ML11166A134: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 2: Line 2:
| number = ML11166A134
| number = ML11166A134
| issue date = 06/22/2011
| issue date = 06/22/2011
| title = 06/08/2011 Meeting Summary with the Beyond Nuclear Petitioners Regarding Their 2.206 Petition to Suspend Operating Licenses (Ols) of General Electric (GE) Boiling Water Reactors (Bwrs) Mark I (Bwrs)
| title = Meeting Summary with the Beyond Nuclear Petitioners Regarding Their 2.206 Petition to Suspend Operating Licenses (Ols) of General Electric (GE) Boiling Water Reactors (Bwrs) Mark I (Bwrs)
| author name = Lingam S
| author name = Lingam S
| author affiliation = NRC/NRR/DORL/LPLII-2
| author affiliation = NRC/NRR/DORL/LPLII-2
Line 19: Line 19:


=Text=
=Text=
{{#Wiki_filter:UNITED NUCLEAR REGULATORY WASHINGTON, D.C. 20555-0001 June 22, 2011 LICENSEES:
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 June 22, 2011 LICENSEES: SEE ENCLOSURE 1 FACILITIES:     SEE ENCLOSURE 1
SEE ENCLOSURE 1 FACILITIES:
SEE ENCLOSURE 1  


==SUBJECT:==
==SUBJECT:==


==SUMMARY==
==SUMMARY==
OF JUNE 8,2011, MEETING WITH BEYOND NUCLEAR REGARDING THEIR 10 CFR 2.206 PETITION TO SUSPEND OPERATING LICENSES (OLs) OF GENERAL ELECTRIC (GE) MARK I BOILING WATER REACTORS (BWRs) (TAC NO. ME6040) On June 8,2011, a Category 3 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of the Beyond Nuclear at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland.
OF JUNE 8,2011, MEETING WITH BEYOND NUCLEAR REGARDING THEIR 10 CFR 2.206 PETITION TO SUSPEND OPERATING LICENSES (OLs) OF GENERAL ELECTRIC (GE) MARK I BOILING WATER REACTORS (BWRs) (TAC NO. ME6040)
The list of attendees is provided as Enclosure
On June 8,2011, a Category 3 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of the Beyond Nuclear at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland. The list of attendees is provided as Enclosure 2.
: 2. On April 13, 2011, Mr. Paul Gunter and Mr. Kevin Kamps representing Beyond Nuclear, hereafter called as the petitioners, submitted a petition pursuant to Title 10 of the Code of Federal Regulations (10 CFR) 2.206 regarding the suspension of OLs of GE Mark 1 BWRs. The purpose of the meeting was to provide the petitioners an opportunity to address the NRC Petition Review Board (PRB). As described in Management Directive 8.11, "Review Process for 10 CFR 2.206 Petitions," the petitioners are provided the opportunity to address the PRB in order to provide any relevant additional explanation and support for the petition in advance of the PRB's evaluation.
On April 13, 2011, Mr. Paul Gunter and Mr. Kevin Kamps representing Beyond Nuclear, hereafter called as the petitioners, submitted a petition pursuant to Title 10 of the Code of Federal Regulations (10 CFR) 2.206 regarding the suspension of OLs of GE Mark 1 BWRs.
The meeting was recorded by the NRC's Operations Center and transcribed by a court reporter.
The purpose of the meeting was to provide the petitioners an opportunity to address the NRC Petition Review Board (PRB).
The transcript is provided as Enclosure
As described in Management Directive 8.11, "Review Process for 10 CFR 2.206 Petitions," the petitioners are provided the opportunity to address the PRB in order to provide any relevant additional explanation and support for the petition in advance of the PRB's evaluation. The meeting was recorded by the NRC's Operations Center and transcribed by a court reporter.
: 3. Members of the public were in attendance.
The transcript is provided as Enclosure 3.
Public Meeting Feedback forms were not received.
Members of the public were in attendance. Public Meeting Feedback forms were not received.
-Please direct any inquiries to me at 301-415-1564, or at Siva.Lingam@nrc.gov. Docket Nos. 50-259, 50-260, 50-341, 50-333, 50-366, 50-354,


50-277, 50-278, 50-254, 50-265, and  
                                              - 2 Please direct any inquiries to me at 301-415-1564, or at Siva.Lingam@nrc.gov.
s.",~      ~'    ~
Siva P. Lingam, Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-259, 50-260, 50-296, 50-325,50-324,50-298, 50-237,50-249,50-331, 50-341, 50-333, 50-321, 50-366, 50-354, 50-263, 50-245,50-220,50-219, 50-277, 50-278, 50-293, 50-254, 50-265, and 50-271


==Enclosures:==
==Enclosures:==
: 1. List of Licensees and Facilities
: 1. List of Licensees and Facilities
: 2. List of Attendees
: 2. List of Attendees
: 3. Transcript cc w/encls: Mr. Paul Gunter, Director Reactor Oversight Project Beyond Nuclear 6930 Carroll Avenue Suite Takoma Park, MD Additional Distribution via Listserv Siva P. Lingam, Project Plant Licensing Branch Division of Operating Reactor Office of Nuclear Reactor Mr. Kevin Kamps, Nuclear Waste Beyond 6930 Carroll Suite Takoma Park, MD JUNE LIST OF LICENSEES AND 10 CFR 2.206 PETITION PUBLIC BEYOND PRESENTATION BEFORE THE NRC PETITION REVIEW Licensee Tennessee Valley Authority Progress Energy Nebraska Public Power District Exelon Corporation, LLC FPL Group, Inc. Detroit Edison Company Entergy Nuclear Operations, Inc. PSEG Nuclear, LLC Northern Power States Company Dominion Generation Constellation Energy Exelon Corporation, LLC Exelon Corporation, LLC Entergy Nuclear Operations, Inc. Exelon Corporation, LLC Entergy Nuclear Operations, Inc. Facility Browns Ferry 1, 2 and Brunswick 1 and Cooper Dresden 2 and Duane Arnold Fermi Fitzpatrick Hope Creek Monticello Millstone 1
: 3. Transcript cc w/encls:
Nine Mile Point Oyster Creek Peach Bottom 2 and Pilgrim Quad Cities 1 and Vermont Yankee Enclosure JUNE 8, LIST OF 10 CFR 2.206 PETITION PUBLIC BEYOND PRESENTATION BEFORE THE NRC PETITION REVIEW BOARD Beyond Nuclear Paul Kevin Co-petitioners (By Mary Lampert (Pilgrim Raymond Shadis (New England Patricia Birnie (GE Stockholders' David Kraft (New Energy Information Doug Scott Patrick Vijay Gerry Siva P. Kamal Tanya Sam Robert Edward NRC (By Jim Clifford (Region Harold Christensen (Region David Hills (Region Vijay Meghani (Region Tom Farnholtz (Region Public* Alfred Meyer Entergy Nuclear Dave Mannai Janet Ecker, Morgan-Lewis Tennessee Valley Authority Scott Vance GE Hitachi Nuclear Energy Patricia Campbell Nuclear Energy Institute Stu Minghan Morgan Meguire, LLC Tom Porter *Due to the number of co-petitioners, the high volume of calls from licensees and the public, and time constraints, identification of all the participants was not feasible.
Mr. Paul Gunter, Director                            Mr. Kevin Kamps, Director Reactor Oversight Project                           Nuclear Waste Specialist Beyond Nuclear                                      Beyond Nuclear 6930 Carroll Avenue                                  6930 Carroll Avenue Suite 400                                            Suite 400 Takoma Park, MD 20912                                Takoma Park, MD 20912 Additional Distribution via Listserv
Only the names of co-petitioners who presented to the PRB, as well as the names of representatives from the licensees and the public, who attended the meeting in person, have been included in this list. Enclosure 2 
-2 Please direct any inquiries to me at 301-415-1564, or at Siva.Lingam@nrc.gov. IRA! Siva P. Lingam, Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-259, 50-260, 50-296, 50-325, 50-324, 50-298, 50-237, 50-249, 50-331, 50-341, 50-333, 50-321, 50-366, 50-354, 50-263, 50-245, 50-220, 50-219, 50-277, 50-278, 50-293, 50-254, 50-265, and 50-271


==Enclosures:==
JUNE 8,2011 LIST OF LICENSEES AND FACILITIES 10 CFR 2.206 PETITION PUBLIC MEETING BEYOND NUCLEAR PRESENTATION BEFORE THE NRC PETITION REVIEW BOARD Licensee                                      Facility Tennessee Valley Authority                    Browns Ferry 1, 2 and 3 Progress Energy                                Brunswick 1 and 2 Nebraska Public Power District                Cooper 1 Exelon Corporation, LLC                        Dresden 2 and 3 FPL Group, Inc.                               Duane Arnold 1 Detroit Edison Company                        Fermi 2 Entergy Nuclear Operations, Inc.               Fitzpatrick 1 PSEG Nuclear, LLC                              Hope Creek 1 Northern Power States Company                  Monticello 1 Dominion Generation                            Millstone 1 (decommissioned)
: 1. List of Licensees and Facilities
Constellation Energy                          Nine Mile Point 1 Exelon Corporation, LLC                        Oyster Creek 1 Exelon Corporation, LLC                        Peach Bottom 2 and 3 Entergy Nuclear Operations, Inc.              Pilgrim 1 Exelon Corporation, LLC                        Quad Cities 1 and 2 Entergy Nuclear Operations, Inc.              Vermont Yankee 1 Enclosure 1
: 2. List of Attendees
 
: 3. Transcript cc w/encls: Mr. Paul Gunter, Director Mr. Kevin Kamps, Director Reactor Oversight Project Nuclear Waste Specialist Beyond Nuclear Beyond Nuclear 6930 Carroll Avenue 6930 Carroll Avenue Suite 400 Suite 400 Takoma Park, MD 20912 Takoma Park, MD 20912 Additional Distribution via Listserv DISTRIBUTION:
JUNE 8, 2011 LIST OF ATTENDEES 10 CFR 2.206 PETITION PUBLIC MEETING BEYOND NUCLEAR PRESENTATION BEFORE THE NRC PETITION REVIEW BOARD (PRB)
PUBLIC RidsNrrPMPeachBottom SRosenberg, NRR LPL2-2 r/f RidsNrrPMPilgrim CSteger, NRR RidsNrrDorlLpl2-2 RidsNrrPMQuadCities PCastleman, OCM RidsAcrsAcnw MailCTR RidsNrrPMSequoyah MClark,OGC RidsNrrLACSola Resource RidsNrrPMVermontYankee KSexton, OGC RidsOgcRp Resource RidsRgn1 MailCenter Resource ESmith, NRR RidsNrrDpr RidsRgn2MailCenter Resource JClifford Region 1 RidsNrrPMBrownsFerry RidsRgn3MailCenter Resource HChristensen, Region 2 RidsNrrPMBrunswick RidsRgn4MailCenter Resource DHills, Region 3 RidsNrrPMCooper MBanic, NRR VMeghani, Region 3 RidsNrrPMDresden DBroaddus, NRR TFarnholtz, Region 4 RidsNrrPMDuaneArnold SBurnell, NRR GBowman, EDO RidsNrrPMFermi VGoel, NRR DMerzke, EDO Region 2 RidsNrrPMFitzpatrick RNelson, NRR SBush-Goddard, EDO Regions 1, 2 & 4 RidsNrrPMHopeCreek KManoly, NRR GGulla,OE RidsNrrPMMonticello TMensah, NRR RidsNrrPMOysterCreek SMiranda, NRR ADAMS Accession Nos. ADAMS PACKAGE ML11166A137 Meeting Notice ML11126A096 Meeting Summary ML11166A134 Meeting Transcript ML11167A114 OFFICE LPL2-2/PM LPL2-2/LA LPL2-2/BC LPL2-2/PM NAME SLingam CSoia DBroaddus SLingam DATE 06/21/11 06/21/11 06/22/11 06/22/11 OFFICIAL RECORD COPY}}
Beyond Nuclear (Petitioners)                                  Public*
Paul Gunter                                                  Alfred Meyer Kevin Kamps Co-petitioners (By Phone)*
Mary Lampert (Pilgrim Watch)
Raymond Shadis (New England Coalition)
Patricia Birnie (GE Stockholders' Alliance)
David Kraft (New Energy Information Service)
Entergy Nuclear Doug Broaddus                                                Dave Mannai Scott Burnell                                                Janet Ecker, Morgan-Lewis Patrick Castleman Vijay Gael                                                    Tennessee Valley Authority Gerry Gulla Siva P. Lingam                                                Scott Vance Kamal Manoly Tanya Mensah Sam Miranda                                                  GE Hitachi Nuclear Energy Robert Nelson Edward Smith                                                  Patricia Campbell NRC (By Phone)                                                Nuclear Energy Institute Jim Clifford (Region 1)                                      Stu Minghan Harold Christensen (Region 2)
David Hills (Region 3)                                        Morgan Meguire, LLC Vijay Meghani (Region 3)
Tom Farnholtz (Region 4)                                      Tom Porter
*Due to the number of co-petitioners, the high volume of calls from licensees and the public, and time constraints, identification of all the participants was not feasible. Only the names of co-petitioners who presented to the PRB, as well as the names of representatives from the licensees and the public, who attended the meeting in person, have been included in this list.
Enclosure 2
 
ADAMS PACKAGE ML11166A137                       Meeting Notice     ML11126A096 Meeting Summary     ML11166A134                 Meeting Transcript ML11167A114 OFFICE         LPL2-2/PM             LPL2-2/LA                   LPL2-2/BC                     LPL2-2/PM NAME         SLingam                 CSoia                       DBroaddus                     SLingam DATE         06/21/11               06/21/11                   06/22/11                     06/22/11}}

Latest revision as of 04:27, 6 December 2019

Meeting Summary with the Beyond Nuclear Petitioners Regarding Their 2.206 Petition to Suspend Operating Licenses (Ols) of General Electric (GE) Boiling Water Reactors (Bwrs) Mark I (Bwrs)
ML11166A134
Person / Time
Site: Millstone, Hatch, Monticello, Dresden, Peach Bottom, Browns Ferry, Nine Mile Point, Fermi, Oyster Creek, Hope Creek, Cooper, Pilgrim, Brunswick, Vermont Yankee, Duane Arnold, Quad Cities, FitzPatrick
Issue date: 06/22/2011
From: Siva Lingam
Plant Licensing Branch II
To: Gunter P, Kamps K
Beyond Nuclear, Constellation Energy Group, Detroit Edison, Dominion Generation, Entergy Nuclear Operations, Exelon Corp, Florida Power & Light Group, Nebraska Public Power District (NPPD), Northern States Power Co, Progress Energy Co, Public Service Enterprise Group, Tennessee Valley Authority
lingam s p
Shared Package
ML11166A137 List:
References
TAC ME6040, 2.206
Download: ML11166A134 (5)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 June 22, 2011 LICENSEES: SEE ENCLOSURE 1 FACILITIES: SEE ENCLOSURE 1

SUBJECT:

SUMMARY

OF JUNE 8,2011, MEETING WITH BEYOND NUCLEAR REGARDING THEIR 10 CFR 2.206 PETITION TO SUSPEND OPERATING LICENSES (OLs) OF GENERAL ELECTRIC (GE) MARK I BOILING WATER REACTORS (BWRs) (TAC NO. ME6040)

On June 8,2011, a Category 3 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of the Beyond Nuclear at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland. The list of attendees is provided as Enclosure 2.

On April 13, 2011, Mr. Paul Gunter and Mr. Kevin Kamps representing Beyond Nuclear, hereafter called as the petitioners, submitted a petition pursuant to Title 10 of the Code of Federal Regulations (10 CFR) 2.206 regarding the suspension of OLs of GE Mark 1 BWRs.

The purpose of the meeting was to provide the petitioners an opportunity to address the NRC Petition Review Board (PRB).

As described in Management Directive 8.11, "Review Process for 10 CFR 2.206 Petitions," the petitioners are provided the opportunity to address the PRB in order to provide any relevant additional explanation and support for the petition in advance of the PRB's evaluation. The meeting was recorded by the NRC's Operations Center and transcribed by a court reporter.

The transcript is provided as Enclosure 3.

Members of the public were in attendance. Public Meeting Feedback forms were not received.

- 2 Please direct any inquiries to me at 301-415-1564, or at Siva.Lingam@nrc.gov.

s.",~ ~' ~

Siva P. Lingam, Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-259, 50-260, 50-296, 50-325,50-324,50-298, 50-237,50-249,50-331, 50-341, 50-333, 50-321, 50-366, 50-354, 50-263, 50-245,50-220,50-219, 50-277, 50-278, 50-293, 50-254, 50-265, and 50-271

Enclosures:

1. List of Licensees and Facilities
2. List of Attendees
3. Transcript cc w/encls:

Mr. Paul Gunter, Director Mr. Kevin Kamps, Director Reactor Oversight Project Nuclear Waste Specialist Beyond Nuclear Beyond Nuclear 6930 Carroll Avenue 6930 Carroll Avenue Suite 400 Suite 400 Takoma Park, MD 20912 Takoma Park, MD 20912 Additional Distribution via Listserv

JUNE 8,2011 LIST OF LICENSEES AND FACILITIES 10 CFR 2.206 PETITION PUBLIC MEETING BEYOND NUCLEAR PRESENTATION BEFORE THE NRC PETITION REVIEW BOARD Licensee Facility Tennessee Valley Authority Browns Ferry 1, 2 and 3 Progress Energy Brunswick 1 and 2 Nebraska Public Power District Cooper 1 Exelon Corporation, LLC Dresden 2 and 3 FPL Group, Inc. Duane Arnold 1 Detroit Edison Company Fermi 2 Entergy Nuclear Operations, Inc. Fitzpatrick 1 PSEG Nuclear, LLC Hope Creek 1 Northern Power States Company Monticello 1 Dominion Generation Millstone 1 (decommissioned)

Constellation Energy Nine Mile Point 1 Exelon Corporation, LLC Oyster Creek 1 Exelon Corporation, LLC Peach Bottom 2 and 3 Entergy Nuclear Operations, Inc. Pilgrim 1 Exelon Corporation, LLC Quad Cities 1 and 2 Entergy Nuclear Operations, Inc. Vermont Yankee 1 Enclosure 1

JUNE 8, 2011 LIST OF ATTENDEES 10 CFR 2.206 PETITION PUBLIC MEETING BEYOND NUCLEAR PRESENTATION BEFORE THE NRC PETITION REVIEW BOARD (PRB)

Beyond Nuclear (Petitioners) Public*

Paul Gunter Alfred Meyer Kevin Kamps Co-petitioners (By Phone)*

Mary Lampert (Pilgrim Watch)

Raymond Shadis (New England Coalition)

Patricia Birnie (GE Stockholders' Alliance)

David Kraft (New Energy Information Service)

Entergy Nuclear Doug Broaddus Dave Mannai Scott Burnell Janet Ecker, Morgan-Lewis Patrick Castleman Vijay Gael Tennessee Valley Authority Gerry Gulla Siva P. Lingam Scott Vance Kamal Manoly Tanya Mensah Sam Miranda GE Hitachi Nuclear Energy Robert Nelson Edward Smith Patricia Campbell NRC (By Phone) Nuclear Energy Institute Jim Clifford (Region 1) Stu Minghan Harold Christensen (Region 2)

David Hills (Region 3) Morgan Meguire, LLC Vijay Meghani (Region 3)

Tom Farnholtz (Region 4) Tom Porter

  • Due to the number of co-petitioners, the high volume of calls from licensees and the public, and time constraints, identification of all the participants was not feasible. Only the names of co-petitioners who presented to the PRB, as well as the names of representatives from the licensees and the public, who attended the meeting in person, have been included in this list.

Enclosure 2

ADAMS PACKAGE ML11166A137 Meeting Notice ML11126A096 Meeting Summary ML11166A134 Meeting Transcript ML11167A114 OFFICE LPL2-2/PM LPL2-2/LA LPL2-2/BC LPL2-2/PM NAME SLingam CSoia DBroaddus SLingam DATE 06/21/11 06/21/11 06/22/11 06/22/11