(One intermediate revision by the same user not shown) |
Line 3: |
Line 3: |
| | issue date = 10/04/2012 | | | issue date = 10/04/2012 |
| | title = (ANO) Units 1 and 2, Revision 14 of the ANO Security Plan | | | title = (ANO) Units 1 and 2, Revision 14 of the ANO Security Plan |
| | author name = Pyle S L | | | author name = Pyle S |
| | author affiliation = Entergy Operations, Inc | | | author affiliation = Entergy Operations, Inc |
| | addressee name = | | | addressee name = |
Line 16: |
Line 16: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:SAFEGUARDS INFORMATION | | {{#Wiki_filter:SAFEGUARDS INFORMATION - Upon separation this page is decontrolled Entergy Operations, Inc. |
| -Upon separation this page is decontrolled En tffA Entergy Operations, Inc.1448 StR. 333 Russellville, AR 72802 Tel 479-858-4704 Stephenie L. Pyle Manager, Licensing Arkansas Nuclear Ono OCAN101202 October 4, 2012 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 | | EntffA 1448 StR. 333 Russellville, AR 72802 Tel 479-858-4704 Stephenie L. Pyle Manager, Licensing Arkansas Nuclear Ono OCAN101202 October 4, 2012 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 |
|
| |
|
| ==Subject:== | | ==Subject:== |
| Revision 14 of the ANO Security Plan Arkansas Nuclear One -Units 1 and 2 Docket Nos. 50-313 and 50-368 License Nos. DPR-51 and NPF-6 | | Revision 14 of the ANO Security Plan Arkansas Nuclear One - Units 1 and 2 Docket Nos. 50-313 and 50-368 License Nos. DPR-51 and NPF-6 |
|
| |
|
| ==Dear Sir or Madam:== | | ==Dear Sir or Madam:== |
| In accordance with 10 CFR 50.4, enclosed is Revision 14 to the Arkansas Nuclear One (ANO) Security Plan including NEI 03-12, Template for Security Plans, Revision 7, changes.These changes have been evaluated in accordance with 10 CFR 50.54(p). | | |
| It was determined that these changes do not decrease the safeguards effectiveness of the ANO Security Plan; therefore, prior NRC approval is not required. | | In accordance with 10 CFR 50.4, enclosed is Revision 14 to the Arkansas Nuclear One (ANO) Security Plan including NEI 03-12, Template for Security Plans, Revision 7, changes. |
| The enclosed material describes current security measures and is considered to be safeguards information as defined by 10 CFR 73.21. The enclosed material should be handled accordingly. | | These changes have been evaluated in accordance with 10 CFR 50.54(p). It was determined that these changes do not decrease the safeguards effectiveness of the ANO Security Plan; therefore, prior NRC approval is not required. The enclosed material describes current security measures and is considered to be safeguards information as defined by 10 CFR 73.21. The enclosed material should be handled accordingly. The specific changes in these revisions are described in the attachment to this letter. In addition, Entergy requests that the attachment, which contains security-related information, be withheld from public disclosure in accordance with 10 CFR 2.390 There are no new commitments contained in this submittal. Should you have any questions concerning this submittal, please contact me. |
| The specific changes in these revisions are described in the attachment to this letter. In addition, Entergy requests that the attachment, which contains security-related information, be withheld from public disclosure in accordance with 10 CFR 2.390 There are no new commitments contained in this submittal. | | Safeguards Information determination made by: |
| Should you have any questions concerning this submittal, please contact me.Sincerely, SLP/nbm | | Sincerely, Name/Title: Natalie Mosher, Licensing Specialist Organization: ANO Licensing Basis: Security Plan Details SLP/nbm Signature: ;q*f,. W . oJ'/2 Date: 10/4/2012 |
|
| |
|
| ==Attachment:== | | ==Attachment:== |
| | | Revision 14 Description of Changes WARNING: Violation of Section 147 of the Atomic Energy Act "Safeguards Information" |
| Revision 14 Description of Changes Safeguards Information determination made by: Name/Title: | |
| Natalie Mosher, Licensing Specialist Organization:
| |
| ANO Licensing Basis: Security Plan Details Signature:
| |
| ;q W .oJ'/2 Date: 10/4/2012 WARNING: Violation of Section 147 of the Atomic Energy Act "Safeguards Information" is Subiect to Civil and Criminal Penalties
| |
|
| |
|
| ==Enclosure:== | | ==Enclosure:== |
| | ANO Security Plan, Revision 14 is Subiect to Civil and Criminal Penalties SAFEGUARDS INFORMATION - Upon separation this page is decontrolled This letter contains security-related information - The attachment is withheld from public disclosure per 10 CFR 2.390 7!_-ýC) (" |
| | oltc |
|
| |
|
| ANO Security Plan, Revision 14 SAFEGUARDS INFORMATION
| | OCAN101202 Page 2 SAFEGUARDS INFORMATION - Upon separation this page is decontrolled This letter contains security-related information - The attachment is withheld from public disclosure per 10 CFR 2.390 cc: Mr. Elmo E. Collins Regional Administrator U. S. Nuclear Regulatory Commission, Region IV 1600 East Lamar Boulevard Arlington, TX 76011-4511 NRC Senior Resident Inspector Arkansas Nuclear One P.O. Box 310 London, AR 72847 U. S. Nuclear Regulatory Commission Attn: Mr. Kaly Kalyanam MS O-8B1 One White Flint North 11555 Rockville Pike Rockville, MD 20852 SAFEGUARDS INFORMATION - Upon separation this page is decontrolled This letter contains security-related information - The attachment is withheld from public disclosure per 10 CFR 2.390}} |
| -Upon separation this page is decontrolled This letter contains security-related information
| |
| -The attachment is withheld from public disclosure per 10 CFR 2.390 7!_-ýC) (" oltc OCAN101202 Page 2 SAFEGUARDS INFORMATION
| |
| -Upon separation this page is decontrolled This letter contains security-related information | |
| -The attachment is withheld from public disclosure per 10 CFR 2.390 cc: Mr. Elmo E. Collins Regional Administrator U. S. Nuclear Regulatory Commission, Region IV 1600 East Lamar Boulevard Arlington, TX 76011-4511 NRC Senior Resident Inspector Arkansas Nuclear One P.O. Box 310 London, AR 72847 U. S. Nuclear Regulatory Commission Attn: Mr. Kaly Kalyanam MS O-8B1 One White Flint North 11555 Rockville Pike Rockville, MD 20852 SAFEGUARDS INFORMATION | |
| -Upon separation this page is decontrolled This letter contains security-related information | |
| -The attachment is withheld from public disclosure per 10 CFR 2.390}} | |
Letter Sequence Request |
---|
|
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance...
|
MONTHYEARRA-12-082, Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, (Revision 12)2012-07-13013 July 2012 Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, (Revision 12) Project stage: Request NOC-AE-12002878, Physical Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan Revision 142012-07-17017 July 2012 Physical Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan Revision 14 Project stage: Request ML12214A2642012-07-25025 July 2012 PVNGS Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program, Revision 14 Project stage: Request CP-201200875, Report of Changes to the Physical Security Plan (Revision 7)2012-07-26026 July 2012 Report of Changes to the Physical Security Plan (Revision 7) Project stage: Request ML12214A5812012-07-30030 July 2012 Associated ISFSIs - Submittal of Security Plan, Training & Qualification Plan, Safeguards Contingency Plan & ISFSI Security Program Project stage: Request RBG-47269, Submittal of Revision 10 to the Security Plan, T&Q Plan and Safeguards Contingency Plan2012-08-0202 August 2012 Submittal of Revision 10 to the Security Plan, T&Q Plan and Safeguards Contingency Plan Project stage: Request L-2012-305, Revision 15 to the Physical Security Plan, Cover Letter2012-08-0303 August 2012 Revision 15 to the Physical Security Plan, Cover Letter Project stage: Request ULNRC-05889, Union Electric Co. Facility Operating License NPF-030 Physical Security Plan, Revision 102012-08-0303 August 2012 Union Electric Co. Facility Operating License NPF-030 Physical Security Plan, Revision 10 Project stage: Request ML12219A2282012-08-0303 August 2012 Revision to the Sequoyah Nuclear Plant Physical Security Plan, Training and Qualification Plan, Safeguards Contingency Plan and Independent Spent Fuel Storage Installation Security Program, Revision 9 Project stage: Request ML12221A3362012-08-0808 August 2012 Draft RAI on Revision to Security Plan Project stage: Draft RAI ML12229A2872012-08-13013 August 2012 Security Plan, Revision 9 to the Training and Qualification Plan, and Safeguards Contingency Plan Project stage: Request ML12237A0772012-08-23023 August 2012 Draft Request for Information Email - Related to Physical Security Plant (Psp), Training and Qualification Plan (T&Qp), and Safeguards Contingency Plan (Scp), Revision 14 (TAC D91660) Project stage: Draft RAI ML12229A4332012-09-0606 September 2012 Request for Additional Information Regarding Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, Revision 12 (TAC No. D91660) Project stage: RAI ML12251A0472012-09-11011 September 2012 Request for Additional Information, Review of Physical Security Plan (Psp), Training and Qualification Plan (T&Qp), and Safeguards Contingency Plan (Scp), Revision 14 (TAC D91660) Project stage: RAI ML12255A0742012-09-18018 September 2012 Request for Additional Information, Changes to Callaway Physical Security Plan (TAC No. D91660) Project stage: RAI ML12286A3362012-10-0404 October 2012 (ANO) Units 1 and 2, Revision 14 of the ANO Security Plan Project stage: Request ML12284A0182012-10-0505 October 2012 NRR E-mail Capture - (D91660) Request for Additional Information (RAI) Draft Questions Corporate Security Plans Submitted 7/30/2012 Project stage: Draft RAI ULNRC-05921, Response to Request for Additional Information Regarding Changes to Security Plan (TAC No. D91660)2012-10-18018 October 2012 Response to Request for Additional Information Regarding Changes to Security Plan (TAC No. D91660) Project stage: Response to RAI ML12296A0102012-10-19019 October 2012 NRR E-mail Capture - D91660 - Dominion Physical Security Plan - Request for Additional Information - This Message Is Publically Available and non-sensitive Project stage: RAI ML12296A9302012-10-23023 October 2012 Enclosudraft Request for Additional Information Project stage: RAI ML12305A0432012-10-29029 October 2012 Email Security-Related Request for Additional Information, Review of Revision 10 of the Physical Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan (TAC D91660) Project stage: RAI ML12305A0192012-10-30030 October 2012 NRR E-mail Capture - FW: D91660 - NextEra Energy Duane Arnold Physical Security Plan - RAI - This Message Is Publically Available and non-sensitive Project stage: RAI ML12306A5462012-11-0101 November 2012 E-mail, Request for Additional Information - Physical Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, Revision 7 for the CPNPP (TAC No. D91660) Project stage: RAI ML12292A3222012-11-0101 November 2012 Request for Additional Information Regarding Revision 9 to Security Plant, Training & Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installa Project stage: RAI ML12297A3602012-11-0101 November 2012 Request for Additional Information, Review of Revision 14 of the Physical Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan Project stage: RAI ML12300A0372012-11-0505 November 2012 Request for Additional Information Regarding Physical Security Plan, Training and Qualifications Plan, Safeguards Contingency Plan and Independent Spent Fuel Storage Installation Security Program Project stage: RAI ML12300A3222012-11-0505 November 2012 Redacted Letter Only, Request for Additional Information Physical Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan (TAC D91660) Project stage: RAI ML12307A3692012-11-0707 November 2012 Request for Additional Information Regarding Revision 18 to the Physical Security Plan (TAC No. D91660) Project stage: RAI ML12310A0292012-11-16016 November 2012 Request for Additional Information Related to Physical Security Plan, Revision 16 Project stage: RAI ML12314A3562012-11-20020 November 2012 Request for Additional Information, Round 2, Changes to Callaway Physical Security Plan (TAC No. D91660) Project stage: RAI ML12335A0112012-11-28028 November 2012 Response to Request for Additional Information Regarding Review of Physical Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, Revision 14 Project stage: Response to RAI ML12347A3022012-12-12012 December 2012 Email, Request for Additional Information on Physical Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, Revision 15, (TAC No. D91660) Project stage: RAI ML12341A1592012-12-18018 December 2012 Request for Additional Information Regarding Physical Security Plan, Training Qualifications Plan, and Safeguards Contingency Security Program Revision 15 Project stage: RAI ML13002A0352012-12-19019 December 2012 Response to Request for Additional Information Regarding Revision 9 to the Wolf Creek Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan Project stage: Response to RAI ML12356A2182012-12-21021 December 2012 Email, Request for Additional Information Physical Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, Revision 14 (TAC No. D91660) Project stage: RAI ML13010A5522013-01-16016 January 2013 Request for Additional Information Regarding Revision 18 to the Physical Security Plan Project stage: RAI ML13010A5512013-01-16016 January 2013 Request for Additional Information Regarding Revision 18 to the Physical Security Plan (TAC No. D91660) Project stage: RAI ML13023A4072013-01-23023 January 2013 Request for Additional Information Email, Review of Physical Security Plan (Psp), Training and Qualification Plan (T&Qp), and Safeguards Contingency Plan (Scp), Revision 7 Project stage: RAI ULNRC-05954, Response to Request for Additional Information Changes to Physical Security Plan (TAC No. D91660)2013-01-28028 January 2013 Response to Request for Additional Information Changes to Physical Security Plan (TAC No. D91660) Project stage: Response to RAI ML13029A7132013-01-29029 January 2013 Email, Request for Additional Information, Revision 13 to Physical Security, Safeguards Contingency, and Training and Qualification Plan (TAC No. D91660) Project stage: RAI ML13077A3372013-03-18018 March 2013 Email, Request for Additional Information, Physical Security Plan (Psp), Training and Qualification Plan (T&Qp), and Safeguards Contingency Plan (Scp), Revision 14 (TAC D91660) Project stage: RAI ML13120A0832013-03-22022 March 2013 Request for Additional Information Email Physical Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, Revision 20 (TAC No. D91660) Project stage: RAI ML13120A0842013-03-22022 March 2013 Request for Additional Information Email Physical Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, Revision 20 (TAC No. D91660) Project stage: RAI ML13165A3442013-06-12012 June 2013 Revision 15 of the ANO Security Plan Project stage: Request ML13165A0842013-06-13013 June 2013 Request for Additional Information Email Physical Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, Revision 21 (TAC No. D91660) Project stage: RAI ML13116A3702013-07-12012 July 2013 (Redacted) Review of Physical Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, Revision 10 (TAC No. D91660) Project stage: Approval ML13116A0942013-07-12012 July 2013 (Redacted) Review of Physical Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, Revision 9 (TAC No. D91660) Project stage: Approval ML13116A3912013-07-12012 July 2013 (Redacted) Review of Physical Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, Revision 17 (TAC No. D91660) Project stage: Approval ML13120A2322013-07-18018 July 2013 (Redacted) Review of Physical Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, Revisions 14 and 15 (TAC D91660) Project stage: Approval ML13275A3102013-11-25025 November 2013 Cover Memo from Robert Caldwell to Robert Pascarelli, RAI for V C Summer Revision 10 Security Plan Review Project stage: RAI 2012-07-26
[Table View] |
|
---|
Category:Letter
MONTHYEARIR 05000368/20253012024-09-0909 September 2024 Notification of NRC Initial Operator Licensing Examination 05000368/2025301 ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification IR 05000313/20240112024-09-0505 September 2024 Comprehensive Engineering Team Inspection Report 05000313/2024011 and 05000368/2024011 IR 05000313/20244042024-08-29029 August 2024 Cybersecurity Inspection Report 05000313/2024404 and 05000368/2024404 ML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 IR 05000313/20240052024-08-21021 August 2024 Updated Inspection Plan for Arkansas Nuclear One – Units 1 and 2 (Report 05000313/2024005, 05000368/2024005) ML24198A0722024-08-21021 August 2024 Correction to Issuance of Amendment No. 333 Revision to Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML24220A2642024-08-20020 August 2024 Entergy Operations, Inc. - Entergy Fleet Project Manager Assignment ML24185A1522024-08-13013 August 2024 Issuance of Amendment Nos. 334, 235, and 215, Respectively, to Revise TSs to Adopt TSTF-205 IR 05000313/20240022024-08-0606 August 2024 Integrated Inspection Report 05000313/2024002 and 05000368/2024002 ML24208A0962024-07-25025 July 2024 57243-EN 57243 - Rssc Wire & Cable LLC, Dba Marmon - Part 21 Notification ML24101A1792024-06-25025 June 2024 Issuance of Amendment No. 333 Revision to Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML24143A0632024-05-22022 May 2024 Notification of Inspection (NRC Inspection Report 05000368/2024003) and Request for Information IR 05000313/20240012024-05-0808 May 2024 Integrated Inspection Report 05000313/2024001 and 05000368/2024001 ML24128A2472024-05-0808 May 2024 Project Manager Assignment ML24017A2982024-04-18018 April 2024 Summary of Regulatory Audit Regarding the License Amendment Request to Revise Technical Specifications to Adopt TSTF 505, Revision 2, Provide Risk-Informed Extended Completion Times RITSTF Initiative 4b ML24107A0282024-04-17017 April 2024 Notification of Comprehensive Engineering Team Inspection (05000313/2024011 and 05000368/2024011) and Request for Information IR 05000313/20243012024-04-16016 April 2024 NRC Examination Report 05000313/2024301 ML24086A5412024-04-10010 April 2024 Authorization of Request for Alternative ANO1-ISI-037 Regarding Extension of Reactor Vessel Inservice Inspection Interval IR 05000313/20244022024-04-0808 April 2024 Security Baseline Inspection Report 05000313/2024402 and 05000368/2024402 (Full Report) ML24089A2262024-03-29029 March 2024 Entergy Response to Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Exams ML24075A1712024-03-15015 March 2024 Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) ML24074A2892024-03-14014 March 2024 Proof of Financial Protection (10 CFR 140.15) ML24031A6442024-03-14014 March 2024 Issuance of Amendment No. 282 to Modify Technical Specification 3.3.1, Reactor Pressure System (RPS) Instrumentation, Turbine Trip Function on Low Control Oil Pressure ML24102A1342024-03-12012 March 2024 AN1-2024-03 Post Exam Submittal IR 05000313/20230062024-02-28028 February 2024 Annual Assessment Letter for Arkansas Nuclear One- Units 1 and 2 Report 05000313/2023006 and 05000368/2023006 IR 05000313/20230042024-02-0808 February 2024 Integrated Inspection Report 05000313/2023004 and 05000368/2023004 and Independent Spent Fuel Storage Installation Inspection Report 07200013/2023002 ML24012A0502024-02-0202 February 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0054 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML23326A0392024-01-24024 January 2024 Issuance of Amendment No. 281 Revision to Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML24017A1582024-01-17017 January 2024 Submittal of Emergency Plan Revision 50 IR 05000313/20234202024-01-10010 January 2024 Security Baseline Inspection Report 05000313/2023420 and 05000368/2023420 IR 05000313/20234022024-01-0202 January 2024 Security Baseline Inspection Report 05000313/2023402 and 05000368/2023402 ML23349A1672023-12-21021 December 2023 Request for Withholding Information from Public Disclosure ML23354A0022023-12-21021 December 2023 Request for Withholding Information from Public Disclosure ML23348A3572023-12-14014 December 2023 Application to Revise Technical Specifications to Use Online Monitoring Methodology – Slides and Affidavit for Pre-Submittal Meeting ML23352A0292023-12-13013 December 2023 Entergy - 2024 Nuclear Energy Liability Evidence of Financial Protection ML23340A1592023-12-13013 December 2023 Entergy Operations, Inc. - Entergy Fleet Project Manager Assignment IR 05000313/20234052023-12-12012 December 2023 – Security Baseline Inspection Report 05000313/2023405 and 05000368/2023405 ML23341A0832023-12-11011 December 2023 – Material Control and Accounting Program Inspection Report 05000313/368/2023404- Cover Letter ML23305A0922023-12-0707 December 2023 Summary of Regulatory Audit Regarding License Amendment Request to Revise Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times RITSTF Initiative 4b ML23333A1362023-11-29029 November 2023 Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23275A2072023-11-28028 November 2023 Issuance of Amendment No. 280 Removal of Technical Specification Condition Allowing Two Reactor Coolant Pump Operation IR 05000313/20230032023-11-21021 November 2023 Revised - ANO Revised Integrated Inspection Report 05000313/2023003 and 05000368/2023003 and Independent Spent Fuel Storage Installation Inspection Report 07200013/ 2023001 ML23325A1412023-11-21021 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23243B0452023-11-13013 November 2023 Request for Withholding Information from Public Disclosure ML23313A0962023-11-13013 November 2023 Integrated Inspection Report 05000313/2023003 and 05000368/2023003 and Independent Spent Fuel Storage Installation Inspection Report 07200013/2023001 ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV IR 05000313/20230112023-10-10010 October 2023 Commercial Grade Dedication Inspection Report 05000313/2023011 and 05000368/2023011 IR 05000313/20230052023-08-21021 August 2023 Updated Inspection Plan for Arkansas Nuclear One, Units 1 and 2 (Report 05000313/2023005 and 05000368/2023005) - Mid Cycle IR 05000313/20230022023-08-11011 August 2023 Integrated Inspection Report 05000313/2023002 and 05000368/2023002 and Notice of Violation 2024-09-09
[Table view] |
Text
SAFEGUARDS INFORMATION - Upon separation this page is decontrolled Entergy Operations, Inc.
EntffA 1448 StR. 333 Russellville, AR 72802 Tel 479-858-4704 Stephenie L. Pyle Manager, Licensing Arkansas Nuclear Ono OCAN101202 October 4, 2012 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001
Subject:
Revision 14 of the ANO Security Plan Arkansas Nuclear One - Units 1 and 2 Docket Nos. 50-313 and 50-368 License Nos. DPR-51 and NPF-6
Dear Sir or Madam:
In accordance with 10 CFR 50.4, enclosed is Revision 14 to the Arkansas Nuclear One (ANO) Security Plan including NEI 03-12, Template for Security Plans, Revision 7, changes.
These changes have been evaluated in accordance with 10 CFR 50.54(p). It was determined that these changes do not decrease the safeguards effectiveness of the ANO Security Plan; therefore, prior NRC approval is not required. The enclosed material describes current security measures and is considered to be safeguards information as defined by 10 CFR 73.21. The enclosed material should be handled accordingly. The specific changes in these revisions are described in the attachment to this letter. In addition, Entergy requests that the attachment, which contains security-related information, be withheld from public disclosure in accordance with 10 CFR 2.390 There are no new commitments contained in this submittal. Should you have any questions concerning this submittal, please contact me.
Safeguards Information determination made by:
Sincerely, Name/Title: Natalie Mosher, Licensing Specialist Organization: ANO Licensing Basis: Security Plan Details SLP/nbm Signature: ;q*f,. W . oJ'/2 Date: 10/4/2012
Attachment:
Revision 14 Description of Changes WARNING: Violation of Section 147 of the Atomic Energy Act "Safeguards Information"
Enclosure:
ANO Security Plan, Revision 14 is Subiect to Civil and Criminal Penalties SAFEGUARDS INFORMATION - Upon separation this page is decontrolled This letter contains security-related information - The attachment is withheld from public disclosure per 10 CFR 2.390 7!_-ýC) ("
oltc
OCAN101202 Page 2 SAFEGUARDS INFORMATION - Upon separation this page is decontrolled This letter contains security-related information - The attachment is withheld from public disclosure per 10 CFR 2.390 cc: Mr. Elmo E. Collins Regional Administrator U. S. Nuclear Regulatory Commission, Region IV 1600 East Lamar Boulevard Arlington, TX 76011-4511 NRC Senior Resident Inspector Arkansas Nuclear One P.O. Box 310 London, AR 72847 U. S. Nuclear Regulatory Commission Attn: Mr. Kaly Kalyanam MS O-8B1 One White Flint North 11555 Rockville Pike Rockville, MD 20852 SAFEGUARDS INFORMATION - Upon separation this page is decontrolled This letter contains security-related information - The attachment is withheld from public disclosure per 10 CFR 2.390