ML18178A677: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML18178A677
| number = ML18178A677
| issue date = 06/14/2018
| issue date = 06/14/2018
| title = 2018/06/14 - Comment (8) E-mail Regarding T.P. 3&4 Slr EIS Scoping
| title = Comment (8) E-mail Regarding T.P. 3&4 SLR EIS Scoping
| author name = Public Commenter
| author name = Public Commenter
| author affiliation = Public Commenter
| author affiliation = Public Commenter
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:TurkeyPoint34SLREISCEm Resource From:                              alvera99@everyactioncustom.com on behalf of Alvera Pritchard <alvera99
                                    @everyactioncustom.com>
Sent:                              Thursday, June 14, 2018 12:27 PM To:                                TurkeyPoint34SLREIS Resource
 
==Subject:==
[External_Sender] Comments RE: Docket ID NRC-2018-0101 (License Renewal for FPL's Turkey Point)
 
==Dear NRC Staff,==
 
As a resident of South Florida, I am very concerned about the operation of Turkey Point until the early 2050s, especially since the plant is already contaminating nearby resources such as Biscayne Bay National Park and threatening our regions drinking water resources.
I request that the NRC independently evaluate the pollution leaking from the cooling canal system and study alternative cooling technologies that could protect the environment, such as the installation of cooling towers, which are already used for the natural gas plant onsite (Unit 5) and were approved by the NRC for use at the proposed new Turkey Point reactors (Units 6 & 7) that are unlikely to ever be built.
The NRC needs to be aware that Turkey Point and the area around it has already experienced the negative effects of sea level rise and storm surges. The NRC needs to study a range of sea level rise projections and consider those impacts on the plant, the cooling canal system, and the surrounding community, including for emergency evacuation procedures and planning.
Thank you.
Sincerely, Alvera Pritchard 120 W San Marino Dr Miami Beach, FL 33139-1130 1
 
Federal Register Notice:        83FR23726 Comment Number:                8 Mail Envelope Properties      (20180614162659.1.FD6C8DD2BA09F66B)
 
==Subject:==
[External_Sender] Comments RE: Docket ID NRC-2018-0101 (License Renewal for FPL's Turkey Point)
Sent Date:              6/14/2018 12:26:59 PM Received Date:          6/14/2018 12:27:01 PM From:                  alvera99@everyactioncustom.com Created By:            alvera99@everyactioncustom.com Recipients:
Post Office:            everyactioncustom.com Files                          Size                  Date & Time MESSAGE                        1173                  6/14/2018 12:27:01 PM Options Priority:                      Standard Return Notification:            No Reply Requested:                No Sensitivity:                    Normal Expiration Date:
Recipients Received:}}

Latest revision as of 05:07, 2 December 2019

Comment (8) E-mail Regarding T.P. 3&4 SLR EIS Scoping
ML18178A677
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 06/14/2018
From: Public Commenter
Public Commenter
To:
Division of Materials and License Renewal
NRC/NRR/DMLR
References
83FR23726
Download: ML18178A677 (2)


Text

TurkeyPoint34SLREISCEm Resource From: alvera99@everyactioncustom.com on behalf of Alvera Pritchard <alvera99

@everyactioncustom.com>

Sent: Thursday, June 14, 2018 12:27 PM To: TurkeyPoint34SLREIS Resource

Subject:

[External_Sender] Comments RE: Docket ID NRC-2018-0101 (License Renewal for FPL's Turkey Point)

Dear NRC Staff,

As a resident of South Florida, I am very concerned about the operation of Turkey Point until the early 2050s, especially since the plant is already contaminating nearby resources such as Biscayne Bay National Park and threatening our regions drinking water resources.

I request that the NRC independently evaluate the pollution leaking from the cooling canal system and study alternative cooling technologies that could protect the environment, such as the installation of cooling towers, which are already used for the natural gas plant onsite (Unit 5) and were approved by the NRC for use at the proposed new Turkey Point reactors (Units 6 & 7) that are unlikely to ever be built.

The NRC needs to be aware that Turkey Point and the area around it has already experienced the negative effects of sea level rise and storm surges. The NRC needs to study a range of sea level rise projections and consider those impacts on the plant, the cooling canal system, and the surrounding community, including for emergency evacuation procedures and planning.

Thank you.

Sincerely, Alvera Pritchard 120 W San Marino Dr Miami Beach, FL 33139-1130 1

Federal Register Notice: 83FR23726 Comment Number: 8 Mail Envelope Properties (20180614162659.1.FD6C8DD2BA09F66B)

Subject:

[External_Sender] Comments RE: Docket ID NRC-2018-0101 (License Renewal for FPL's Turkey Point)

Sent Date: 6/14/2018 12:26:59 PM Received Date: 6/14/2018 12:27:01 PM From: alvera99@everyactioncustom.com Created By: alvera99@everyactioncustom.com Recipients:

Post Office: everyactioncustom.com Files Size Date & Time MESSAGE 1173 6/14/2018 12:27:01 PM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received: