ML13205A083: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(One intermediate revision by the same user not shown) | |||
Line 2: | Line 2: | ||
| number = ML13205A083 | | number = ML13205A083 | ||
| issue date = 07/24/2013 | | issue date = 07/24/2013 | ||
| title = | | title = Summary of Public Meeting to Discuss the 2012 Kewaunee Power Station End-of-Cycle Performance Assessment | ||
| author name = Riemer K | | author name = Riemer K | ||
| author affiliation = NRC/RGN-III/DRP/B2 | | author affiliation = NRC/RGN-III/DRP/B2 | ||
Line 15: | Line 15: | ||
=Text= | =Text= | ||
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 July 24, 2013 LICENSEE: Dominion Energy Kewaunee, Inc. | ||
FACILITY: Kewaunee Power Station | |||
FACILITY: Kewaunee Power Station | |||
==SUBJECT:== | ==SUBJECT:== | ||
==SUMMARY== | ==SUMMARY== | ||
OF THE JUNE 25, 2013, PUBLIC MEETING TO DISCUSS THE 2012 KEWAUNEE POWER STATION | OF THE JUNE 25, 2013, PUBLIC MEETING TO DISCUSS THE 2012 KEWAUNEE POWER STATION END-OF-CYCLE PERFORMANCE ASSESSMENT On June 25, 2013, a public meeting was held at the Town Hall in the Town of Carlton, WI, between the U.S. Nuclear Regulatory Commission (NRC), the Kewaunee Power Station management, and the public to discuss NRC activities, nuclear power issues, Kewaunee Power Station performance for the period of January 1, 2012, through December 31, 2012, and the decommissioning of Kewaunee Power Station. The NRC letter and meeting notice for this public meeting can be found in the Agencywide Documents Access and Management System (ADAMS) as ML13161A396 and ML13161A428, respectively. The presentation that was shown during the public meeting can also be found in ADAMS as ML13204A138. | ||
The NRC began the meeting with an overview of the NRCs Reactor Oversight Program (ROP), | |||
On June 25, 2013, a public meeting was held at the Town Hall in the Town of Carlton, WI, between the U.S. Nuclear Regulatory Commission (NRC), the Kewaunee Power Station management, and the public to discuss NRC | national ROP results, and the Action Matrix in general. This was followed by a discussion of the NRCs assessment of the performance of Kewaunee Power Station and a general discussion on the transition to a plant undergoing decommissioning. As part of this regulatory performance meeting, the licensee briefly responded to the NRCs assessment. At the end of the meeting, members of the public were given the opportunity to ask questions of NRC officials. A list of principal meeting attendees can be found in the attached enclosure. | ||
The NRC began the meeting with an overview of | /RA by N. Shah for/ | ||
Kenneth Riemer, Branch Chief Branch 2 Division of Reactor Projects Docket No. 50-305 License No. DPR-43 | |||
Kenneth Riemer, Branch Chief Branch 2 Division of Reactor Projects Docket No. 50-305 | |||
==Enclosure:== | ==Enclosure:== | ||
As stated | As stated cc w/encl: Distribution via ListServTM | ||
cc w/encl: | |||
R. Simmons, Plant Manager, Kewaunee Power Station J. Stafford, Director Safety and Licensing, Kewaunee Power Station | NRC REGION III July 25, 2013 MEETING ATTENDANCE LIST Nuclear Regulatory Commission K. OBrien, Deputy Director, Division of Reactor Projects, Region III K. Riemer, Chief, Branch 2, Division of Reactor Projects, Region III R. Krsek, Senior Resident Inspector, Kewaunee Power Station K. Barclay, Resident Inspector, Kewaunee Power Station V. Mitlyng, Senior Public Affairs Officer, Region III P. Chandrathil, Public Affairs Officer, Region III K. Haskins, Administrative Assistant, Kewaunee Power Station J. Mancuso, Rector Engineer, Region III Dominion A. Jordon, Site Vice President, Kewaunee Power Station R. Simmons, Plant Manager, Kewaunee Power Station J. Stafford, Director Safety and Licensing, Kewaunee Power Station Enclosure | ||
FACILITY: Kewaunee Power Station | UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 July 24, 2013 LICENSEE: Dominion Energy Kewaunee FACILITY: Kewaunee Power Station | ||
==SUBJECT:== | ==SUBJECT:== | ||
==SUMMARY== | ==SUMMARY== | ||
OF THE JUNE 25, 2013, PUBLIC MEETING TO DISCUSS THE 2012 KEWAUNEE POWER STATION | OF THE JUNE 25, 2013, PUBLIC MEETING TO DISCUSS THE 2012 KEWAUNEE POWER STATION END-OF-CYCLE PERFORMANCE ASSESSMENT On June 25, 2013, a public meeting was held at the Town Hall in the Town of Carlton, WI, between the U.S. Nuclear Regulatory Commission (NRC), the Kewaunee Power Station management, and the public to discuss NRC activities, nuclear power issues, Kewaunee Power Station performance for the period of January 1, 2012, through December 31, 2012, and the decommissioning of Kewaunee Power Station. The NRC letter and meeting notice for this public meeting can be found in the Agencywide Documents Access and Management System (ADAMS) as ML13161A396 and ML13161A428, respectively. The presentation that was shown during the public meeting can also be found in ADAMS as ML13204A138. | ||
The NRC began the meeting with an overview of the NRCs Reactor Oversight Program (ROP), | |||
national ROP results, and the Action Matrix in general. This was followed by a discussion of the NRCs assessment of the performance of Kewaunee Power Station and a general discussion on the transition to a plant undergoing decommissioning. As part of this regulatory performance meeting, the licensee briefly responded to the NRCs assessment. At the end of the meeting, members of the public were given the opportunity to ask questions of NRC officials. A list of principal meeting attendees can be found in the attached enclosure. | |||
/RA by N. Shah for/ | |||
Kenneth Riemer, Branch Chief Branch 2 Division of Reactor Projects Docket No. 50-305 License No. DPR-43 | |||
==Enclosure:== | |||
As stated cc w/encl: Distribution via ListServTM DOCUMENT NAME: KEW EOC 2012 Public Meeting Summary Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII-DRP RIII-DRP RIII NAME NShah for NShah for MZiolkowski:rj KRiemer DATE 07/24/13 07/24/13 OFFICIAL RECORD COPY | |||
Letter to Dominion Energy Kewaunee from K. Reimer dated July 24, 2014 | |||
==SUBJECT:== | ==SUBJECT:== | ||
==SUMMARY== | ==SUMMARY== | ||
OF THE JUNE 25, 2013, PUBLIC MEETING TO DISCUSS THE 2012 KEWAUNEE POWER STATION | OF THE JUNE 25, 2013, PUBLIC MEETING TO DISCUSS THE 2012 KEWAUNEE POWER STATION END-OF-CYCLE PERFORMANCE ASSESSMENT DISTRIBUTION: | ||
Vivian Campbell RidsNrrDorlLpl3-1 Resource RidsNrrPMKewaunee RidsNrrDirsIrib Resource Chuck Casto Cynthia Pederson Steven Orth Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley Tammy Tomczak ROPreports Resource}} | |||
DISTRIBUTION | |||
RidsNrrDorlLpl3-1 Resource RidsNrrPMKewaunee RidsNrrDirsIrib Resource | |||
Chuck Casto Cynthia Pederson Steven Orth Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley Tammy Tomczak | |||
ROPreports Resource}} |
Latest revision as of 11:42, 5 December 2019
ML13205A083 | |
Person / Time | |
---|---|
Site: | Kewaunee |
Issue date: | 07/24/2013 |
From: | Kenneth Riemer NRC/RGN-III/DRP/B2 |
To: | |
References | |
Download: ML13205A083 (4) | |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 July 24, 2013 LICENSEE: Dominion Energy Kewaunee, Inc.
FACILITY: Kewaunee Power Station
SUBJECT:
SUMMARY
OF THE JUNE 25, 2013, PUBLIC MEETING TO DISCUSS THE 2012 KEWAUNEE POWER STATION END-OF-CYCLE PERFORMANCE ASSESSMENT On June 25, 2013, a public meeting was held at the Town Hall in the Town of Carlton, WI, between the U.S. Nuclear Regulatory Commission (NRC), the Kewaunee Power Station management, and the public to discuss NRC activities, nuclear power issues, Kewaunee Power Station performance for the period of January 1, 2012, through December 31, 2012, and the decommissioning of Kewaunee Power Station. The NRC letter and meeting notice for this public meeting can be found in the Agencywide Documents Access and Management System (ADAMS) as ML13161A396 and ML13161A428, respectively. The presentation that was shown during the public meeting can also be found in ADAMS as ML13204A138.
The NRC began the meeting with an overview of the NRCs Reactor Oversight Program (ROP),
national ROP results, and the Action Matrix in general. This was followed by a discussion of the NRCs assessment of the performance of Kewaunee Power Station and a general discussion on the transition to a plant undergoing decommissioning. As part of this regulatory performance meeting, the licensee briefly responded to the NRCs assessment. At the end of the meeting, members of the public were given the opportunity to ask questions of NRC officials. A list of principal meeting attendees can be found in the attached enclosure.
/RA by N. Shah for/
Kenneth Riemer, Branch Chief Branch 2 Division of Reactor Projects Docket No. 50-305 License No. DPR-43
Enclosure:
As stated cc w/encl: Distribution via ListServTM
NRC REGION III July 25, 2013 MEETING ATTENDANCE LIST Nuclear Regulatory Commission K. OBrien, Deputy Director, Division of Reactor Projects, Region III K. Riemer, Chief, Branch 2, Division of Reactor Projects, Region III R. Krsek, Senior Resident Inspector, Kewaunee Power Station K. Barclay, Resident Inspector, Kewaunee Power Station V. Mitlyng, Senior Public Affairs Officer, Region III P. Chandrathil, Public Affairs Officer, Region III K. Haskins, Administrative Assistant, Kewaunee Power Station J. Mancuso, Rector Engineer, Region III Dominion A. Jordon, Site Vice President, Kewaunee Power Station R. Simmons, Plant Manager, Kewaunee Power Station J. Stafford, Director Safety and Licensing, Kewaunee Power Station Enclosure
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 July 24, 2013 LICENSEE: Dominion Energy Kewaunee FACILITY: Kewaunee Power Station
SUBJECT:
SUMMARY
OF THE JUNE 25, 2013, PUBLIC MEETING TO DISCUSS THE 2012 KEWAUNEE POWER STATION END-OF-CYCLE PERFORMANCE ASSESSMENT On June 25, 2013, a public meeting was held at the Town Hall in the Town of Carlton, WI, between the U.S. Nuclear Regulatory Commission (NRC), the Kewaunee Power Station management, and the public to discuss NRC activities, nuclear power issues, Kewaunee Power Station performance for the period of January 1, 2012, through December 31, 2012, and the decommissioning of Kewaunee Power Station. The NRC letter and meeting notice for this public meeting can be found in the Agencywide Documents Access and Management System (ADAMS) as ML13161A396 and ML13161A428, respectively. The presentation that was shown during the public meeting can also be found in ADAMS as ML13204A138.
The NRC began the meeting with an overview of the NRCs Reactor Oversight Program (ROP),
national ROP results, and the Action Matrix in general. This was followed by a discussion of the NRCs assessment of the performance of Kewaunee Power Station and a general discussion on the transition to a plant undergoing decommissioning. As part of this regulatory performance meeting, the licensee briefly responded to the NRCs assessment. At the end of the meeting, members of the public were given the opportunity to ask questions of NRC officials. A list of principal meeting attendees can be found in the attached enclosure.
/RA by N. Shah for/
Kenneth Riemer, Branch Chief Branch 2 Division of Reactor Projects Docket No. 50-305 License No. DPR-43
Enclosure:
As stated cc w/encl: Distribution via ListServTM DOCUMENT NAME: KEW EOC 2012 Public Meeting Summary Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII-DRP RIII-DRP RIII NAME NShah for NShah for MZiolkowski:rj KRiemer DATE 07/24/13 07/24/13 OFFICIAL RECORD COPY
Letter to Dominion Energy Kewaunee from K. Reimer dated July 24, 2014
SUBJECT:
SUMMARY
OF THE JUNE 25, 2013, PUBLIC MEETING TO DISCUSS THE 2012 KEWAUNEE POWER STATION END-OF-CYCLE PERFORMANCE ASSESSMENT DISTRIBUTION:
Vivian Campbell RidsNrrDorlLpl3-1 Resource RidsNrrPMKewaunee RidsNrrDirsIrib Resource Chuck Casto Cynthia Pederson Steven Orth Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley Tammy Tomczak ROPreports Resource