|
|
(2 intermediate revisions by the same user not shown) |
Line 3: |
Line 3: |
| | issue date = 07/13/2006 | | | issue date = 07/13/2006 |
| | title = E-MAIL: NRC to Discuss Pilgrim Audit Findings | | | title = E-MAIL: NRC to Discuss Pilgrim Audit Findings |
| | author name = Sheehan N A | | | author name = Sheehan N |
| | author affiliation = NRC/OPA | | | author affiliation = NRC/OPA |
| | addressee name = | | | addressee name = |
Line 19: |
Line 19: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:K9lt Howard -NRC To Discuss Pilgrim Audit Findings Page_1 From: Neil Sheehan To: OPA@nrc.gov Date: 7/13/2006 2:30:52 PM | | {{#Wiki_filter:K9lt Howard - NRC To Discuss Pilgrim Audit Findings Page_1 From: Neil Sheehan To: OPA@nrc.gov Date: 7/13/2006 2:30:52 PM |
|
| |
|
| ==Subject:== | | ==Subject:== |
| NRC To Discuss Pilgrim Audit Findings For release in about 1 hour CC: Betsy Keeling; Brenda Akstulewicz; Dennis Rathbun; Elizabeth Hackley; Janet Schlueter; Josephine Piccone; Marjorie McLaughlin; Nancy Belmore; Nancy McNamara; Raeann Shane; Ram Subbaratnam; Rebecca Schmidt; Rosetta Virgilio; Thomas Combs; Valerie Shannon | | NRC To Discuss Pilgrim Audit Findings For release in about 1 hour CC: Betsy Keeling; Brenda Akstulewicz; Dennis Rathbun; Elizabeth Hackley; Janet Schlueter; Josephine Piccone; Marjorie McLaughlin; Nancy Belmore; Nancy McNamara; Raeann Shane; Ram Subbaratnam; Rebecca Schmidt; Rosetta Virgilio; Thomas Combs; Valerie Shannon |
| 'cAtemp\GW)00001.TMP Page 111 II c:\tem~AGWlOOOO1 .TMP Paae 1 II I Mail Envelope Properties (44B6914D.128 21: 55678) | | |
| | 'cAtemp\GW)00001.TMP Page 111 IIc:\tem~AGWlOOOO1 .TMP Paae 1 II I |
| | Mail Envelope Properties (44B6914D.128 21: 55678) |
|
| |
|
| ==Subject:== | | ==Subject:== |
| NRC To Discuss Pilgrim Audit Findings Creation Date 7/13/2006 2:30:37 PM From: Neil Sheehan Created By: NAS @nrc.gov Recipients OWGWPO01.HQGWDO01 BAA CC (Brenda Akstulewicz) | | NRC To Discuss Pilgrim Audit Findings Creation Date 7/13/2006 2:30:37 PM From: Neil Sheehan Created By: NAS @nrc.gov Recipients OWGWPO01.HQGWDO01 BAA CC (Brenda Akstulewicz) |
| NDB2 CC (Nancy Belmore)OWGWPOO2.HQGWDOO1 EFH1 CC (Elizabeth Hackley)OWGWPOO3.HQGWDOO1 TRC CC (Thomas Combs)OWGWPOO4.HQGWDOO1 BJK CC (Betsy Keeling)TWGWPO02.HQGWDOO1 JRS 1 CC (Janet Schlueter) | | NDB2 CC (Nancy Belmore) |
| RLS8 CC (Rebecca Schmidt)RMS2 CC (Raeann Shane)RXS2 CC (Ram Subbaratnam) | | OWGWPOO2.HQGWDOO1 EFH1 CC (Elizabeth Hackley) |
| VAS CC (Valerie Shannon)TWGWPO03.HQGWDO01 DKR CC (Dennis Rathbun)JMPI CC (Josephine Piccone)TWGWPO04.HQGWDOO1 ROV CC (Rosetta Virgilio)kpl-po.KPDO MMM3 CC (Marjorie McLaughlin) | | OWGWPOO3.HQGWDOO1 TRC CC (Thomas Combs) |
| NTM CC (Nancy McNamara)nrc.gov TWGWPO02.HQGWDOO]1 OPA (OPA@nrc.gov) 11 cAtemEAGWI00001.TMP Page 2 11 II c-,-:---t | | OWGWPOO4.HQGWDOO1 BJK CC (Betsy Keeling) |
| -- -;,,\ -.,-1 -.O.,1 .TM P ......... "- 11 I Post Office Route OWGWPO01 .HQGWDOO1 OWGWPO02.HQGWDO01 OWGWPOO3.HQGWDOO1 OWGWPOO4.HQGWDO01 TWGWPO02.HQGWDO01 TWGWPO03.HQGWDO01 TWGWPO04.HQGWDO01 kpl-po.KPDO TWGWPO02.HQGWDO01 nrc.gov Files Size Date & Time MESSAGE 370 7/13/2006 2:30:37 PM Pilgrim-audit.wpd 30336 7/13/2006 2:24:28 PM Options Expiration Date: None Priority: | | TWGWPO02.HQGWDOO1 JRS 1 CC (Janet Schlueter) |
| Standard ReplyRequested: | | RLS8 CC (Rebecca Schmidt) |
| No Return Notification: | | RMS2 CC (Raeann Shane) |
| None Concealed | | RXS2 CC (Ram Subbaratnam) |
| | VAS CC (Valerie Shannon) |
| | TWGWPO03.HQGWDO01 DKR CC (Dennis Rathbun) |
| | JMPI CC (Josephine Piccone) |
| | TWGWPO04.HQGWDOO1 ROV CC (Rosetta Virgilio) kpl-po.KPDO MMM3 CC (Marjorie McLaughlin) |
| | NTM CC (Nancy McNamara) nrc.gov TWGWPO02.HQGWDOO]1 OPA (OPA@nrc.gov) |
| | |
| | 11cAtemEAGWI00001.TMP Page 2 11 II c-,-:---t -- -;,,\-., .O.,1.TM P . . . ...... "- 11 I |
| | Post Office Route OWGWPO01 .HQGWDOO1 OWGWPO02.HQGWDO01 OWGWPOO3.HQGWDOO1 OWGWPOO4.HQGWDO01 TWGWPO02.HQGWDO01 TWGWPO03.HQGWDO01 TWGWPO04.HQGWDO01 kpl-po.KPDO TWGWPO02.HQGWDO01 nrc.gov Files Size Date & Time MESSAGE 370 7/13/2006 2:30:37 PM Pilgrim-audit.wpd 30336 7/13/2006 2:24:28 PM Options Expiration Date: None Priority: Standard ReplyRequested: No Return Notification: None Concealed |
|
| |
|
| ==Subject:== | | ==Subject:== |
| No Security: | | No Security: Standard Junk Mail Handling Evaluation Results Message is not eligible for Junk Mail handling Message is from an internal sender Junk Mail settings when this message was delivered Junk Mail handling disabled by User Junk Mail handling disabled by Administrator Junk List is not enabled Junk Mail using personal address books is not enabled Block List is not enabled |
| Standard Junk Mail Handling Evaluation Results Message is not eligible for Junk Mail handling Message is from an internal sender Junk Mail settings when this message was delivered Junk Mail handling disabled by User Junk Mail handling disabled by Administrator Junk List is not enabled Junk Mail using personal address books is not enabled Block List is not enabled NRC NEWS U.S. NUCLEAR REGULATORY COMMISSION Office of Public Affairs, Region I 475 Allendale Road, King of Prussia, Pa.www.nrc.gov No. 1-06-040 July 13, 2006 Contact: Diane Screnci, 610/337-5330 E-mail: opal@nrc.gov Neil Sheehan, 610/337-5331 NRC TO MEET WITH ENTERGY ON JULY 1 9 th TO DISCUSS PILGRIM LICENSE RENEWAL AUDIT FINDINGS The Nuclear Regulatory Commission staff will meet with Entergy representatives on Wednesday, July 19, to discuss the findings of a team audit associated with the license renewal application for the Pilgrim nuclear power plant. Entergy submitted the application to the NRC in late January. It seeks an additional 20 years of operation for the plant, which is located in Plymouth, Mass.The current operatinglicense for the facility is set to expire on June 8, 2012.The NRC performs audits early in the license renewal review process to evaluate whether the application is consistent with established guidance and NRC staff positions. | | |
| Additional technical reviews, including inspections, of the application will take place over the next 12 months.The conclusions from the audits, technical reviews and inspections will be incorporated into a safety evaluation report, which is expected to be issued next July.The meeting is scheduled to take place from 9 a.m. until noon at the Radisson Plymouth Harbor Hotel, 180 Water St. in Plymouth. | | NRC NEWS U.S. NUCLEAR REGULATORY COMMISSION Office of Public Affairs, Region I 475 Allendale Road, King of Prussia, Pa. |
| It will be open to public observation. | | www.nrc.gov No. 1-06-040 July 13, 2006 |
| Following the business portion of the meeting, the NRC staff will be available to answer questions from the public.Under NRC regulations, the original operating license for a nuclear power plant has a duration of up to 40 years. The license may be renewed for up to an additional 20 years if NRC requirements are met. Information on the license renewal process is posted on the NRC's web page at http://www.nrc.gov/reactors/operating/licensing/renewal.html. | | |
| Information specific to Pilgrim's application is posted at: http://www.nrc.Pgov/reactors/operating/licensing/renewal/applications/pilgrim.html.}} | | ==Contact:== |
| | Diane Screnci, 610/337-5330 E-mail: opal@nrc.gov Neil Sheehan, 610/337-5331 NRC TO MEET WITH ENTERGY ON JULY 19 th TO DISCUSS PILGRIM LICENSE RENEWAL AUDIT FINDINGS The Nuclear Regulatory Commission staff will meet with Entergy representatives on Wednesday, July 19, to discuss the findings of a team audit associated with the license renewal application for the Pilgrim nuclear power plant. Entergy submitted the application to the NRC in late January. It seeks an additional 20 years of operation for the plant, which is located in Plymouth, Mass. |
| | The current operatinglicense for the facility is set to expire on June 8, 2012. |
| | The NRC performs audits early in the license renewal review process to evaluate whether the application is consistent with established guidance and NRC staff positions. Additional technical reviews, including inspections, of the application will take place over the next 12 months. |
| | The conclusions from the audits, technical reviews and inspections will be incorporated into a safety evaluation report, which is expected to be issued next July. |
| | The meeting is scheduled to take place from 9 a.m. until noon at the Radisson Plymouth Harbor Hotel, 180 Water St. in Plymouth. It will be open to public observation. Following the business portion of the meeting, the NRC staff will be available to answer questions from the public. |
| | Under NRC regulations, the original operating license for a nuclear power plant has a duration of up to 40 years. The license may be renewed for up to an additional 20 years if NRC requirements are met. Information on the license renewal process is posted on the NRC's web page at http://www.nrc.gov/reactors/operating/licensing/renewal.html. Information specific to Pilgrim's application is posted at: |
| | http://www.nrc.Pgov/reactors/operating/licensing/renewal/applications/pilgrim.html.}} |
Letter Sequence Other |
---|
|
Results
Other: ML062080142, ML062480361, ML062480362, ML062480381, ML062480383, ML062480388, ML062480391, ML062510295, ML062510296, ML062510299, ML062510302, ML062510306, ML062510307, ML062510324, ML062510346, ML062510350, ML062510355, ML062510359, ML062510361, ML063050380, ML063050385, ML063050388, ML063050392, ML063050396, ML063050501, ML063050504, ML063050506, ML063050512, ML063050514, ML063050518, ML063050603, ML063050610, ML063050613, ML063060239, ML063060249, ML063060259, ML063060267, ML063060296, ML063060299, ML063060302, ML063060309, ML063060322, ML063070187, ML063070190, ML063070217, ML063070219, ML063070220, ML063070222, ML063070225, ML063070232... further results
|
|
|
---|
Category:E-Mail
MONTHYEARML22335A2802022-11-0404 November 2022 11-4-2022 Email Transmitting Draft Questions Pertaining to Pilgrim ISFSI Exemption Request ML22270A0422022-09-26026 September 2022 Acknowledgement Email for Holtec'S Request for Reporting Exemption with Regards to the Pilgrim ISFSI Annual Radioactive Effluent Release Report (Docket No. 05000293) ML22154A1622022-05-26026 May 2022 Letter and Email from Save Our Bay/Diane Turco Regarding Irradiated Water Release from Pilgrim ML22007A2602021-12-0606 December 2021 E-mail from P. O'Brien, Holtec, to A. Snyder, NRC, on Pilgrim Effluent Discharge ML21287A6192021-10-14014 October 2021 E-mail from S. Phillips, MEMA, to A. Snyder, NRC, Pilgrim Nuclear Power Station, Commonwealth of Massachusetts Consultation Response to Amendment Review for Emergency Preparedness ML21266A2512021-09-23023 September 2021 Consultation with Commonwealth of Massachusetts Regarding Proposed Amendment Application for Emergency Plan and Emergency Action Levels ML21266A2772021-09-23023 September 2021 HDI Clarification of Exemption Requested from 10 CFR 20, Appendix G, Section Iii.E ML21267A0012021-09-23023 September 2021 E-mail from A. Snyder, NRC, to A. Sterdis, Holtec, - Pilgrim Nuclear Power Station - Request for Exemption from 10 CFR 20, Appendix G, Section Iii.E Acceptance Review ML21257A3832021-09-15015 September 2021 E-mail from A. Snyder, NRC, to A. Sterdis, Holtec, - Pilgrim Nuclear Power Station - Follow-on Request Re Request for Additional Information 2 Pilgrim - License Amendment Request Independent Spent Fuel Storage Installation Only Emergency Pl ML21211A5912021-07-22022 July 2021 Consultation Response from Commonwealth of Massachusetts Regarding Proposed Pilgrim ISFSI Only Technical Specifications ML21211A5162021-07-22022 July 2021 Consultation Response from Commonwealth of Massachusetts Regarding Proposed Pilgrim ISFSI Only Physical Security Plan ML21200A2352021-07-13013 July 2021 Consultation Request to Commonwealth of Massachusetts Regarding Proposed Pilgrim ISFSI Only Technical Specifications ML21200A1522021-07-13013 July 2021 Consultation Request to Commonwealth of Massachusetts Regarding Proposed Pilgrim Isfi Only Physical Security Plan ML21176A1842021-06-25025 June 2021 Email from HDI Regarding Pilgrim Nuclear Power Station Training ML21180A0582021-06-17017 June 2021 Email from Region I Regarding Pilgrim Nuclear Power Station Inspection - EA-13-132 ML21097A0402021-04-0606 April 2021 E-Mail Consult with Commonwealth of Mass Re - Amendment Application - Physical Security Plan for the Pilgrim Nuclear Power Station L-20-092, Email Pilgrim Nuclear Power Station-Exemption from Annual Force-On-Force Exercise Requirements of 10 CFR Part 73, Appendix B,2020-12-10010 December 2020 Email Pilgrim Nuclear Power Station-Exemption from Annual Force-On-Force Exercise Requirements of 10 CFR Part 73, Appendix B, L-20-096, Supplemental Information to Support Physical Security Plan Revision and License Amendment Request to Incorporate Alternate Measures - Holtec Email Dated December 10, 20102020-12-10010 December 2020 Supplemental Information to Support Physical Security Plan Revision and License Amendment Request to Incorporate Alternate Measures - Holtec Email Dated December 10, 2010 ML20328A2982020-11-16016 November 2020 Response from Commonwealth of Massachusetts on No Significant Hazard for Pilgrim ISFSI Amendment to Address ISFSI II Dated November 16, 2020 ML20297A2372020-10-22022 October 2020 Request for Additional Information - HDI Fleet Decommissioning Quality Assurance Program ML20266G4032020-09-22022 September 2020 Acceptance Review Email - Request for Approval of HDI Fleet Decommissioning Quality Assurance Program, Revision 0 ML20163A6802020-06-11011 June 2020 Confirmation of the Scope of the Requested Regulatory Relief for Pilgrim Security Qualifications ML20280A1912020-04-17017 April 2020 Request for Additional Information- Clarifying Information for Pilgrim ISFSI Physical Security Amendment Application ML20269A3542020-03-0505 March 2020 CFR 26.717 Reports 2019 Transmittal Email ML19336A0302019-11-27027 November 2019 OEDO-15-00479 - Re 2.206 Petition Regarding Pilgrim Nuclear Power Station'S Current Licensing Basis for Flooding ML19336A0332019-11-26026 November 2019 OEDO-15-00479 - E-mail to Petitioner - 2.206 Petition Regarding Pilgrim Nuclear Power Station'S Current Licensing Basis for Flooding (CAC No. MF6460; EPID L-2015-CRS-0002)- Issuance of Final Director'S Decision ML19331A1952019-11-21021 November 2019 NRR E-mail Capture - (External_Sender) Pilgrim Nuclear Power Station - Commonwealth Consultation Response - Amendment Regarding Site Emergency Plan and Emergency Action Level Scheme ML19331A1732019-11-12012 November 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station -Consult with Commonwealth - Amendment Regarding Cyber Security Plan ML19331A1642019-11-0505 November 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station -Consult with Commonwealth - Amendment Regarding Site Emergency Plan and Emergency Action Level Scheme ML19331A1792019-11-0505 November 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station - EA and Fonsi for Pilgrim Emergency Planning Exemption CY-19-007, LTR-19-0441 Henrietta Cosentino, E-mail SECY-19-0078 Request by Entergy Nuclear Operations Inc. for Exemptions from Certain Emergency Planning Requirements for the Pilgrim Nuclear Power Station2019-11-0404 November 2019 LTR-19-0441 Henrietta Cosentino, E-mail SECY-19-0078 Request by Entergy Nuclear Operations Inc. for Exemptions from Certain Emergency Planning Requirements for the Pilgrim Nuclear Power Station ML19275H1962019-09-24024 September 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station - Consult with Commonwealth - Amendment Regarding Permanently Defueled Technical Specifications (PDTS) ML19239A0372019-08-26026 August 2019 E-mail from Entergy Dated August 26, 2019, Notification of Pilgrim License Transfer ML19239A0262019-08-23023 August 2019 LTR-19-0330 Janet Azarovitz, E-mail a Plea for More Time and Reasonable Discussion Including the Citizens of the Commonwealth in the Sale of the Pilgrim Nuclear Power Station ML19234A2072019-08-20020 August 2019 LTR-19-0328 Lawrence Delafield, President, Six Ponds Improv Assoc., Plymouth, Ma, Ltr Requests NRC to Postpone Consideration of Transferring the Licenses for the Pilgrim Nuclear Power Until the NRC Has Answered Concerns by Pilgrim Watch, Se ML19232A4032019-08-20020 August 2019 LTR-19-0322 Diane Turco, Director, Cape Downwinders, Massachusetts, Letter/E-mail Requests Suspension of the Pilgrim License Transfer from Entergy to Holtec Until the Adjudicatory Hearing Is Held and Raised Contentions Are Resolved ML19308A9942019-08-19019 August 2019 Entergy Nuclear Operations, Inc. Confirmatory Order Rescission Supplemental Information ML19226A3912019-08-14014 August 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station - EA and Fonsi for Pilgrim Decommissioning Trust Fund Exemption (Holtec) ML19226A3962019-08-14014 August 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station -Consult with Commonwealth - Conforming Amendment in Support of Pilgrim License Transfer Application ML19226A1212019-08-13013 August 2019 OEDO-15-00479-2.206 Petition Regarding Pilgrim Nuclear Power Station'S Current Licensing Basis for Flooding - Status (CAC No. MF6460; EPID L-2015-CRS-0002) ML19227A1032019-08-0707 August 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station - Draft Wording for Potential Condition of License Transfer Order ML19207B3662019-07-26026 July 2019 NRR E-mail Capture - Pilgrim - RAI Direct and Indirect Transfer of Lic.; Conforming Lic. Amend.; Req. for Exemption 10 CFR 50.82(A)(8)(I)(A) for Holtec Decom. International, Llc ML19176A3452019-06-25025 June 2019 2.206 Petition Regarding Pilgrim Nuclear Power Station'S Current Licensing Basis for Flooding - Information (OEDO-15-00479) (CAC No. MF6460; EPID L-2015-CRS-0002) ML19154A0652019-06-0303 June 2019 NRR E-mail Capture - Pilgrim - Permanent Cessation of Power Operations ML19154A5242019-06-0303 June 2019 NRR E-mail Capture - RAI - Pilgrim Post-Decommissioning Technical Specifications (PDTS) License Amendment Request (LAR) ML19161A2122019-05-20020 May 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station - Acceptance of License Amendment Request to Remove Cyber Security Plan Requirements ML19123A0332019-05-0101 May 2019 NRR E-mail Capture - Logbook Entry: 05/01/2019 Endangered Species Report Regarding a Confirmed Sighting of North Atlantic Right Whale(S) (Balaena Glacialis) ML19122A4912019-04-29029 April 2019 NRR E-mail Capture - Logbook Entry: 04/29/2019 Regarding the Confirmed Sighting of Ten North Atlantic Right Whales (Balaena Glacialis) ML19108A2372019-04-18018 April 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station - Acceptance of Requested Licensing Action, Proposed Exemptions from 10 CFR 50.54(w)(1) - On-Site Property Damage Insurance ML19108A2362019-04-18018 April 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station - Acceptance of Requested Licensing Action, Proposed Exemptions from 10 CFR 140.11(a)(4) - Primary and Secondary Liability Insurance 2022-09-26
[Table view] Category:Press Release
MONTHYEARPress Release-19-056, NRC Approves Changes to Pilgrim Nuclear Power Station'S Emergency Planning Requirements2019-11-0404 November 2019 Press Release-19-056: NRC Approves Changes to Pilgrim Nuclear Power Station'S Emergency Planning Requirements Press Release-19-041, NRC Approves License Transfer for Pilgrim Nuclear Power Plant2019-08-23023 August 2019 Press Release-19-041: NRC Approves License Transfer for Pilgrim Nuclear Power Plant Press Release-19-039, NRC Announces Public Meetings Dates and Venues for Community Advisory Boards Near Decommissioning Nuclear Power Plants2019-08-21021 August 2019 Press Release-19-039: NRC Announces Public Meetings Dates and Venues for Community Advisory Boards Near Decommissioning Nuclear Power Plants Press Release-I-19-004, NRC to Hold Public Meeting to Discuss 2018 Performance of Pilgrim Nuclear Power Station2019-03-19019 March 2019 Press Release-I-19-004: NRC to Hold Public Meeting to Discuss 2018 Performance of Pilgrim Nuclear Power Station Press Release-I-19-002, NRC to Hold Public Meeting for Comments on Pilgrim Nuclear Power Plant Decommissioning Activities Report2019-01-0808 January 2019 Press Release-I-19-002: NRC to Hold Public Meeting for Comments on Pilgrim Nuclear Power Plant Decommissioning Activities Report Press Release-I-19-001, NRC to Conduct Public Webinar to Discuss Pilgrim Nuclear Power Plant Decommissioning Topics2019-01-0303 January 2019 Press Release-I-19-001: NRC to Conduct Public Webinar to Discuss Pilgrim Nuclear Power Plant Decommissioning Topics Press Release-I-18-022, NRC Names New Senior Resident Inspector at Pilgrim Nuclear Plant2018-10-0404 October 2018 Press Release-I-18-022: NRC Names New Senior Resident Inspector at Pilgrim Nuclear Plant Press Release-I-18-003, NRC Staff to Conduct Public Meeting to Discuss 2017 Performance of Pilgrim Nuclear Power Plant2018-03-19019 March 2018 Press Release-I-18-003: NRC Staff to Conduct Public Meeting to Discuss 2017 Performance of Pilgrim Nuclear Power Plant Press Release-IV-18-002, NRC Issues Confirmatory Order to Entergy2018-03-14014 March 2018 Press Release-IV-18-002: NRC Issues Confirmatory Order to Entergy Press Release-18-008, NRC Issues Annual Assessments for Nation'S Nuclear Plants2018-03-0505 March 2018 Press Release-18-008: NRC Issues Annual Assessments for Nation'S Nuclear Plants Press Release-I-17-028, NRC Issues Confirmatory Action Letter to Pilgrim Nuclear Power Plant on Safety Performance Improvement Commitments2017-08-0202 August 2017 Press Release-I-17-028: NRC Issues Confirmatory Action Letter to Pilgrim Nuclear Power Plant on Safety Performance Improvement Commitments Press Release-I-17-026, NRC to Hold Regulatory Conference with Entergy Regarding Apparent Violation at Pilgrim Nuclear Power Plant2017-07-12012 July 2017 Press Release-I-17-026: NRC to Hold Regulatory Conference with Entergy Regarding Apparent Violation at Pilgrim Nuclear Power Plant Press Release-I-17-005, NRC to Hold Pilgrim Nuclear Plant Public Exit Meeting for Inspection, Annual Assessment Discussion2017-03-14014 March 2017 Press Release-I-17-005: NRC to Hold Pilgrim Nuclear Plant Public Exit Meeting for Inspection, Annual Assessment Discussion Press Release-I-17-002, NRC Plans Plymouth Public Meeting to Discuss Reviews at Pilgrim Nuclear Power Plant2017-01-30030 January 2017 Press Release-I-17-002: NRC Plans Plymouth Public Meeting to Discuss Reviews at Pilgrim Nuclear Power Plant Press Release-I-16-030, NRC to Perform Wide-Ranging Team Inspection at Pilgrim Nuclear Power Plant; Review Supports Agency'S Increased Oversight2016-11-28028 November 2016 Press Release-I-16-030: NRC to Perform Wide-Ranging Team Inspection at Pilgrim Nuclear Power Plant; Review Supports Agency'S Increased Oversight Press Release-I-16-020, New NRC Resident Inspector Assigned to Pilgrim Nuclear Plant2016-07-15015 July 2016 Press Release-I-16-020: New NRC Resident Inspector Assigned to Pilgrim Nuclear Plant Press Release-I-16-010, NRC to Hold Regulatory Performance Public Meeting Regarding Pilgrim Nuclear Power Plant on April 13 in Plymouth, Mass2016-04-0505 April 2016 Press Release-I-16-010: NRC to Hold Regulatory Performance Public Meeting Regarding Pilgrim Nuclear Power Plant on April 13 in Plymouth, Mass Press Release-16-011, NRC Issues Annual Assessments for Nation'S Nuclear Plants2016-03-0404 March 2016 Press Release-16-011: NRC Issues Annual Assessments for Nation'S Nuclear Plants Press Release-I-16-003, NRC Creates Web Page on Increased Oversight of Pilgrim Nuclear Power Plant2016-02-18018 February 2016 Press Release-I-16-003: NRC Creates Web Page on Increased Oversight of Pilgrim Nuclear Power Plant Press Release-15-068, NRC Accelerates Schedule for Earthquake Risk Analysis at U.S. Reactors2015-10-27027 October 2015 Press Release-15-068: NRC Accelerates Schedule for Earthquake Risk Analysis at U.S. Reactors Press Release-I-15-035a: NRC to Increase Oversight of Pilgrim Nuclear Power Plant Based on New Inspection Finding, Press Release-I-15-035a: NRC to Increase Oversight of Pilgrim Nuclear Power Plant Based on New Inspection Finding2015-09-0202 September 2015 Press Release-I-15-035a: NRC to Increase Oversight of Pilgrim Nuclear Power Plant Based on New Inspection Finding Press Release-I-15-031, NRC to Hold Regulatory Conference with Entergy on July 8th Regarding Apparent Violation at Pilgrim Nuclear Power Plant2015-06-26026 June 2015 Press Release-I-15-031: NRC to Hold Regulatory Conference with Entergy on July 8th Regarding Apparent Violation at Pilgrim Nuclear Power Plant Press Release-I-15-006, NRC to Hold Regulatory Performance Public Meeting Regarding Pilgrim Nuclear Power Plant on March 18th2015-03-0909 March 2015 Press Release-I-15-006: NRC to Hold Regulatory Performance Public Meeting Regarding Pilgrim Nuclear Power Plant on March 18th Press Release-I-15-003, NRC Initiates Special Inspection at Pilgrim Nuclear Power Plant2015-02-0202 February 2015 Press Release-I-15-003: NRC Initiates Special Inspection at Pilgrim Nuclear Power Plant Press Release-I-14-029, NRC Assigns New Senior Resident Inspector to Pilgrim Nuclear Plant2014-06-24024 June 2014 Press Release-I-14-029: NRC Assigns New Senior Resident Inspector to Pilgrim Nuclear Plant Press Release-I-14-018, NRC to Meet with Entergy on May 1st to Discuss Performance of Pilgrim Nuclear Power Plant2014-04-21021 April 2014 Press Release-I-14-018: NRC to Meet with Entergy on May 1st to Discuss Performance of Pilgrim Nuclear Power Plant Press Release-14-016, NRC Issues Annual Assessments for Nation'S Nuclear Plants2014-03-0606 March 2014 Press Release-14-016: NRC Issues Annual Assessments for Nation'S Nuclear Plants Press Release-I-13-042, NRC Assigns New Resident Inspector to Pilgrim Station2013-12-0505 December 2013 Press Release-I-13-042: NRC Assigns New Resident Inspector to Pilgrim Station Press Release-I-13-041, NRC Region I Office to Conduct Webinar on Use of Dry Cask Storage at Pilgrim Nuclear Power Plant2013-12-0202 December 2013 Press Release-I-13-041: NRC Region I Office to Conduct Webinar on Use of Dry Cask Storage at Pilgrim Nuclear Power Plant ML13335A0022013-11-13013 November 2013 G20130211 - 11/13/13 E-mail from T.Judson to R.Guzman - Supplement #5 to 2.206 Petition Financial Qualifications Fitzpatrick/Vermont Yankee/Pilgrim Press Release-I-13-011, NRC to Hold Open House on April 2 in Plymouth, Mass., to Discuss Pilgrim Nuclear Power Plant Annual Assessment2013-03-28028 March 2013 Press Release-I-13-011: NRC to Hold Open House on April 2 in Plymouth, Mass., to Discuss Pilgrim Nuclear Power Plant Annual Assessment Press Release-I-13-003, NRC Monitors Pilgrim Station After Loss of Offsite Power and Unusual Event Declaration2013-02-0909 February 2013 Press Release-I-13-003: NRC Monitors Pilgrim Station After Loss of Offsite Power and Unusual Event Declaration Press Release-12-099, NRC Issues Mid-Cycle Assessments for Nation? Nuclear Plants2012-09-0606 September 2012 Press Release-12-099: NRC Issues Mid-Cycle Assessments for Nation? Nuclear Plants Press Release-I-12-028, Oral Arguments Session on Request for Hearing on NRC Orders Planned for June 7 in Boston2012-05-30030 May 2012 Press Release-I-12-028: Oral Arguments Session on Request for Hearing on NRC Orders Planned for June 7 in Boston Press Release-12-063, NRC Renews Operating License for Pilgrim Nuclear Power Plant for an Additional 20 Years2012-05-29029 May 2012 Press Release-12-063: NRC Renews Operating License for Pilgrim Nuclear Power Plant for an Additional 20 Years Press Release-12-062, Nuclear Regulatory Commission Authorizes Staff to Renew Operating License for Pilgrim Nuclear Power Plant2012-05-25025 May 2012 Press Release-12-062: Nuclear Regulatory Commission Authorizes Staff to Renew Operating License for Pilgrim Nuclear Power Plant Press Release-I-12-011, NRC to Hold Open House on March 29 in Plymouth, Mass., to Discuss Annual Assessment of Pilgrim Nuclear Power Plant2012-03-22022 March 2012 Press Release-I-12-011: NRC to Hold Open House on March 29 in Plymouth, Mass., to Discuss Annual Assessment of Pilgrim Nuclear Power Plant Press Release-I-11-042, NRC Cites Pilgrim Nuclear Power Plant for Inspection Findings of Low to Moderate Safety Significance2011-11-21021 November 2011 Press Release-I-11-042: NRC Cites Pilgrim Nuclear Power Plant for Inspection Findings of Low to Moderate Safety Significance Press Release-11-159, NRC Makes Preparations for Approach of Hurricane Irene; Dispatches Additional Inspectors to Nuclear Plants2011-08-26026 August 2011 Press Release-11-159: NRC Makes Preparations for Approach of Hurricane Irene; Dispatches Additional Inspectors to Nuclear Plants Press Release-IV-11-038, NRC Issues Confirmatory Order to Entergy with Actions to Improve Quality Control and Employee Concerns Programs2011-08-25025 August 2011 Press Release-IV-11-038: NRC Issues Confirmatory Order to Entergy with Actions to Improve Quality Control and Employee Concerns Programs Press Release-11-124, NRC Issues Supplemental Safety Evaluation for Pilgrim Nuclear Power Plant License Renewal2011-07-0606 July 2011 Press Release-11-124: NRC Issues Supplemental Safety Evaluation for Pilgrim Nuclear Power Plant License Renewal Press Release-I-11-017, NRC to Hold Public Meeting on June 1st in Plymouth, Mass., to Discuss Annual Assessment of Pilgrim Nuclear Power Plant2011-05-23023 May 2011 Press Release-I-11-017: NRC to Hold Public Meeting on June 1st in Plymouth, Mass., to Discuss Annual Assessment of Pilgrim Nuclear Power Plant Press Release-I-11-013, NRC Begins Special Inspection at Pilgrim Nuclear Power Plant2011-05-16016 May 2011 Press Release-I-11-013: NRC Begins Special Inspection at Pilgrim Nuclear Power Plant Press Release-I-11-004, Licensing Board Grants Motion Expediting March 9th Proceedings Plymouth, Mass., on Pilgrim License Renewal Contention2011-02-24024 February 2011 Press Release-I-11-004: Licensing Board Grants Motion Expediting March 9th Proceedings Plymouth, Mass., on Pilgrim License Renewal Contention Press Release-I-11-002, Licensing Board to Hold Evidentiary Hearing on March 9th in Plymouth, Mass., on Pilgrim License Renewal Contention2011-02-16016 February 2011 Press Release-I-11-002: Licensing Board to Hold Evidentiary Hearing on March 9th in Plymouth, Mass., on Pilgrim License Renewal Contention Press Release-I-10-015, NRC to Hold Public Meeting on April 13 with Entergy Nuclear to Discuss Results of Independent Safety Culture Surveys2010-04-0606 April 2010 Press Release-I-10-015: NRC to Hold Public Meeting on April 13 with Entergy Nuclear to Discuss Results of Independent Safety Culture Surveys Press Release-III-10-007, NRC to Hold Public Meeting with Entergy Nuclear Operations Inc2010-03-26026 March 2010 Press Release-III-10-007: NRC to Hold Public Meeting with Entergy Nuclear Operations Inc Press Release-I-10-009, NRC to Hold Open House on March 30, in Plymouth, Mass. to Discuss Annual Assessment of Pilgrim Nuclear Power Plant2010-03-23023 March 2010 Press Release-I-10-009: NRC to Hold Open House on March 30, in Plymouth, Mass. to Discuss Annual Assessment of Pilgrim Nuclear Power Plant Press Release-I-09-013, NRC to Hold Meeting on March 26 in Plymouth, Mass., to Discuss Annual Assessment of Performance for Pilgrim Nuclear Plant2009-03-19019 March 2009 Press Release-I-09-013: NRC to Hold Meeting on March 26 in Plymouth, Mass., to Discuss Annual Assessment of Performance for Pilgrim Nuclear Plant Press Release-08-138, NRC Staff Approves Transfer of Entergy Operating Licenses to New Corporate Structure2008-07-28028 July 2008 Press Release-08-138: NRC Staff Approves Transfer of Entergy Operating Licenses to New Corporate Structure 2019-08-23
[Table view] |
Text
K9lt Howard - NRC To Discuss Pilgrim Audit Findings Page_1 From: Neil Sheehan To: OPA@nrc.gov Date: 7/13/2006 2:30:52 PM
Subject:
NRC To Discuss Pilgrim Audit Findings For release in about 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> CC: Betsy Keeling; Brenda Akstulewicz; Dennis Rathbun; Elizabeth Hackley; Janet Schlueter; Josephine Piccone; Marjorie McLaughlin; Nancy Belmore; Nancy McNamara; Raeann Shane; Ram Subbaratnam; Rebecca Schmidt; Rosetta Virgilio; Thomas Combs; Valerie Shannon
'cAtemp\GW)00001.TMP Page 111 IIc:\tem~AGWlOOOO1 .TMP Paae 1 II I
Mail Envelope Properties (44B6914D.128 21: 55678)
Subject:
NRC To Discuss Pilgrim Audit Findings Creation Date 7/13/2006 2:30:37 PM From: Neil Sheehan Created By: NAS @nrc.gov Recipients OWGWPO01.HQGWDO01 BAA CC (Brenda Akstulewicz)
NDB2 CC (Nancy Belmore)
OWGWPOO2.HQGWDOO1 EFH1 CC (Elizabeth Hackley)
OWGWPOO3.HQGWDOO1 TRC CC (Thomas Combs)
OWGWPOO4.HQGWDOO1 BJK CC (Betsy Keeling)
TWGWPO02.HQGWDOO1 JRS 1 CC (Janet Schlueter)
RLS8 CC (Rebecca Schmidt)
RMS2 CC (Raeann Shane)
RXS2 CC (Ram Subbaratnam)
VAS CC (Valerie Shannon)
TWGWPO03.HQGWDO01 DKR CC (Dennis Rathbun)
JMPI CC (Josephine Piccone)
TWGWPO04.HQGWDOO1 ROV CC (Rosetta Virgilio) kpl-po.KPDO MMM3 CC (Marjorie McLaughlin)
NTM CC (Nancy McNamara) nrc.gov TWGWPO02.HQGWDOO]1 OPA (OPA@nrc.gov)
11cAtemEAGWI00001.TMP Page 2 11 II c-,-:---t -- -;,,\-., .O.,1.TM P . . . ...... "- 11 I
Post Office Route OWGWPO01 .HQGWDOO1 OWGWPO02.HQGWDO01 OWGWPOO3.HQGWDOO1 OWGWPOO4.HQGWDO01 TWGWPO02.HQGWDO01 TWGWPO03.HQGWDO01 TWGWPO04.HQGWDO01 kpl-po.KPDO TWGWPO02.HQGWDO01 nrc.gov Files Size Date & Time MESSAGE 370 7/13/2006 2:30:37 PM Pilgrim-audit.wpd 30336 7/13/2006 2:24:28 PM Options Expiration Date: None Priority: Standard ReplyRequested: No Return Notification: None Concealed
Subject:
No Security: Standard Junk Mail Handling Evaluation Results Message is not eligible for Junk Mail handling Message is from an internal sender Junk Mail settings when this message was delivered Junk Mail handling disabled by User Junk Mail handling disabled by Administrator Junk List is not enabled Junk Mail using personal address books is not enabled Block List is not enabled
NRC NEWS U.S. NUCLEAR REGULATORY COMMISSION Office of Public Affairs, Region I 475 Allendale Road, King of Prussia, Pa.
www.nrc.gov No. 1-06-040 July 13, 2006
Contact:
Diane Screnci, 610/337-5330 E-mail: opal@nrc.gov Neil Sheehan, 610/337-5331 NRC TO MEET WITH ENTERGY ON JULY 19 th TO DISCUSS PILGRIM LICENSE RENEWAL AUDIT FINDINGS The Nuclear Regulatory Commission staff will meet with Entergy representatives on Wednesday, July 19, to discuss the findings of a team audit associated with the license renewal application for the Pilgrim nuclear power plant. Entergy submitted the application to the NRC in late January. It seeks an additional 20 years of operation for the plant, which is located in Plymouth, Mass.
The current operatinglicense for the facility is set to expire on June 8, 2012.
The NRC performs audits early in the license renewal review process to evaluate whether the application is consistent with established guidance and NRC staff positions. Additional technical reviews, including inspections, of the application will take place over the next 12 months.
The conclusions from the audits, technical reviews and inspections will be incorporated into a safety evaluation report, which is expected to be issued next July.
The meeting is scheduled to take place from 9 a.m. until noon at the Radisson Plymouth Harbor Hotel, 180 Water St. in Plymouth. It will be open to public observation. Following the business portion of the meeting, the NRC staff will be available to answer questions from the public.
Under NRC regulations, the original operating license for a nuclear power plant has a duration of up to 40 years. The license may be renewed for up to an additional 20 years if NRC requirements are met. Information on the license renewal process is posted on the NRC's web page at http://www.nrc.gov/reactors/operating/licensing/renewal.html. Information specific to Pilgrim's application is posted at:
http://www.nrc.Pgov/reactors/operating/licensing/renewal/applications/pilgrim.html.