19, 2018
- (3) 2A EDG room (fire area 7) on September 20, 2018
- (4) 2B EDG room (fire area 8) on September 20, 2018
- (5) auxiliary building 695 level (fire area 1) on September 20, 2018
71111.07 - Heat Sink Performance Heat Sink
The inspectors evaluated 2B component cooling water (KC) heat exchanger performance on September 24, 2018.
71111.08 - Inservice Inspection Activities
The inspectors evaluated pressurized water reactor non-destructive testing by reviewing the following examinations from September 17, 2018, to September 26, 2018:
- (1) Liquid Penetrant Examination a) Weld NC2FW103-13, pipe to valve weld, ASME Class 2. This included a review of associated welding activities b) Weld 2NC2FW24-3, elbow to pipe weld, ASME Class 2 c) Weld NC2FW45-5, pipe to nozzle weld, ASME Class 1. This included a review of associated welding activities
- (2) Radiographic Examination a) Weld NC2FW45-5, pipe to nozzle weld, ASME Class 1. This included a review of associated welding activities
- (3) Ultrasonic Examination a) Weld 2NC2FW24-3, elbow to pipe weld, ASME Class 2 b) Weld NC2FW45-5, pipe to nozzle weld, ASME Class 1. This included a review of associated welding activities.
c) 2SGD-INLET, ASME Class 1 d) 2SGD-OUTLET, ASME Class 1
- (4) Visual Examination a) Reactor Vessel Head (per Code Case N-794-4)
- (5) Metrology Scan a) CRDM thermal sleeves The inspectors evaluated the licensees boric acid control program performance. The inspectors also verified that no steam generator tube inspection activities were required for this refueling outage.
71111.11 - Licensed Operator Requalification Program and Licensed Operator Performance Operator Requalification
The inspectors observed and evaluated two training exercises that were conducted in preparation for refueling outage M2R25. The two exercises were transient response with B train of solid state protection system (SSPS) in test and loss of residual heat removal. This evaluation was performed on August 8, 2018.
Operator Performance (1 Sample)
The inspectors observed and evaluated Unit 2 reactor shutdown and cooldown for a refueling outage on September 15, 2018.
71111.12 - Maintenance Effectiveness Routine Maintenance Effectiveness
The inspectors evaluated the effectiveness of routine maintenance activities associated with the following equipment and/or safety significant functions:
- (1) Breaker 1ETA-6 closing springs not charged (1A containment spray pump), Nuclear condition report (NCR) 2225857
- (2) E instrument air (VI) compressor tripped multiple times during functional testing NCR
===2221353
71111.13 - Maintenance Risk Assessments and Emergent Work Control
The inspectors evaluated the risk assessments for the following planned and emergent work activities:
- (1) Equipment protection plan for the 1B charging (NV) pump OOS for planned maintenance, on July 10, 2018
- (2) Equipment protection plan for the 2A decay heat removal (ND) train OOS for 2ND-68A actuator replacement, on July 17, 2018
- (3) Equipment protection plan for the 2A nuclear service water train OOS for strainer maintenance, on July 24, 2018
- (4) Equipment protection plan for the 1B EDG OOS for diesel down day maintenance, on August 14, 2018
- (5) Equipment protection plan for the Unit 1 CA pump planned maintenance, on August 27, 2018
- (6) Equipment protection plan for the standby shutdown facility (SSF) diesel generator planned maintenance, on August 29-30, 2018
71111.15 - Operability Determinations and Functionality Assessments
The inspectors evaluated the following operability determinations and functionality assessments:
- (1) 2A EDG BL relay in panel 2EQCPNDGP2A was missing one of four mounting screws (NCR 2216961), on July 11, 2018
- (2) Unqualified sealant used in containment (NCR 2220979), on July 30, 2018
- (3) Lack of temperature rating documentation for motor control centers in the diesel generator room (NCR 2223373), on August 13, 2018
- (5) 1B containment spray pump vent piping leakage (NCR 2232463), on September 26, 2018
71111.18 - Plant Modifications
The inspectors evaluated the following permanent modification:
- (1) Engineering change (EC) 112053, Electrical Supplemental Power System (ESPS)/Tie-in to Unit 2 Turbine Building Infrastructure MNS, on September 23, 2018
71111.19 - Post Maintenance Testing
The inspectors evaluated the following post maintenance tests:
- (1) PT/1/A/4403/002 B, RN Train B Valve Stroke Timing -Quarterly, following mechanical and electrical preventive maintenance on 1RN-238, on July 11, 2018
- (2) PT/2/A/4204/002 A, ND Train A Valve Stroke Timing - Quarterly, following actuator replacement on 2ND-68, on July 17, 2018
- (3) PT/1/A/4350/002 B, Diesel Generator 1B Operability Test, following preventative maintenance, on August 14, 2018
- (4) PT/2/A/4350/002 B, Diesel Generator 2B Operability Test, following timer calibration on September 4, 2018
- (5) OP/2/A/6350/002, Diesel Generator, following outage maintenance activities on the 2B DG on September 25, 2018
- (6) TT/0/A/112501/002, Unit 2 ESPS Dynamic Testing, following tie-in of the ESPS diesels to the Unit 2 electrical distribution system on September 27, 2018
==71111.20 - Refueling and Other Outage Activities (1/2 Sample)
The inspectors evaluated refueling outage M2R25 activities from September 15, 2018, to September 30, 2018.
71111.22 - Surveillance Testing The inspectors evaluated the following surveillance tests: Routine==
- (1) PT/1/A/4350/002 A, Diesel Generator 1A Operability Test, on July 31, 2018
- (2) PT/1/A/4252/028 A, Slave Start CA Pump 1A, on August 1, 2018
- (3) PT/2/A/4350/036 B, 2B Diesel Generator 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> Run, on August 6, 2018
- (4) PT/2/A/4600/003 B, Daily Surveillance Items, on September 2, 2018 In-service ===
- (1) PT/2/A/4252/001 B, 2B CA Pump Performance Test, on September 11, 2018 EMERGENCY PREPAREDNESS
71114.02 - Alert and Notification System Testing
The inspectors evaluated the maintenance and testing of the alert and notification system during the week of August 27, 2018.
71114.03 - Emergency Response Organization Staffing and Augmentation System
The inspectors evaluated the readiness of the Emergency Response Organization during the week of August 27, 2018.
71114.04 - Emergency Action Level and Emergency Plan Changes
The inspectors evaluated submitted Emergency Action Level, Emergency Plan, and Emergency Plan Implementing Procedure changes during the week of August 27, 2018.
This evaluation does not constitute NRC approval.
71114.05 - Maintenance of Emergency Preparedness
The inspectors evaluated the maintenance of the emergency preparedness program during the week of August 27,
OTHER ACTIVITIES - BASELINE
71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below for the period from July 2017, through June 2018.
- (1) secondary heat removal
- (3) cooling water
- (4) drill and exercise performance
- (5) emergency response organization drill participation
- (6) alert and notification system reliability
71152 - Problem Identification and Resolution Annual Follow-up of Selected Issues
The inspectors reviewed the licensees implementation of its corrective action program related to the following issue:
- (1) 1B emergency diesel generator failed to maintain voltage during a slow start, NCR
OTHER ACTIVITIES
- TEMPORARY INSTRUCTIONS, INFREQUENT AND ABNORMAL 71003 - License Renewal Activities (Phase 1)
The inspectors observed and reviewed the implementation of the following license renewal activities (listed by aging management program) from September 24 - 28, 2018:
- (1) Inservice Inspection Program a) Ultrasonic examination of 6 safety injection system pipe-to-elbow and elbow-to-pipe welds 2NI2F446 and 2NI2F447
- (2) Liquid Waste System Inspection Program a) Visual inspection of 1 liquid waste system valve 2WL-385 internals
- (3) Flow-Accelerated Corrosion Program a) UT inspection of 30 condensate system elbow 2CMEC0010
- (4) Refueling Water Storage Tank Internal Coating Inspection Program a) Ultrasonic examination of refueling water storage tank bottom, 2FWTK0001 b) Remote visual examination of refueling water storage tank bottom, 2FWTK0001
INSPECTION RESULTS
Failure to Adequately Document the Basis for a Change to the Emergency Plan Cornerstone Severity Cross-cutting Aspect Report Section Emergency Severity Level IV (SL IV) Not Applicable
==71114.04 - Preparedness Non-Cited Violation (NCV) Emergency Action
==
05000369,370/2018003-01 Level and Closed Emergency Plan Changes
Introduction:
The inspectors identified a SL IV NCV of Title 10 of the Code of Federal Regulations (CFR), Part 50.54(q)(3), for changes made to the McGuire Nuclear Station (MNS)
Radiological Emergency Plan (E-Plan) that failed to demonstrate the changes would not reduce the effectiveness of the E-Plan. Specifically, the licensee did not provide an adequate analysis to determine that the removal of specific procedure references was not a reduction in effectiveness of the MNS E-Plan.
Description:
While performing a detailed review of a change to the MNS E-Plan, the inspectors identified multiple occurrences of specific references to emergency plan implementing procedures being removed. These references were replaced with generic language, e.g., replacing Emergency Planning Implementing Procedure, HP/0/B/1009/023 (Environmental Monitoring for Emergency Conditions) lists locations to a procedure lists locations, and HP/0/B/1009/003, Recovery Plan, provides a plan with A Recovery Plan will be developed, based on event, to provide a plan. The inspectors found in the 50.54(q) change documentation, that the licensee categorized these changes as administrative or editorial in nature. By categorizing the changes as administrative, an analysis to determine whether the changes were a reduction in effectiveness to the E-Plan was not conducted. The inspectors determined that these changes were more than administrative and therefore required an analysis be performed because the removal of specific procedural reference could delay the ERO in the performance of their duties.
Corrective Action(s): The licensee entered the issue into the corrective action program.
Corrective Action Reference: NCR 02228278
Performance Assessment:
The licensees failure to provide an analysis demonstrating that changes to the emergency plan was not a reduction in effectiveness was determined to impede the NRCs ability to perform its regulatory function and is dispositioned using the Traditional Enforcement process.
Enforcement:
Severity: This finding is a violation of NRC requirements because it had the potential for impacting the NRCs ability to perform its regulatory function. Therefore, traditional enforcement is applicable, in accordance with Inspection Manual Chapter 0611 and 0612, Appendix B, Figure 2. This finding is determined to be a SL IV violation in accordance with Section 6.6.d.1 of the Enforcement Policy because it involves the licensees ability to meet or implement a regulatory requirement not related to assessment or notification such that the effectiveness of the emergency plan is reduced.
Violation: Title 10 of the Code of Federal Regulations, Part 50.54(q)(3) states, in part, that a licensee may make changes to its emergency plan without NRC approval only if the licensee performs and retains an analysis demonstrating that the changes do not reduce the effectiveness of the plan and the plan, as changed, continues to meet the requirements in Appendix E to this part.
Contrary to the above, as of August 31, 2018, the licensee failed to perform an analysis demonstrating that changes to their E-Plan did not reduce the effectiveness of the plan.
Specifically, the licensee did not provide an analysis to determine whether the removal of specific procedure references was not a reduction in effectiveness of the approved MNS E-Plan.
Disposition: This violation is being treated as an NCV, consistent with Section 2.3.2 of the Enforcement Policy.
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
The inspectors confirmed that proprietary information was controlled to protect from public disclosure.
- On October 10, 2018, the inspector presented the inspection results to Mr. Thomas Ray, and other members of the licensee staff.
- The emergency preparedness inspectors held a subsequent exit on October 24, 2018.
DOCUMENTS REVIEWED
71111.01: Adverse Weather Protection
RP/0/B/5700/027, Severe Weather Preparation
OP/0/B/6100/031, Response to Local Intense Precipitation (LIP) or Probable Maximum Flood
(PMF) External Flooding Event
71111.04: Equipment Alignment
MCFD-2592-01.01, Unit 2, Flow Diagram of Auxiliary Feedwater System
OP/2/A/6350/002, Diesel Generator
OP/1/A/6250/002, Auxiliary Feedwater System
MCFD-1592-01.01, Unit 1, Flow Diagram of Auxiliary Feedwater System
71111.05AQ: Fire Protection Annual/Quarterly
MCS-1465.00-00-0008, Design Basis Specification for Fire Protection
MCS-1465.00-00-0022, Appendix R Safe Shutdown Analysis
MCC-1435.00-00-0059, NFPA 805 - Appendix R Safe Shutdown Deterministic Analysis
AD-EG-ALL-1520, Transient Combustible Control
FS/2/B/9000/007, Unit 2 2A Diesel Generator Room Fire Strategy #7
FS/2/B/9000/008, Unit 2 2B Diesel Generator Room Fire Strategy #8
FS/0/B/9000/001, Auxiliary Building 695 Fire Strategy #1
MFSD-009, Unit 1 Electrical Penetration Room
MFSD-007, Unit 2 2A Diesel Generator Room
MFSD-008, Unit 2 2B Diesel Generator Room
MFSD-001, Auxiliary Building 695 Level
71111.07: Heat Sink Performance
MP/0/A/7700/013, Component Cooling System (KC) Maintenance
WO 20183878, Clean/Inspect/Eddy Current Test 2B KC Heat Exchanger
MG-NDE-ET-002, 2B KC Heat Exchanger Eddy Current Report
71111.08: Inservice Inspection Activities
Procedures
AD-EG-PWR-1611, Boric Acid Corrosion Control Program - Implementation, Revision 2
MP/0/A/7700/080, Inspection, Assessment, and Cleanup of Boric Acid on Plant Materials,
Revision 022
NDE-10, General Radiography Procedure, Revision 26
NDE-NE-ALL-4101, Liquid Penetrant Examination, Revision 1
NDE-NE-ALL-6102, Utilization of PDI-UT-2 Generic Procedure for the Ultrasonic Examination
of Austenitic Pipe Welds, Revision 1
NDE-NE-ALL-7202, Visual Examination of PWR Reactor Pressure Vessel Upper Head
Penetrations, Revision 2
Calculations
MCC-1201.01.00-0064, EDY and RIY Calculation to Determine Reactor Vessel Head
Inspection Requirements, Revision 010
Drawings:
MC-2414-03.20-0, Piping Layout, Reactor Coolant (NC) System Plan Quad 0-90o Reactor
Building, Revision 24
ISO Drawing No. MCFI-2NC103, Revision 2
ISO Drawing No. MCFI-2NC45, Revision 12
NDE Examiner Qualifications:
Day & Zimmerman Certification Record (McCray): Liquid Penetrant Level II, dated July 6, 2017
Duke Energy Certificate of Method Qualification (Sanders): Liquid Penetrant Level II, dated
August 14, 2018
Duke Energy Certificate of Method Qualification (Sherrill): Liquid Penetrant Level II, dated June
8, 2017
Duke Energy Certificate of Method Qualification (Jones): Radiographic Testing Level II, dated
March 12, 2016
Duke Energy Certificate of Method Qualification (Gantt): Radiographic Testing Level II, dated
September 15, 2015
Sonic Systems International Certificate of Method Qualification (Healey), Visual Testing Level
III, dated August 8, 2018
Sonic Systems International Certificate of Method Qualification (Hill), Visual Testing Level II,
dated August 8, 2018
Sonic Systems International Certificate of Method Qualification (Regan), Ultrasonic Level II,
dated June 8, 2017
System One Certificate of Method Qualification (Williams), Ultrasonic Level II, dated September
13, 2015
System One Certificate of Method Qualification (McDonnell), Radiographic Testing Level II,
dated September 8, 2016
System One Certificate of Method Qualification (Harmon), Ultrasonic Level II, dated November
18, 2015
Condition Reports
NCRs: 02114069, 02116222, 02117180, 02118108, 02118551, 02121319, 02121803,
2122329, 02123821, 02172332, 02219569, 02224655
Miscellaneous Documents
EC412897, MNS U2 RVCH Thermal Sleeve Replacement, Revision 0
Focused Self-Assessment Report AR #01985576, Boric Acid Control Program - Implementation
Procedure Effectiveness
McGuire Unit 2 Steam Generators, M2R25 Skipped Inspection Cycle Outage Review, Revision
MNS-2018-03-29-04, Reactor Vessel Closure Head (RVCH) Surface Visual (VE), Revision 0
Inspection Report No. PT-18-005, dated September 17, 2018
Inspection Report No. UT-17-011, dated April 26, 2017
Inspection Report No. UT-18-002, dated September 18, 2018
Inspection Report No. VT-17-041, dated April 14, 2017
Inspection Report No. DEM2_NCFW 45-5_2017-04-09, dated April 9, 2017
Welder Continuity Report for Welders: F7211, I8275, O8835
Welder Performance Qualification Test Records for Welders: F7211, I8275, O8835
Work Orders: 20151614, 20209068
71111.11: Licensed Operator Requalification Program and Licensed Operator
Performance
AD-OP-ALL-1000, Conduct of Operations
NSD 509, Site Standards in Support of Operational Focus
OMP 4.3, Use of Emergency and Abnormal Procedures and FLEX Support Guidelines
SOMP 01-07, Control Room Oversight
OP/2/A/6100/002, Controlling Procedure for Unit Shutdown
OP/2/A/6100/SD-7, Cooldown to 200 Degrees F
OP/2/A/6100/SD-6A, Placing train A ND in Service
71111.12: Maintenance Effectiveness
AD-EG-ALL-1204, Single Point Vulnerability Identification, Elimination and Mitigation
AD-EG-ALL-1206, Equipment Reliability Classification
AD-EG-ALL-1209, System, Component, and Program Health Reports and Notebooks
AD-EG-ALL-1210, Maintenance Rule Program
AD-EG-ALL-1211, System Performance Monitoring and Trending
Duke Equipment Reliability Maintenance Rule Database
71111.13: Maintenance Risk Assessments and Emergent Work Control
NSD-213, Risk Management Process
NSD-415, Operational Risk Management (Modes 1-3) per 10 CFR 50.65(a)(4)
SOMP 02-02, Operations Roles in the Risk Management Process
OMP 13-7, Operational Control of Protected Equipment
AD-OP-ALL-0201, Protected Equipment
71111.15: Operability Determinations and Functionality Assessments
AD-OP-ALL-0102, Operability Decision Making
AD-OP-ALL-0105, Operability Determinations and Functionality Assessment
71111.18: Plant Modifications
Engineering change EC 112053, Electrical Supplemental Power System (ESPS)/Tie-in to
Unit 2 Turbine Building Infrastructure MNS
TT/0/A/112501/002, Unit 2 ESPS Dynamic Testing
AR 2021966, 10 CFR 50.59 Screen for EC 112503
71111.19: Post-Maintenance Testing
AD-EG-ALL-1155, Post Modification Testing
PT/1/A/4403/002 B, RN Train B Valve Stroke Timing -Quarterly
PT/2/A/4204/002 A, ND Train A Valve Stroke Timing - Quarterly
PT/1/A/4350/002 B, Diesel Generator 1B Operability Test
PT/2/A/4350/002 B, Diesel Generator 2B Operability Test
OP/2/A/6350/002, Diesel Generator
TT/0/A/112501/002, Unit 2 ESPS Dynamic Testing
71111.22: Surveillance Testing
AD-EG-ALL-1202, Preventive Maintenance and Surveillance Testing Administration
AD-WC-ALL-0250, Work Implementation and Completion
AD-EG-ALL-1720, In-service Testing (IST) Program Implementation
71114.02: Alert and Notification System Evaluation
Procedures
PT/0/A/4600/103A, Siren System Availability (Silent Test), Rev. 4
PT/0/A/4600/103B, Siren System Quarterly Test, Rev. 3
PT/0/A/4600/103C, Siren System Annual Preventive Maintenance Review, Rev. 2
FEMA Report - Analysis of the Prompt Alert and Notification System, dated 12/8/86
FEMA Back-up ANS letter, November 2012
CentrAlert Guardian User Manual, Rev. 2.0, July 2007
CentrAlert Guardian Administration Manual, Rev. 2.0, July 2007
Emergency Area Functional Area Manual, Section 3.3, Alert and Notification System (Siren
Program), Rev. 16
Records and Data
Siren System Annual Preventive Maintenance records for 2017 and 2018
Quarterly and Bi-weekly Activation Results from September 2017 through June 2018
Annual RTU and Battery Preventative Maintenance from 1/13/17 to 5/2/17
McGuire Nuclear Station 2017-2018 Emergency Preparedness School Visitors brochure
McGuire Nuclear Station 2018 Emergency Preparedness Information Calendar
Corrective Action Program Documents (Nuclear Condition Reports)
NCR 02089244, Siren failed scheduled silent test 1/3/17
NCR 02091101, 1st Quarter 2017 Full Cycle siren test
NCR 02116360, MNS 2nd Quarter 2017 Full Cycle siren test
NCR 02131345, Siren #15 out of service
NCR 02134444, Siren #15 reported failure on 6/13/17 test-retest
NCR 02157435, Siren#1 reported failure during Quarterly test
NCR 02181655, Siren#57 reported failure during 2/1/18 silent test
NCR 02197892, MNS siren 52 failed Quarterly test
NCR 02198099, Siren #52 out-of-service
71114.03: Emergency Response Organization Staffing and Augmentation System
Procedures
AD-EP-ALL-0002, NRC Regulatory Assessment Performance Indicator Guideline Emergency
Preparedness Cornerstone, Rev. 14
AD-EP-ALL-0500, Emergency Response Training, Rev. 1
AD-EP-ALL-0501, Emergency Preparedness Staff Training and Qualification, Rev. 02
Records and Data
MNS Drill 17-05, Critique report, 12/06/2017
MNS Drill 17-06, Critique Report, 12/13/2017
MNS Drill 18-01, Critique Report, 2/27/2018
MNS Drill 18-02, Critique Report, for drill on 03/15/2018
Quick Cause Evaluation Report, 02060853-02, Emergency Preparedness Program
MNS-OSSA-12212012, McGuire Nuclear Station On-Shift Staffing Analysis (OSSA) Report,
Rev. 1, dated 12/13/125/22/2018
Various EP staff and ERO member training records
Corrective Action Program Documents
NCR 02060853, Adherence to standards and drill critique gaps identified
NCR 02081894, Team ERO drill on 11-29-16
NCR 02091193, EOF ERO Performance issues critiqued for Oconee Graded Ex
NCR 02097125, MNS ERO augmentation drill on 2-1-17
NCR 02097207, Activation of the JIC for ERO notification
NCR 02100356, New ERO Member did not receive ERONS test
NCR 02109724, ERO Training Expiration
NCR 02122505, KPI for Drill and Exercise Performance changed to Yellow
NCR 02142735, TSC equipment issues identified during NRC graded exercise
NCR 02142932, MNS Exercise Off-site JIC FEMA, 8-8-17
NCR 02157833, Two EOF Drill Participants were not shows for RNP Drill
NCR 02172808, Evaluate/Determine Required ERO Muster Meeting Attendees
NCR 02188290, EP Agreement Letter Requirement Not Performed
NCR 02213964, Internet outage affecting nuclear ERO applications
NCR 02228278, NRC EP inspection issues related to Emergency Plan
71114.04: Emergency Action Level and Emergency Plan Changes
Procedures
AD-EP-ALL-0501, Emergency Preparedness Staff Training & Qualifications, Rev. 1
AD-EP-ALL-0502, Emergency Preparedness 10 CFR 50.54(q) Training Requirements, Rev. 1
AD-EP-ALL-0602, Emergency Plan Change Screening & Effectiveness Evaluations 10 CFR 50.54(q), Rev. 1
AD-EP-ALL-0602, Emergency Plan Change Screening & Effectiveness Evaluations 10 CFR 50.54 (q), Rev. 5
McGuire Emergency Plan, Rev. 16-3, 16-4, & 16-5
RP/0/A/5700/000, Classification of Emergencies, Rev. 029
RP/0/A/5700/018, Notifications to the State & Counties from the TSC, Rev. 031
RP/0/B/5700/029, Notifications to Offsite Agencies from the Control Room, Rev. 022
Nuclear Policy Manual-Volume 2, Appendix B.110, Nomination Letter Format for Qualified
Reviewers (for E-Plan reduction in effectiveness review process (50.54(q)) and associated
training records for nominees
Change Packages
CFR 50.54(q) Screening Evaluation Form for RP/0/A/5700/000, Rev. 029, dated 6/1/17
Records and Data
CFR 50.54(q) Screening Evaluation Form for MNS Emergency Plan Section N, Exercises
and Drills, Rev. 17-1, dated 8/24/17
CFR 50.54(q) Screening Evaluation Form for MNS Emergency Plan Section O, Radiological
Emergency Respirator Training, Rev. 17-1, dated 8/24/17
CFR 50.54(q) Screening Evaluation Form for MNS Emergency Plan Section P.9, dated
9/6/17
CFR 50.54(q) Screening Evaluation Form for MNS Emergency Plan Section Q, Appendices,
Rev. 17-1, dated 8/24/17
CFR 50.54(q) Screening Evaluation Form for MNS Emergency Plan Section F, Emergency
Communicator, Rev. 17-1, dated 9/7/17
CFR 50.54(q) Screening Evaluation Form for MNS Emergency Plan Section H, Emergency
Facilities and Equipment, dated 9/7/17
CFR 50.54(q) Screening Evaluation Form for MNS Emergency Plan Section I, Accident
Assessment, Rev. 17-1, dated 8/24/17
CFR 50.54(q) Screening Evaluation Form for MNS Emergency Plan, ML-Administration - E-
Plan-Manual, Rev. 18, dated 6/4/18
CFR 50.54(q) Screening Evaluation Form for MNS Emergency Plan Section ML-
Administration- E-Plan-Manual, App. 1, dated 10/25/17
CFR 50.54(q) Effectiveness Evaluation Form for MNS Emergency Plan, ML-Administration -
E-Plan-Manual, dated 10/25/17
CFR 50.54(q) Effectiveness Evaluation Form for MNS Emergency Plan, ML-Administration -
E-Plan-Manual,Section I.1, dated 1/8/18
CFR 50.54(q) Effectiveness Evaluation Form for MNS Emergency Plan, ML-Administration -
E-Plan-Manual,Section I.9, dated 1/10/18
CFR 50.54(q) Screening Evaluation Form for MNS Emergency Plan Section A, Rev. 18-2,
Section A, Rev. Assignment of Responsibility, dated 5/14/18
CFR 50.54(q) Screening Evaluation Form for MNS Emergency Plan Section B, Transfer On-
shift Dose Assessment to Operations, Rev. 18-2, dated 3/21/18
CFR 50.54(q) Effectiveness Evaluation Form for MNS Emergency Plan Section B, Transfer
On-shift Dose Assessment to Operations, Rev. 18-2, dated 3/21/18
CFR 50.54(q) Screening Evaluation Form for MNS Emergency Plan Section G, Public
Education and Information, Rev. 18-2, dated 5/13/18
CFR 50.54(q) Effectiveness Evaluation Form for MNS Emergency Plan Section G, Public
Education and Information, Rev. 18-2, dated 5/14/18
CFR 50.54(q) Screening Evaluation Form for MNS Emergency Plan Section H, Emergency
Facility and Equipment, Rev. 18-2, dated 5/14/18
CFR 50.54(q) Effectiveness Evaluation Form for MNS Emergency Plan Section H,
Emergency Facility and Equipment, Rev. 18-2, dated 5/14/18
CFR 50.54(q) Screening Evaluation Form for MNS Emergency Plan Section I, Accident
Assessment, Rev. 18-2, dated 5/14/18
CFR 50.54(q) Effectiveness Evaluation Form for MNS Emergency Plan Section I, Accident
Assessment, Rev. 18-2, dated 5/17/18
CFR 50.54(q) Screening Evaluation Form for MNS Emergency Plan Section J, Protective
Resp., Rev. 18-2, dated 5/17/18
CFR 50.54(q) Effectiveness Evaluation Form for MNS Emergency Plan Section J, Protective
Resp., Rev. 18-2, dated 5/17/18
CFR 50.54(q) Screening Evaluation Form for MNS Emergency Plan Section L, Medical and
Public Health Support, Rev. 18-2, dated 5/8/18
CFR 50.54(q) Screening Evaluation Form for MNS Emergency Plan Section M, .Recovery
and Re-entry planning and Post Accident Operations, Rev. 18-2, dated 5/17/18
CFR 50.54(q) Screening Evaluation Form for MNS Emergency Plan Section Q, Appendix 6,
dated 5/17/18, Rev. 18-2, dated 5/17/18
Corrective Action Program Documents
NCR 02053399, NRC Baseline Inspection Minor Violation
NCR 02069320, NEI 99-01R6 Emergency Action Level (EAL) upgrade
NCR 02103672, Conflicting information in Emergency Plan
NCR 02141070, EAL classification question - application of unisolable criteria
NCR 02146235, OSC performed issues noted during MNS graded exercise
NCR 02186884, Latest Emergency Plan revision does not contain correct SPCC Plan
NCR 02187191, 50.54q evaluation not performed on MNS EP changes
NCR 02204660, Emergency Plan update information from Revision 17-1 was omitted in
Revision 18-1
71114.05: Maintenance of Emergency Preparedness
AD-EP-ALL-0105, Activation & Operation of the Technical Support Center, Rev. 1
AD-EP-ALL-0106, Activation & Operation of the Operations Support Center, Rev. 1
AD-EP-ALL-0801, Design & Development of Drills and Exercises, Rev. 5
AD-EP-ALL-0802, Conducting Drills & Exercises, Rev. 4
AD-EP-ALL-0803, Evaluation & Critique of Drills and Exercises, Rev. 4
AD-EP-MNS-0105, MNS Site Specific TSC Support, Rev. 001
AD-EP-MNS-0106, MNS Site Specific OSC Support, Rev. 001
AD-NO-ALL-1001, Conduct of Audit, Rev. 5
AD-PI-ALL-0100, Corrective Action Program, Rev. 18
AD-PI-ALL-0300, Self-Assessment & Benchmark Programs, Rev. 4
PD-EP-ALL-0800, Drills & Exercises Program, Rev. 5
PT/0/A/4600/088, Functional Check of Emergency Vehicle & Equipment, Rev. 010
Records and Data
2016-FLEET-EMP-PR-01, NOS Fleet Emergency Preparedness Performance Review, dated
1/5/17
2017-MNS-EMP-PR-01, NOS - Audit McGuire Emergency Preparedness Performance, dated
5/25/17
2018-MNS-EMP-01, NOS - Audit MNS Emergency Preparedness, dated 3/6/18
Critique Report for Drill 16-03, dated 9/1/16
Critique Report for Drill 16-04, dated 11/8/16
Critique Report for Drill 16-05, dated 1/17/17
Critique Report for Drill 17-01, dated 2/16/17
KLD TR-501, MNS Development of Evacuation Time Estimates Final Report, Rev. 1, Dec. 2012
KLD TR-961, MNS 2017 Population Update Analysis Final Report, Rev. 0, dated 10/16/17
McGuire Nuclear Station Agreement Letters
McGuire Nuclear Station Drill 17-02 Critique Report, dated 6/20/17
McGuire Nuclear Station Drill 17-04 Critique Report, dated 8/31/17
McGuire Nuclear Station Drill 17-05 Critique Report, dated 12/14/17
McGuire Nuclear Station Drill 17-06 Critique Report, dated 1/11/18
PT/0/A/4600/088, Functional Check of Emergency Vehicle & Equipment, dated 12/21/17
PT/0/A/4600/088, Functional Check of Emergency Vehicle & Equipment, dated 2/12/18
PT/0/A/4600/088, Functional Check of Emergency Vehicle & Equipment, dated 3/5/18
PT/0/A/4600/088, Functional Check of Emergency Vehicle & Equipment, dated 4/19/18
PT/0/A/4600/088, Functional Check of Emergency Vehicle & Equipment, dated 6/18/18
Self-Assessment Report 02119506-05, 2017 Emergency Preparedness Graded Exercise
Readiness Self-Assessment, dated 7/27/17
Self-Assessment Report 2157616, MNS EP Self-Assessment to Prepare for the NRC Program
Audit, dated 5/31/18
Corrective Action Documents
NCR 02124558, Changes to ERO Drill after validation
NCR 02127108, NRC identified - simulator controller/evaluator performance
NCR 02142733, 2017 MNS Graded Exercise - unsatisfactory demonstration criteria
NCR 02142735, TSC equipment issues identified during NRC Graded Exercise
NCR 02172626, Delay in emergency notification due to inadequate system
NCR 02184867, EP Drill 2/14/18 failed Objective E04 NRC notification
NCR 02188290, EP agreement letter requirement not performed
NCR 02195944, MNS TSC declared non-functional due to planned HVAC modification
NCR 02198818, Onsite TSC 0VHTK0015 dedicated power source
71151: Performance Indicator (PI) Verification
Procedures
AD-LS-ALL-0004, NRC Performance Indicators and Monthly Operating Report
AD-PI-ALL-0100, Corrective Action Program
AD-EP-ALL-0002, NRC Regulatory Assessment Performance Indicator Guideline Emergency
Preparedness Cornerstone, Rev. 3
Records and Data
AD-BO-ALL-0002, Performance Measures Program, Rev. 5
AD-EP-ALL-0002, NRC Regulatory Assessment Performance Indicator Guideline Emergency
Preparedness Cornerstone, Rev. 4
AD-EP-ALL-0801, Design and Development of Drills and Exercises, Rev. 5
DEP opportunities documentation for 3rd and 4th quarters 2017; 1st and 2nd quarters 2018
Siren test data for 3rd and 4th quarters 2017; 1st and 2nd quarters 2018
Drill and exercise participation records of ERO personnel for 3rd and 4th quarters 2017; 1st and
2nd quarters 2018
Corrective Action Documents
NCR 02119733, Error in September 2016 MNS DEP KPI data
NCR 02122505, KPI for DEP changed to Yellow
71152: Problem Identification and Resolution
AD-PI-ALL-0100, Corrective Action Program
AD-PI-ALL-0102, Apparent Cause Evaluation
AD-PI-ALL-0103, Quick Cause Evaluation
AD-PI-ALL-0104, Prompt Investigation Response Team
AD-PI-ALL-0105, Effectiveness Reviews
AD-LS-ALL-0006, Notification/Reportability Evaluation
71003 - License Renewal Activities (Phase 1)
Procedures
NDEMAN-NDE-640, Ultrasonic Examination Using Longitudinal Wave and Shear Wave,
Straight Beam Techniques, Rev. 5
NDEMAN-NDE-946, Ultrasonic Thickness Measurement, Rev. 2
NDE-NE-ALL-6102, Utilization of PDI-UT-2 Generic Procedure for the Ultrasonic Examination of
Austenitic Pipe Welds, Rev. 002
Work Orders
WO20077676, UT Inspection of Weld 2NI2F447, dated September 26, 2018
WO20077677, UT Inspection of Weld 2NI2F447, dated September 26, 2018
WO20163792, Visual Inspection of 2WL-385 Valve Internals, dated September 27, 2018
WO20175534, UT Inspection of Condensate Piping Elbow 2CMEC0010, dated September 25,
2018
WO2147441, Examinations of Refueling Water Storage Tank Bottom (2FWTK0001), dated
September 26, 2018
Condition Reports
AR2234037, License Renewal Inspection Qualifications, dated September 29, 2018
NCR2234057, Boron Found in RCP Seal Area, dated September 26, 2018
Miscellaneous Documents
Corrosion Inspection Form (2FWTK0001), dated September 26, 2018
Erosion Inspection Form (2CMEC0010), dated September 26, 2018
Sonic Systems International, Inc. Certificate of Qualification: UT LIIL (Hunter), dated August 3,
2018
Sonic Systems International, Inc. Certificate of Qualification: UT LII (Steinbauer), dated
February 27, 2018
Sonic Systems International, Inc. Vision Acuity Record (Hunter), dated September 7, 2018
Sonic Systems International, Inc. Vision Acuity Record (Steinbauer), dated September 5, 2018
UT-18-022, UT Calibration/Examination Record: 2NI2F446, dated September 26, 2018
UT-18-023, UT Calibration/Examination Record: 2NI2F447, dated September 26, 2018
19