| title = 06/25/2013 Summary of Public Meeting to Discuss the 2012 Kewaunee Power Station End-of-Cycle Performance Assessment
| title = Summary of Public Meeting to Discuss the 2012 Kewaunee Power Station End-of-Cycle Performance Assessment
| author name = Riemer K R
| author name = Riemer K
| author affiliation = NRC/RGN-III/DRP/B2
| author affiliation = NRC/RGN-III/DRP/B2
| addressee name =  
| addressee name =  
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 July 24, 2013 LICENSEE: Dominion Energy Kewaunee, Inc.  
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 July 24, 2013 LICENSEE:       Dominion Energy Kewaunee, Inc.
 
FACILITY:       Kewaunee Power Station
FACILITY: Kewaunee Power Station


==SUBJECT:==
==SUBJECT:==


==SUMMARY==
==SUMMARY==
OF THE JUNE 25, 2013, PUBLIC MEETING TO DISCUSS THE 2012 KEWAUNEE POWER STATION E ND-OF-CYCLE PERFORMANCE ASSESSMENT  
OF THE JUNE 25, 2013, PUBLIC MEETING TO DISCUSS THE 2012 KEWAUNEE POWER STATION END-OF-CYCLE PERFORMANCE ASSESSMENT On June 25, 2013, a public meeting was held at the Town Hall in the Town of Carlton, WI, between the U.S. Nuclear Regulatory Commission (NRC), the Kewaunee Power Station management, and the public to discuss NRC activities, nuclear power issues, Kewaunee Power Station performance for the period of January 1, 2012, through December 31, 2012, and the decommissioning of Kewaunee Power Station. The NRC letter and meeting notice for this public meeting can be found in the Agencywide Documents Access and Management System (ADAMS) as ML13161A396 and ML13161A428, respectively. The presentation that was shown during the public meeting can also be found in ADAMS as ML13204A138.
 
The NRC began the meeting with an overview of the NRCs Reactor Oversight Program (ROP),
On June 25, 2013, a public meeting was held at the Town Hall in the Town of Carlton, WI, between the U.S. Nuclear Regulatory Commission (NRC), the Kewaunee Power Station management, and the public to discuss NRC activit ies, nuclear power issues, Kewaunee Power Station performance for the period of January 1, 2012, through December 31, 2012, and the decommissioning of Kewaunee Power Station. The NRC letter and meeting notice for this public meeting can be found in the Agencywide Documents Access and Management System (ADAMS) as ML13161A396 and ML13161A428, respectively. The presentation that was shown during the public meeting can also be found in ADAMS as ML13204A138.
national ROP results, and the Action Matrix in general. This was followed by a discussion of the NRCs assessment of the performance of Kewaunee Power Station and a general discussion on the transition to a plant undergoing decommissioning. As part of this regulatory performance meeting, the licensee briefly responded to the NRCs assessment. At the end of the meeting, members of the public were given the opportunity to ask questions of NRC officials. A list of principal meeting attendees can be found in the attached enclosure.
The NRC began the meeting with an overview of t he NRC's Reactor Oversight Program (ROP), national ROP results, and the Action Matrix in general. This was followed by a discussion of the  
                                            /RA by N. Shah for/
 
Kenneth Riemer, Branch Chief Branch 2 Division of Reactor Projects Docket No. 50-305 License No. DPR-43
NRC's assessment of the performance of Kewaunee Power Station and a general discussion on the transition to a plant undergoing decommissioning. As part of this regulatory performance meeting, the licensee briefly responded to the NRC's assessment. At the end of the meeting, members of the public were given the opportunity to ask questions of NRC officials. A list of principal meeting attendees can be found in the attached enclosure.  
 
      /RA by N. Shah for/
Kenneth Riemer, Branch Chief Branch 2 Division of Reactor Projects Docket No. 50-305 License No. DPR-43  


==Enclosure:==
==Enclosure:==
As stated  
As stated cc w/encl: Distribution via ListServTM
 
cc w/encl: Distribution via ListServ TM Enclosure NRC REGION III July 25, 2013
 
MEETING ATTENDANCE LIST
 
Nuclear Regulatory Commission K. O'Brien, Deputy Director, Division of Reactor Projects, Region III K. Riemer, Chief, Branch 2, Division of Reactor Projects, Region III R. Krsek, Senior Resident Inspector, Kewaunee Power Station
 
K. Barclay, Resident Inspector, Kewaunee Power Station V. Mitlyng, Senior Public Affairs Officer, Region III P. Chandrathil, Public Affairs Officer, Region III K. Haskins, Administrative Assistant, Kewaunee Power Station J. Mancuso, Rector Engineer, Region III
 
Dominion A. Jordon, Site Vice President, Kewaunee Power Station


R. Simmons, Plant Manager, Kewaunee Power Station J. Stafford, Director Safety and Licensing, Kewaunee Power Station UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL  60532-4352 July 24, 2013 LICENSEE: Dominion Energy Kewaunee
NRC REGION III July 25, 2013 MEETING ATTENDANCE LIST Nuclear Regulatory Commission K. OBrien, Deputy Director, Division of Reactor Projects, Region III K. Riemer, Chief, Branch 2, Division of Reactor Projects, Region III R. Krsek, Senior Resident Inspector, Kewaunee Power Station K. Barclay, Resident Inspector, Kewaunee Power Station V. Mitlyng, Senior Public Affairs Officer, Region III P. Chandrathil, Public Affairs Officer, Region III K. Haskins, Administrative Assistant, Kewaunee Power Station J. Mancuso, Rector Engineer, Region III Dominion A. Jordon, Site Vice President, Kewaunee Power Station R. Simmons, Plant Manager, Kewaunee Power Station J. Stafford, Director Safety and Licensing, Kewaunee Power Station Enclosure


FACILITY: Kewaunee Power Station
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 July 24, 2013 LICENSEE:          Dominion Energy Kewaunee FACILITY:         Kewaunee Power Station


==SUBJECT:==
==SUBJECT:==


==SUMMARY==
==SUMMARY==
OF THE JUNE 25, 2013, PUBLIC MEETING TO DISCUSS THE 2012 KEWAUNEE POWER STATION E ND-OF-CYCLE PERFORMANCE ASSESSMENT  
OF THE JUNE 25, 2013, PUBLIC MEETING TO DISCUSS THE 2012 KEWAUNEE POWER STATION END-OF-CYCLE PERFORMANCE ASSESSMENT On June 25, 2013, a public meeting was held at the Town Hall in the Town of Carlton, WI, between the U.S. Nuclear Regulatory Commission (NRC), the Kewaunee Power Station management, and the public to discuss NRC activities, nuclear power issues, Kewaunee Power Station performance for the period of January 1, 2012, through December 31, 2012, and the decommissioning of Kewaunee Power Station. The NRC letter and meeting notice for this public meeting can be found in the Agencywide Documents Access and Management System (ADAMS) as ML13161A396 and ML13161A428, respectively. The presentation that was shown during the public meeting can also be found in ADAMS as ML13204A138.
The NRC began the meeting with an overview of the NRCs Reactor Oversight Program (ROP),
national ROP results, and the Action Matrix in general. This was followed by a discussion of the NRCs assessment of the performance of Kewaunee Power Station and a general discussion on the transition to a plant undergoing decommissioning. As part of this regulatory performance meeting, the licensee briefly responded to the NRCs assessment. At the end of the meeting, members of the public were given the opportunity to ask questions of NRC officials. A list of principal meeting attendees can be found in the attached enclosure.
                                                      /RA by N. Shah for/
Kenneth Riemer, Branch Chief Branch 2 Division of Reactor Projects Docket No. 50-305 License No. DPR-43


On June 25, 2013, a public meeting was held at the Town Hall in the Town of Carlton, WI, between the U.S. Nuclear Regulatory Commission (NRC), the Kewaunee Power Station management, and the public to discuss NRC activit ies, nuclear power issues, Kewaunee Power Station performance for the period of January 1, 2012, through December 31, 2012, and the decommissioning of Kewaunee Power Station. The NRC letter and meeting notice for this public meeting can be found in the Agencywide Documents Access and Management System (ADAMS) as ML13161A396 and ML13161A428, respectively. The presentation that was shown during the public meeting can also be found in ADAMS as ML13204A138.
==Enclosure:==
The NRC began the meeting with an overview of t he NRC's Reactor Oversight Program (ROP), national ROP results, and the Action Matrix in general. This was followed by a discussion of the
As stated cc w/encl: Distribution via ListServTM DOCUMENT NAME: KEW EOC 2012 Public Meeting Summary Publicly Available                Non-Publicly Available    Sensitive        Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE        RIII-DRP                  RIII-DRP                RIII NAME          NShah for                NShah for MZiolkowski:rj            KRiemer DATE          07/24/13                  07/24/13 OFFICIAL RECORD COPY
 
NRC's assessment of the performance of Kewaunee Power Station and a general discussion on the transition to a plant undergoing decommissioning. As part of this regulatory performance meeting, the licensee briefly responded to the NRC's assessment. At the end of the meeting, members of the public were given the opportunity to ask questions of NRC officials. A list of principal meeting attendees can be found in the attached enclosure.
      /RA by N. Shah for/
Kenneth Riemer, Branch Chief Branch 2 Division of Reactor Projects Docket No. 50-305 License No. DPR-43


==Enclosure:==
Letter to Dominion Energy Kewaunee from K. Reimer dated July 24, 2014
As stated cc w/encl:  Distribution via ListServ TM  DOCUMENT NAME:  KEW EOC 2012 Public Meeting Summary  Publicly Available  Non-Publicly Available  Sensitive  Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII-DRP  RIII-DRP  RIII  NAME NShah for MZiolkowski:rj NShah for KRiemer  DATE 07/24/13 07/24/13  OFFICIAL RECORD COPY Letter to Dominion Energy Kewaunee from K. Reimer dated July 24, 2014  


==SUBJECT:==
==SUBJECT:==


==SUMMARY==
==SUMMARY==
OF THE JUNE 25, 2013, PUBLIC MEETING TO DISCUSS THE 2012 KEWAUNEE POWER STATION E ND-OF-CYCLE PERFORMANCE ASSESSMENT  
OF THE JUNE 25, 2013, PUBLIC MEETING TO DISCUSS THE 2012 KEWAUNEE POWER STATION END-OF-CYCLE PERFORMANCE ASSESSMENT DISTRIBUTION:
 
Vivian Campbell RidsNrrDorlLpl3-1 Resource RidsNrrPMKewaunee RidsNrrDirsIrib Resource Chuck Casto Cynthia Pederson Steven Orth Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley Tammy Tomczak ROPreports Resource}}
DISTRIBUTION
: Vivian Campbell  
 
RidsNrrDorlLpl3-1 Resource RidsNrrPMKewaunee RidsNrrDirsIrib Resource  
 
Chuck Casto Cynthia Pederson Steven Orth Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley Tammy Tomczak  
 
ROPreports Resource}}

Latest revision as of 11:42, 5 December 2019

Summary of Public Meeting to Discuss the 2012 Kewaunee Power Station End-of-Cycle Performance Assessment
ML13205A083
Person / Time
Site: Kewaunee Dominion icon.png
Issue date: 07/24/2013
From: Kenneth Riemer
NRC/RGN-III/DRP/B2
To:
References
Download: ML13205A083 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 July 24, 2013 LICENSEE: Dominion Energy Kewaunee, Inc.

FACILITY: Kewaunee Power Station

SUBJECT:

SUMMARY

OF THE JUNE 25, 2013, PUBLIC MEETING TO DISCUSS THE 2012 KEWAUNEE POWER STATION END-OF-CYCLE PERFORMANCE ASSESSMENT On June 25, 2013, a public meeting was held at the Town Hall in the Town of Carlton, WI, between the U.S. Nuclear Regulatory Commission (NRC), the Kewaunee Power Station management, and the public to discuss NRC activities, nuclear power issues, Kewaunee Power Station performance for the period of January 1, 2012, through December 31, 2012, and the decommissioning of Kewaunee Power Station. The NRC letter and meeting notice for this public meeting can be found in the Agencywide Documents Access and Management System (ADAMS) as ML13161A396 and ML13161A428, respectively. The presentation that was shown during the public meeting can also be found in ADAMS as ML13204A138.

The NRC began the meeting with an overview of the NRCs Reactor Oversight Program (ROP),

national ROP results, and the Action Matrix in general. This was followed by a discussion of the NRCs assessment of the performance of Kewaunee Power Station and a general discussion on the transition to a plant undergoing decommissioning. As part of this regulatory performance meeting, the licensee briefly responded to the NRCs assessment. At the end of the meeting, members of the public were given the opportunity to ask questions of NRC officials. A list of principal meeting attendees can be found in the attached enclosure.

/RA by N. Shah for/

Kenneth Riemer, Branch Chief Branch 2 Division of Reactor Projects Docket No. 50-305 License No. DPR-43

Enclosure:

As stated cc w/encl: Distribution via ListServTM

NRC REGION III July 25, 2013 MEETING ATTENDANCE LIST Nuclear Regulatory Commission K. OBrien, Deputy Director, Division of Reactor Projects, Region III K. Riemer, Chief, Branch 2, Division of Reactor Projects, Region III R. Krsek, Senior Resident Inspector, Kewaunee Power Station K. Barclay, Resident Inspector, Kewaunee Power Station V. Mitlyng, Senior Public Affairs Officer, Region III P. Chandrathil, Public Affairs Officer, Region III K. Haskins, Administrative Assistant, Kewaunee Power Station J. Mancuso, Rector Engineer, Region III Dominion A. Jordon, Site Vice President, Kewaunee Power Station R. Simmons, Plant Manager, Kewaunee Power Station J. Stafford, Director Safety and Licensing, Kewaunee Power Station Enclosure

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 July 24, 2013 LICENSEE: Dominion Energy Kewaunee FACILITY: Kewaunee Power Station

SUBJECT:

SUMMARY

OF THE JUNE 25, 2013, PUBLIC MEETING TO DISCUSS THE 2012 KEWAUNEE POWER STATION END-OF-CYCLE PERFORMANCE ASSESSMENT On June 25, 2013, a public meeting was held at the Town Hall in the Town of Carlton, WI, between the U.S. Nuclear Regulatory Commission (NRC), the Kewaunee Power Station management, and the public to discuss NRC activities, nuclear power issues, Kewaunee Power Station performance for the period of January 1, 2012, through December 31, 2012, and the decommissioning of Kewaunee Power Station. The NRC letter and meeting notice for this public meeting can be found in the Agencywide Documents Access and Management System (ADAMS) as ML13161A396 and ML13161A428, respectively. The presentation that was shown during the public meeting can also be found in ADAMS as ML13204A138.

The NRC began the meeting with an overview of the NRCs Reactor Oversight Program (ROP),

national ROP results, and the Action Matrix in general. This was followed by a discussion of the NRCs assessment of the performance of Kewaunee Power Station and a general discussion on the transition to a plant undergoing decommissioning. As part of this regulatory performance meeting, the licensee briefly responded to the NRCs assessment. At the end of the meeting, members of the public were given the opportunity to ask questions of NRC officials. A list of principal meeting attendees can be found in the attached enclosure.

/RA by N. Shah for/

Kenneth Riemer, Branch Chief Branch 2 Division of Reactor Projects Docket No. 50-305 License No. DPR-43

Enclosure:

As stated cc w/encl: Distribution via ListServTM DOCUMENT NAME: KEW EOC 2012 Public Meeting Summary Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII-DRP RIII-DRP RIII NAME NShah for NShah for MZiolkowski:rj KRiemer DATE 07/24/13 07/24/13 OFFICIAL RECORD COPY

Letter to Dominion Energy Kewaunee from K. Reimer dated July 24, 2014

SUBJECT:

SUMMARY

OF THE JUNE 25, 2013, PUBLIC MEETING TO DISCUSS THE 2012 KEWAUNEE POWER STATION END-OF-CYCLE PERFORMANCE ASSESSMENT DISTRIBUTION:

Vivian Campbell RidsNrrDorlLpl3-1 Resource RidsNrrPMKewaunee RidsNrrDirsIrib Resource Chuck Casto Cynthia Pederson Steven Orth Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley Tammy Tomczak ROPreports Resource