ML120650203: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML120650203
| number = ML120650203
| issue date = 03/05/2012
| issue date = 03/05/2012
| title = Crystal River - EOC Report 22
| title = EOC Report 22
| author name =  
| author name =  
| author affiliation = NRC/RGN-II
| author affiliation = NRC/RGN-II
Line 14: Line 14:
| page count = 1
| page count = 1
}}
}}
=Text=
{{#Wiki_filter:Page 1 of 1                                                                          Crystal River 03/05/2012    07:42:41                                                        Inspection / Activity Plan Report 22 03/01/2012 - 06/30/2013 Unit          Planned Dates                                                                                                                                    No. of Staff Number        Start      End      Inspection Activity                                                                Title                                        on Site 95001        - CR3 95001 SUPPLEMENTAL INSPECTION                                                                                        1 3      04/30/2012  05/04/2012  IP 95001                Supplemental Inspection for One or Two White Inputs in a Strategic Performance Area TI-182        - TI-182 BURIED PIPING/TANK - PHASE 1                                                                                      1 3      07/09/2012  07/13/2012  IP 2515/182            Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping MOD          - MODIFICATION INSPECTION                                                                                                  5 3      08/27/2012  08/31/2012  IP 7111117T            Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 3      09/10/2012  09/14/2012  IP 7111117T            Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications PSB1EP        - EMERGENCY PREPAREDNESS EXERCISE                                                                                          4 3      11/12/2012  11/16/2012  IP 7111401              Exercise Evaluation 3      11/12/2012  11/16/2012  IP 7111404              Emergency Action Level and Emergency Plan Changes 3      11/12/2012  11/16/2012  IP 71151                Performance Indicator Verification PSB1-RP      - PUBLIC RADIATION PROTECTION BASELINE                                                                                    4 3      11/26/2012  11/30/2012  IP 71124.01            Radiological Hazard Assessment and Exposure Controls 3      11/26/2012  11/30/2012  IP 71124.06            Radioactive Gaseous and Liquid Effluent Treatment 3      11/26/2012  11/30/2012  IP 71124.07            Radiological Environmental Monitoring Program 3      11/26/2012  11/30/2012  IP 71124.08            Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 3      11/26/2012  11/30/2012  IP 71151                Performance Indicator Verification ISFSI        - ISFSI FIRST LOADING CAMPAIGN                                                                                            2 3      03/04/2013  03/08/2013  IP 2690/008            Inspec Add Security Measures for Dry Cask Storage at ISFSIs Located Within Protected Area of Op Rctr OL EXAM      - INITIAL EXAM PREP                                                                                                        6 3      03/04/2013  03/08/2013      V23379              CRYSTAL RIVER / MARCH 2013 EXAM AT POWER FACILITIES OL EXAM      - INITIAL EXAM - WEEK 1                                                                                                    3 3      03/25/2013  03/29/2013      V23379              CRYSTAL RIVER / MARCH 2013 EXAM AT POWER FACILITIES OL EXAM      - INITIAL EXAM - WEEK 2                                                                                                    3 3      04/01/2013  04/05/2013      V23379              CRYSTAL RIVER / MARCH 2013 EXAM AT POWER FACILITIES CDBI          - COMPONENT DESIGN BASES INSPECTION                                                                                        7 3      05/06/2013  05/10/2013  IP 7111121              Component Design Bases Inspection 3      05/20/2013  05/24/2013  IP 7111121              Component Design Bases Inspection 3      06/03/2013  06/07/2013  IP 7111121              Component Design Bases Inspection This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.                                                Enclosure}}

Latest revision as of 07:14, 12 November 2019

EOC Report 22
ML120650203
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 03/05/2012
From:
NRC/RGN-II
To:
Shared Package
ML120650169 List:
References
Download: ML120650203 (1)


Text

Page 1 of 1 Crystal River 03/05/2012 07:42:41 Inspection / Activity Plan Report 22 03/01/2012 - 06/30/2013 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site 95001 - CR3 95001 SUPPLEMENTAL INSPECTION 1 3 04/30/2012 05/04/2012 IP 95001 Supplemental Inspection for One or Two White Inputs in a Strategic Performance Area TI-182 - TI-182 BURIED PIPING/TANK - PHASE 1 1 3 07/09/2012 07/13/2012 IP 2515/182 Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping MOD - MODIFICATION INSPECTION 5 3 08/27/2012 08/31/2012 IP 7111117T Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 3 09/10/2012 09/14/2012 IP 7111117T Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications PSB1EP - EMERGENCY PREPAREDNESS EXERCISE 4 3 11/12/2012 11/16/2012 IP 7111401 Exercise Evaluation 3 11/12/2012 11/16/2012 IP 7111404 Emergency Action Level and Emergency Plan Changes 3 11/12/2012 11/16/2012 IP 71151 Performance Indicator Verification PSB1-RP - PUBLIC RADIATION PROTECTION BASELINE 4 3 11/26/2012 11/30/2012 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 3 11/26/2012 11/30/2012 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 3 11/26/2012 11/30/2012 IP 71124.07 Radiological Environmental Monitoring Program 3 11/26/2012 11/30/2012 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 3 11/26/2012 11/30/2012 IP 71151 Performance Indicator Verification ISFSI - ISFSI FIRST LOADING CAMPAIGN 2 3 03/04/2013 03/08/2013 IP 2690/008 Inspec Add Security Measures for Dry Cask Storage at ISFSIs Located Within Protected Area of Op Rctr OL EXAM - INITIAL EXAM PREP 6 3 03/04/2013 03/08/2013 V23379 CRYSTAL RIVER / MARCH 2013 EXAM AT POWER FACILITIES OL EXAM - INITIAL EXAM - WEEK 1 3 3 03/25/2013 03/29/2013 V23379 CRYSTAL RIVER / MARCH 2013 EXAM AT POWER FACILITIES OL EXAM - INITIAL EXAM - WEEK 2 3 3 04/01/2013 04/05/2013 V23379 CRYSTAL RIVER / MARCH 2013 EXAM AT POWER FACILITIES CDBI - COMPONENT DESIGN BASES INSPECTION 7 3 05/06/2013 05/10/2013 IP 7111121 Component Design Bases Inspection 3 05/20/2013 05/24/2013 IP 7111121 Component Design Bases Inspection 3 06/03/2013 06/07/2013 IP 7111121 Component Design Bases Inspection This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures. Enclosure