ML100880398: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:MN No. 10-018 U.S. NUCLEAR REGULATORY NOTICE OF PUBLIC MEETING March 29, 2010 Licensee:
{{#Wiki_filter:MN No. 10-018 U.S. NUCLEAR REGULATORY COMMISSION REGION' NOTICE OF PUBLIC MEETING March 29, 2010 Licensee:             Dominion Nuclear Connecticut, Inc.
Dominion Nuclear Connecticut, Inc. Facility:
Facility:             Millstone Power Station Docket No.             50-336 and 50-423 Date and Time:         April 22, 2010 6:00 p.m. - 8:00 p.m.
Millstone Power Station Docket No. 50-336 and 50-423 Date and Time: April 22, 2010 6:00 p.m. -8:00 p.m. location:
location:             Waterford Town Hall 15 Rope Ferry Road Waterford, CT 06385 Purpose:               To discuss NRC's assessment of the safety performance of the Millstone Power Station for calendar year 2009 with the Nuclear Energy Advisory Council (NEAC).
Waterford Town Hall 15 Rope Ferry Road Waterford, CT 06385 Purpose: To discuss NRC's assessment of the safety performance of the Millstone Power Station for calendar year 2009 with the Nuclear Energy Advisory Council (NEAC). Attendees:
Attendees:
NRC: D. Jackson, Chief, Projects Branch 5, Region I S. Shaffer, Senior Resident Inspector J. Krafty, Resident Inspector NEAC : W. Sheehan, Chairman Quorum of NEAC Committee Membership Public This is a Category 1 Meeting. The public is invited to observe the meeting. After the business portion, but before the meeting adjourns, the public will have an opportunity to communicate with the NRC regarding Dominion's performance at Millstone Power Station and the role of the agency in ensuring safe plant operations.
NRC:         D. Jackson, Chief, Projects Branch 5, Region I S. Shaffer, Senior Resident Inspector J. Krafty, Resident Inspector NEAC :       W. Sheehan, Chairman Quorum of NEAC Committee Membership Public Participation*: This is a Category 1 Meeting. The public is invited to observe the meeting. After the business portion, but before the meeting adjourns, the public will have an opportunity to communicate with the NRC regarding Dominion's performance at Millstone Power Station and the role of the agency in ensuring safe plant operations.
The NRC's Annual Assessment Letter for Millstone Power Station can be located in ADAMS with Accession Number ML100621420.
The NRC's Annual Assessment Letter for Millstone Power Station can be located in ADAMS with Accession Number ML100621420. ADAMS is accessible from the NRC Web Site at:
ADAMS is accessible from the NRC Web Site at: http://www.nrc.gov/reading-rm/adams.html.
http://www.nrc.gov/reading-rm/adams.html.
Additional information relative to the NRC's Annual Assessment Process and the safety performance of Millstone Power Station can be found on the NRC's web site at: www.nrc.gov/NRRlOVERSIGHT/ASSESS/index.html. Meeting Donald E. Jackson, Chief Projects Branch 5 {610} 337-5306 E-mail: donald.jackson@nrc.gov Handicapped persons requiring assistance to attend the meeting shall make their requests known to the NRC meeting contact no later than two business days prior to the meeting. Attendance by NRC personnel at this meeting should be made known by April 15. 2010, via telephone to the NRC meeting contact. Donald E. Ja son, Chief Projects Branch 5 Division of Reactor Projects Distribution via ListServ Additional information relative to the NRC's Annual Assessment Process and the safety performance of Millstone Power Station can be found on the NRC's web site at: www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html. Meeting Donald E. Jackson, Chief Projects Branch 5 (610) 337-5306 E-mail: donald.iackson@nrc.gov Handicapped persons requiring assistance to attend the meeting shall make their requests known to the NRC meeting contact no later than two business days prior to the meeting. Attendance by NRC personnel at this meeting should be made known by April 15, 2010, via telephone to the NRC meeting contact. Approved by: IRA! Donald E. Jackson, Chief Projects Branch 5 Division of Reactor Projects See attached DOCUMENT NAME: G:\DRP\BRANCH5\Annual Assessment Meetings\2009 Notices\Millstone ROP 10 Public Outreach NEAC Meeting SUNSI Review Complete:
 
_.......:J.:.:,H
2 Additional information relative to the NRC's Annual Assessment Process and the safety performance of Millstone Power Station can be found on the NRC's web site at:
__ (Reviewer's ML After declaring this document DAn Official Agency Record" it will be released to the To receive a copy of this document, indicate in the box: "C":= Copy liE" = Co with attachment/enclosure "N":= No co ML RIIDRP DJackson/DJ 03/29/10 OFFICIAL RECORD COpy 3 NRC & NEAC Meeting Millstone Power Station Waterford Town 6:00 -8:00 pm Introduction  
www.nrc.gov/NRRlOVERSIGHT/ASSESS/index.html.
..........  
Meeting Contact:        Donald E. Jackson, Chief Projects Branch 5
'" ., .......................................................................................
{610} 337-5306 E-mail: donald.jackson@nrc.gov
NRC (3 Review of Reactor Oversight Process ................................................................
* Handicapped persons requiring assistance to attend the meeting shall make their requests known to the NRC meeting contact no later than two business days prior to the meeting. Attendance by NRC personnel at this meeting should be made known by April 15. 2010, via telephone to the NRC meeting contact.
NRC (5 National Summary of Plant Performance  
D(~..-:::.:;...---
............................................................
Donald E. Ja son, Chief Projects Branch 5 Division of Reactor Projects cc:    Distribution via ListServ
NRC (7 Discussion of Millstone Station Performanbe  
 
....................................................
2 Additional information relative to the NRC's Annual Assessment Process and the safety performance of Millstone Power Station can be found on the NRC's web site at:
NRC (15 NEAC's Response and Questions  
www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.
..................................................................
Meeting Contact:        Donald E. Jackson, Chief Projects Branch 5 (610) 337-5306 E-mail: donald.iackson@nrc.gov
NEAC (20 Closing Remarks ................................................................................................
* Handicapped persons requiring assistance to attend the meeting shall make their requests known to the NRC meeting contact no later than two business days prior to the meeting. Attendance by NRC personnel at this meeting should be made known by April 15, 2010, via telephone to the NRC meeting contact.
NRC (5 Short Break .................................................................................................................
Approved by:
(5 NRC to address public questions  
IRA!
.................. " ...........
Donald E. Jackson, Chief Projects Branch 5 Division of Reactor Projects Distribution:
NRC/Members of the Public (as 4 Distribution: (via email) Executive Director for Operations, OEDO Deputy Executive Director for Reactor Programs, OED Director, Office of Nuclear Reactor Regulation, NRR Deputy Director, Office of Nuclear Reactor Regulation NRR Director, Division of Inspection  
See attached page DOCUMENT NAME: G:\DRP\BRANCH5\Annual Assessment Meetings\2009 EOC\Meeting Notices\Millstone ROP 10 Public Outreach NEAC Meeting Notice.doc SUNSI Review Complete: _.......:J.:.:,H__ (Reviewer's Initials)                    ML100880398 After declaring this document DAn Official Agency Record" it will be released to the Public.
&Regional Support, NRR/DIRS Director, Division of Operating Reactor Licensing, NRRIDORl Asst. General Counsel Materials Litigation  
To receive a copy of this document, indicate in the box: "C":= Copy without attachment/enclosure liE" = Co with attachment/enclosure "N":= No co                   ML RIIDRP DJackson/DJ 03/29/10 OFFICIAL RECORD COpy
&Enforcement, OGC S. Collins, ORA (R10RAMAll RESOURCE)
 
M. Dapas, ORA (R10RAMAIL RESOURCE)
3 Agenda NRC & NEAC Meeting Concerning Millstone Power Station Performance Waterford Town Hall Apri122,2010 6:00 - 8:00 pm Introduction .......... '" ., ....................................................................................... NRC (3 minutes)
D. Lew, DRP (R1DRPMAIL RESOURCE)
Review of Reactor Oversight Process ................................................................ NRC (5 minutes)
J. Clifford, DRP (R1 DRPMAIL RESOURCE)
National Summary of Plant Performance ............................................................ NRC (7 minutes)
D. Roberts, DRS (R1DRSMAIL RESOURCE)
Discussion of Millstone Station Performanbe .................................................... NRC (15 minutes)
P. Wilson, DRS (R1DRSMAIL RESOURCE)
NEAC's Response and Questions .................................................................. NEAC (20 minutes)
Closing Remarks ................................................................................................NRC (5 minutes)
Short Break .................................................................................................................(5 minutes)
NRC to address public questions .................. " ........... NRC/Members of the Public (as needed)
 
4 Distribution: (via email)
Executive Director for Operations, OEDO                       (RIDSEDOMAILCENTER)
Deputy Executive Director for Reactor Programs, OED           (RIDSEDOMAILCENTER)
Director, Office of Nuclear Reactor Regulation, NRR           (RIDSNRROD)
Deputy Director, Office of Nuclear Reactor Regulation NRR     (RIDSNRROD)
Director, Division of Inspection & Regional Support, NRR/DIRS (RIDSNRRDJRS)
Director, Division of Operating Reactor Licensing, NRRIDORl   (RIDSNRRDORL)
Asst. General Counsel Materials Litigation & Enforcement, OGC (RIDSOGCMAILCENTER)
S. Collins, ORA           (R10RAMAll RESOURCE)
M. Dapas, ORA             (R10RAMAIL RESOURCE)
D. Lew, DRP               (R1DRPMAIL RESOURCE)
J. Clifford, DRP         (R1 DRPMAIL RESOURCE)
D. Roberts, DRS           (R1DRSMAIL RESOURCE)
P. Wilson, DRS           (R1DRSMAIL RESOURCE)
L. Trocine, RI OEDO ROPreportsResource@nrc.gov RidsNRRPM Millstone Resource D. Jackson, DRP T. Setzer, DRP J. Heinly, DRP S. Shaffer, DRP, SRI B. Haagensen, RI J. Krafty, DRP, RI C. Kowalyshyn, OA N. Sheehan. PAO D. Screnci, PAO N. McNamara, SLO D. Tifft, SLO G. Matakas, ORA C. O'Daniell, ORA K. Heater. DRP L. Pinkham, DRP D. Bearde, DRS T. Havercamp, DNMS L. Larche, DRM V. Lewis, RI Receptionist PMNS}}
L. Trocine, RI OEDO ROPreportsResource@nrc.gov RidsNRRPM Millstone Resource D. Jackson, DRP T. Setzer, DRP J. Heinly, DRP S. Shaffer, DRP, SRI B. Haagensen, RI J. Krafty, DRP, RI C. Kowalyshyn, OA N. Sheehan. PAO D. Screnci, PAO N. McNamara, SLO D. Tifft, SLO G. Matakas, ORA C. O'Daniell, ORA K. Heater. DRP L. Pinkham, DRP D. Bearde, DRS T. Havercamp, DNMS L. Larche, DRM V. Lewis, RI Receptionist PMNS}}

Revision as of 21:19, 13 November 2019

04/22/2010 Notice of Meeting with Dominion Nuclear Connecticut, Inc., to Discuss Nrc'S Assessment of the Safety Performance of the Millstone Power Station for Calendar Year 2009 with the Nuclear Energy Advisory Council (Neac)
ML100880398
Person / Time
Site: Millstone  Dominion icon.png
Issue date: 03/29/2010
From: Diane Jackson
NRC/RGN-I/DRP/PB5
To:
References
FOIA/PA-2011-0115
Download: ML100880398 (5)


Text

MN No.10-018 U.S. NUCLEAR REGULATORY COMMISSION REGION' NOTICE OF PUBLIC MEETING March 29, 2010 Licensee: Dominion Nuclear Connecticut, Inc.

Facility: Millstone Power Station Docket No. 50-336 and 50-423 Date and Time: April 22, 2010 6:00 p.m. - 8:00 p.m.

location: Waterford Town Hall 15 Rope Ferry Road Waterford, CT 06385 Purpose: To discuss NRC's assessment of the safety performance of the Millstone Power Station for calendar year 2009 with the Nuclear Energy Advisory Council (NEAC).

Attendees:

NRC: D. Jackson, Chief, Projects Branch 5, Region I S. Shaffer, Senior Resident Inspector J. Krafty, Resident Inspector NEAC : W. Sheehan, Chairman Quorum of NEAC Committee Membership Public Participation*: This is a Category 1 Meeting. The public is invited to observe the meeting. After the business portion, but before the meeting adjourns, the public will have an opportunity to communicate with the NRC regarding Dominion's performance at Millstone Power Station and the role of the agency in ensuring safe plant operations.

The NRC's Annual Assessment Letter for Millstone Power Station can be located in ADAMS with Accession Number ML100621420. ADAMS is accessible from the NRC Web Site at:

http://www.nrc.gov/reading-rm/adams.html.

2 Additional information relative to the NRC's Annual Assessment Process and the safety performance of Millstone Power Station can be found on the NRC's web site at:

www.nrc.gov/NRRlOVERSIGHT/ASSESS/index.html.

Meeting Contact: Donald E. Jackson, Chief Projects Branch 5

{610} 337-5306 E-mail: donald.jackson@nrc.gov

  • Handicapped persons requiring assistance to attend the meeting shall make their requests known to the NRC meeting contact no later than two business days prior to the meeting. Attendance by NRC personnel at this meeting should be made known by April 15. 2010, via telephone to the NRC meeting contact.

D(~..-:::.:;...---

Donald E. Ja son, Chief Projects Branch 5 Division of Reactor Projects cc: Distribution via ListServ

2 Additional information relative to the NRC's Annual Assessment Process and the safety performance of Millstone Power Station can be found on the NRC's web site at:

www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.

Meeting Contact: Donald E. Jackson, Chief Projects Branch 5 (610) 337-5306 E-mail: donald.iackson@nrc.gov

  • Handicapped persons requiring assistance to attend the meeting shall make their requests known to the NRC meeting contact no later than two business days prior to the meeting. Attendance by NRC personnel at this meeting should be made known by April 15, 2010, via telephone to the NRC meeting contact.

Approved by:

IRA!

Donald E. Jackson, Chief Projects Branch 5 Division of Reactor Projects Distribution:

See attached page DOCUMENT NAME: G:\DRP\BRANCH5\Annual Assessment Meetings\2009 EOC\Meeting Notices\Millstone ROP 10 Public Outreach NEAC Meeting Notice.doc SUNSI Review Complete: _.......:J.:.:,H__ (Reviewer's Initials) ML100880398 After declaring this document DAn Official Agency Record" it will be released to the Public.

To receive a copy of this document, indicate in the box: "C":= Copy without attachment/enclosure liE" = Co with attachment/enclosure "N":= No co ML RIIDRP DJackson/DJ 03/29/10 OFFICIAL RECORD COpy

3 Agenda NRC & NEAC Meeting Concerning Millstone Power Station Performance Waterford Town Hall Apri122,2010 6:00 - 8:00 pm Introduction .......... '" ., ....................................................................................... NRC (3 minutes)

Review of Reactor Oversight Process ................................................................ NRC (5 minutes)

National Summary of Plant Performance ............................................................ NRC (7 minutes)

Discussion of Millstone Station Performanbe .................................................... NRC (15 minutes)

NEAC's Response and Questions .................................................................. NEAC (20 minutes)

Closing Remarks ................................................................................................NRC (5 minutes)

Short Break .................................................................................................................(5 minutes)

NRC to address public questions .................. " ........... NRC/Members of the Public (as needed)

4 Distribution: (via email)

Executive Director for Operations, OEDO (RIDSEDOMAILCENTER)

Deputy Executive Director for Reactor Programs, OED (RIDSEDOMAILCENTER)

Director, Office of Nuclear Reactor Regulation, NRR (RIDSNRROD)

Deputy Director, Office of Nuclear Reactor Regulation NRR (RIDSNRROD)

Director, Division of Inspection & Regional Support, NRR/DIRS (RIDSNRRDJRS)

Director, Division of Operating Reactor Licensing, NRRIDORl (RIDSNRRDORL)

Asst. General Counsel Materials Litigation & Enforcement, OGC (RIDSOGCMAILCENTER)

S. Collins, ORA (R10RAMAll RESOURCE)

M. Dapas, ORA (R10RAMAIL RESOURCE)

D. Lew, DRP (R1DRPMAIL RESOURCE)

J. Clifford, DRP (R1 DRPMAIL RESOURCE)

D. Roberts, DRS (R1DRSMAIL RESOURCE)

P. Wilson, DRS (R1DRSMAIL RESOURCE)

L. Trocine, RI OEDO ROPreportsResource@nrc.gov RidsNRRPM Millstone Resource D. Jackson, DRP T. Setzer, DRP J. Heinly, DRP S. Shaffer, DRP, SRI B. Haagensen, RI J. Krafty, DRP, RI C. Kowalyshyn, OA N. Sheehan. PAO D. Screnci, PAO N. McNamara, SLO D. Tifft, SLO G. Matakas, ORA C. O'Daniell, ORA K. Heater. DRP L. Pinkham, DRP D. Bearde, DRS T. Havercamp, DNMS L. Larche, DRM V. Lewis, RI Receptionist PMNS