{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257
{{#Wiki_filter:UNITED STATES
  January 18, 2011  
                                NUCLEAR REGULATORY COMMISSION
Mr. Jon A. Franke Vice President, Crystal River Nuclear Plant  
                                                REGION II
Crystal River Nuclear Plant (NA2C)  
                            245 PEACHTREE CENTER AVENUE NE, SUITE 1200
15760 W. Power Line Street Crystal River, FL 34428-6708  
                                      ATLANTA, GEORGIA 30303-1257
                                            January 18, 2011
SUBJECT: CRYSTAL RIVER NUCLEAR PLANT, UNIT 3 - NOTIFICATION OF CONDUCT OF A TRIENNIAL FIRE PROTECTION BASELINE INSPECTION WHILE TRANSITION TO 10 CFR PART 50.48(c) IS IN PROGRESS (NRC INSPECTION REPORT NO. 05000302/2011008)
Mr. Jon A. Franke
Vice President, Crystal River Nuclear Plant
Dear Mr. Franke:  
Crystal River Nuclear Plant (NA2C)
The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC) Region II staff will conduct a triennial fire protection baseline inspection at Crystal River Nuclear Plant, Unit 3 in May 2011. The inspection team will be led by Mrs. LaDonna Suggs, NRC Reactor Inspector, of the Region II Office. The team will be composed of personnel from the NRC Region II Office. The inspection will be conducted in accordance with Inspection  
15760 W. Power Line Street
Procedure 71111.05TTP, the NRC's baseline fire protection inspection procedure for plants in the process of implementing 10 CFR 50.48(c) and National Fire Protection Association Standard (NFPA) 805. The inspection guidance is different from the regular triennial inspections, in that the inspectors will concentrate on the fire protection program infrastructure and the adequacy of compensatory measures implemented for identified departures from code  
Crystal River, FL 34428-6708
requirements. Inspection of circuit analysis is not included in the inspection procedure; however, electrical topics will be addressed by the team.
SUBJECT:       CRYSTAL RIVER NUCLEAR PLANT, UNIT 3 - NOTIFICATION OF CONDUCT
On January 06, 2011, during a telephone conversation between Mr. Dennis Herrin (Crystal River Lead Compliance Engineer - Licensing & Regulatory Programs) of your staff, and Mrs.  
                OF A TRIENNIAL FIRE PROTECTION BASELINE INSPECTION WHILE
Suggs, our respective staffs confirmed arrangements for a three-day information gathering onsite visit and a two-week onsite inspection. The schedule for the inspection is as follows:
                TRANSITION TO 10 CFR PART 50.48(c) IS IN PROGRESS (NRC INSPECTION
* Information gathering visit: March 15 - 17, 2011
                REPORT NO. 05000302/2011008)
* Week 1 of onsite inspection: April 4 - 8, 2011  
Dear Mr. Franke:
* Week 2 of onsite inspection: April 18 - 22, 2011
The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC)
The purposes of the information gathering visit are to obtain information and documentation needed to support the inspection, to become familiar with the Crystal River Nuclear Plant, Unit 3 fire protection program, fire protection features, post-fire safe shutdown capabilities,plant layout, and mitigating strategies to address Section B.5.b of the Interim Compensatory Measures  
Region II staff will conduct a triennial fire protection baseline inspection at Crystal River Nuclear
Order, EA-02-026, of February 25, 2002/10 CFR 50.54(hh)(2). The types of documents the team will be interested in reviewing, and possibly obtaining, are listed in Enclosures 1 and 2. Please contact Mrs. Suggs prior to preparing copies of the materials listed in the Enclosures. The inspection team will try to minimize your administrative burden by specifically identifying those documents required for inspection preparation.  
Plant, Unit 3 in May 2011. The inspection team will be led by Mrs. LaDonna Suggs, NRC
FPC 2 During the information gathering visit, the team will also discuss the following inspection support administrative details: office space; specific documents to be made available to the team in their office space; arrangements for unescorted site access (including radiation protection training, security, safety and fitness for duty requirements); and the availability of knowledgeable plant engineering and licensing organization personnel to serve as points of contact during the inspection. 
Reactor Inspector, of the Region II Office. The team will be composed of personnel from the
NRC Region II Office. The inspection will be conducted in accordance with Inspection
Procedure 71111.05TTP, the NRCs baseline fire protection inspection procedure for plants in
the process of implementing 10 CFR 50.48(c) and National Fire Protection Association
Standard (NFPA) 805. The inspection guidance is different from the regular triennial
inspections, in that the inspectors will concentrate on the fire protection program infrastructure
and the adequacy of compensatory measures implemented for identified departures from code
requirements. Inspection of circuit analysis is not included in the inspection procedure;
however, electrical topics will be addressed by the team.
On January 06, 2011, during a telephone conversation between Mr. Dennis Herrin (Crystal
River Lead Compliance Engineer - Licensing & Regulatory Programs) of your staff, and Mrs.
Suggs, our respective staffs confirmed arrangements for a three-day information gathering
onsite visit and a two-week onsite inspection. The schedule for the inspection is as follows:
        *       Information gathering visit: March 15 - 17, 2011
        *       Week 1 of onsite inspection: April 4 - 8, 2011
        *       Week 2 of onsite inspection: April 18 - 22, 2011
The purposes of the information gathering visit are to obtain information and documentation
needed to support the inspection, to become familiar with the Crystal River Nuclear Plant, Unit 3
fire protection program, fire protection features, post-fire safe shutdown capabilities,plant layout,
and mitigating strategies to address Section B.5.b of the Interim Compensatory Measures
Order, EA-02-026, of February 25, 2002/10 CFR 50.54(hh)(2). The types of documents the
team will be interested in reviewing, and possibly obtaining, are listed in Enclosures 1 and 2.
Please contact Mrs. Suggs prior to preparing copies of the materials listed in the Enclosures.
The inspection team will try to minimize your administrative burden by specifically identifying
those documents required for inspection preparation.


We request that during the inspection weeks you ensure that copies of analyses, evaluations or documentation regarding the implementation and maintenance of the Crystal River fire protection program, including post-fire safe shutdown capability, be readily accessible to the team for their review. Of specific interest for the fire protection portion of the inspection are  
FPC                                                2
those documents which establish that your fire protection program satisfies NRC regulatory requirements and conforms to applicable NRC and industry fire protection guidance. For the B.5.b portion of the inspection, those documents implementing your mitigating strategies and demonstrating the management of your commitments for the strategies are of specific interest. Also, personnel should be available at the site during the inspection who are knowledgeable regarding those plant systems required to achieve and maintain safe shutdown conditions from inside and outside the control room (including the electrical aspects of the relevant post-fire safe  
During the information gathering visit, the team will also discuss the following inspection support
shutdown analyses), reactor plant fire protection systems and features, and the Crystal River fire protection program and its implementation.
administrative details: office space; specific documents to be made available to the team in their
This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection  
office space; arrangements for unescorted site access (including radiation protection training,
requirements were approved by the Office of Management and Budget, control number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control number.  
security, safety and fitness for duty requirements); and the availability of knowledgeable plant
engineering and licensing organization personnel to serve as points of contact during the
Your cooperation and support during this inspection will be appreciated. If you have questions concerning this inspection, or the inspection team's information or logistical needs, please contact Mrs. Suggs at (404) 997-4539, or me at (404) 562-4530.  
inspection.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its  
We request that during the inspection weeks you ensure that copies of analyses, evaluations or
enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system  
documentation regarding the implementation and maintenance of the Crystal River fire
FPC 3 (ADAMS).  ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html
protection program, including post-fire safe shutdown capability, be readily accessible to the
http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).  Sincerely, 
team for their review. Of specific interest for the fire protection portion of the inspection are
      /RA/  Rebecca L. Nease, Chief Engineering Branch 2 Division of Reactor Safety 
those documents which establish that your fire protection program satisfies NRC regulatory
requirements and conforms to applicable NRC and industry fire protection guidance. For the
Docket No.: 50-302 License No.: DPR-72 
B.5.b portion of the inspection, those documents implementing your mitigating strategies and
Enclosures: 1. Triennial Fire Protection Inspection Support Documentation    2. Mitigating Strategies Support Documentation
demonstrating the management of your commitments for the strategies are of specific interest.
Also, personnel should be available at the site during the inspection who are knowledgeable
regarding those plant systems required to achieve and maintain safe shutdown conditions from
inside and outside the control room (including the electrical aspects of the relevant post-fire safe
shutdown analyses), reactor plant fire protection systems and features, and the Crystal River
fire protection program and its implementation.
This letter does not contain new or amended information collection requirements subject to the
Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection
requirements were approved by the Office of Management and Budget, control number 3150-
0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a
request for information or an information collection requirement unless the requesting document
displays a currently valid Office of Management and Budget control number.
Your cooperation and support during this inspection will be appreciated. If you have questions
concerning this inspection, or the inspection team's information or logistical needs, please
contact Mrs. Suggs at (404) 997-4539, or me at (404) 562-4530.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its
enclosure will be available electronically for public inspection in the NRC Public Document
Room or from the Publicly Available Records (PARS) component of NRCs document system


cc w/encl. (See page 4)
FPC                                            3
 
(ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-
FPC 4 cc w/encls: R. J. Duncan, II Vice President Nuclear Operations Carolina Power & Light Company Electronic Mail Distribution
rm/adams.html http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading
Room).
                                            Sincerely,
                                            /RA/
                                            Rebecca L. Nease, Chief
                                            Engineering Branch 2
                                            Division of Reactor Safety
Docket No.: 50-302
License No.: DPR-72
Enclosures:  1. Triennial Fire Protection Inspection Support Documentation
              2. Mitigating Strategies Support Documentation
cc w/encl. (See page 4)


Brian C. McCabe Manager, Nuclear Regulatory Affairs Progress Energy Carolinas, Inc. Electronic Mail Distribution  
FPC                                4
cc w/encls:                          Joseph W. Donahue
R. J. Duncan, II                      Vice President
Vice President                        Nuclear Oversight
Nuclear Operations                    Carolina Power and Light Company
Carolina Power & Light Company        Electronic Mail Distribution
Electronic Mail Distribution
                                      Jack E. Huegel
Brian C. McCabe                       Manager, Nuclear Oversight
Manager, Nuclear Regulatory Affairs   Crystal River Nuclear Plant
Progress Energy Carolinas, Inc.       Electronic Mail Distribution
Electronic Mail Distribution
                                      David T. Conley
James W. Holt                        Associate General Counsel
Plant General Manager                Legal Dept.
Crystal River Nuclear Plant (NA2C)    Progress Energy Service Company, LLC
Electronic Mail Distribution          Electronic Mail Distribution
Stephen J. Cahill                    Mark Rigsby
Engineering Manager                  Manager, Support Services - Nuclear
Crystal River Nuclear Plant (NA2C)    Crystal River Nuclear Plant (NA2C)
Electronic Mail Distribution          Electronic Mail Distribution
R. Alexander Glenn                    Senior Resident Inspector
Associate General Counsel            U.S. Nuclear Regulatory Commission
(MAC - BT15A)                        Crystal River Nuclear Generating Plant
Florida Power Corporation            U.S. NRC
Electronic Mail Distribution          6745 N Tallahassee Rd
                                      Crystal River, FL 34428
Christos Kamilaris
Director                              Attorney General
Fleet Support Services                Department of Legal Affairs
Carolina Power & Light Company        The Capitol PL-01
Electronic Mail Distribution          Tallahassee, FL 32399-1050
William A. Passetti                  Ruben D. Almaguer
Chief                                Director
Florida Bureau of Radiation Control  Division of Emergency Preparedness
Department of Health                  Department of Community Affairs
Electronic Mail Distribution          Electronic Mail Distribution
Daniel R. Westcott                    Chairman
Supervisor                            Board of County Commissioners
Licensing & Regulatory Programs      Citrus County
Crystal River Nuclear Plant (NA1B)    110 N. Apopka Avenue
Electronic Mail Distribution          Inverness, FL 36250


James W. Holt Plant General Manager Crystal River Nuclear Plant (NA2C) Electronic Mail Distribution
Stephen J. Cahill
Engineering Manager Crystal River Nuclear Plant (NA2C) Electronic Mail Distribution
R. Alexander Glenn
Associate General Counsel (MAC - BT15A) Florida Power Corporation Electronic Mail Distribution
Christos Kamilaris Director Fleet Support Services Carolina Power & Light Company Electronic Mail Distribution


  William A. Passetti Chief Florida Bureau of Radiation Control Department of Health
_________________________            G SUNSI REVIEW COMPLETE
Electronic Mail Distribution
OFFICE            RII;DRS      RII:DRP      RII:DRS
  Daniel R. Westcott Supervisor Licensing & Regulatory Programs Crystal River Nuclear Plant (NA1B) Electronic Mail Distribution
SIGNATURE          RA            RA          RA
NAME              SUGGS        RICH        NEASE
DATE              1/18/2011    1/18/2011    1/18/2011      1/ /2011    1/  /2011    1/  /2011    1/  /2011
E-MAIL COPY?      YES        NO YES      NO YES        NO YES        NO YES        NO YES        NO YES      NO
       
                    Triennial Fire Protection Inspection Support Documentation
Note: This is a broad list of the documents the NRC inspection team may be interested in
reviewing, and possibly obtaining, during the information gathering site visit. The current
version of these documents is expected unless specified otherwise. Electronic media is
preferred, if readily available. (The preferred file format on CD-ROM or DVDROM is .pdf).
The CD/DVD-ROM should be indexed, hyperlinked, readable, and searchable to facilitate ease
of use. Please provide 5 copies of each CD/DVD-ROM submitted). Information in lists should
contain enough information to be easily understood by someone who has knowledge of the
technology. The lead inspector will discuss specific information needs with the licensee staff
and may request additional documents or electronic information.
1.      The Fire Protection Program document and the Fire Hazards Analysis.
2.      The Fire Protection Program implementing procedures (e.g., administrative controls,
        surveillance testing, fire brigade).
3.      The fire brigade training program document and the pre-fire plans for the selected fire
        areas/zones (to be determined during information gathering visit).
4.      The post-fire safe shutdown analysis, including system and separation analyses.
5.      The alternative shutdown analysis.
6.      Piping and instrumentation (flow) diagrams for the fire suppression systems.
7.      Piping and instrumentation (flow) diagrams for the systems and components used to
        achieve and maintain hot standby, and cold shutdown, for fires involving shutdown from
        the control room.
8.      Piping and instrumentation (flow) diagrams for the systems and components used to
        achieve and maintain hot standby, and cold shutdown, for fires in areas requiring
        alternative or dedicated shutdown capability.
9.      Plant layout and equipment drawings which identify the physical plant locations of hot
        standby and cold shutdown equipment.
  10.   Plant layout drawings which identify plant fire area and/or fire zone delineation, areas
        protected by automatic fire suppression and detection, and the locations of fire
        protection equipment for the selected fire areas/zones (to be determined during
        information gathering visit).
11.    Plant layout drawings which identify the general location of the post-fire emergency
        lighting units.
12.    Plant operating procedures used to, and describing shutdown from inside the control
        room with a postulated fire occurring in any plant area outside the control room.
13.    Plant operating procedures used to implement the alternative shutdown capability from
        outside the control room with a fire in either the control or cable spreading room (or any
        other alternative shutdown area).
                                                                                        Enclosure 1


Joseph W. Donahue Vice President Nuclear Oversight Carolina Power and Light Company Electronic Mail Distribution
                                                2
14. Maintenance and surveillance testing procedures for alternative shutdown capability
Jack E. Huegel Manager, Nuclear Oversight Crystal River Nuclear Plant Electronic Mail Distribution
    (including Appendix R emergency lights and communication systems) fire barriers,
    detectors, fire pumps and fire suppression systems.
David T. Conley Associate General Counsel Legal Dept. Progress Energy Service Company, LLC Electronic Mail Distribution
15. Calculations and/or justifications that verify fuse/breaker coordination for the selected fire
Mark Rigsby
    areas/zones (to be determined during information gathering visit) that are fed off the
Manager, Support Services - Nuclear Crystal River Nuclear Plant (NA2C) Electronic Mail Distribution
    same electrical buses as components in the protected train. Also, a list of the
Senior Resident Inspector
    maintenance procedures used to routinely verify fuse/breaker coordination in
U.S. Nuclear Regulatory Commission Crystal River Nuclear Generating Plant U.S. NRC 6745 N Tallahassee Rd Crystal River, FL  34428
    accordance with the post-fire safe shutdown coordination analysis.
16. A list of the significant fire protection and post-fire safe shutdown design change
    descriptions (including their associated 10 CFR 50.59 evaluations) and Generic Letter
    (GL) 86-10 evaluations.
17. A list of the protection methodologies (as identified in 10 CFR Part 50, Appendix R,
    Section Ill.G) used to achieve regulatory compliance for the selected fire areas/zones (to
    be determined during information gathering visit). That is, please specify whether 3-hour
    rated fire barriers (Section Ill.G.2.a), 20-foot separation along with detection and
    suppression (Section IIl.G.2.b), 1-hour rated fire barriers with detection and suppression
    (Section lII.G.2.c), or alternative shutdown capability (Section lll.G.3) is used for the
    selected fire areas/zones.
18. Procedures or instructions that govern the implementation of plant modifications,
    temporary modifications, maintenance, and special operations, and their impact on fire
    protection.
19. Organization chart(s) of site personnel down to the level of the fire protection staff.
20. Procedures or instructions that control the configuration of the fire protection program,
    features, and post-fire safe shutdown methodology and system design.
21. A list of applicable codes and standards related to the design of plant fire protection
    features and evaluations of code deviations (i.e., a listing of the NFPA code editions
    committed to (Code of Record)).
22. The three most recent fire protection QA audits and/or fire protection self-assessments.
23. A list of open and closed fire protection problem identification and resolution reports
    [also known as action reports/condition reports/problem investigation
    reports/NCRs/EARs] associated with fire protection or Appendix R safe shutdown for the
    past three years.
24. A list of plant fire protection licensing basis documents (i.e., a list of the SERs and
    change evaluations which form the licensing basis for the facilitys post-fire safe
    shutdown configuration).
25. A list of fire protection or Appendix R calculations,
26. A list of fire impairments identified during the previous year.
27. A list of abbreviations/designators for plant systems.
                                                                                      Enclosure 1


Attorney General Department of Legal Affairs The Capitol PL-01 Tallahassee, FL  32399-1050
                            Mitigating Strategies Support Documentation
 
Note: This is a broad list of the documents the NRC inspection team may be interested in
Ruben D. Almaguer Director Division of Emergency Preparedness Department of Community Affairs
reviewing, and possibly obtaining, during the information gathering visit. The current version of
Electronic Mail Distribution
these documents is expected unless specified otherwise. Electronic media is preferred, if
Chairman Board of County Commissioners Citrus County 110 N. Apopka Avenue Inverness, FL  36250
readily available. (The preferred file format on CD-ROM or DVDROM is .pdf). The CD/DVD-
 
ROM should be indexed, hyperlinked, readable, and searchable to facilitate ease of use.
     
Please provide 5 copies of each CD/DVD-ROM submitted). The lead inspector will discuss
 
specific information needs with the licensee staff and may request additional documents or
_________________________ 
electronic information.
G  SUNSI REVIEW COMPLETE OFFICE RII;DRS RII:DRP RII:DRS    SIGNATURE RA RA RA    NAME SUGGS RICH NEASE    DATE 1/18/2011 1/18/2011 1/18/2011 1/      /2011 1/      /2011 1/      /2011 1/      /2011 E-MAIL COPY? YES NO YES NO YES NOYES NOYES NO YES NOYES NO
1.     A list of all modifications to regulatory commitments made to meet the requirements of
Enclosure 1 Triennial Fire Protection Inspection Support Documentation
        Section B.5.b of the ICM Order, EA-02-026, dated February 25, 2002, the subsequently
  Note: This is a broad list of the documents the NRC inspection team may be interested in reviewing, and possibly obtaining, during the information gathering site visit.  The current version of these documents is expected unless specified otherwise.  Electronic media is preferred, if readily available.  (The preferred file format on CD-ROM or DVDROM is ".pdf"). 
        imposed license conditions, and 10 CFR 50.54(hh)(2).
The CD/DVD-ROM should be indexed, hyperlinked, readable, and searchable to facilitate ease of use.  Please provide 5 copies of each CD/DVD-ROM submitted).  Information in "lists" should contain enough information to be easily understood by someone who has knowledge of the technology.  The lead inspector will discuss specific information needs with the licensee staff and may request additional documents or electronic information. 
2.     Copies of procedures/guidelines that were revised or generated to implement the
 
        mitigation strategies. These could be extensive damage mitigation guidelines (EDMGs),
1. The Fire Protection Program document and the Fire Hazards Analysis.
        severe accident management guidelines (SAMGs), emergency operating procedures
2. The Fire Protection Program implementing procedures (e.g., administrative controls, surveillance testing, fire brigade).
        (EOPs), abnormal operating procedures (AOPs), etc.
3. The fire brigade training program document and the pre-fire plans for the selected fire areas/zones (to be determined during information gathering visit).
3.     A matrix that shows the correlation between the mitigation strategies identified in
4. The post-fire safe shutdown analysis, including system and separation analyses.
        Nuclear Energy Institute 06-12 and the site-specific procedures or guidelines that are
5. The alternative shutdown analysis.
        used to implement each strategy.
 
4.     Engineering evaluations/calculations that were used to verify engineering bases for the
6.  Piping and instrumentation (flow) diagrams for the fire suppression systems.
        mitigation strategies.
7. Piping and instrumentation (flow) diagrams for the systems and components used to achieve and maintain hot standby, and cold shutdown, for fires involving shutdown from
5.     Piping and instrumentation diagram (P&ID) or simplified flow diagrams for systems relied
the control room.
        upon in the mitigation strategies. These could be the type used for training.
8. Piping and instrumentation (flow) diagrams for the systems and components used to achieve and maintain hot standby, and cold shutdown, for fires in areas requiring alternative or dedicated shutdown capability.
6.     A modification package or simplified drawings/descriptions of modifications that were
9. Plant layout and equipment drawings which identify the physical plant locations of hot standby and cold shutdown equipment.
        made to plant systems to implement the mitigation strategies.
10. Plant layout drawings which identify plant fire area and/or fire zone delineation, areas protected by automatic fire suppression and detection, and the locations of fire protection equipment for the selected fire areas/zones (to be determined during information gathering visit).
7.     Copies of procedures used to inventory equipment (hoses, fittings, pumps, etc.) required
11. Plant layout drawings which identify the general location of the post-fire emergency lighting units.
        to be used to implement the mitigation strategies.
8.     A list of B.5.b strategies, if any, which have implementing details that differ from that
12. Plant operating procedures used to, and describing shutdown from inside the control room with a postulated fire occurring in any plant area outside the control room. 
        documented in the submittals and the safety evaluation report.
13. Plant operating procedures used to implement the alternative shutdown capability from outside the control room with a fire in either the control or cable spreading room (or any
9.     A copy of site general arrangement drawing(s) that show the majority of buildings/areas
other alternative shutdown area).
        referenced in B.5.b documents.
2 Enclosure 1
10.     Training records/training matrix/lesson plans related to B.5.b.
14. Maintenance and surveillance testing procedures for alternative shutdown capability (including Appendix R emergency lights and communication systems) fire barriers, detectors, fire pumps and fire suppression systems.
11.     Copies of Memoranda of Understanding (MOUs) (e.g., with local fire departments)
15. Calculations and/or justifications that verify fuse/breaker coordination for the selected fire areas/zones (to be determined during information gathering visit) that are fed off the same electrical buses as components in the protected train. Also, a list of the maintenance procedures used to routinely verify fuse/breaker coordination in accordance with the post-fire safe shutdown coordination analysis.
        required to implement any mitigating strategies.
                                                                                          Enclosure 2
16. A list of the significant fire protection and post-fire safe shutdown design change descriptions (including their associated 10 CFR 50.59 evaluations) and Generic Letter (GL) 86-10 evaluations.
17. A list of the protection methodologies (as identified in 10 CFR Part 50, Appendix R, Section Ill.G) used to achieve regulatory compliance for the selected fire areas/zones (to be determined during information gathering visit). That is, please specify whether 3-hour
rated fire barriers (Section Ill.G.2.a), 20-foot separation along with detection and suppression (Section IIl.G.2.b), 1-hour rated fire barriers with detection and suppression (Section lII.G.2.c), or alternative shutdown capability (Section lll.G.3) is used for the selected fire areas/zones.
18. Procedures or instructions that govern the implementation of plant modifications, temporary modifications, maintenance, and special operations, and their impact on fire protection.
19. Organization chart(s) of site personnel down to the level of the fire protection staff.
 
20. Procedures or instructions that control the configuration of the fire protection program, features, and post-fire safe shutdown methodology and system design.
21. A list of applicable codes and standards related to the design of plant fire protection features and evaluations of code deviations (i.e., a listing of the NFPA code editions committed to (Code of Record)).
22. The three most recent fire protection QA audits and/or fire protection self-assessments.
23. A list of open and closed fire protection problem identification and resolution reports [also known as action reports/condition reports/problem investigation reports/NCRs/EARs] associated with fire protection or Appendix R safe shutdown for the past three years. 
24. A list of plant fire protection licensing basis documents (i.e., a list of the SERs and change evaluations which form the licensing basis for the facility's post-fire safe
shutdown configuration). 
25. A list of fire protection or Appendix R calculations,  26. A list of fire impairments identified during the previous year. 
 
27. A list of abbreviations/designators for plant systems. 
Enclosure 2
Mitigating Strategies Support Documentation
  Note: This is a broad list of the documents the NRC inspection team may be interested in reviewing, and possibly obtaining, during the information gathering visit. The current version of these documents is expected unless specified otherwise. Electronic media is preferred, if  
readily available. (The preferred file format on CD-ROM or DVDROM is ".pdf"). The CD/DVD-ROM should be indexed, hyperlinked, readable, and searchable to facilitate ease of use. Please provide 5 copies of each CD/DVD-ROM submitted). The lead inspector will discuss specific information needs with the licensee staff and may request additional documents or electronic information.  
 
1.   A list of all modifications to regulatory commitments made to meet the requirements of Section B.5.b of the ICM Order, EA-02-026, dated February 25, 2002, the subsequently imposed license conditions, and 10 CFR 50.54(hh)(2).  
2.   Copies of procedures/guidelines that were revised or generated to implement the mitigation strategies. These could be extensive damage mitigation guidelines (EDMGs),  
severe accident management guidelines (SAMGs), emergency operating procedures (EOPs), abnormal operating procedures (AOPs), etc.
3. A matrix that shows the correlation between the mitigation strategies identified in Nuclear Energy Institute 06-12 and the site-specific procedures or guidelines that are  
used to implement each strategy.  
4. Engineering evaluations/calculations that were used to verify engineering bases for the mitigation strategies.
5. Piping and instrumentation diagram (P&ID) or simplified flow diagrams for systems relied upon in the mitigation strategies. These could be the type used for training.
6. A modification package or simplified drawings/descriptions of modifications that were made to plant systems to implement the mitigation strategies.
7. Copies of procedures used to inventory equipment (hoses, fittings, pumps, etc.) required to be used to implement the mitigation strategies.  
8. A list of B.5.b strategies, if any, which have implementing details that differ from that documented in the submittals and the safety evaluation report.
9. A copy of site general arrangement drawing(s) that show the majority of buildings/areas referenced in B.5.b documents.  
10. Training records/training matrix/lesson plans related to B.5.b.  
11. Copies of Memoranda of Understanding (MOUs) (e.g., with local fire departments) required to implement any mitigating strategies.
}}
}}

Latest revision as of 05:25, 13 November 2019

IR 05000302-11-008, on 01/06/11, Crystal River Nuclear Plant, Unit 3
ML110180664
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 01/18/2011
From: Nease R
NRC/RGN-II/DRS/EB2
To: Franke J
Florida Power Corp
References
IR-11-008
Download: ML110180664 (8)


See also: IR 05000302/2011008

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION II

245 PEACHTREE CENTER AVENUE NE, SUITE 1200

ATLANTA, GEORGIA 30303-1257

January 18, 2011

Mr. Jon A. Franke

Vice President, Crystal River Nuclear Plant

Crystal River Nuclear Plant (NA2C)

15760 W. Power Line Street

Crystal River, FL 34428-6708

SUBJECT: CRYSTAL RIVER NUCLEAR PLANT, UNIT 3 - NOTIFICATION OF CONDUCT

OF A TRIENNIAL FIRE PROTECTION BASELINE INSPECTION WHILE

TRANSITION TO 10 CFR PART 50.48(c) IS IN PROGRESS (NRC INSPECTION

REPORT NO. 05000302/2011008)

Dear Mr. Franke:

The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC)

Region II staff will conduct a triennial fire protection baseline inspection at Crystal River Nuclear

Plant, Unit 3 in May 2011. The inspection team will be led by Mrs. LaDonna Suggs, NRC

Reactor Inspector, of the Region II Office. The team will be composed of personnel from the

NRC Region II Office. The inspection will be conducted in accordance with Inspection

Procedure 71111.05TTP, the NRCs baseline fire protection inspection procedure for plants in

the process of implementing 10 CFR 50.48(c) and National Fire Protection Association

Standard (NFPA) 805. The inspection guidance is different from the regular triennial

inspections, in that the inspectors will concentrate on the fire protection program infrastructure

and the adequacy of compensatory measures implemented for identified departures from code

requirements. Inspection of circuit analysis is not included in the inspection procedure;

however, electrical topics will be addressed by the team.

On January 06, 2011, during a telephone conversation between Mr. Dennis Herrin (Crystal

River Lead Compliance Engineer - Licensing & Regulatory Programs) of your staff, and Mrs.

Suggs, our respective staffs confirmed arrangements for a three-day information gathering

onsite visit and a two-week onsite inspection. The schedule for the inspection is as follows:

  • Information gathering visit: March 15 - 17, 2011
  • Week 1 of onsite inspection: April 4 - 8, 2011
  • Week 2 of onsite inspection: April 18 - 22, 2011

The purposes of the information gathering visit are to obtain information and documentation

needed to support the inspection, to become familiar with the Crystal River Nuclear Plant, Unit 3

fire protection program, fire protection features, post-fire safe shutdown capabilities,plant layout,

and mitigating strategies to address Section B.5.b of the Interim Compensatory Measures

Order, EA-02-026, of February 25, 2002/10 CFR 50.54(hh)(2). The types of documents the

team will be interested in reviewing, and possibly obtaining, are listed in Enclosures 1 and 2.

Please contact Mrs. Suggs prior to preparing copies of the materials listed in the Enclosures.

The inspection team will try to minimize your administrative burden by specifically identifying

those documents required for inspection preparation.

FPC 2

During the information gathering visit, the team will also discuss the following inspection support

administrative details: office space; specific documents to be made available to the team in their

office space; arrangements for unescorted site access (including radiation protection training,

security, safety and fitness for duty requirements); and the availability of knowledgeable plant

engineering and licensing organization personnel to serve as points of contact during the

inspection.

We request that during the inspection weeks you ensure that copies of analyses, evaluations or

documentation regarding the implementation and maintenance of the Crystal River fire

protection program, including post-fire safe shutdown capability, be readily accessible to the

team for their review. Of specific interest for the fire protection portion of the inspection are

those documents which establish that your fire protection program satisfies NRC regulatory

requirements and conforms to applicable NRC and industry fire protection guidance. For the

B.5.b portion of the inspection, those documents implementing your mitigating strategies and

demonstrating the management of your commitments for the strategies are of specific interest.

Also, personnel should be available at the site during the inspection who are knowledgeable

regarding those plant systems required to achieve and maintain safe shutdown conditions from

inside and outside the control room (including the electrical aspects of the relevant post-fire safe

shutdown analyses), reactor plant fire protection systems and features, and the Crystal River

fire protection program and its implementation.

This letter does not contain new or amended information collection requirements subject to the

Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection

requirements were approved by the Office of Management and Budget, control number 3150-

0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a

request for information or an information collection requirement unless the requesting document

displays a currently valid Office of Management and Budget control number.

Your cooperation and support during this inspection will be appreciated. If you have questions

concerning this inspection, or the inspection team's information or logistical needs, please

contact Mrs. Suggs at (404) 997-4539, or me at (404) 562-4530.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its

enclosure will be available electronically for public inspection in the NRC Public Document

Room or from the Publicly Available Records (PARS) component of NRCs document system

FPC 3

(ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-

rm/adams.html http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading

Room).

Sincerely,

/RA/

Rebecca L. Nease, Chief

Engineering Branch 2

Division of Reactor Safety

Docket No.: 50-302

License No.: DPR-72

Enclosures: 1. Triennial Fire Protection Inspection Support Documentation

2. Mitigating Strategies Support Documentation

cc w/encl. (See page 4)

FPC 4

cc w/encls: Joseph W. Donahue

R. J. Duncan, II Vice President

Vice President Nuclear Oversight

Nuclear Operations Carolina Power and Light Company

Carolina Power & Light Company Electronic Mail Distribution

Electronic Mail Distribution

Jack E. Huegel

Brian C. McCabe Manager, Nuclear Oversight

Manager, Nuclear Regulatory Affairs Crystal River Nuclear Plant

Progress Energy Carolinas, Inc. Electronic Mail Distribution

Electronic Mail Distribution

David T. Conley

James W. Holt Associate General Counsel

Plant General Manager Legal Dept.

Crystal River Nuclear Plant (NA2C) Progress Energy Service Company, LLC

Electronic Mail Distribution Electronic Mail Distribution

Stephen J. Cahill Mark Rigsby

Engineering Manager Manager, Support Services - Nuclear

Crystal River Nuclear Plant (NA2C) Crystal River Nuclear Plant (NA2C)

Electronic Mail Distribution Electronic Mail Distribution

R. Alexander Glenn Senior Resident Inspector

Associate General Counsel U.S. Nuclear Regulatory Commission

(MAC - BT15A) Crystal River Nuclear Generating Plant

Florida Power Corporation U.S. NRC

Electronic Mail Distribution 6745 N Tallahassee Rd

Crystal River, FL 34428

Christos Kamilaris

Director Attorney General

Fleet Support Services Department of Legal Affairs

Carolina Power & Light Company The Capitol PL-01

Electronic Mail Distribution Tallahassee, FL 32399-1050

William A. Passetti Ruben D. Almaguer

Chief Director

Florida Bureau of Radiation Control Division of Emergency Preparedness

Department of Health Department of Community Affairs

Electronic Mail Distribution Electronic Mail Distribution

Daniel R. Westcott Chairman

Supervisor Board of County Commissioners

Licensing & Regulatory Programs Citrus County

Crystal River Nuclear Plant (NA1B) 110 N. Apopka Avenue

Electronic Mail Distribution Inverness, FL 36250

_________________________ G SUNSI REVIEW COMPLETE

OFFICE RII;DRS RII:DRP RII:DRS

SIGNATURE RA RA RA

NAME SUGGS RICH NEASE

DATE 1/18/2011 1/18/2011 1/18/2011 1/ /2011 1/ /2011 1/ /2011 1/ /2011

E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO

Triennial Fire Protection Inspection Support Documentation

Note: This is a broad list of the documents the NRC inspection team may be interested in

reviewing, and possibly obtaining, during the information gathering site visit. The current

version of these documents is expected unless specified otherwise. Electronic media is

preferred, if readily available. (The preferred file format on CD-ROM or DVDROM is .pdf).

The CD/DVD-ROM should be indexed, hyperlinked, readable, and searchable to facilitate ease

of use. Please provide 5 copies of each CD/DVD-ROM submitted). Information in lists should

contain enough information to be easily understood by someone who has knowledge of the

technology. The lead inspector will discuss specific information needs with the licensee staff

and may request additional documents or electronic information.

1. The Fire Protection Program document and the Fire Hazards Analysis.

2. The Fire Protection Program implementing procedures (e.g., administrative controls,

surveillance testing, fire brigade).

3. The fire brigade training program document and the pre-fire plans for the selected fire

areas/zones (to be determined during information gathering visit).

4. The post-fire safe shutdown analysis, including system and separation analyses.

5. The alternative shutdown analysis.

6. Piping and instrumentation (flow) diagrams for the fire suppression systems.

7. Piping and instrumentation (flow) diagrams for the systems and components used to

achieve and maintain hot standby, and cold shutdown, for fires involving shutdown from

the control room.

8. Piping and instrumentation (flow) diagrams for the systems and components used to

achieve and maintain hot standby, and cold shutdown, for fires in areas requiring

alternative or dedicated shutdown capability.

9. Plant layout and equipment drawings which identify the physical plant locations of hot

standby and cold shutdown equipment.

10. Plant layout drawings which identify plant fire area and/or fire zone delineation, areas

protected by automatic fire suppression and detection, and the locations of fire

protection equipment for the selected fire areas/zones (to be determined during

information gathering visit).

11. Plant layout drawings which identify the general location of the post-fire emergency

lighting units.

12. Plant operating procedures used to, and describing shutdown from inside the control

room with a postulated fire occurring in any plant area outside the control room.

13. Plant operating procedures used to implement the alternative shutdown capability from

outside the control room with a fire in either the control or cable spreading room (or any

other alternative shutdown area).

Enclosure 1

2

14. Maintenance and surveillance testing procedures for alternative shutdown capability

(including Appendix R emergency lights and communication systems) fire barriers,

detectors, fire pumps and fire suppression systems.

15. Calculations and/or justifications that verify fuse/breaker coordination for the selected fire

areas/zones (to be determined during information gathering visit) that are fed off the

same electrical buses as components in the protected train. Also, a list of the

maintenance procedures used to routinely verify fuse/breaker coordination in

accordance with the post-fire safe shutdown coordination analysis.

16. A list of the significant fire protection and post-fire safe shutdown design change

descriptions (including their associated 10 CFR 50.59 evaluations) and Generic Letter

(GL) 86-10 evaluations.

17. A list of the protection methodologies (as identified in 10 CFR Part 50, Appendix R,

Section Ill.G) used to achieve regulatory compliance for the selected fire areas/zones (to

be determined during information gathering visit). That is, please specify whether 3-hour

rated fire barriers (Section Ill.G.2.a), 20-foot separation along with detection and

suppression (Section IIl.G.2.b), 1-hour rated fire barriers with detection and suppression

(Section lII.G.2.c), or alternative shutdown capability (Section lll.G.3) is used for the

selected fire areas/zones.

18. Procedures or instructions that govern the implementation of plant modifications,

temporary modifications, maintenance, and special operations, and their impact on fire

protection.

19. Organization chart(s) of site personnel down to the level of the fire protection staff.

20. Procedures or instructions that control the configuration of the fire protection program,

features, and post-fire safe shutdown methodology and system design.

21. A list of applicable codes and standards related to the design of plant fire protection

features and evaluations of code deviations (i.e., a listing of the NFPA code editions

committed to (Code of Record)).

22. The three most recent fire protection QA audits and/or fire protection self-assessments.

23. A list of open and closed fire protection problem identification and resolution reports

[also known as action reports/condition reports/problem investigation

reports/NCRs/EARs] associated with fire protection or Appendix R safe shutdown for the

past three years.

24. A list of plant fire protection licensing basis documents (i.e., a list of the SERs and

change evaluations which form the licensing basis for the facilitys post-fire safe

shutdown configuration).

25. A list of fire protection or Appendix R calculations,

26. A list of fire impairments identified during the previous year.

27. A list of abbreviations/designators for plant systems.

Enclosure 1

Mitigating Strategies Support Documentation

Note: This is a broad list of the documents the NRC inspection team may be interested in

reviewing, and possibly obtaining, during the information gathering visit. The current version of

these documents is expected unless specified otherwise. Electronic media is preferred, if

readily available. (The preferred file format on CD-ROM or DVDROM is .pdf). The CD/DVD-

ROM should be indexed, hyperlinked, readable, and searchable to facilitate ease of use.

Please provide 5 copies of each CD/DVD-ROM submitted). The lead inspector will discuss

specific information needs with the licensee staff and may request additional documents or

electronic information.

1. A list of all modifications to regulatory commitments made to meet the requirements of

Section B.5.b of the ICM Order, EA-02-026, dated February 25, 2002, the subsequently

imposed license conditions, and 10 CFR 50.54(hh)(2).

2. Copies of procedures/guidelines that were revised or generated to implement the

mitigation strategies. These could be extensive damage mitigation guidelines (EDMGs),

severe accident management guidelines (SAMGs), emergency operating procedures

(EOPs), abnormal operating procedures (AOPs), etc.

3. A matrix that shows the correlation between the mitigation strategies identified in

Nuclear Energy Institute 06-12 and the site-specific procedures or guidelines that are

used to implement each strategy.

4. Engineering evaluations/calculations that were used to verify engineering bases for the

mitigation strategies.

5. Piping and instrumentation diagram (P&ID) or simplified flow diagrams for systems relied

upon in the mitigation strategies. These could be the type used for training.

6. A modification package or simplified drawings/descriptions of modifications that were

made to plant systems to implement the mitigation strategies.

7. Copies of procedures used to inventory equipment (hoses, fittings, pumps, etc.) required

to be used to implement the mitigation strategies.

8. A list of B.5.b strategies, if any, which have implementing details that differ from that

documented in the submittals and the safety evaluation report.

9. A copy of site general arrangement drawing(s) that show the majority of buildings/areas

referenced in B.5.b documents.

10. Training records/training matrix/lesson plans related to B.5.b.

11. Copies of Memoranda of Understanding (MOUs) (e.g., with local fire departments)

required to implement any mitigating strategies.

Enclosure 2