{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION                                                         REGION I                                               475 ALLENDALE ROAD                                         KING OF PRUSSIA, PA 19406 December 13, 2007 Mr. John Carlin, Vice President R. E. Ginna Nuclear Power Plant, LLC 1503 Lake Road Ontario, NY 14519  
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 475 ALLENDALE ROAD KING OF PRUSSIA, PA 19406 December 13, 2007 Mr. John Carlin, Vice President R. E. Ginna Nuclear Power Plant, LLC 1503 Lake Road Ontario, NY 14519


==SUBJECT:==
==SUBJECT:==
CHANGE TO THE INSPECTION PLAN FOR THE R.E. GINNA NUCLEAR POWER PLANT  
CHANGE TO THE INSPECTION PLAN FOR THE R.E. GINNA NUCLEAR POWER PLANT


==Dear Mr. Carlin:==
==Dear Mr. Carlin:==
Line 24: Line 24:
As part of a periodic self-assessment, the Nuclear Regulatory Commission (NRC) thoroughly reviewed the inspection procedures to ensure the continued effective application of inspection resources. The main objective of the review was to determine the appropriate inspection scope for the majority of the inspection procedures in the reactor oversight process (ROP). The result of this effort (designated ROP realignment) created changes to both inspection scope and/or inspection frequency for selected inspection procedures in the ROP. The purpose of this letter is to update the schedule of future inspection activities at your facility that was provided with the mid-cycle assessment letter in August 2007. Please note that there were no changes made to inspection procedures in the security, emergency preparedness, and health physics areas.
As part of a periodic self-assessment, the Nuclear Regulatory Commission (NRC) thoroughly reviewed the inspection procedures to ensure the continued effective application of inspection resources. The main objective of the review was to determine the appropriate inspection scope for the majority of the inspection procedures in the reactor oversight process (ROP). The result of this effort (designated ROP realignment) created changes to both inspection scope and/or inspection frequency for selected inspection procedures in the ROP. The purpose of this letter is to update the schedule of future inspection activities at your facility that was provided with the mid-cycle assessment letter in August 2007. Please note that there were no changes made to inspection procedures in the security, emergency preparedness, and health physics areas.
The enclosed inspection plan details the inspections (less those related to physical protection) scheduled for calendar year 2008. The inspection plan is provided to resolve any scheduling and/or personnel availability issues well in advance of the inspector(s) arrival onsite. Routine resident inspections are not listed due to their continuous nature.
The enclosed inspection plan details the inspections (less those related to physical protection) scheduled for calendar year 2008. The inspection plan is provided to resolve any scheduling and/or personnel availability issues well in advance of the inspector(s) arrival onsite. Routine resident inspections are not listed due to their continuous nature.
In accordance with 10 CFR 2.390 of the NRC's "Rules and Practices" a copy of this letter and its  
In accordance with 10 CFR 2.390 of the NRCs Rules and Practices a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRCs document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (The Public Electronic Reading Room).


enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (The Public Electronic Reading Room).
J. Carlin                                       2 Please contact me at 610-337-5233 with any questions you may have regarding this letter or the inspection plan.
 
Sincerely,
J. Carlin 2 Please contact me at 610-337-5233 with any questions you may have regarding this letter or the inspection plan.
                                            /RA/
Sincerely,
Mr. Glenn T. Dentel, Chief Projects Branch 1 Division of Reactor Projects, Region I Docket No. 50-244 License No. DPR-18
      /RA/
Mr. Glenn T. Dentel, Chief       Projects Branch 1 Division of Reactor Projects, Region I  
 
Docket No. 50-244 License No. DPR-18  


==Enclosures:==
==Enclosures:==
R. E. Ginna Nuclear Power Plant Inspection/Activity Plans
R. E. Ginna Nuclear Power Plant Inspection/Activity Plans cc w/encl:
M. J. Wallace, President, Constellation Energy Nuclear Group, LLC J. M. Heffley, Senior Vice President and Chief Nuclear Officer P. Eddy, Electric Division, NYS Department of Public Service C. Donaldson, Esquire, Assistant Attorney General, New York Department of Law C. W. Fleming, Esquire, Senior Counsel, Constellation Energy Group, Inc.
B. Weaver, Director, Licensing, Constellation Energy Nuclear Group, LLC P. Tonko, President and CEO, New York State Energy Research and Development Authority J. Spath, Program Director, New York State Energy Research and Development Authority T. Wideman, Director, Wayne County Emergency Management Office M. Meisenzahl, Administrator, Monroe County, Office of Emergency Preparedness T. Judson, Central New York Citizens Awareness Network


cc w/encl:
J. Carlin                                           2 Please contact me at 610-337-5233 with any questions you may have regarding this letter or the inspection plan.
M. J. Wallace, President, Constellation Energy Nuclear Group, LLC J. M. Heffley, Senior Vice President and Chief Nuclear Officer P. Eddy, Electric Division, NYS Department of Public Service C. Donaldson, Esquire, Assistant Attorney General, New York Department of Law C. W. Fleming, Esquire, Senior Counsel, Constellation Energy Group, Inc. B. Weaver, Director, Licensing, Constellation Energy Nuclear Group, LLC P. Tonko, President and CEO, New York State Energy Research and Development    Authority J. Spath, Program Director, New York State Energy Research and Development Authority T. Wideman, Director, Wayne County Emergency Management Office M. Meisenzahl, Administrator, Monroe County, Office of Emergency Preparedness T. Judson, Central New York Citizens Awareness Network J. Carlin 2Please contact me at 610-337-5233 with any questions you may have regarding this letter or the inspection plan.
Sincerely,
Sincerely,       /RA/
                                                /RA/
Mr. Glenn T. Dentel, Chief Projects Branch 1       Division of Reactor Projects, Region I  
Mr. Glenn T. Dentel, Chief Projects Branch 1 Division of Reactor Projects, Region I Docket No. 50-244 License No. DPR-18
 
Docket No. 50-244 License No. DPR-18  


==Enclosures:==
==Enclosures:==
R. E. Ginna Nuclear Power Plant Inspection/Activity Plans
R. E. Ginna Nuclear Power Plant Inspection/Activity Plans cc w/encl:
 
cc w/encl:
M. J. Wallace, President, Constellation Energy Nuclear Group, LLC J. M. Heffley, Senior Vice President and Chief Nuclear Officer P. Eddy, Electric Division, NYS Department of Public Service C. Donaldson, Esquire, Assistant Attorney General, New York Department of Law C. W. Fleming, Esquire, Senior Counsel, Constellation Energy Group, Inc.
M. J. Wallace, President, Constellation Energy Nuclear Group, LLC J. M. Heffley, Senior Vice President and Chief Nuclear Officer P. Eddy, Electric Division, NYS Department of Public Service C. Donaldson, Esquire, Assistant Attorney General, New York Department of Law C. W. Fleming, Esquire, Senior Counsel, Constellation Energy Group, Inc.
B. Weaver, Director, Licensing, Constellation Energy Nuclear Group, LLC P. Tonko, President and CEO, New York State Energy Research and Development   Authority J. Spath, Program Director, New York State Energy Research and Development Authority T. Wideman, Director, Wayne County Emergency Management Office M. Meisenzahl, Administrator, Monroe County, Office of Emergency Preparedness T. Judson, Central New York Citizens Awareness Network  
B. Weaver, Director, Licensing, Constellation Energy Nuclear Group, LLC P. Tonko, President and CEO, New York State Energy Research and Development Authority J. Spath, Program Director, New York State Energy Research and Development Authority T. Wideman, Director, Wayne County Emergency Management Office M. Meisenzahl, Administrator, Monroe County, Office of Emergency Preparedness T. Judson, Central New York Citizens Awareness Network Distribution: see next page SUNSI Review Complete:        BAB4        (Reviewer=s Initials)
DOCUMENT NAME: T:\DRP\BRANCH1\ROP 8 Letters\ROP8 Letter - GIN.doc After declaring this document AAn Official Agency Record@ it will be released to the Public.
To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE      RI/DRP                      RI/DRP NAME        BBickett/BAB4              GDentel/GTD DATE        12/06/07                    12/06/07 OFFICIAL RECORD COPY


Distribution:  see next page SUNSI Review Complete:      BAB4        (Reviewer
J. Carlin                               3 Distribution w/encl:                       J. Trapp, DRS S. Collins, RA                             J. Rogge, DRS M. Dapas, DRA                             M. Sykes, DRS G. West, RI OEDO (Acting)                  J. White, DRS J. Lubinski, NRR                          L. Doerflein, DRS D. Pickett, PM, NRR                        R. Conte, DRS M. David, PM, NRR                          L. Scholl, DRS G. Dentel, DRP                            P. Frechette, DRS B. Bickett, DRP                            D. Silk, DRS K. Kolaczyk, DRP, SRI                      D. Screnci, PAO M. Marshfield, DRP, RI                    N. Sheehan, PAO M. Rose, DRP, Resident OA                  R. Barkley, ORA Region I Docket Room (with concurrences)  D. Holody, ORA J. Thompson, NRR (JWT1@nrc.gov)
=s Initials)
DOCUMENT NAME: T:\DRP\BRANCH1\ROP 8 Letters\ROP8 Letter - GIN.doc After declaring this document AAn Official Agency Record
@ it will be released to the Public. To receive a copy of this document, indicate in the box: 
" C" = Copy without attachment/enclosure  " E" = Copy with attachment/enclosure  " N" = No copy OFFICE  RI/DRP      RI/DRP            NAME  BBickett/BAB4 GDentel/GTD DATE  12/06/07  12/06/07      OFFICIAL RECORD COPY J. Carlin 3 Distribution w/encl: S. Collins, RA M. Dapas, DRA


G. West, RI OEDO (Acting)
Page 1 of 2                                                                                      Ginna 12/11/2007    14:26:54                                                              Inspection / Activity Plan Report 22 01/01/2008 - 12/31/2008 Unit                                                                                                                          No. of Staff    Planned Dates          Inspection Number      Inspection Activity                                                  Title                                        on Site        Start    End              Type 95002          - SUPPLEMENTAL EP INSPECTION                                                                              3 1              IP 95002                Inspection For One Degraded Cornerstone Or Any Three White Inputs In A Strategic Perform              01/28/2008 02/08/2008 EP Supplemental Insp 71121          - OCC RAD SAFETY                                                                                          1 1              IP 7112101              Access Control to Radiologically Significant Areas                                                    02/11/2008 02/15/2008 Baseline Inspections 1              IP 7112102              ALARA Planning and Controls                                                                          02/11/2008 02/15/2008 Baseline Inspections 1              IP 71151                Performance Indicator Verification                                                                    02/11/2008 02/15/2008 Baseline Inspections EP              - EP PROGRAM INSPECTION                                                                                    2 1              IP 7111402              Alert and Notification System Testing                                                                03/17/2008 03/21/2008 EP Baseline Inspectio 1              IP 7111403              Emergency Response Organization Augmentation Testing                                                  03/17/2008 03/21/2008 EP Baseline Inspectio 1              IP 7111404              Emergency Action Level and Emergency Plan Changes                                                    03/17/2008 03/21/2008 EP Baseline Inspectio 1              IP 7111405              Correction of Emergency Preparedness Weaknesses and Deficiencies                                      03/17/2008 03/21/2008 EP Baseline Inspectio 1              IP 71151-EP01          Drill/Exercise Performance                                                                            03/17/2008 03/21/2008 Baseline Inspections 1              IP 71151-EP02          ERO Drill Participation                                                                              03/17/2008 03/21/2008 Baseline Inspections 1              IP 71151-EP03          Alert & Notification System                                                                          03/17/2008 03/21/2008 Baseline Inspections 7111108P        - INSERVICE INSPECTION                                                                                    1 1              IP 7111108P            Inservice Inspection Activities - PWR                                                                04/21/2008 04/25/2008 Baseline Inspections 1              IP 7111108P            Inservice Inspection Activities - PWR                                                                04/28/2008 05/02/2008 Baseline Inspections 8/25 EXM        - INITIAL OPERATOR LICENSING EXAM                                                                          5 1                U01687              FY08 - GINNA INITIAL OPERATOR EXAM                                                                    07/14/2008 07/18/2008 Not Applicable 1                U01687              FY08 - GINNA INITIAL OPERATOR EXAM                                                                    08/25/2008 09/05/2008 Not Applicable LRI            - LR COMMITMENTS INSP                                                                                      1 1              IP 71003                Post-Approval Site Inspection for License Renewal                                                    04/20/2008 05/06/2008 License Renewal Insp 71121          - OCC RAD SAFETY                                                                                          1 1              IP 7112101              Access Control to Radiologically Significant Areas                                                    04/28/2008 05/02/2008 Baseline Inspections 1              IP 7112102              ALARA Planning and Controls                                                                          04/28/2008 05/02/2008 Baseline Inspections 1              IP 7112103              Radiation Monitoring Instrumentation and Protective Equipment                                        04/28/2008 05/02/2008 Baseline Inspections 1              IP 71151                Performance Indicator Verification                                                                    04/28/2008 05/02/2008 Baseline Inspections TI-166          - CONTAINMENT SUMP MODIFICATIONS                                                                          1 1              IP 2515/166            Pressurized Water Reactor Containment Sump Blockage [NRC GENERIC LETTER 2004-02]                      04/28/2008 05/02/2008 Safety Issues MODS            - MODS                                                                                                    5 1              IP 7111117B            Permanent Plant Modifications                                                                        06/09/2008 06/13/2008 Baseline Inspections 1              IP 7111117B            Permanent Plant Modifications                                                                        06/23/2008 06/27/2008 Baseline Inspections 7111107B        - HEAT SINK INSP                                                                                          1 1              IP 7111107B            Heat Sink Performance                                                                                07/21/2008 07/25/2008 Baseline Inspections This report does not include INPO and OUTAGE activities.
J. Lubinski, NRR 
This report shows only on-site and announced inspection procedures.
 
D. Pickett, PM, NRR M. David, PM, NRR G. Dentel, DRP B. Bickett, DRP
 
K. Kolaczyk, DRP, SRI 
 
M. Marshfield, DRP, RI
 
M. Rose, DRP, Resident OA Region I Docket Room (with concurrences)
J. Trapp, DRS J. Rogge, DRS M. Sykes, DRS J. White, DRS L. Doerflein, DRS


R. Conte, DRS L. Scholl, DRS P. Frechette, DRS  D. Silk, DRS D. Screnci, PAO
Page 2 of 2                                                                                     Ginna 12/11/2007     14:26:54                                                               Inspection / Activity Plan Report 22 01/01/2008 - 12/31/2008 Unit                                                                                                                        No. of Staff   Planned Dates        Inspection Number      Inspection Activity                                                  Title                                        on Site       Start    End            Type 7112202         - PUB RAD SAFETY - RADWASTE                                                                               1 1              IP 7112202              Radioactive Material Processing and Transportation                                                  07/21/2008 07/25/2008 Baseline Inspections 1             IP 71151                Performance Indicator Verification                                                                  07/21/2008 07/25/2008 Baseline Inspections PI&R           - PI&R                                                                                                   7 1              IP 71152B              Identification and Resolution of Problems                                                            09/08/2008 09/12/2008 Baseline Inspections 7112203         - PUB RAD SAFETY - REMP                                                                                   1 1             IP 7112203             Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control P             09/15/2008 09/19/2008 Baseline Inspections 1             IP 71151               Performance Indicator Verification                                                                   09/15/2008 09/19/2008 Baseline Inspections PI&R           - PI&R                                                                                                   7 1              IP 71152B              Identification and Resolution of Problems                                                            09/22/2008 09/26/2008 Baseline Inspections 71121           - OCC RAD SAFETY                                                                                         1 1             IP 7112101             Access Control to Radiologically Significant Areas                                                   11/17/2008 11/21/2008 Baseline Inspections 1             IP 7112102             ALARA Planning and Controls                                                                         11/17/2008 11/21/2008 Baseline Inspections 1             IP 7112103             Radiation Monitoring Instrumentation and Protective Equipment                                       11/17/2008 11/21/2008 Baseline Inspections 1             IP 71151               Performance Indicator Verification                                                                   11/17/2008 11/21/2008 Baseline Inspections This report does not include INPO and OUTAGE activities.
 
N. Sheehan, PAO
 
R. Barkley, ORA  D. Holody, ORA J. Thompson, NRR (JWT1@nrc.gov)
 
Ginna Inspection / Activity Plan 01/01/2008
-12/31/2008 Inspection Type Inspection Activity Planned Dates Start          End No. of Staff on Site Title Unit Number Page 1 of 2 12/11/2007 14:26:54 Report 22 3 95002-SUPPLEMENTAL EP INSPECTION EP Supplemental Ins p 01/28/2008 02/08/2008 1    95002 IP Inspection For One Degraded Cornerstone Or Any Three White Inputs In A Strategic Perfor m 1 71121-OCC RAD SAFETY Baseline Inspections 02/11/2008 02/15/2008 1    7112101 IP A ccess Control to Radiologically Significant Areas Baseline Inspections 02/11/2008 02/15/2008 1    7112102 IP A LARA Planning and Controls Baseline Inspections 02/11/2008 02/15/2008 1    71151 IP Performance Indicator Verification 2 EP-EP PROGRAM INSPECTION EP Baseline Inspecti o 03/17/2008 03/21/2008 1    7111402 IP A lert and Notification System Testing EP Baseline Inspecti o 03/17/2008 03/21/2008 1    7111403 IP Emergency Response Organization Augmentation Testing EP Baseline Inspecti o 03/17/2008 03/21/2008 1    7111404 IP Emergency Action Level and Emergency Plan Changes EP Baseline Inspecti o 03/17/2008 03/21/2008 1    7111405 IP Correction of Emergency Preparedness Weaknesses and Deficiencies Baseline Inspections 03/17/2008 03/21/2008 1    71151-EP01 IP Drill/Exercise Performance Baseline Inspections 03/17/2008 03/21/2008 1    71151-EP02 IP ERO Drill Participation Baseline Inspections 03/17/2008 03/21/2008 1    71151-EP03 IP A lert & Notification System 1 7111108P-INSERVICE INSPECTION Baseline Inspections 04/21/2008 04/25/2008 1    7111108P IP Inservice Inspection Activities - PWR Baseline Inspections 04/28/2008 05/02/2008 1    7111108P IP Inservice Inspection Activities - PWR 5 8/25 EXM-INITIAL OPERATOR LICENSING EXAM Not Applicable 07/14/2008 07/18/2008 1    U01687 FY08 - GINNA INITIAL OPERATOR EXAM Not Applicable 08/25/2008 09/05/2008 1    U01687 FY08 - GINNA INITIAL OPERATOR EXAM 1 LRI-LR COMMITMENTS INSP License Renewal Ins p 04/20/2008 05/06/2008 1    71003 IP Post-Approval Site Inspection for License Renewal 1 71121-OCC RAD SAFETY Baseline Inspections 04/28/2008 05/02/2008 1    7112101 IP A ccess Control to Radiologically Significant Areas Baseline Inspections 04/28/2008 05/02/2008 1    7112102 IP A LARA Planning and Controls Baseline Inspections 04/28/2008 05/02/2008 1    7112103 IP Radiation Monitoring Instrumentation and Protective Equipment Baseline Inspections 04/28/2008 05/02/2008 1    71151 IP Performance Indicator Verification 1 TI-166-CONTAINMENT SUMP MODIFICATIONS Safety Issues 04/28/2008 05/02/2008 1    2515/166 IP Pressurized Water Reactor Containment Sump Blockage [NRC GENERIC LETTER 2004-02
]5 MODS-MODS Baseline Inspections 06/09/2008 06/13/2008 1    7111117B IP Permanent Plant Modifications Baseline Inspections 06/23/2008 06/27/2008 1    7111117B IP Permanent Plant Modifications 1 7111107B-HEAT SINK INSP Baseline Inspections 07/21/2008 07/25/2008 1    7111107B IP Heat Sink Performance This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Ginna Inspection / Activity Plan 01/01/2008
-12/31/2008 Inspection Type Inspection Activity Planned Dates Start          End No. of Staff on Site Title Unit Number Page 2 of 2 12/11/2007 14:26:54 Report 22 1 7112202-PUB RAD SAFETY - RADWASTE Baseline Inspections 07/21/2008 07/25/2008 1     7112202 IP Radioactive Material Processing and Transportation Baseline Inspections 07/21/2008 07/25/2008 1    71151 IP Performance Indicator Verification 7 PI&R-PI&R Baseline Inspections 09/08/2008 09/12/2008 1    71152B IP Identification and Resolution of Problems 1 7112203-PUB RAD SAFETY - REMP Baseline Inspections 09/15/2008 09/19/2008 1     7112203 IP Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control P Baseline Inspections 09/15/2008 09/19/2008 1     71151 IP Performance Indicator Verification 7 PI&R-PI&R Baseline Inspections 09/22/2008 09/26/2008 1    71152B IP Identification and Resolution of Problems 1 71121-OCC RAD SAFETY Baseline Inspections 11/17/2008 11/21/2008 1     7112101 IP A ccess Control to Radiologically Significant Areas Baseline Inspections 11/17/2008 11/21/2008 1     7112102 IP A LARA Planning and Controls Baseline Inspections 11/17/2008 11/21/2008 1     7112103 IP Radiation Monitoring Instrumentation and Protective Equipment Baseline Inspections 11/17/2008 11/21/2008 1     71151 IP Performance Indicator Verification This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.}}
This report shows only on-site and announced inspection procedures.}}

Latest revision as of 00:54, 23 November 2019

ROP8 - Ginna - Change to Inspection Plan, 12/13/07
ML073470960
Person / Time
Site: Ginna Constellation icon.png
Issue date: 12/13/2007
From: Glenn Dentel
Reactor Projects Branch 1
To: John Carlin
Ginna
Dentel, G RGN-I/DRP/BR1/610-337-5233
References
Download: ML073470960 (6)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 475 ALLENDALE ROAD KING OF PRUSSIA, PA 19406 December 13, 2007 Mr. John Carlin, Vice President R. E. Ginna Nuclear Power Plant, LLC 1503 Lake Road Ontario, NY 14519

SUBJECT:

CHANGE TO THE INSPECTION PLAN FOR THE R.E. GINNA NUCLEAR POWER PLANT

Dear Mr. Carlin:

As part of a periodic self-assessment, the Nuclear Regulatory Commission (NRC) thoroughly reviewed the inspection procedures to ensure the continued effective application of inspection resources. The main objective of the review was to determine the appropriate inspection scope for the majority of the inspection procedures in the reactor oversight process (ROP). The result of this effort (designated ROP realignment) created changes to both inspection scope and/or inspection frequency for selected inspection procedures in the ROP. The purpose of this letter is to update the schedule of future inspection activities at your facility that was provided with the mid-cycle assessment letter in August 2007. Please note that there were no changes made to inspection procedures in the security, emergency preparedness, and health physics areas.

The enclosed inspection plan details the inspections (less those related to physical protection) scheduled for calendar year 2008. The inspection plan is provided to resolve any scheduling and/or personnel availability issues well in advance of the inspector(s) arrival onsite. Routine resident inspections are not listed due to their continuous nature.

In accordance with 10 CFR 2.390 of the NRCs Rules and Practices a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRCs document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (The Public Electronic Reading Room).

J. Carlin 2 Please contact me at 610-337-5233 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

Mr. Glenn T. Dentel, Chief Projects Branch 1 Division of Reactor Projects, Region I Docket No. 50-244 License No. DPR-18

Enclosures:

R. E. Ginna Nuclear Power Plant Inspection/Activity Plans cc w/encl:

M. J. Wallace, President, Constellation Energy Nuclear Group, LLC J. M. Heffley, Senior Vice President and Chief Nuclear Officer P. Eddy, Electric Division, NYS Department of Public Service C. Donaldson, Esquire, Assistant Attorney General, New York Department of Law C. W. Fleming, Esquire, Senior Counsel, Constellation Energy Group, Inc.

B. Weaver, Director, Licensing, Constellation Energy Nuclear Group, LLC P. Tonko, President and CEO, New York State Energy Research and Development Authority J. Spath, Program Director, New York State Energy Research and Development Authority T. Wideman, Director, Wayne County Emergency Management Office M. Meisenzahl, Administrator, Monroe County, Office of Emergency Preparedness T. Judson, Central New York Citizens Awareness Network

J. Carlin 2 Please contact me at 610-337-5233 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

Mr. Glenn T. Dentel, Chief Projects Branch 1 Division of Reactor Projects, Region I Docket No. 50-244 License No. DPR-18

Enclosures:

R. E. Ginna Nuclear Power Plant Inspection/Activity Plans cc w/encl:

M. J. Wallace, President, Constellation Energy Nuclear Group, LLC J. M. Heffley, Senior Vice President and Chief Nuclear Officer P. Eddy, Electric Division, NYS Department of Public Service C. Donaldson, Esquire, Assistant Attorney General, New York Department of Law C. W. Fleming, Esquire, Senior Counsel, Constellation Energy Group, Inc.

B. Weaver, Director, Licensing, Constellation Energy Nuclear Group, LLC P. Tonko, President and CEO, New York State Energy Research and Development Authority J. Spath, Program Director, New York State Energy Research and Development Authority T. Wideman, Director, Wayne County Emergency Management Office M. Meisenzahl, Administrator, Monroe County, Office of Emergency Preparedness T. Judson, Central New York Citizens Awareness Network Distribution: see next page SUNSI Review Complete: BAB4 (Reviewer=s Initials)

DOCUMENT NAME: T:\DRP\BRANCH1\ROP 8 Letters\ROP8 Letter - GIN.doc After declaring this document AAn Official Agency Record@ it will be released to the Public.

To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRP RI/DRP NAME BBickett/BAB4 GDentel/GTD DATE 12/06/07 12/06/07 OFFICIAL RECORD COPY

J. Carlin 3 Distribution w/encl: J. Trapp, DRS S. Collins, RA J. Rogge, DRS M. Dapas, DRA M. Sykes, DRS G. West, RI OEDO (Acting) J. White, DRS J. Lubinski, NRR L. Doerflein, DRS D. Pickett, PM, NRR R. Conte, DRS M. David, PM, NRR L. Scholl, DRS G. Dentel, DRP P. Frechette, DRS B. Bickett, DRP D. Silk, DRS K. Kolaczyk, DRP, SRI D. Screnci, PAO M. Marshfield, DRP, RI N. Sheehan, PAO M. Rose, DRP, Resident OA R. Barkley, ORA Region I Docket Room (with concurrences) D. Holody, ORA J. Thompson, NRR (JWT1@nrc.gov)

Page 1 of 2 Ginna 12/11/2007 14:26:54 Inspection / Activity Plan Report 22 01/01/2008 - 12/31/2008 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type 95002 - SUPPLEMENTAL EP INSPECTION 3 1 IP 95002 Inspection For One Degraded Cornerstone Or Any Three White Inputs In A Strategic Perform 01/28/2008 02/08/2008 EP Supplemental Insp 71121 - OCC RAD SAFETY 1 1 IP 7112101 Access Control to Radiologically Significant Areas 02/11/2008 02/15/2008 Baseline Inspections 1 IP 7112102 ALARA Planning and Controls 02/11/2008 02/15/2008 Baseline Inspections 1 IP 71151 Performance Indicator Verification 02/11/2008 02/15/2008 Baseline Inspections EP - EP PROGRAM INSPECTION 2 1 IP 7111402 Alert and Notification System Testing 03/17/2008 03/21/2008 EP Baseline Inspectio 1 IP 7111403 Emergency Response Organization Augmentation Testing 03/17/2008 03/21/2008 EP Baseline Inspectio 1 IP 7111404 Emergency Action Level and Emergency Plan Changes 03/17/2008 03/21/2008 EP Baseline Inspectio 1 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 03/17/2008 03/21/2008 EP Baseline Inspectio 1 IP 71151-EP01 Drill/Exercise Performance 03/17/2008 03/21/2008 Baseline Inspections 1 IP 71151-EP02 ERO Drill Participation 03/17/2008 03/21/2008 Baseline Inspections 1 IP 71151-EP03 Alert & Notification System 03/17/2008 03/21/2008 Baseline Inspections 7111108P - INSERVICE INSPECTION 1 1 IP 7111108P Inservice Inspection Activities - PWR 04/21/2008 04/25/2008 Baseline Inspections 1 IP 7111108P Inservice Inspection Activities - PWR 04/28/2008 05/02/2008 Baseline Inspections 8/25 EXM - INITIAL OPERATOR LICENSING EXAM 5 1 U01687 FY08 - GINNA INITIAL OPERATOR EXAM 07/14/2008 07/18/2008 Not Applicable 1 U01687 FY08 - GINNA INITIAL OPERATOR EXAM 08/25/2008 09/05/2008 Not Applicable LRI - LR COMMITMENTS INSP 1 1 IP 71003 Post-Approval Site Inspection for License Renewal 04/20/2008 05/06/2008 License Renewal Insp 71121 - OCC RAD SAFETY 1 1 IP 7112101 Access Control to Radiologically Significant Areas 04/28/2008 05/02/2008 Baseline Inspections 1 IP 7112102 ALARA Planning and Controls 04/28/2008 05/02/2008 Baseline Inspections 1 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 04/28/2008 05/02/2008 Baseline Inspections 1 IP 71151 Performance Indicator Verification 04/28/2008 05/02/2008 Baseline Inspections TI-166 - CONTAINMENT SUMP MODIFICATIONS 1 1 IP 2515/166 Pressurized Water Reactor Containment Sump Blockage [NRC GENERIC LETTER 2004-02] 04/28/2008 05/02/2008 Safety Issues MODS - MODS 5 1 IP 7111117B Permanent Plant Modifications 06/09/2008 06/13/2008 Baseline Inspections 1 IP 7111117B Permanent Plant Modifications 06/23/2008 06/27/2008 Baseline Inspections 7111107B - HEAT SINK INSP 1 1 IP 7111107B Heat Sink Performance 07/21/2008 07/25/2008 Baseline Inspections This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 2 of 2 Ginna 12/11/2007 14:26:54 Inspection / Activity Plan Report 22 01/01/2008 - 12/31/2008 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type 7112202 - PUB RAD SAFETY - RADWASTE 1 1 IP 7112202 Radioactive Material Processing and Transportation 07/21/2008 07/25/2008 Baseline Inspections 1 IP 71151 Performance Indicator Verification 07/21/2008 07/25/2008 Baseline Inspections PI&R - PI&R 7 1 IP 71152B Identification and Resolution of Problems 09/08/2008 09/12/2008 Baseline Inspections 7112203 - PUB RAD SAFETY - REMP 1 1 IP 7112203 Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control P 09/15/2008 09/19/2008 Baseline Inspections 1 IP 71151 Performance Indicator Verification 09/15/2008 09/19/2008 Baseline Inspections PI&R - PI&R 7 1 IP 71152B Identification and Resolution of Problems 09/22/2008 09/26/2008 Baseline Inspections 71121 - OCC RAD SAFETY 1 1 IP 7112101 Access Control to Radiologically Significant Areas 11/17/2008 11/21/2008 Baseline Inspections 1 IP 7112102 ALARA Planning and Controls 11/17/2008 11/21/2008 Baseline Inspections 1 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 11/17/2008 11/21/2008 Baseline Inspections 1 IP 71151 Performance Indicator Verification 11/17/2008 11/21/2008 Baseline Inspections This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.