Turbine Low Pressure Rotor Inspection:
Turbine Low Pressure Rotor Inspection:
RF-16 Emergent Activities Failed Fuel:
RF-16 Emergent Activities Failed Fuel:
*Identified Assembly via In Mast Sipping  
* Identified Assembly via In Mast Sipping and Visual Inspection
* Cause Determined to be Baffle Jetting
* Installed Clips to Prevent Recurrence
* Perform Upflow Modification in RF-18


and Visual Inspection
Upflow Conversion:
*Cause Determined to be Baffle Jetting
New flow hole Plug Downflow      Upflow Configuration Configuration}}
*Installed Clips to Prevent Recurrence
*Perform Upflow Modification in RF-18 Upflow Conversion:DownflowConfigurationUpflowConfigurationNew flow hole Plug}}

Revision as of 07:15, 23 November 2019

05/02/2007 Meeting Handout on RB Tendon/Iwe/Iwl Inspection
ML071350102
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 05/02/2007
From:
SCANA Corp, South Carolina Electric & Gas Co
To:
Office of Nuclear Reactor Regulation
References
Download: ML071350102 (5)


Text

RB Tendon/IWE/IWL Inspection:

Turbine Low Pressure Rotor Inspection:

RF-16 Emergent Activities Failed Fuel:

  • Identified Assembly via In Mast Sipping and Visual Inspection
  • Cause Determined to be Baffle Jetting
  • Installed Clips to Prevent Recurrence
  • Perform Upflow Modification in RF-18

Upflow Conversion:

New flow hole Plug Downflow Upflow Configuration Configuration