ML070320601: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:Page 1 of 1 I Monette, Frederick A.From: Metz, William C.Sent: Thursday, October 05, 2006 11:46 AM To: Monette, Frederick A.Cc: Allison, Timothy  
{{#Wiki_filter:Page 1 of 1 I
Monette, Frederick A.
From:           Metz, William C.
Sent:           Thursday, October 05, 2006 11:46 AM To:             Monette, Frederick A.
Cc:             Allison, Timothy


==Subject:==
==Subject:==
Susquehanna Data Needs Attachments:
Susquehanna Data Needs Attachments:     Susquehanna Data Assessment 10-05-06.doc I have fully proofed this, so check it.
Susquehanna Data Assessment 10-05-06.doc I have fully proofed this, so check it.****** * ************  
    ******     * ************     **********
**********  
* William C. Metz, MBA, MISPh.D.
*William C. Metz, MBA, MISPh.D.Director, Center for Integrated Emergency Preparedness Decision & Information Sciences Division Argonne National Laboratory 9700 South Cass Avenue, Bldg 900 Argonne, IL 60439-4832 (630) 252-3271 (voice) (630) 252-5327 (fax) metz4anI.gQ.\{ (e-mail)1/22/2007 INFORMATION NEEDS FOR SUSQUEHANNA STEAM ELECTRIC STATION UNITS 1 AND 2 October 5, 2006 I have reviewed Appendix E, Applicant's Environmental Report -Operating License Renewal Stage, and the two Final Environmental Statements (construction and operation) in advance of the site visit and preparing the Supplemental Environmental Impact Statement.
Director, Center for Integrated Emergency Preparedness Decision & Information Sciences Division Argonne National Laboratory 9700 South Cass Avenue, Bldg 900 Argonne, IL 60439-4832 (630) 252-3271 (voice) (630) 252-5327 (fax)   metz4anI.gQ.\{ (e-mail) 1/22/2007
I have found several instances of where additional information is required or where the information contained in the Environmental Report needs to be presented in a more structured format.2.2.1 Land Use" There is confusion in the acreage totals and breakouts.
 
Mention is made of PPL Susquehanna property and SSES property, is there a difference in the ownership?
INFORMATION NEEDS FOR SUSQUEHANNA STEAM ELECTRIC STATION UNITS 1 AND 2 October 5, 2006 I have reviewed Appendix E, Applicant's Environmental Report - Operating License Renewal Stage, and the two Final Environmental Statements (construction and operation) in advance of the site visit and preparing the Supplemental Environmental Impact Statement. I have found several instances of where additional information is required or where the information contained in the Environmental Report needs to be presented in a more structured format.
For example, in Section 2.4 there is mention of land being leased, is the 65 acre Gould Island in the totals, where does the 88-acre Overlook fit in the totals, and are the "Susquehanna Riverlands" and the "Riverlands Recreation Area" the same, which is the accurate title?" Site land cover/land use percentages are missing -there are no descriptions or percentages for land cover categories, such as, open area (fields, marshes, swamps, beach, cemetary), forests, facilities and structures, parking areas, water (ponds, lakes, canal -whether natural or manmade), and visitor or recreation areas. Reference is made to undeveloped lands, but no actual accounting can be done, while there is mention of developed portions of the land being 487 acres. Developed is assumed to be just the plant structures, cooling towers, and parking areas?* There is no description of the measures or impedinments between the Riverlands Recreation Area and the Protected Area to halt ingress of recreational users, beyond it an assumption that the "security fencing" west of Route II provides that barrier (2. 1-).* There is no description of the railroad and highway that cross the site.* Critical terrain elevations are also not included.2.2.8.3 Offsite Land Use Data should be sufficient.
2.2.1   Land Use
2.2.8.4 Visual Aesthetics and Noise* No description is provided as the height, color of visibility of the facilities and structures and from what distances and locations they can be seen. Appendix A referenced that a discussion as to Issue 73 (Aesthetic impacts) would be found in Section 4.0, but it could not be found.* No information is provided regarding plant and cooling tower noise and what can be heard at the site boundaries or in the Riverlands Recreation Area. Appendix A}}
    "   There is confusion in the acreage totals and breakouts. Mention is made of PPL Susquehanna property and SSES property, is there a difference in the ownership? For example, in Section 2.4 there is mention of land being leased, is the 65 acre Gould Island in the totals, where does the 88-acre Overlook fit in the totals, and are the "Susquehanna Riverlands" and the "Riverlands Recreation Area" the same, which is the accurate title?
    "   Site land cover/land use percentages are missing - there are no descriptions or percentages for land cover categories, such as, open area (fields, marshes, swamps, beach, cemetary), forests, facilities and structures, parking areas, water (ponds, lakes, canal - whether natural or manmade), and visitor or recreation areas. Reference is made to undeveloped lands, but no actual accounting can be done, while there is mention of developed portions of the land being 487 acres. Developed is assumed to be just the plant structures, cooling towers, and parking areas?
* There is no description of the measures or impedinments between the Riverlands Recreation Area and the Protected Area to halt ingress of recreational users, beyond it an assumption that the "security fencing" west of Route II provides that barrier (2. 1-).
* There is no description of the railroad and highway that cross the site.
* Critical terrain elevations are also not included.
2.2.8.3 Offsite Land Use Data should be sufficient.
2.2.8.4 Visual Aesthetics and Noise
* No description is provided as the height, color of visibility of the facilities and structures and from what distances and locations they can be seen. Appendix A referenced that a discussion as to Issue 73 (Aesthetic impacts) would be found in Section 4.0, but it could not be found.
* No information is provided regarding plant and cooling tower noise and what can be heard at the site boundaries or in the Riverlands Recreation Area. Appendix A}}

Revision as of 09:54, 23 November 2019

E-mail from Metz Regarding the Susquehanna Steam Electric Station Data Assessment
ML070320601
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 10/05/2006
From: Metz W
Argonne National Lab (ANL)
To: Monette F
Argonne National Lab (ANL), Office of Nuclear Reactor Regulation
References
TAC MD3021, TAC MD3022
Download: ML070320601 (2)


Text

Page 1 of 1 I

Monette, Frederick A.

From: Metz, William C.

Sent: Thursday, October 05, 2006 11:46 AM To: Monette, Frederick A.

Cc: Allison, Timothy

Subject:

Susquehanna Data Needs Attachments: Susquehanna Data Assessment 10-05-06.doc I have fully proofed this, so check it.

            • * ************ **********
  • William C. Metz, MBA, MISPh.D.

Director, Center for Integrated Emergency Preparedness Decision & Information Sciences Division Argonne National Laboratory 9700 South Cass Avenue, Bldg 900 Argonne, IL 60439-4832 (630) 252-3271 (voice) (630) 252-5327 (fax) metz4anI.gQ.\{ (e-mail) 1/22/2007

INFORMATION NEEDS FOR SUSQUEHANNA STEAM ELECTRIC STATION UNITS 1 AND 2 October 5, 2006 I have reviewed Appendix E, Applicant's Environmental Report - Operating License Renewal Stage, and the two Final Environmental Statements (construction and operation) in advance of the site visit and preparing the Supplemental Environmental Impact Statement. I have found several instances of where additional information is required or where the information contained in the Environmental Report needs to be presented in a more structured format.

2.2.1 Land Use

" There is confusion in the acreage totals and breakouts. Mention is made of PPL Susquehanna property and SSES property, is there a difference in the ownership? For example, in Section 2.4 there is mention of land being leased, is the 65 acre Gould Island in the totals, where does the 88-acre Overlook fit in the totals, and are the "Susquehanna Riverlands" and the "Riverlands Recreation Area" the same, which is the accurate title?

" Site land cover/land use percentages are missing - there are no descriptions or percentages for land cover categories, such as, open area (fields, marshes, swamps, beach, cemetary), forests, facilities and structures, parking areas, water (ponds, lakes, canal - whether natural or manmade), and visitor or recreation areas. Reference is made to undeveloped lands, but no actual accounting can be done, while there is mention of developed portions of the land being 487 acres. Developed is assumed to be just the plant structures, cooling towers, and parking areas?

  • There is no description of the measures or impedinments between the Riverlands Recreation Area and the Protected Area to halt ingress of recreational users, beyond it an assumption that the "security fencing" west of Route II provides that barrier (2. 1-).
  • There is no description of the railroad and highway that cross the site.
  • Critical terrain elevations are also not included.

2.2.8.3 Offsite Land Use Data should be sufficient.

2.2.8.4 Visual Aesthetics and Noise

  • No description is provided as the height, color of visibility of the facilities and structures and from what distances and locations they can be seen. Appendix A referenced that a discussion as to Issue 73 (Aesthetic impacts) would be found in Section 4.0, but it could not be found.
  • No information is provided regarding plant and cooling tower noise and what can be heard at the site boundaries or in the Riverlands Recreation Area. Appendix A