ML12194A652: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(4 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML12194A652
| number = ML12194A652
| issue date = 07/11/2012
| issue date = 07/11/2012
| title = Sequoyah, Units 1 and 2 - Response to NRC Regulatory Issue Summary 2012-07, Preparation and Scheduling of Operator Licensing Examinations
| title = Response to NRC Regulatory Issue Summary 2012-07, Preparation and Scheduling of Operator Licensing Examinations
| author name = Shea J W
| author name = Shea J
| author affiliation = Tennessee Valley Authority
| author affiliation = Tennessee Valley Authority
| addressee name =  
| addressee name =  
Line 14: Line 14:
| page count = 5
| page count = 5
}}
}}
See also: [[followed by::RIS 2012-07]]


=Text=
=Text=
{{#Wiki_filter:Tennessee Valley Authority, 1101 Market Street, Chattanooga, Tennessee 37402July 11, 201210 CFR 50.4ATTN: Document Control DeskU.S. Nuclear Regulatory CommissionWashington, D.C. 20555-0001Sequoyah Nuclear Plant, Units 1 and 2Facility Operating License Nos. DPR-77 and DPR-79NRC Docket Nos. 50-327 and 50-328Subject: Response to NRC Regulatory Issue Summary 2012-07, Preparationand Scheduling of Operator Licensing ExaminationsReference: 1. NRC Regulatory Issue Summary 2012-07, "Preparation andScheduling of Operator Licensing Examinations,"dated June 8, 20122. Letter from TVA to NRC, "Response to NRC Regulatory IssueSummary 2011-04, Preparation and Scheduling of OperatorLicensing Examinations," dated July 7, 2011Nuclear Regulatory Commission's (NRC) Regulatory Issue Summary (RIS) 2012-07(Reference 1) requested specific information regarding the Sequoyah NuclearPlant's (SQN) projected operator licensing examination schedules and the estimatednumber of applicants. The enclosure to this letter addresses the NRC's request andprovides an estimate of the examination requirements for the SQN on NRC Form 536,"Operator Licensing Examination Data." SQN has no initial operator licenseexamination planned for calendar year 2014.Please note that the information provided in the enclosure updates the informationpreviously provided in Reference 2. Information on the proposed GenericFundamentals Examination (GFE) schedule for calendar year 2013 is provided sincethe estimated number of candidates has been revised and also includes a changefrom June to September.Printed on recycled paper
{{#Wiki_filter:Tennessee Valley Authority, 1101 Market Street, Chattanooga, Tennessee 37402 July 11, 2012 10 CFR 50.4 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Sequoyah Nuclear Plant, Units 1 and 2 Facility Operating License Nos. DPR-77 and DPR-79 NRC Docket Nos. 50-327 and 50-328
U.S. Nuclear Regulatory CommissionPage 2July 11, 2012There are no regulatory commitments associated with this submittal. If you have anyquestions related to this response, please contact Rusty Proffitt at (423) 843-6651.Res tfully,SheacV c President, Nuclear LicensingEnclosure:NRC Form 536, Operator Licensing Examination Datacc (Enclosure):NRC Regional Administrator -Region IINRC Senior Resident Inspector -Sequoyah Nuclear Plant
ENCLOSURENRC Form 536Operator Licensing Examination DataTennessee Valley AuthoritySequoyah Nuclear PlantNRC Docket Nos. 50-327 and 50-328  
NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 09130120145-201"1) Estimated burden per response to comply with this voluntary information collection request:hour. This inforrnation collection is used to plan budgets and resources for operatorexaminations. Send comments-regarding burden estimate to the Information Services BranchOPERATOR LICENSING (T-5 F53), U.S. Nudear Regulatory Commission, Washington, DC .or by nterna e-mail to lrfocolect&Resource@nrc.gov. and to the Desk Ofkcr, Office of Information andEXAMINATION DATA Regulatory Affairs, NEOB.-10202, (3150-0131), Ofttce of Management and Budget, Washington,DC 20503. If a means used'to impose an information collection does not display a currentlyvalid OMBcontrol number, the NRC may not conduct or sponsor, and a person is riot required torespond to, the information cogection.FACILITY NRC REKGONSequoyah Nuclear Plant Region IIA. PROPOSED EXAMINATION PREPARATION SCHEDULEPROPOSED NUMBER CY 2013 CY 2013 CY 2015 CY 2015ESTIMATED NUMBER OFLICENSEE-PREPARED ] 1 1EXAMINATIONSESTIMATED NUMBER OFNRC-PREPARED 0 0 0 0EXAMINATIONSB. INITIAL OPERATOR LICENSE EXAMINATIONSPROPOSED NUMBER CY 2013 CY 2013 CY 2015 CY 2015NUMBER OF REACTOROPERATORS 7 8 8NUMBER OF SENIOR REACTOROPERATORS -INSTANT 2 6 7 3NUMBER OF SENIOR REACTOROPERATORS -UPGRADE I I I INUMBER OF SENIOR REACTOROPERATORS -LIMITED 0 0 0 0PROPOSED DATESPRIMARY D)ATE 05-13-20.13 12-02-2013 03-02-201.5 11.-30-2.015AL.TERNATE DATE 05-20-2013 12-09-2013 03-09-2015 12-07-2015C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULECY 2013 CY 2014P RO PO SED I_.. ... _ ........ ,I...... .,,I___NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBERESTIMATEDNUMBER OF 0 0 15 011 0 0CANDIDATESNRC FORM 536 (9-2011)
NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO, 3150-0131 EXPIRES: 09/30/2014I(9-2011) Estimated burden per response to comply with this voluntary information collection request: Ihour. This intotmaiion coitectiorn is used to plan budgets and resources otI operatorexaEminatons. Send comments regarding burden estimate to the Information Services BranchOPERATOR LICENSING (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by intemet eEXAMINATION DATA mai to hifocolects.RIsouroeurrc.gov, and to the Desk Officer, Office of Informat/on andRegulatory Affairs, NEOB-10202, (3150-0131), 0ffce of Management and Budget, Washington,DC 20503. It a means used to impose an information collection does not display a currentlyvalid OMB control number, the NRC may not conduct or sponsor, and a person is not required:torespond to, the information collection.FACILITY NRC REGIONSequoyah Nuclear Plant Region IIA. PROPOSED EXAMINATION PREPARATION SCHEDULEPROPOSED NUMBER CY2016 CY 201.7 CY N/A CY N/AESTIMATED NUMBER OFLICENSEE-PREPAREDEXAMINATIONSESTIMATED NUMBER OFNRC-PREPARED 0 0EXAMINATIONSB. INITIAL OPERATOR LICENSE EXAMINATIONSPROPOSED NUMBER CY 2016 CY2017 CY N/A CY N/ANUMBER OF REACTOROPERATORS 8 8NUMBER OF SENIOR REACTOROPERATORS -INSTANT 2NUMBER OF SENIOR REACTOROPERATORS -UPGRADE 1 2NUMBER OF SENIOR REACTOR o 0OPERArORS -LIMITEDPROPOSED DATESPRIMARY DATE 12-05-2016 12-04-2017ALTERNATE DATE 12-12-2016 12-11-2017C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULECY 201.5 CY N/APROPOSED I INUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBERESTIMATEDNUMBER OF 0 11 0 0CANDIDATESNRC FORM 536 (9-2011)


}}
==Subject:==
Response to NRC Regulatory Issue Summary 2012-07, Preparation and Scheduling of Operator Licensing Examinations
 
==Reference:==
: 1. NRC Regulatory Issue Summary 2012-07, "Preparation and Scheduling of Operator Licensing Examinations,"
dated June 8, 2012
: 2. Letter from TVA to NRC, "Response to NRC Regulatory Issue Summary 2011-04, Preparation and Scheduling of Operator Licensing Examinations," dated July 7, 2011 Nuclear Regulatory Commission's (NRC) Regulatory Issue Summary (RIS) 2012-07 (Reference 1) requested specific information regarding the Sequoyah Nuclear Plant's (SQN) projected operator licensing examination schedules and the estimated number of applicants. The enclosure to this letter addresses the NRC's request and provides an estimate of the examination requirements for the SQN on NRC Form 536, "Operator Licensing Examination Data." SQN has no initial operator license examination planned for calendar year 2014.
Please note that the information provided in the enclosure updates the information previously provided in Reference 2. Information on the proposed Generic Fundamentals Examination (GFE) schedule for calendar year 2013 is provided since the estimated number of candidates has been revised and also includes a change from June to September.
Printed on recycled paper
 
U.S. Nuclear Regulatory Commission Page 2 July 11, 2012 There are no regulatory commitments associated with this submittal. If you have any questions related to this response, please contact Rusty Proffitt at (423) 843-6651.
Res    tfully, Shea c President, Nuclear Licensing cV
 
==Enclosure:==
 
NRC Form 536, Operator Licensing Examination Data cc (Enclosure):
NRC Regional Administrator - Region II NRC Senior Resident Inspector - Sequoyah Nuclear Plant
 
ENCLOSURE NRC Form 536 Operator Licensing Examination Data Tennessee Valley Authority Sequoyah Nuclear Plant NRC Docket Nos. 50-327 and 50-328
 
NRC FORM 536                    U.S. NUCLEAR REGULATORY COMMISSION              APPROVED BY OMB: NO. 3150-0131                                  EXPIRES: 0913012014 5-201"1)                                                                        Estimated burden per response to comply with this voluntary information collection request:
hour. This inforrnation collection is used to plan budgets and resources for operator examinations. Send comments-regarding burden estimate to the Information Services Branch OPERATOR LICENSING                                        (T-5F53), U.S. Nudear Regulatory Commission, Washington, DC20*555-O .or by nterna e-mail to lrfocolect&Resource@nrc.gov. and to the Desk Ofkcr, Office of Information        and EXAMINATION DATA                                        Regulatory Affairs, NEOB.-10202, (3150-0131), Ofttce of Management and Budget, Washington, DC 20503. Ifa means used'to impose an information collection does not display a currently valid OMBcontrol number, the NRCmay notconduct orsponsor, and a person is riot required to respond to, the information cogection.
FACILITY                                                                                                                            NRC REKGON Sequoyah Nuclear Plant                                                                                                              Region II A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER                            CY 2013                    CY 2013                                CY 2015                            CY 2015 ESTIMATED NUMBER OF LICENSEE-PREPARED                      ]                                                                    1                                1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED                        0                          0                                        0                                0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER                          CY 2013                      CY 2013                                CY 2015                          CY 2015 NUMBER OF REACTOR OPERATORS                                                      7                                        8                                8 NUMBER OF SENIOR REACTOR OPERATORS - INSTANT                      2                          6                                        7                                3 NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE                        I                          I                                        I                                I NUMBER OF SENIOR REACTOR OPERATORS - LIMITED                      0                          0                                        0                                0 PROPOSED DATES PRIMARY D)ATE                05-13-20.13                  12-02-2013                          03-02-201.5                      11.-30-2.015 AL.TERNATE DATE                05-20-2013                    12-09-2013                          03-09-2015                        12-07-2015 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2013                                                                        CY 2014 P RO PO SED            I_..              ... _    ........ ,I......                                    .,,I___
NUMBER            MARCH            JUNE      SEPTEMBER DECEMBER                      MARCH                    JUNE        SEPTEMBER DECEMBER ESTIMATED NUMBER OF              0              0              15                011                                                          0                      0 CANDIDATES NRC FORM 536 (9-2011)
 
NRC FORM 536                U.S. NUCLEAR REGULATORY COMMISSION    APPROVED BY OMB: NO, 3150-0131                                    EXPIRES: 09/30/2014 I(9-2011)                                                          Estimated burden per response to comply with this voluntary information collection request: I hour. This intotmaiion coitectiorn is used to plan budgets and resources otI operator exaEminatons. Send comments regarding burden estimate to the Information Services Branch OPERATOR LICENSING                            (T-5F53), U.S.Nuclear Regulatory Commission, Washington, DC 20555-0001, or by intemet e EXAMINATION DATA                            mai to hifocolects.RIsouroeurrc.gov, and to the Desk Officer, Office of Informat/on      and Regulatory Affairs,NEOB-10202, (3150-0131), 0ffce of Management and Budget, Washington, DC 20503. Ita means used to impose an information collection does not display a currently valid OMBcontrol number, the NRC may not conduct or sponsor, and a person is not required:to respond to, the information collection.
FACILITY                                                                                                              NRC REGION Sequoyah Nuclear Plant                                                                                                  Region II A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER                      CY2016            CY 201.7                                CY N/A                            CY N/A ESTIMATED NUMBER OF LICENSEE-PREPARED EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED                    0                  0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER                      CY 2016            CY2017                                  CY N/A                            CY N/A NUMBER OF REACTOR OPERATORS                      8                  8 NUMBER OF SENIOR REACTOR OPERATORS - INSTANT                                    2 NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE                  1                  2 NUMBER OF SENIOR REACTOR                  o                  0 OPERArORS - LIMITED PROPOSED DATES PRIMARY DATE              12-05-2016        12-04-2017 ALTERNATE DATE              12-12-2016          12-11-2017 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 201.5                                                          CY N/A PROPOSED                      I                        I NUMBER            MARCH        JUNE      SEPTEMBER DECEMBER            MARCH                    JUNE      SEPTEMBER DECEMBER ESTIMATED NUMBER OF            0            11          0        0 CANDIDATES NRC FORM 536 (9-2011)}}

Latest revision as of 01:59, 12 November 2019

Response to NRC Regulatory Issue Summary 2012-07, Preparation and Scheduling of Operator Licensing Examinations
ML12194A652
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 07/11/2012
From: James Shea
Tennessee Valley Authority
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
RIS 2012-07
Download: ML12194A652 (5)


Text

Tennessee Valley Authority, 1101 Market Street, Chattanooga, Tennessee 37402 July 11, 2012 10 CFR 50.4 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Sequoyah Nuclear Plant, Units 1 and 2 Facility Operating License Nos. DPR-77 and DPR-79 NRC Docket Nos. 50-327 and 50-328

Subject:

Response to NRC Regulatory Issue Summary 2012-07, Preparation and Scheduling of Operator Licensing Examinations

Reference:

1. NRC Regulatory Issue Summary 2012-07, "Preparation and Scheduling of Operator Licensing Examinations,"

dated June 8, 2012

2. Letter from TVA to NRC, "Response to NRC Regulatory Issue Summary 2011-04, Preparation and Scheduling of Operator Licensing Examinations," dated July 7, 2011 Nuclear Regulatory Commission's (NRC) Regulatory Issue Summary (RIS) 2012-07 (Reference 1) requested specific information regarding the Sequoyah Nuclear Plant's (SQN) projected operator licensing examination schedules and the estimated number of applicants. The enclosure to this letter addresses the NRC's request and provides an estimate of the examination requirements for the SQN on NRC Form 536, "Operator Licensing Examination Data." SQN has no initial operator license examination planned for calendar year 2014.

Please note that the information provided in the enclosure updates the information previously provided in Reference 2. Information on the proposed Generic Fundamentals Examination (GFE) schedule for calendar year 2013 is provided since the estimated number of candidates has been revised and also includes a change from June to September.

Printed on recycled paper

U.S. Nuclear Regulatory Commission Page 2 July 11, 2012 There are no regulatory commitments associated with this submittal. If you have any questions related to this response, please contact Rusty Proffitt at (423) 843-6651.

Res tfully, Shea c President, Nuclear Licensing cV

Enclosure:

NRC Form 536, Operator Licensing Examination Data cc (Enclosure):

NRC Regional Administrator - Region II NRC Senior Resident Inspector - Sequoyah Nuclear Plant

ENCLOSURE NRC Form 536 Operator Licensing Examination Data Tennessee Valley Authority Sequoyah Nuclear Plant NRC Docket Nos. 50-327 and 50-328

NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 0913012014 5-201"1) Estimated burden per response to comply with this voluntary information collection request:

hour. This inforrnation collection is used to plan budgets and resources for operator examinations. Send comments-regarding burden estimate to the Information Services Branch OPERATOR LICENSING (T-5F53), U.S. Nudear Regulatory Commission, Washington, DC20*555-O .or by nterna e-mail to lrfocolect&Resource@nrc.gov. and to the Desk Ofkcr, Office of Information and EXAMINATION DATA Regulatory Affairs, NEOB.-10202, (3150-0131), Ofttce of Management and Budget, Washington, DC 20503. Ifa means used'to impose an information collection does not display a currently valid OMBcontrol number, the NRCmay notconduct orsponsor, and a person is riot required to respond to, the information cogection.

FACILITY NRC REKGON Sequoyah Nuclear Plant Region II A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2013 CY 2013 CY 2015 CY 2015 ESTIMATED NUMBER OF LICENSEE-PREPARED ] 1 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2013 CY 2013 CY 2015 CY 2015 NUMBER OF REACTOR OPERATORS 7 8 8 NUMBER OF SENIOR REACTOR OPERATORS - INSTANT 2 6 7 3 NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE I I I I NUMBER OF SENIOR REACTOR OPERATORS - LIMITED 0 0 0 0 PROPOSED DATES PRIMARY D)ATE 05-13-20.13 12-02-2013 03-02-201.5 11.-30-2.015 AL.TERNATE DATE 05-20-2013 12-09-2013 03-09-2015 12-07-2015 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2013 CY 2014 P RO PO SED I_.. ... _ ........ ,I...... .,,I___

NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 0 15 011 0 0 CANDIDATES NRC FORM 536 (9-2011)

NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO, 3150-0131 EXPIRES: 09/30/2014 I(9-2011) Estimated burden per response to comply with this voluntary information collection request: I hour. This intotmaiion coitectiorn is used to plan budgets and resources otI operator exaEminatons. Send comments regarding burden estimate to the Information Services Branch OPERATOR LICENSING (T-5F53), U.S.Nuclear Regulatory Commission, Washington, DC 20555-0001, or by intemet e EXAMINATION DATA mai to hifocolects.RIsouroeurrc.gov, and to the Desk Officer, Office of Informat/on and Regulatory Affairs,NEOB-10202, (3150-0131), 0ffce of Management and Budget, Washington, DC 20503. Ita means used to impose an information collection does not display a currently valid OMBcontrol number, the NRC may not conduct or sponsor, and a person is not required:to respond to, the information collection.

FACILITY NRC REGION Sequoyah Nuclear Plant Region II A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2016 CY 201.7 CY N/A CY N/A ESTIMATED NUMBER OF LICENSEE-PREPARED EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2016 CY2017 CY N/A CY N/A NUMBER OF REACTOR OPERATORS 8 8 NUMBER OF SENIOR REACTOR OPERATORS - INSTANT 2 NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE 1 2 NUMBER OF SENIOR REACTOR o 0 OPERArORS - LIMITED PROPOSED DATES PRIMARY DATE 12-05-2016 12-04-2017 ALTERNATE DATE 12-12-2016 12-11-2017 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 201.5 CY N/A PROPOSED I I NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 11 0 0 CANDIDATES NRC FORM 536 (9-2011)