Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML24004A04731 January 2024U.S. Nuclear Regulatory Commission Summary of the November 16, 2023, Observation Public Meeting to Discuss NuScales Us600 Exemption RequestExemption Request
ML24025A13731 January 2024Summary of Observation Pre-Submittal Meeting Held with Snc., Regarding a Proposed Alternative Request - Explosively Actuated Valves for Vogtle Electric Generating Plant, Units 3 and 4
ML24017A27831 January 2024Memorandum - Aco Conference Call Summary Jan 17, 2024 Re Phase Ii+ RAI
ML24019A19330 January 2024Summary of January 8, 2024, Observation Pre-Submittal Meeting Held with Southern Nuclear Operating Company Regarding a Proposed LAR for Vogtle Electric Generating Plant, Units 1, 2, 3, & 4; Hatch, Units 1 & 2; Farley, Units 1 & 2
ML24019A03430 January 2024Public Meeting Summary - 01-04-2024 - Comanche Peak LRA - Structures Monitoring Program
ML24012A15930 January 2024Summary of January 8, 2024, Meeting Held with Southern Nuclear Operating Company, Inc., to Discuss a RAI License Amendment Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Head Bolts
ML24024A16325 January 2024January 17, 2024, Summary of Meeting with Triso-X, LLC, to Align on the Triso-X Draft Environmental Impact Analysis Requests for Additional Information Part 2-2
ML24009A05524 January 2024Summary of January 8, 2024, Presubmittal Meeting Between the U.S. Nuclear Regulatory Commission and Constellation Energy Generation, LLC, Regarding Removal of the Power Distribution Monitoring System from Technical Specifications
ML24016A00523 January 2024Summary of Meeting with Holtec Decommissioning International, LLC, Regarding Power Operations Technical Specifications
ML23324A43323 January 202410/16-17/2023 Summary of Routine NRC Site Visit at the Oyster Creek Nuclear Generating Station to Discuss License Termination Plans and Other Technical Topics
ML24018A17719 January 2024Summary of August 30, 2023, Presubmittal Meeting Between the U.S. Nuclear Regulatory Commission and Constellation Energy Generation, LLC, Regarding Relaxation of Inspection Requirements for the Head Penetration P-75 Flaw
ML24008A15918 January 2024Summary of December 13, 2023, Meeting with Tennessee Valley Authority Regarding a Proposed Change to the Tennessee Valley Authority Nuclear Quality Assurance Plan
ML23362A06616 January 202412-19-23 Summary of Meeting with Triso-X, LLC, to Align on Triso-X Draft Environmental Safety Request for Additional Information
ML23317A00112 January 2024Audit Summary Regarding LAR to Clarify Support System Requirements for the Residual Heat Removal and Control Room Air Conditioning System Under Technical Specifications 3.4.8, 3.7.11, and 3.9.6
ML23352A0599 January 2024Summary of December 11, 2023, Meeting with Constellation on Alternative Request Involving Carbon Fiber Reinforced Polymer Composite
ML24008A0808 January 2024Kairos Power LLC, Summary of 11/2/2023, Public Meeting to Discuss Material Control and Accounting
ML23363A0943 January 2024Summary of October 4, 2023, Pre Submittal Meeting Between the U.S. NRC and Constellation Energy Generation, LLC, Regarding Revising Technical Specification 3.7.9. Ultimate Heat Sink (UHS)Ultimate heat sink
ML23362A0042 January 2024Documentation of Cancelled September 1, 2023, Presubmittal Meeting Between the NRC and Constellation Energy Generation, LLC, Regarding 6-Month Extension of Certain Reactor Pressure Vessel Weld Inspections
ML23356A02827 December 2023December 11, 2023, Pre-Application Meeting with SNC Regarding a Proposed Fleet LAR to Revise TS 5.3.1 to Relocate Training Qualification Requirements from TS to Their Qatr/Ndqam
ML23353A18327 December 2023Summary of Meeting on December 4, 2023, with TRISO-X LLC, to Align on TRISO-X Draft Responses to the Requests for Additional Information for the Chemical Safety Analysis
ML23352A38219 December 2023Summary of December 11, 2023, Presubmittal Meeting Between the U.S. Nuclear Regulatory Commission and Constellation Energy Generation, LLC, Regarding Deletion of Technical Specification 5.6.5.b.5
ML23345A10914 December 2023December 7, 2023, Summary of Public Meeting with Virginia Electric and Power Company Concerning a License Amendment Request to Revise Emergency Augmentation Times for North Anna Station, Units 1 & 2, and Surry Station, Units 1 & 2
ML23338A2598 December 2023Summary of Observation Public Meeting Held with Southern Nuclear Operating Company, Inc., Regarding a License Amendment Request for the Reactor Pressure Vessel Head Closure Bolts for Hatch, Units 1 & 2 (EPID No. L-2022-LLA- 0120)
ML23313A20621 November 2023Summary of Meeting with Framatome, Inc., to Discuss Framatome'S Response to NRC Staff'S Request for Additional Information for License Amendment Request Submittal
ML23313A11721 November 2023October 26, 2023 Summary of Holtec International Pre-decisional Enforcement ConferenceFinite Element Analysis
ML23311A13017 November 2023Summary of Nov. 6, 2023, - Closed Meeting Held with Southern Nuclear Operating Company, Inc., Regarding Physical Barriers Exemptions for Hatch Units 1 & 2, Farley Units 1 & 2 and Vogtle Units 1, 2, 3 & 4 (EPID L-2023-LLE-0018 & L-2023-LLE-0Exemption Request
ML23320A24717 November 2023Constellation - Summary of November 14, 2023, Public Pre-Application Meeting with Constellation Energy Generation, LLC on Adoption of TSTF-591Probabilistic Risk Assessment
ML23313A09516 November 2023Summary of November 7, 2023, Observation Pre-Submittal Meeting Held with Southern Nuclear Operating Company, Inc., Regarding a Proposed License Amendment Request for Vogtle Electric Generating Plant, Units 1 and 2Ultimate heat sink
Mission time
Chernobyl
Power Uprate
ML23320A03216 November 2023Meeting Summary - NuScale Sdaa - NuScale NRC Management Public Meeting November 7, 2023 (Non-prop)
ML23311A36414 November 2023Summary of September 28, 2023, Meeting with NAC International, Inc. to Discuss Submittal of the Application for Magnastor Amendments 15 and 16
ML23325A24413 November 2023Enclosure 1 - Attendance List
ML23325A24313 November 2023Regulatory Conference Summary
ML23325A24513 November 2023Enclosure 2 - Dominion SlidesUltimate heat sink
Mission time
FLEX
Large early release frequency
Fire Protection Program
ML23289A22213 November 2023Summary of Call with the U.S. Department of Commerce, National Institute of Standards and Technology: Special Nuclear Material License Number-362 Renewal Application
ML23317A11113 November 2023Cimarron Environmental Response Trust - October 18, 2023, Project Status Teleconference Notes
ML23331A7899 November 2023Nov. 2023 Enviro Scoping Meetings Related to the V.C. Summer Subsequent License Renewal Application Meeting SummaryLicense Renewal
Subsequent License Renewal
ML23305A0099 November 2023Summary of the October 26, 2023 Meeting with Tennessee Historical Commission Regarding Section 106 Consultations
ML23313A1599 November 2023U.S. Nuclear Regulatory Commission Summary of the October 10, 2023, Public Meeting to Discuss Monticello'S Condensate Backwash Receiving Tank Fatigue Evaluation
ML23312A2488 November 20237-5-23 Email Summary of Meeting to Discuss Draft ISA RAIs for Alignment
ML23303A2186 November 2023Summary of October 16, 2023, Pre-Submittal Teleconference with Wolf Creek Nuclear Operating Corporation Regarding a License Amendment Request to Adopt TSTF-505 for Wolf Creek Generating Station, Unit 1Probabilistic Risk Assessment
ML23304A0686 November 2023Summary of October 24, 2023, Public Mtg W/Tennessee Valley Authority Regarding Proposed License Amendment Request for Watts Bar Nuclear Plant, Units 1 and 2, and Sequoyah Nuclear Plant, Units 1 and 2 to Revise Function 5, Turbine Trip and F