IR 05000317/2018010: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(4 intermediate revisions by the same user not shown)
Line 5: Line 5:
| author name = Gray M
| author name = Gray M
| author affiliation = NRC/RGN-I/DRS
| author affiliation = NRC/RGN-I/DRS
| addressee name = Hanson B C
| addressee name = Hanson B
| addressee affiliation = Exelon Generation Co, LLC, Exelon Nuclear
| addressee affiliation = Exelon Generation Co, LLC, Exelon Nuclear
| docket = 05000317, 05000318
| docket = 05000317, 05000318
Line 21: Line 21:


==SUBJECT:==
==SUBJECT:==
CALVERT CLIFFS NUCLEAR POWER PLANT
CALVERT CLIFFS NUCLEAR POWER PLANT - DESIGN BASES ASSURANCE INSPECTION (TEAMS) REPORT 05000317/2018010 AND 05000318/2018010
- DESIGN BASES ASSURANCE INSPECTION (TEAMS) REPORT 05000 3 17/20 18 0 1 0 AND 05000 3 18/20 18 0 10


==Dear Mr. Hanson:==
==Dear Mr. Hanson:==
On October 5, 2018 , the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Calvert Cliffs Nuclear Power Plant (CCNPP), Units 1 and 2. The NRC inspectors discussed the results of this inspection with Mr. Todd Tierney , Plant Manager , and other members of your staff. The results of this inspection are documented in the enclosed report.
On October 5, 2018, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Calvert Cliffs Nuclear Power Plant (CCNPP), Units 1 and 2. The NRC inspectors discussed the results of this inspection with Mr. Todd Tierney, Plant Manager, and other members of your staff. The results of this inspection are documented in the enclosed report.


The NRC inspectors did not identify any findings or more
The NRC inspectors did not identify any findings or more-than-minor violations.
-than-minor violations.


This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and the NRCs Public Document Room in accordance with Title 10 of the Code of Federal Regulations (10 CFR), Part 2.390, Public Inspections, Exemptions, Requests for Withholding.
-rm/adams.html and the NRC
's Public Document Room in accordance with Title 10 of the Code of Federal Regulations (10 CFR), Part 2.390, "Public Inspections, Exemptions, Requests for Withholding."


Sincerely,
Sincerely,
/RA/ Mel Gray, Chief Engineering Branch 1 Division of Reactor Safety Docket Nos.
/RA/
 
Mel Gray, Chief Engineering Branch 1 Division of Reactor Safety Docket Nos. 50-317 and 50-318 License Nos. DPR-53 and DPR-69
50-317 and 50
-318 License Nos.
 
DPR-53 and DPR
-69  


===Enclosure:===
===Enclosure:===
Inspection Report 050003 17/20180 10 and 050003 18/20180 10
Inspection Report 05000317/2018010 and 05000318/2018010


==Inspection Report==
==Inspection Report==
Docket Numbers: 50-3 17 and 50-3 18 License Numbers: DPR-53 and DPR
Docket Numbers: 50-317 and 50-318 License Numbers: DPR-53 and DPR-69 Report Numbers: 05000317/2018010 and 05000318/2018010 Enterprise Identifier: I-2018-010-0013 Licensee: Exelon Generation Company, LLC Facility: Calvert Cliffs Nuclear Power Plant, Units 1 and 2 Location: Lusby, MD Inspection Dates: September 17, 2018, through October 5, 2018 Inspectors: J. Schoppy, Senior Reactor Inspector, Division of Reactor Safety (DRS), Team Leader J. Lilliendahl, Senior Emergency Response Coordinator, DRS M. Orr, Reactor Inspector, DRS S. Pindale, Senior Reactor Inspector, DRS C. Baron, NRC Mechanical Contractor S. Kobylarz, NRC Electrical Contractor Approved By: M. Gray, Chief Engineering Branch 1 Division of Reactor Safety Enclosure
-69 Report Numbers: 05000 3 17/20 18 0 10 and 05000 3 18/20 180 10 Enterprise Identifier:
I-2018-0 10-00 1 3 Licensee: Exelon Generation Company, LLC Facility: Calvert Cliffs Nuclear Power Plant, Units 1 and 2 Location: Lusby, MD Inspection Dates: September 1 7, 2018 , through October 5, 2018 Inspectors:
J. Schoppy, Senior Reactor Inspec tor, Division of Reactor Safety (DRS), Team Leader J. Lilliendahl, Senior Emergency Response Coordinator, DRS M. Orr, Reactor Inspector, DRS S. Pindale
, Senior Reactor Inspector, DRS C. Baron, NRC Mechanical Contractor S. Kobylarz, NRC Electrical Contractor Approved By:
M. Gray , Chief Engineering Branch 1 Division of Reactor Safety 2


=SUMMARY=
=SUMMARY=
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring Exelons performance at
 
Calvert Cliffs Nuclear Power Plant Units 1 and 2 by conducting a design bases assurance inspection in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors.


Exelon's performance at Calvert Cliffs Nuclear Power Plant Units 1 and 2 by conducting a design bases assurance inspection in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRC's program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.


No findings or more-than-minor violations were identified.
No findings or more-than-minor violations were identified.


3
=INSPECTION SCOPES=


=INSPECTION SCOPES=
This inspection was conducted using the appropriate portions of the inspection procedure in effect at the beginning of the inspection unless otherwise noted. Currently approved inspection procedures with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html.


This inspection was conducted using the appropriate portions of the inspection procedure in effect at the beginning of the inspection unless otherwise noted. Currently approved inspection procedures with their attached revision histories are located on the public website at http://www.nrc.gov/reading
Samples were declared complete when the inspection procedure requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter 2515, Light-Water Reactor Inspection Program - Operations Phase. The team reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
-rm/doc-collections/insp-manual/inspection
-procedure/index.html. Samples were declared complete when the inspection procedure requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter 2515, "Light-Water Reactor Inspection Program - Operations Phase.The team reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.


==REACTOR SAFETY==
==REACTOR SAFETY==
71111.21 M - Design Bases Assurance Inspection (Teams)
The team evaluated the following components, permanent modifications, and operating experience during the weeks of September 1 7, 2018, and October 1 , 2018. For the components, the team reviewed the attributes listed in IP 71111.21M, Appendix A, Component Review Attributes, such as those listed below. Specifically, the team evaluated these attributes as per 71111.21M, Appendix B, Component Design Review Considerations and 71111.21M, Appendix C, Component Walkdown Considerations. Specific documents review ed are listed in the Documents Reviewed section.


Components (4 Samples)  Unit 2 No. 21 High Pressure Safety Injection Pump o Material condition and installed configuration (e.g., visual inspection/walkdown) o Normal, abnormal, and emergency operating procedures o Consistency among design and licensing bases and other documents/procedures o System health report, maintenance effectiveness and records, and corrective action history o Equipment/environmental controls and qualification o Design calculations o Surveillance testing and recent test results o System and component level performance monitoring o Equipment protection from fire, flood, and water intrusion or spray o Heat removal cooling water and ventilation The team used Appendix B guidance for Valves, Pumps, Instrumentation, and As-Built System. Unit 1 No. 11 125 Vdc Battery o Material condition and installed configuration (e.g., visual inspection/walkdown)o Normal, abnormal, and emergency operating procedures o Consistency among design and licensing bases and other documents/procedures o System health report, maintenance effectiveness and records, and corrective action history o Operator actions o Design calculations o Surveillance testing and recent test results o Environmental conditions o Contactor and fuse ratings; Component adequacy for minimum voltage o Equipment protection from fire, flood, and water intrusion or spray o Heat removal cooling water and ventilation The team used Appendix B guidance fo r Instrumentation, Circuit Breakers and Fuses , Cables, Electric Loads, and As-Built System
===71111.21M - Design Bases Assurance Inspection (Teams)
. Unit 1 No. 14 4160V Bus o Material condition and installed configuration (e.g., visual inspection/walkdown)o Normal, abnormal, and emergency operating procedures o Consistency among design and licensing bases and other documents/procedures o System health report, maintenance effectiveness and records, and corrective action history o Control logic o Design calculations o Surveillance testing and recent test results o Equipment protection (sealing of cable and conduits)o Environmental conditions o Protection coordination; Load in
The team evaluated the following components, permanent modifications, and operating experience during the weeks of September 17, 2018, and October 1, 2018.
-rush and full load current o Range, accuracy, and setpoint of installed relays o Equipment protection from fire, flood, and water intrusion or spray The team used Appendix B guidance for Instrumentation, Circuit Breakers and Fuses , Cables, Electric Loads, and Motor Control Centers (MCCs).
 
For the components, the team reviewed the attributes listed in IP 71111.21M, Appendix A, Component Review Attributes, such as those listed below. Specifically, the team evaluated these attributes as per 71111.21M, Appendix B, Component Design Review Considerations and 71111.21M, Appendix C, Component Walkdown Considerations. Specific documents reviewed are listed in the Documents Reviewed section.
 
Components ===
{{IP sample|IP=IP 71111.21|count=4}}
* Unit 2 No. 21 High Pressure Safety Injection Pump o   Material condition and installed configuration (e.g., visual inspection/walkdown)o   Normal, abnormal, and emergency operating procedures o   Consistency among design and licensing bases and other documents/procedures o   System health report, maintenance effectiveness and records, and corrective action history o   Equipment/environmental controls and qualification o   Design calculations o   Surveillance testing and recent test results o   System and component level performance monitoring o   Equipment protection from fire, flood, and water intrusion or spray o   Heat removal cooling water and ventilation The team used Appendix B guidance for Valves, Pumps, Instrumentation, and As-Built System.
* Unit 1 No. 11 125 Vdc Battery o   Material condition and installed configuration (e.g., visual inspection/walkdown)o   Normal, abnormal, and emergency operating procedures o   Consistency among design and licensing bases and other documents/procedures o   System health report, maintenance effectiveness and records, and corrective action history o   Operator actions o   Design calculations o   Surveillance testing and recent test results o   Environmental conditions o   Contactor and fuse ratings; Component adequacy for minimum voltage o   Equipment protection from fire, flood, and water intrusion or spray o   Heat removal cooling water and ventilation The team used Appendix B guidance for Instrumentation, Circuit Breakers and Fuses, Cables, Electric Loads, and As-Built System.
* Unit 1 No. 14 4160V Bus o   Material condition and installed configuration (e.g., visual inspection/walkdown)o   Normal, abnormal, and emergency operating procedures o   Consistency among design and licensing bases and other documents/procedures o   System health report, maintenance effectiveness and records, and corrective action history o   Control logic o   Design calculations o   Surveillance testing and recent test results o   Equipment protection (sealing of cable and conduits)o   Environmental conditions o   Protection coordination; Load in-rush and full load current o   Range, accuracy, and setpoint of installed relays o   Equipment protection from fire, flood, and water intrusion or spray The team used Appendix B guidance for Instrumentation, Circuit Breakers and Fuses, Cables, Electric Loads, and Motor Control Centers (MCCs).
* Unit 1 Containment Sump Recirculation Valve 1-MOV-4144 o  Material condition and installed configuration (e.g., visual inspection/walkdown)o  Normal, abnormal, and emergency operating procedures o  Consistency among design and licensing bases and other documents/procedures o  System health report, maintenance effectiveness and records, and corrective action history o  Equipment/environmental controls and qualification o  Operator actions o  Design calculations o  Surveillance testing and recent test results o  Equipment protection (sealing of cable and conduits)o  Equipment protection from fire, flood, and water intrusion or spray The team used Appendix B guidance for Valves, Instrumentation, Cables, Electric Loads, and As-Built System.
 
===Component, Large Early Release Frequency (1 Sample)===
* Unit 2 Containment Penetration Room Ventilation System o  Material condition and installed configuration (e.g., visual inspection/walkdown)o  Normal, abnormal, and emergency operating procedures o  Consistency among design and licensing bases and other documents/procedures o  Maintenance effectiveness and records, and corrective action history o  Operator actions o  Design calculations o  Surveillance testing and recent test results o  Environmental conditions o  Equipment protection from fire, flood, and water intrusion or spray o  Heat removal cooling water and ventilation The team used Appendix B guidance for Instrumentation, Motor Control Centers (MCCs),and As-Built System.
 
===Permanent Modifications (5 Samples)===
* ECP-14-000064; ESR-13-000829 - 4kV Normal Incoming Supply Feeder Breaker Modification
* ECP-14-000159: AFW Emergency Ventilation System Upgrade
* ECP-15-000727: ESR-15-002466 - Provide Engineering to Raise RAS Setpoint
* ECP-16-000353: ESR-16-000050 - Enable RWT Outlet MOVs 4142 and 4143 to Close Automatically on a RAS
* ECP-16-000462: Update Fairbanks Morse Trip Circuit Design


Unit 1 Containment Sump Recirculation Valve 1-MOV-4144  o Material condition and installed configuration (e.g., visual inspection/walkdown)o Normal, abnormal, and emergency operating procedures o Consistency among design and licensing bases and other documents/procedures o System health report, maintenance effectiveness and records, and corrective action history o Equipment/environmental controls and qualification o Operator actions o Design calculations o Surveillance testing and recent test results o Equipment protection (sealing of cable and conduits)o Equipment protection from fire, flood, and water intrusion or spray The team used Appendix B guidance for Valves, Instrumentation, Cables, Electric Loads, and As-Built System
===Operating Experience (3 Samples)===
.
* NRC Information Notice 2014-03: Turbine-Driven Auxiliary Feedwater Pump Overspeed Trip Mechanism Issues, dated February 25, 2014
Component, Large Early Release Frequency (1 Sample)  Unit 2 Containment Penetration Room Ventilation System o Material condition and installed configuration (e.g., visual inspection/walkdown)o Normal, abnormal, and emergency operating procedures o Consistency among design and licensing bases and other documents/procedures o Maintenance effectiveness and records, and corrective action history o Operator actions o Design calculation s o Surveillance testing and recent test results o Environmental conditions o Equipment protection from fire, flood, and water intrusion or spray o Heat removal cooling water and ventilation The team used Appendix B guidance for Instrumentation, Motor Control Centers (MCCs), and As-Built System
* Prairie Island 2 10CFR21 (2017-45-00), EDG High Crankcase Pressure Switch Mounting Bracket Fastener System Failure, dated September 14, 2017
. Permanent Modifications (5 Samples)  ECP-14-000064; ESR-13-000829 - 4kV Normal Incoming Supply Feeder Breaker Modification  ECP-14-000159: AFW Emergency Ventilation System Upgrade ECP-15-000727: ESR-15-002466 - Provide Engineering to Raise RAS Setpoint  ECP-16-000353: ESR-16-000050 - Enable RWT Outlet MOVs 4142 and 4143 to Close Automatically on a RAS ECP-16-000462: Update Fairbanks Morse Trip Circuit Design Operating Experience (3 Samples)   NRC Information Notice 2014
* Report of Defect per 10CFR21, Basler Electric SBSR Automatic Voltage Regulator Card Solder Joints, dated September 21,
-03: Turbine-Driven Auxiliary Feedwater Pump Overspeed Trip Mechanism Issues , dated February 25, 2014 Prairie Island 2 10CFR21 (2017-45-00), EDG High Crankcase Pressure Switch Mounting Bracket Fastener System Failure , dated September 14, 20 1 7  Report of Defect per 10CFR21, Basler Electric SBSR Automatic Voltage Regulator Card Solder Joints, dated September 21, 2007


==INSPECTION RESULTS==
==INSPECTION RESULTS==
No findings or more
No findings or more-than-minor violations were identified.
-than-minor violations were identified.


==EXIT MEETING S AND DEBRIEFS==
==EXIT MEETINGS AND DEBRIEFS==
The team verified no proprietary information was retained or documented in this report.
The team verified no proprietary information was retained or documented in this report.
 
* On October 5, 2018, the team presented the Design Bases Assurance Inspection (Teams)results to Mr. Todd Tierney, Plant Manager, and other members of Exelon staff.
On October 5, 2018, the team presented the Design Bases Assurance Inspection (Teams) results to Mr. Todd Tierney , Plant Manager
, and other members of Exelon staff.
 
7   


=DOCUMENTS REVIEWED=
=DOCUMENTS REVIEWED=


71111.21M  
71111.21M - DESIGN BASES ASSURANCE INSPECTION (TEAMS)
- DESIGN BASES ASSURANCE INSPECTION (TEAM
Audits and Self-Assessments
S)  Audits and Self
04058864, Readiness Review for 2018 NRC Design Bases Assurance Inspection Self
-Assessments
Assessment, dated 6/1/18
04058864, Readiness Review for 2018 NRC Design Bases Assurance Inspection Self Assessment, dated 6/1/18
Calculations
Calculations
95-0188, Seismic II/I Evaluation
95-0188, Seismic II/I Evaluation of ILRT Piping to Containment Penetration #50, Revision 0
of ILRT Piping to Containment Penetration #50, Revision 0
A01080.F02-002, Pressure Locking Thrust Calculation, Revision 1
A01080.F02
-002, Pressure Locking Thrust Calculation, Revision 1
CA0772, AC Load Flow Study, Revision 2
CA0772, AC Load Flow Study, Revision 2
CA04079, Comparison of Available and Required NPSH for the Safety Injection and Containment Spray Pumps during Post
CA04079, Comparison of Available and Required NPSH for the Safety Injection and
-RAS Operation, Revision 0
Containment Spray Pumps during Post-RAS Operation, Revision 0
CA04691, Circulating Water Flooding in the Turbine Building through a Ruptured Expansion Joint, Revision 0
CA04691, Circulating Water Flooding in the Turbine Building through a Ruptured Expansion
Joint, Revision 0
CA07773, AFW Pump Room Cooler Sizing, Revision 0
CA07773, AFW Pump Room Cooler Sizing, Revision 0
CA10206 , Refueling Water Tank Level
CA10206, Refueling Water Tank Level RAS Setpoint Determination, Revision 0
RAS Setpoint Determination, Revision 0
E-85-010, 125VDC Battery 01, 11, 12, 21 and 22 Fault Current Calculation, Revision 2
E-85-010, 125VDC Battery 01, 11, 12, 21 and 22 Fault Current Calculation, Revision 2
E-87-009, 125VDC System Short
E-87-009, 125VDC System Short-Circuit Review, Revision 1
-Circuit Review, Revision 1
E-89-005, SBO & LOCA Battery Duty Cycle - Bus 11, Revision 4
E-89-005, SBO & LOCA Battery Duty Cycle  
- Bus 11, Revision 4
E-89-042, Voltage Drop in DC Systems, Revision 4
E-89-042, Voltage Drop in DC Systems, Revision 4
E-90-033, Master
E-90-033, Master Fault Calculation, Revision 4
Fault Calculation, Revision 4
E-90-038, MOV Minimum Voltages Lasting More than 5 Seconds, Revision 11
E-90-038, MOV Minimum Voltages Lasting More than 5 Seconds, Revision 11
E-90-071, 4kV Bus 14 Protective Devices, Revision 6
E-90-071, 4kV Bus 14 Protective Devices, Revision 6
I-94-003 , Refueling Water Tank Level(s) and Capacity, Revision 4
I-94-003, Refueling Water Tank Level(s) and Capacity, Revision 4
M-91-044, MOV Weak Link Analysis, Revision 2 M-90-193, Flood Heights Resulting from a Pipe Break in the Turbine Building, Revision 0
M-91-044, MOV Weak Link Analysis, Revision 2
M-91-197, Maximum Line and Differential Pressure Valves 1 & 2
M-90-193, Flood Heights Resulting from a Pipe Break in the Turbine Building, Revision 0
-MOV-4144 & 4145 May Experience During Operation, Revision 0
M-91-197, Maximum Line and Differential Pressure Valves 1 & 2-MOV-4144 & 4145 May
Experience During Operation, Revision 0
Completed Surveillance, Performance, and Functional Tests
Completed Surveillance, Performance, and Functional Tests
2013-29, Unit 2 Integrated Leakage Rate Test Report, dated 5/8/13
2013-29, Unit 2 Integrated Leakage Rate Test Report, dated 5/8/13
OP-6 , PreStartup Checkoff, performed 3/15/18
OP-6, PreStartup Checkoff, performed 3/15/18
STP-M-152-1, 11 Station Battery Weekly Check, performed 8/30/18 STP-M-352-1, 11 Station Battery Quarterly Check, performed 6/23/16, 9/22/16, 12/21/16, 3/23/17, 6/22/17, 9/21/17, 12/19/17, 3/22/18, and 6/21/18
STP-M-152-1, 11 Station Battery Weekly Check, performed 8/30/18
STP-M-352-1, 11 Station Battery Quarterly Check, performed 6/23/16, 9/22/16, 12/21/16,
3/23/17, 6/22/17, 9/21/17, 12/19/17, 3/22/18, and 6/21/18
STP M544A-2, #21 Penetration Room Exhaust Filter Test, performed 4/6/18
STP M544A-2, #21 Penetration Room Exhaust Filter Test, performed 4/6/18
STP M5445-2, #22 Penetration Room Exhaust Filter Test, performed 5/8/18
STP M5445-2, #22 Penetration Room Exhaust Filter Test, performed 5/8/18
STP-M-552-1, 11 Station Battery Service Test, performed 11/5/13, 4/1/16, and 4/9/18
STP-M-552-1, 11 Station Battery Service Test, performed 11/5/13, 4/1/16, and 4/9/18
STP M-651 A-2A , SIAS B-10 Trip Bypass for 2A Diesel Generator , performed 7/31/18
STP M-651A-2A, SIAS B-10 Trip Bypass for 2A Diesel Generator, performed 7/31/18
STP M-651 A-2B , SIAS B-10 Trip Bypass for 2B Diesel Generator , performed 1/16/15 and 5/16/17 STP M-651C-1B, SIAS B-10 Trip Bypass for 1 B Diesel Generator , performed 12/6/16
STP M-651A-2B, SIAS B-10 Trip Bypass for 2B Diesel Generator, performed 1/16/15 and
STP O-4B-1 , "B" Train Integrated Engineered Safety Features Test, performed 3/17/18
5/16/17
STP O-5A21-2, 21 Auxiliary Feedwater Pump Quarterly Surveillance
STP M-651C-1B, SIAS B-10 Trip Bypass for 1B Diesel Generator, performed 12/6/16
Test, performed 7/25/18
STP O-4B-1, B Train Integrated Engineered Safety Features Test, performed 3/17/18
STP O-5A21-2, 21 Auxiliary Feedwater Pump Quarterly Surveillance Test, performed 7/25/18
STP O-7A-1, "A" Train Engineered Safety Features Logic Test, performed 5/1/18
STP O-7A-1, "A" Train Engineered Safety Features Logic Test, performed 5/1/18
STP O-7B-2, B Train Engineered Safety Features Logic Test, performed 10/20/17
STP O-7B-2, B Train Engineered Safety Features Logic Test, performed 10/20/17
STP O-7C-2, A Train Engineered Safety Features Logic Test, performed 5/3/18
STP O-7C-2, A Train Engineered Safety Features Logic Test, performed 5/3/18
STP O-14 A-2 , A Train Safety Injection, Containment
STP O-14A-2, A Train Safety Injection, Containment Spray, and SDC Gas Accumulation Test,
Spray, and SDC Gas Accumulation
performed 7/5/18
Test , performed 7/5/18
STP O-55-2, Unit 2 Containment Integrity Verification Mode 1-4, performed 7/30/18
STP O-55-2, Unit 2 Containment Integrity Verification Mode 1
STP O-70-2, Monthly Test of "A" Train Containment Cooling Units, Iodine Removal Units, &
-4, performed 7/30/18
Penetration Room Exhaust Filter, performed 5/22/18
 
STP O-71-2, Monthly Test of "B" Train Containment Cooling Units, Iodine Removal Units, &
STP O-70-2, Monthly Test of "A" Train Containment Cooling Units, Iodine Removal Units, & Penetration Room Exhaust Filt er , performed 5/22/18
Penetration Room Exhaust Filter, performed 6/4/18
STP O-7 1-2, Monthly Test o
STP O-73G-2, HPSI Pump Large Flow Test, performed 2/19/17
f " B" Train Containment Cooling Units, Iodine Removal Units, & Penetration Room Exhaust Filter , performed 6/4/18
STP O-731A-2, A-Train HPSI Pump and Check Valve Operability Test, performed 8/1/18
STP O-73G-2, HPSI Pump Large Flow Test , performed 2/19/17
STP XM-503-1 Calibration Check of #14 4KV Bus LOCI and Shutdown Sequencer, performed
STP O-731A-2, A-Train HPSI Pump and Check Valve Operability Test , performed 8/1/18
3/15/16
STP XM-503-1 Calibration Check of #14 4KV Bus LOCI and Shutdown Sequencer, performed 3/15/16 TURB-04, AFW Turbine Overspeed Trip Adjustment, performed 3/17/18
TURB-04, AFW Turbine Overspeed Trip Adjustment, performed 3/17/18
Completed Preventive Maintenance, Calibrations, and Inspections
Completed Preventive Maintenance, Calibrations, and Inspections
1-44-2-O-Q, Condensate Level Switch, performed 4/3/18
1-44-2-O-Q, Condensate Level Switch, performed 4/3/18
2-44-2-O-Q, Condensate Level Switch, performed
2-44-2-O-Q, Condensate Level Switch, performed 2/22/18
2/22/18 Initial Scoping Report 0027, Aging Related Degradation Inspection Check List for Identification of Aging Effects, Unit 2 5' Fan Room, dated 1/4/11
Initial Scoping Report 0027, Aging Related Degradation Inspection Check List for Identification
Corrective Action Issue Report
of Aging Effects, Unit 2 5 Fan Room, dated 1/4/11
s (IR s) 4-024-38 6 2009-6043 2009-6251 2009-6252 2014-0396 1700131 1700348 1786965 1803213 1803587 1803588 1803624 1803831 1851368 1852812 1855691 1856563 1856715 1856779 1857138 2010203 2402107 2409006 2454706 2464168 2482579 2494780 2497552 2498947 2528973 2552315 2552673 2554032 2555303 2574382 2574385 2580916 2581489 2581500 2589648 2595124 2633221 2639867 2644934 2668740 2676847 2682276 2689863 2703487 2714272 3980419 4007684 4025294 4029406 4033503 4054408 4056915 4058864 4063744 4064642 4065747 4090677 4106197 4111139 4113435 4113450 4113717 4114625 4116170 4130071 4144777 4149542 4154234 4155119 4161927 4170441* 4175196* 4175295* 4177713* 4178917* 4179072* 4179914* 4179941* 4180135* 4180558* 4180563* 4180 608* *IR written as a result of this inspection
Corrective Action Issue Reports (IRs)
Drawings 61-076-B, Schematic Diagram High Pressure Safety Injection
4-024-386            1856779              2580916            4033503              4154234
Pump 13, Revision 6
2009-6043             1857138              2581489            4054408              4155119
2009-6251             2010203              2581500            4056915              4161927
2009-6252             2402107              2589648            4058864              4170441*
2014-0396             2409006             2595124           4063744             4175196*
1700131              2454706              2633221            4064642              4175295*
1700348              2464168              2639867            4065747              4177713*
1786965              2482579              2644934            4090677              4178917*
1803213              2494780              2668740            4106197              4179072*
1803587              2497552              2676847            4111139              4179914*
1803588              2498947              2682276            4113435              4179941*
1803624              2528973              2689863            4113450              4180135*
1803831              2552315              2703487            4113717              4180558*
1851368              2552673              2714272            4114625              4180563*
1852812              2554032              3980419            4116170              4180608*
1855691              2555303              4007684            4130071
1856563              2574382              4025294            4144777
1856715              2574385              4029406            4149542
*IR written as a result of this inspection
Drawings
61-076-B, Schematic Diagram High Pressure Safety Injection Pump 13, Revision 6
2083-34, Terry Steam Turbine, Revision 1
2083-34, Terry Steam Turbine, Revision 1
2103-0001, High Pressure Safety Injection Pump Outline Dimension, Revisio
2103-0001, High Pressure Safety Injection Pump Outline Dimension, Revision 4
n 4 12103-0014, Piping
2103-0014, Piping-Bearing and Stuffing Box w/Seal Circulation, Revision 5
-Bearing and Stuffing Box w/Seal Circulation, Revision 5
33810, High Pressure Safety Injection Pump Performance Curve, dated 12/19/69
33810, High Pressure Safety Injection Pump Performance Curve, dated 12/19/69
60307, Area & Equipment Drains Containment & Aux
60307, Area & Equipment Drains Containment & Aux. Bldg. Unit 1 Plan at El 27, Revision 8
. Bldg. Unit 1 Plan at El 27', Revision 8
60710 Sh.1, Component Cooling System, Revision 46
60710 Sh.1, Component Cooling System, Revision 46
60722 Sh. 2, Auxiliary Building Ventilation System, Revision 48
60722 Sh. 2, Auxiliary Building Ventilation System, Revision 48
Line 175: Line 186:
60723 Sh. 2, Ventilation Systems Containment Turbine and Penetration Rooms, Revision 38
60723 Sh. 2, Ventilation Systems Containment Turbine and Penetration Rooms, Revision 38
60731 Sh. 1, Safety Injection and Containment Spray Systems, Revision 94
60731 Sh. 1, Safety Injection and Containment Spray Systems, Revision 94
60733 Sh. 3 , Miscellaneous Drain & Sump Piping Turbine & Diesel Bldg. and Yard , Revision 64
60733 Sh. 3, Miscellaneous Drain & Sump Piping Turbine & Diesel Bldg. and Yard, Revision 64
61001 Sh. 1, Electrical Main Single Line Diagram, Revision 48
61001 Sh. 1, Electrical Main Single Line Diagram, Revision 48
61005, Meter and Relay Diagram 4KV System Unit Buses 11 and 14, Revision 36
61005, Meter and Relay Diagram 4KV System Unit Buses 11 and 14, Revision 36
61022 Sh. 1, Single Line Diagram 120VAC Vital System, Revision 57
61022 Sh. 1, Single Line Diagram 120VAC Vital System, Revision 57
61024 Sh. 1, Single Line Diagram 125VDC Vital System Bus 11, Revision 57
61024 Sh. 1, Single Line Diagram 125VDC Vital System Bus 11, Revision 57
61024 Sh. 2, Single Line Diagram 125VDC Vital System Bus 14, Revision
61024 Sh. 2, Single Line Diagram 125VDC Vital System Bus 14, Revision 3
61024 Sh. 3, Single Line Diagram 125VDC Vital System Bus 15, Revision 3
61024 Sh. 3, Single Line Diagram 125VDC Vital System Bus 15, Revision 3
61071 Sh. 7, Schematic Diagram 4KV Bus 14 Feeder Breaker 152
61071 Sh. 7, Schematic Diagram 4KV Bus 14 Feeder Breaker 152-1401, Revision 19
-1401, Revision 19
61071 Sh. 8, Schematic Diagram 4KV Bus 14 Feeder Breaker 152-1414, Revision 20
61071 Sh. 8, Schematic Diagram 4KV Bus 14 Feeder Breaker 152
-1414, Revision 20
61076 Sh. 4, Schematic Diagram High Pressure Safety Injection Pump 12, Revision 18
61076 Sh. 4, Schematic Diagram High Pressure Safety Injection Pump 12, Revision 18
61076 Sh. 7, Schematic Diagram High Pressure Safety Injection Pump 13, Revision 17
61076 Sh. 7, Schematic Diagram High Pressure Safety Injection Pump 13, Revision 17
61076 Sh. 30B, Schematic Diagram Reactor Safeguards Containment Sump Discharge Valve 1MOV4144, Revision 4
61076 Sh. 30B, Schematic Diagram Reactor Safeguards Containment Sump Discharge Valve
61076 Sh. 31, Schematic Diagram Reactor Safeguards CS & SI Pumps Recirc Valve 1MOV659, Revision 18
1MOV4144, Revision 4
61076 Sh. 31, Schematic Diagram Reactor Safeguards CS & SI Pumps Recirc Valve
1MOV659, Revision 18
61740 Sh. 1, Containment Liner Plan, Elevation and Penetrations, Revision 22
61740 Sh. 1, Containment Liner Plan, Elevation and Penetrations, Revision 22
61740 Sh. 2, Containment Structure Penetrations, Revision 8
61740 Sh. 2, Containment Structure Penetrations, Revision 8
2151 Sh. 1, Appendix "R" Separation Requirements Aux. Bldg. & Containment Structure Floor Plan at El. 27', Revision 10
2151 Sh. 1, Appendix R Separation Requirements Aux. Bldg. & Containment Structure Floor
Plan at El. 27, Revision 10
2731 Sh. 1, Safety Injection and Containment Spray Systems, Revision 84
2731 Sh. 1, Safety Injection and Containment Spray Systems, Revision 84
63076 Sh. 31, Reactor Safeguards CS and SI Pumps, Recirc Valves 2MOV659, Revision 14
63076 Sh. 31, Reactor Safeguards CS and SI Pumps, Recirc Valves 2MOV659, Revision 14
63076 Sh. 31A, Reactor Safeguards CS and SI Pumps, Recirc Valves 2MOV660, Revision 2
63076 Sh. 31A, Reactor Safeguards CS and SI Pumps, Recirc Valves 2MOV660, Revision 2
64311, Simplified System Drawing  
64311, Simplified System Drawing - Safety Injection and Containment Spray, Revision 14
- Safety Injection and Containment Spray, Revision 14
64316, Containment and Penetration Room Ventilation SL-065A, Revision 12
64316, Containment and Penetration Room Ventilation SL
-065A, Revision 12
84311, Safety Injection and Containment Spray System, Revision 15
84311, Safety Injection and Containment Spray System, Revision 15
ECP-16-0462-CN-001, Update Fairbanks Morse EDG Trip Circuit Design, Revision 0
ECP-16-0462-CN-001, Update Fairbanks Morse EDG Trip Circuit Design, Revision 0
ECP-16-0462-CN-006, Update Fairbanks Morse EDG Trip Circuit Design, Revision 0
ECP-16-0462-CN-006, Update Fairbanks Morse EDG Trip Circuit Design, Revision 0
ECP-16-0462-PCN-1002-CN-005, Update Fairbanks Morse EDG Trip Circuit Design, Revision 0
ECP-16-0462-PCN-1002-CN-005, Update Fairbanks Morse EDG Trip Circuit Design, Revision 0
N2010-FCU-4-FAB Sh. 5, Auxiliary Feedwater Pump Room Emergency Cooler/Fan Coil Unit Fabrication Drawing, Revision 1
N2010-FCU-4-FAB Sh. 5, Auxiliary Feedwater Pump Room Emergency Cooler/Fan Coil Unit
Engineering Evaluations   1MOV4144, MIDACALC Results  
Fabrication Drawing, Revision 1
- AC Motor Operated GL96
Engineering Evaluations
-05 Gate Valve, Revision 2 Comments on Calculation CA07773, AFW Pump Room SR Ventilation Gothic Evaluation and Unit Sizing, dated 4/27/12
1MOV4144, MIDACALC Results - AC Motor Operated GL96-05 Gate Valve, Revision 2
ECP-12-000318 , AFW Pump Room Emergency Ventilation System, Revision 0
Comments on Calculation CA07773, AFW Pump Room SR Ventilation Gothic Evaluation and
ECP-14-000064 Form 7 and 7A
Unit Sizing, dated 4/27/12
, Design Change Technical Evaluation, Revision 3 ECP-14-000064 Form 9 , Installation Testing Instructions, Revision 4
ECP-12-000318, AFW Pump Room Emergency Ventilation System, Revision 0
ECP-14-000064 Form 7 and 7A, Design Change Technical Evaluation, Revision 3
ECP-14-000064 Form 9, Installation Testing Instructions, Revision 4
ECP-14-000159-015-7-01, Form 7, Design Change Technical Evaluation, Revision 3
ECP-14-000159-015-7-01, Form 7, Design Change Technical Evaluation, Revision 3
ECP-14-000159-015-7A-01, Form 7A, Design Change Technical Evaluation Continuation , Revision 8
ECP-14-000159-015-7A-01, Form 7A, Design Change Technical Evaluation Continuation,
ECP-14-000159-5059-01 , AFW Pump Room Emergency Ventilation System Upgrade
Revision 8
50.59 Screen, Revision 9
ECP-14-000159-5059-01, AFW Pump Room Emergency Ventilation System Upgrade 50.59
Screen, Revision 9
ECP-15-000023, Technical Evaluation for Connection Resistance Methodology, Revision 0
ECP-15-000023, Technical Evaluation for Connection Resistance Methodology, Revision 0
ECP-15-000727, Raise RAS Setpoint, Revision 2
ECP-15-000727, Raise RAS Setpoint, Revision 2
ECP-16-000353, Enable RWT Outlet MOVs 4142 and 4143 to Close Automatically on a RAS , Revision 0
ECP-16-000353, Enable RWT Outlet MOVs 4142 and 4143 to Close Automatically on a RAS,
Revision 0
ECP-16-000462, Update Fairbanks Morse Trip Circuit Design, Revision 0
ECP-16-000462, Update Fairbanks Morse Trip Circuit Design, Revision 0
ECP-17-000523, Vortexing in the Refueling Water Tank Technical Evaluation, Revision 0
ECP-17-000523, Vortexing in the Refueling Water Tank Technical Evaluation, Revision 0
Line 223: Line 237:
ES-034, Electrical Device Settings, Revision 1
ES-034, Electrical Device Settings, Revision 1
ES199801327, MOV Pressure Locking Evaluation, Revision 0
ES199801327, MOV Pressure Locking Evaluation, Revision 0
Operability Evaluation 17
Operability Evaluation 17-002, 2CV5171: 21 ECCS Cooler Outlet Control Valve, Revision 0
-002, 2CV5171: 21 ECCS Cooler Outlet Control Valve, Revision 0
Project No. 11562-061, AFW Pump Room Elevated Temperature Issue - NRC Comment
Project No. 11562
Resolution, Revision 0
-061, AFW Pump Room Elevated Temperature Issue  
QL00847, Barrier Function Table, Revision 2
- NRC Comment Resolution, Revision 0
SE00558, Automatic Closure of the RWT Outlet Valve MOVs 50.59 Evaluation, Revision 0
QL00847, Barrier Function Table
, Revision 2 SE00558 , Automatic Closure of the RWT Outlet Valve MOVs
50.59 Evaluation, Revision 0
Maintenance Work Orders
Maintenance Work Orders
C 12 023668 C20072161 C20074962 C20074963 C2 0083624 C90728304 C90767769 C91408624 C91426157 C91909242 C91910467 C91944763 C91945787 C92413803 C92543727
C12023668            C91408624           C92543727           C92967907        C93609295
C92813807 C92935353 C92957877 C92957878 C92957879 C92957880 C92967907 C93110332 C93445185 C93466890 C93476179 C93509570 C93549452 C93609295 C93622647 C 93640623 C93644323 C936 44324 Miscellaneous
C20072161            C91426157          C92813807           C93110332        C93622647
004, 4160 VAC Electrical
C20074962            C91909242          C92935353           C93445185        C93640623
Power Distribution System Description, Revision 3
C20074963            C91910467          C92957877           C93466890        C93644323
C20083624            C91944763          C92957878           C93476179        C93644324
C90728304            C91945787          C92957879           C93509570
C90767769            C92413803          C92957880           C93549452
Miscellaneous
004, 4160 VAC Electrical Power Distribution System Description, Revision 3
2, Auxiliary Building Ventilation System Description, Revision 7
2, Auxiliary Building Ventilation System Description, Revision 7
2-1401, CCNPP Protective Relaying Setting Sheet, Revision 3
2-1401, CCNPP Protective Relaying Setting Sheet, Revision 3
2-1410/2/SB2, CCNPP Protective Relaying Setting Sheet, Revision 2
2-1410/2/SB2, CCNPP Protective Relaying Setting Sheet, Revision 2
2-1414, CCNPP Protective Relaying Setting Sheet, Revision 3
2-1414, CCNPP Protective Relaying Setting Sheet, Revision 3
A116, NRR Letter: Request for Additional Information Regarding Generic Letter 2004
A116, NRR Letter: Request for Additional Information Regarding Generic Letter 2004-02, dated
-02, dated 7/23/10 Fairbanks Morse Owners' Group, Maintenance Guidelines, Voltage Regulator and Excitation System Maintenance Recommendations, Revision 4
7/23/10
Master Calibration Data Package for 2
Fairbanks Morse Owners Group, Maintenance Guidelines, Voltage Regulator and Excitation
-PS-4779, dated 2/3/17
System Maintenance Recommendations, Revision 4
Master Calibration Data Package for 2-PS-4779, dated 2/3/17
Normal and Special (Abnormal) Operations Procedures
Normal and Special (Abnormal) Operations Procedures
1C10-ALM , ESFAS 13 Alarm Manual
1C10-ALM, ESFAS 13 Alarm Manual, Revision 51
, Revision 51
1C19-ALM, 13KV & 4KV Essential Feeder Bkrs Contr Board Alarm Manual, Revision 40
1C19-ALM, 13KV &
4KV Essential Feeder Bkrs Contr Board Alarm Manual, Revision 40
1C62/2C62/2C61, 1B/2A/2B Diesel Generator Alarm Manual, Revision 10
1C62/2C62/2C61, 1B/2A/2B Diesel Generator Alarm Manual, Revision 10
AOP-3B , Abnormal Shutdown Cooling Conditions, Revision 30
AOP-3B, Abnormal Shutdown Cooling Conditions, Revision 30
AOP-71, Loss of 4KV, 480 Volt or 208/120 Volt Instrument Bus Power, Revision 33
AOP-71, Loss of 4KV, 480 Volt or 208/120 Volt Instrument Bus Power, Revision 33
EOP-3, Loss of All Feedwater, Revision 23
EOP-3, Loss of All Feedwater, Revision 23
EOP-5, Loss of Coolant Accident, Revision 30
EOP-5, Loss of Coolant Accident, Revision 30
EOP-8 , Functional Recovery Procedure , Revision 41
EOP-8, Functional Recovery Procedure, Revision 41
OI-3A, Safety Injection and Containment Spray, Unit 2, Revision 35
OI-3A, Safety Injection and Containment Spray, Unit 2, Revision 35
OI-11A , Condensate System , Revision 4 3 OI-21A, 2A Diesel Generator Operating Instructions, Revision 25
OI-11A, Condensate System, Revision 43
OI-21A, 2A Diesel Generator Operating Instructions, Revision 25
OI-22G, Penetration Room Exhaust System, Revision 6
OI-22G, Penetration Room Exhaust System, Revision 6
OI-26A, 125 Volt Vital DC, Revision 21
OI-26A, 125 Volt Vital DC, Revision 21
Line 262: Line 278:
OI-32A, Auxiliary Feedwater System, Unit 1, Revision 39
OI-32A, Auxiliary Feedwater System, Unit 1, Revision 39
OI-32A, Auxiliary Feedwater System, Unit 2, Revision 32
OI-32A, Auxiliary Feedwater System, Unit 2, Revision 32
OP-6 , PreStartup Checkoff, Revision 53
OP-6, PreStartup Checkoff, Revision 53
Operating Experience
Operating Experience
NRC Information Notice 2014
NRC Information Notice 2014-03: Turbine-Driven Auxiliary Feedwater Pump Overspeed Trip
-03: Turbine
Mechanism Issues, dated 2/25/14
-Driven Auxiliary Feedwater Pump Overspeed Trip Mechanism Issues, dated 2/25/14
Report of Defect per 10CFR21, Basler Electric SBSR Automatic Voltage Regulator Card Solder
Report of Defect per 10CFR21, Basler Electric SBSR Automatic Voltage Regulator Card Solder Joints, dated 9/21/07
Joints, dated 9/21/07
 
Procedures
Procedures
BUS-014K, 4 KV Buses 13 and 14 Inspection, Testing and Cleaning, Revision 1
BUS-014K, 4 KV Buses 13 and 14 Inspection, Testing and Cleaning, Revision 1
E-10, Testing and Adjustment of Agastat Relays, Revision
E-10, Testing and Adjustment of Agastat Relays, Revision 5
ER-AA-200-1001 , Equipment Classification, Revision 4
ER-AA-200-1001, Equipment Classification, Revision 4
ER-CA-450, Structure and System Walkdowns , Revision 0
ER-CA-450, Structure and System Walkdowns, Revision 0
FTE-59, Periodic Maintenance, Calibration and Functional Testing of Protective Relays, Revision 8
FTE-59, Periodic Maintenance, Calibration and Functional Testing of Protective Relays,
Revision 8
FTM-11, Rotating Equipment Vibration Monitoring, Revision 3
FTM-11, Rotating Equipment Vibration Monitoring, Revision 3
HVAC-03 , Inspection and Replacement o
HVAC-03, Inspection and Replacement of V-Belts, Revision 8
f V-Belts, Revision 8
LS-AA-104, Exelon 50.59 Review Process, Revision 10
LS-AA-104 , Exelon 50.59 Review Process, Revision 10
LS-AA-104-1000, 50.59 Resource Manual, Revision 12
LS-AA-104-1000 , 50.59 Resource Manual , Revision 12
MN-1-209, Predictive Maintenance Program, Revision 7
MN-1-209, Predictive Maintenance Program, Revision 7
NSWP-S-06, Core Drilling, Revision 1
NSWP-S-06, Core Drilling, Revision 1
OP-CA-102-106 , Operator Response Time Program at Calvert Cliffs , Revision 6
OP-CA-102-106, Operator Response Time Program at Calvert Cliffs, Revision 6
TURB-04, AFW Turbine Overspeed Trip Adjustment, Revision 5
TURB-04, AFW Turbine Overspeed Trip Adjustment, Revision 5
Risk and Margin Management
Risk and Margin Management
Plant Risk Information e
Plant Risk Information e-Book for Calvert Cliffs Nuclear Power Plant, dated 3/1/17
-Book for Calvert Cliffs Nuclear Power Plant
Risk-Informed Inspection Notebook for Calvert Cliffs Nuclear Power Plant Units 1 and 2,
, dated 3/1/1 7 Risk-Informed Inspection
Revision 2.1a
Notebook for Calvert Cliffs Nuclear Power Plant Units 1 and 2 , Revision 2.1a
System Health Reports, System Walkdowns, & Trending
System Health Reports, System Walkdowns, & Trending
HPSI Pump IST Trend Data, dated 1/20/98  
HPSI Pump IST Trend Data, dated 1/20/98 - 2/6/18
- 2/6/18 Auxiliary Feedwater (System 036) System Health Report, dated 7/25/18
Auxiliary Feedwater (System 036) System Health Report, dated 7/25/18
High Pressure Injection (System 052) System Health Report, dated 7/23/18
High Pressure Injection (System 052) System Health Report, dated 7/23/18
MRFF/MPFF Report Data, 2013
MRFF/MPFF Report Data, 2013 - 2017
- 2017 Unit 1 and Unit 2 AFW Pump Room Temperature Logs, 7/31/17  
Unit 1 and Unit 2 AFW Pump Room Temperature Logs, 7/31/17 - 8/10/18
- 8/10/18 Vendor Technical Manuals & Specifications
Vendor Technical Manuals & Specifications
2400-206-1006, GE Magne
2400-206-1006, GE Magne-Blast Circuit Breaker Instructions GEI-88771D, Revision 0
-Blast Circuit Breaker Instructions GEI
15138-002-1001, Installation and Operating Instructions for GNB Lead-Calcium Batteries,
-88771D , Revision 0 15138-002-1001, Installation and Operating Instructions for GNB Lead
Revision 8
-Calcium Batteries, Revision 8
ES200800209, Borg-Warner High Pressure Heat Exchanger, dated 11/1/84
ES200800209, Borg
-Warner High Pressure Heat Exchanger, dated 11/1/84
Installation, Operation and Maintenance for Bingham Pump Type MSD, dated 11/1/84
Installation, Operation and Maintenance for Bingham Pump Type MSD, dated 11/1/84
VTD 12 083-010-1017, Terry Corporation Std Instructions, Section 7, dated 12/9/91
VTD 12083-010-1017, Terry Corporation Std Instructions, Section 7, dated 12/9/91
}}
}}

Latest revision as of 09:20, 2 November 2019

Design Bases Assurance Inspection (Teams) Report 05000317/2018010 and 05000318/2018010
ML18292A579
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 10/19/2018
From: Mel Gray
Division of Reactor Safety I
To: Bryan Hanson
Exelon Generation Co, Exelon Nuclear
References
IR 2018010
Download: ML18292A579 (13)


Text

October 19, 2018

SUBJECT:

CALVERT CLIFFS NUCLEAR POWER PLANT - DESIGN BASES ASSURANCE INSPECTION (TEAMS) REPORT 05000317/2018010 AND 05000318/2018010

Dear Mr. Hanson:

On October 5, 2018, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Calvert Cliffs Nuclear Power Plant (CCNPP), Units 1 and 2. The NRC inspectors discussed the results of this inspection with Mr. Todd Tierney, Plant Manager, and other members of your staff. The results of this inspection are documented in the enclosed report.

The NRC inspectors did not identify any findings or more-than-minor violations.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and the NRCs Public Document Room in accordance with Title 10 of the Code of Federal Regulations (10 CFR), Part 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

/RA/

Mel Gray, Chief Engineering Branch 1 Division of Reactor Safety Docket Nos. 50-317 and 50-318 License Nos. DPR-53 and DPR-69

Enclosure:

Inspection Report 05000317/2018010 and 05000318/2018010

Inspection Report

Docket Numbers: 50-317 and 50-318 License Numbers: DPR-53 and DPR-69 Report Numbers: 05000317/2018010 and 05000318/2018010 Enterprise Identifier: I-2018-010-0013 Licensee: Exelon Generation Company, LLC Facility: Calvert Cliffs Nuclear Power Plant, Units 1 and 2 Location: Lusby, MD Inspection Dates: September 17, 2018, through October 5, 2018 Inspectors: J. Schoppy, Senior Reactor Inspector, Division of Reactor Safety (DRS), Team Leader J. Lilliendahl, Senior Emergency Response Coordinator, DRS M. Orr, Reactor Inspector, DRS S. Pindale, Senior Reactor Inspector, DRS C. Baron, NRC Mechanical Contractor S. Kobylarz, NRC Electrical Contractor Approved By: M. Gray, Chief Engineering Branch 1 Division of Reactor Safety Enclosure

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring Exelons performance at

Calvert Cliffs Nuclear Power Plant Units 1 and 2 by conducting a design bases assurance inspection in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors.

Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

No findings or more-than-minor violations were identified.

INSPECTION SCOPES

This inspection was conducted using the appropriate portions of the inspection procedure in effect at the beginning of the inspection unless otherwise noted. Currently approved inspection procedures with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html.

Samples were declared complete when the inspection procedure requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter 2515, Light-Water Reactor Inspection Program - Operations Phase. The team reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

REACTOR SAFETY

===71111.21M - Design Bases Assurance Inspection (Teams)

The team evaluated the following components, permanent modifications, and operating experience during the weeks of September 17, 2018, and October 1, 2018.

For the components, the team reviewed the attributes listed in IP 71111.21M, Appendix A, Component Review Attributes, such as those listed below. Specifically, the team evaluated these attributes as per 71111.21M, Appendix B, Component Design Review Considerations and 71111.21M, Appendix C, Component Walkdown Considerations. Specific documents reviewed are listed in the Documents Reviewed section.

Components ===

  • Unit 2 No. 21 High Pressure Safety Injection Pump o Material condition and installed configuration (e.g., visual inspection/walkdown)o Normal, abnormal, and emergency operating procedures o Consistency among design and licensing bases and other documents/procedures o System health report, maintenance effectiveness and records, and corrective action history o Equipment/environmental controls and qualification o Design calculations o Surveillance testing and recent test results o System and component level performance monitoring o Equipment protection from fire, flood, and water intrusion or spray o Heat removal cooling water and ventilation The team used Appendix B guidance for Valves, Pumps, Instrumentation, and As-Built System.
  • Unit 1 No. 11 125 Vdc Battery o Material condition and installed configuration (e.g., visual inspection/walkdown)o Normal, abnormal, and emergency operating procedures o Consistency among design and licensing bases and other documents/procedures o System health report, maintenance effectiveness and records, and corrective action history o Operator actions o Design calculations o Surveillance testing and recent test results o Environmental conditions o Contactor and fuse ratings; Component adequacy for minimum voltage o Equipment protection from fire, flood, and water intrusion or spray o Heat removal cooling water and ventilation The team used Appendix B guidance for Instrumentation, Circuit Breakers and Fuses, Cables, Electric Loads, and As-Built System.
  • Unit 1 No. 14 4160V Bus o Material condition and installed configuration (e.g., visual inspection/walkdown)o Normal, abnormal, and emergency operating procedures o Consistency among design and licensing bases and other documents/procedures o System health report, maintenance effectiveness and records, and corrective action history o Control logic o Design calculations o Surveillance testing and recent test results o Equipment protection (sealing of cable and conduits)o Environmental conditions o Protection coordination; Load in-rush and full load current o Range, accuracy, and setpoint of installed relays o Equipment protection from fire, flood, and water intrusion or spray The team used Appendix B guidance for Instrumentation, Circuit Breakers and Fuses, Cables, Electric Loads, and Motor Control Centers (MCCs).
  • Unit 1 Containment Sump Recirculation Valve 1-MOV-4144 o Material condition and installed configuration (e.g., visual inspection/walkdown)o Normal, abnormal, and emergency operating procedures o Consistency among design and licensing bases and other documents/procedures o System health report, maintenance effectiveness and records, and corrective action history o Equipment/environmental controls and qualification o Operator actions o Design calculations o Surveillance testing and recent test results o Equipment protection (sealing of cable and conduits)o Equipment protection from fire, flood, and water intrusion or spray The team used Appendix B guidance for Valves, Instrumentation, Cables, Electric Loads, and As-Built System.

Component, Large Early Release Frequency (1 Sample)

  • Unit 2 Containment Penetration Room Ventilation System o Material condition and installed configuration (e.g., visual inspection/walkdown)o Normal, abnormal, and emergency operating procedures o Consistency among design and licensing bases and other documents/procedures o Maintenance effectiveness and records, and corrective action history o Operator actions o Design calculations o Surveillance testing and recent test results o Environmental conditions o Equipment protection from fire, flood, and water intrusion or spray o Heat removal cooling water and ventilation The team used Appendix B guidance for Instrumentation, Motor Control Centers (MCCs),and As-Built System.

Permanent Modifications (5 Samples)

  • ECP-14-000064; ESR-13-000829 - 4kV Normal Incoming Supply Feeder Breaker Modification
  • ECP-14-000159: AFW Emergency Ventilation System Upgrade
  • ECP-15-000727: ESR-15-002466 - Provide Engineering to Raise RAS Setpoint
  • ECP-16-000353: ESR-16-000050 - Enable RWT Outlet MOVs 4142 and 4143 to Close Automatically on a RAS
  • ECP-16-000462: Update Fairbanks Morse Trip Circuit Design

Operating Experience (3 Samples)

  • Prairie Island 2 10CFR21 (2017-45-00), EDG High Crankcase Pressure Switch Mounting Bracket Fastener System Failure, dated September 14, 2017
  • Report of Defect per 10CFR21, Basler Electric SBSR Automatic Voltage Regulator Card Solder Joints, dated September 21,

INSPECTION RESULTS

No findings or more-than-minor violations were identified.

EXIT MEETINGS AND DEBRIEFS

The team verified no proprietary information was retained or documented in this report.

  • On October 5, 2018, the team presented the Design Bases Assurance Inspection (Teams)results to Mr. Todd Tierney, Plant Manager, and other members of Exelon staff.

DOCUMENTS REVIEWED

71111.21M - DESIGN BASES ASSURANCE INSPECTION (TEAMS)

Audits and Self-Assessments

04058864, Readiness Review for 2018 NRC Design Bases Assurance Inspection Self

Assessment, dated 6/1/18

Calculations

95-0188, Seismic II/I Evaluation of ILRT Piping to Containment Penetration #50, Revision 0

A01080.F02-002, Pressure Locking Thrust Calculation, Revision 1

CA0772, AC Load Flow Study, Revision 2

CA04079, Comparison of Available and Required NPSH for the Safety Injection and

Containment Spray Pumps during Post-RAS Operation, Revision 0

CA04691, Circulating Water Flooding in the Turbine Building through a Ruptured Expansion

Joint, Revision 0

CA07773, AFW Pump Room Cooler Sizing, Revision 0

CA10206, Refueling Water Tank Level RAS Setpoint Determination, Revision 0

E-85-010, 125VDC Battery 01, 11, 12, 21 and 22 Fault Current Calculation, Revision 2

E-87-009, 125VDC System Short-Circuit Review, Revision 1

E-89-005, SBO & LOCA Battery Duty Cycle - Bus 11, Revision 4

E-89-042, Voltage Drop in DC Systems, Revision 4

E-90-033, Master Fault Calculation, Revision 4

E-90-038, MOV Minimum Voltages Lasting More than 5 Seconds, Revision 11

E-90-071, 4kV Bus 14 Protective Devices, Revision 6

I-94-003, Refueling Water Tank Level(s) and Capacity, Revision 4

M-91-044, MOV Weak Link Analysis, Revision 2

M-90-193, Flood Heights Resulting from a Pipe Break in the Turbine Building, Revision 0

M-91-197, Maximum Line and Differential Pressure Valves 1 & 2-MOV-4144 & 4145 May

Experience During Operation, Revision 0

Completed Surveillance, Performance, and Functional Tests

2013-29, Unit 2 Integrated Leakage Rate Test Report, dated 5/8/13

OP-6, PreStartup Checkoff, performed 3/15/18

STP-M-152-1, 11 Station Battery Weekly Check, performed 8/30/18

STP-M-352-1, 11 Station Battery Quarterly Check, performed 6/23/16, 9/22/16, 12/21/16,

3/23/17, 6/22/17, 9/21/17, 12/19/17, 3/22/18, and 6/21/18

STP M544A-2, #21 Penetration Room Exhaust Filter Test, performed 4/6/18

STP M5445-2, #22 Penetration Room Exhaust Filter Test, performed 5/8/18

STP-M-552-1, 11 Station Battery Service Test, performed 11/5/13, 4/1/16, and 4/9/18

STP M-651A-2A, SIAS B-10 Trip Bypass for 2A Diesel Generator, performed 7/31/18

STP M-651A-2B, SIAS B-10 Trip Bypass for 2B Diesel Generator, performed 1/16/15 and

5/16/17

STP M-651C-1B, SIAS B-10 Trip Bypass for 1B Diesel Generator, performed 12/6/16

STP O-4B-1, B Train Integrated Engineered Safety Features Test, performed 3/17/18

STP O-5A21-2, 21 Auxiliary Feedwater Pump Quarterly Surveillance Test, performed 7/25/18

STP O-7A-1, "A" Train Engineered Safety Features Logic Test, performed 5/1/18

STP O-7B-2, B Train Engineered Safety Features Logic Test, performed 10/20/17

STP O-7C-2, A Train Engineered Safety Features Logic Test, performed 5/3/18

STP O-14A-2, A Train Safety Injection, Containment Spray, and SDC Gas Accumulation Test,

performed 7/5/18

STP O-55-2, Unit 2 Containment Integrity Verification Mode 1-4, performed 7/30/18

STP O-70-2, Monthly Test of "A" Train Containment Cooling Units, Iodine Removal Units, &

Penetration Room Exhaust Filter, performed 5/22/18

STP O-71-2, Monthly Test of "B" Train Containment Cooling Units, Iodine Removal Units, &

Penetration Room Exhaust Filter, performed 6/4/18

STP O-73G-2, HPSI Pump Large Flow Test, performed 2/19/17

STP O-731A-2, A-Train HPSI Pump and Check Valve Operability Test, performed 8/1/18

STP XM-503-1 Calibration Check of #14 4KV Bus LOCI and Shutdown Sequencer, performed

3/15/16

TURB-04, AFW Turbine Overspeed Trip Adjustment, performed 3/17/18

Completed Preventive Maintenance, Calibrations, and Inspections

1-44-2-O-Q, Condensate Level Switch, performed 4/3/18

2-44-2-O-Q, Condensate Level Switch, performed 2/22/18

Initial Scoping Report 0027, Aging Related Degradation Inspection Check List for Identification

of Aging Effects, Unit 2 5 Fan Room, dated 1/4/11

Corrective Action Issue Reports (IRs)

4-024-386 1856779 2580916 4033503 4154234

2009-6043 1857138 2581489 4054408 4155119

2009-6251 2010203 2581500 4056915 4161927

2009-6252 2402107 2589648 4058864 4170441*

2014-0396 2409006 2595124 4063744 4175196*

1700131 2454706 2633221 4064642 4175295*

1700348 2464168 2639867 4065747 4177713*

1786965 2482579 2644934 4090677 4178917*

1803213 2494780 2668740 4106197 4179072*

1803587 2497552 2676847 4111139 4179914*

1803588 2498947 2682276 4113435 4179941*

1803624 2528973 2689863 4113450 4180135*

1803831 2552315 2703487 4113717 4180558*

1851368 2552673 2714272 4114625 4180563*

1852812 2554032 3980419 4116170 4180608*

1855691 2555303 4007684 4130071

1856563 2574382 4025294 4144777

1856715 2574385 4029406 4149542

  • IR written as a result of this inspection

Drawings

61-076-B, Schematic Diagram High Pressure Safety Injection Pump 13, Revision 6

2083-34, Terry Steam Turbine, Revision 1

2103-0001, High Pressure Safety Injection Pump Outline Dimension, Revision 4

2103-0014, Piping-Bearing and Stuffing Box w/Seal Circulation, Revision 5

33810, High Pressure Safety Injection Pump Performance Curve, dated 12/19/69

60307, Area & Equipment Drains Containment & Aux. Bldg. Unit 1 Plan at El 27, Revision 8

60710 Sh.1, Component Cooling System, Revision 46

60722 Sh. 2, Auxiliary Building Ventilation System, Revision 48

60722 Sh. 3, Auxiliary Building Ventilation System, Revision 17

60723 Sh. 2, Ventilation Systems Containment Turbine and Penetration Rooms, Revision 38

60731 Sh. 1, Safety Injection and Containment Spray Systems, Revision 94

60733 Sh. 3, Miscellaneous Drain & Sump Piping Turbine & Diesel Bldg. and Yard, Revision 64

61001 Sh. 1, Electrical Main Single Line Diagram, Revision 48

61005, Meter and Relay Diagram 4KV System Unit Buses 11 and 14, Revision 36

61022 Sh. 1, Single Line Diagram 120VAC Vital System, Revision 57

61024 Sh. 1, Single Line Diagram 125VDC Vital System Bus 11, Revision 57

61024 Sh. 2, Single Line Diagram 125VDC Vital System Bus 14, Revision 3

61024 Sh. 3, Single Line Diagram 125VDC Vital System Bus 15, Revision 3

61071 Sh. 7, Schematic Diagram 4KV Bus 14 Feeder Breaker 152-1401, Revision 19

61071 Sh. 8, Schematic Diagram 4KV Bus 14 Feeder Breaker 152-1414, Revision 20

61076 Sh. 4, Schematic Diagram High Pressure Safety Injection Pump 12, Revision 18

61076 Sh. 7, Schematic Diagram High Pressure Safety Injection Pump 13, Revision 17

61076 Sh. 30B, Schematic Diagram Reactor Safeguards Containment Sump Discharge Valve

1MOV4144, Revision 4

61076 Sh. 31, Schematic Diagram Reactor Safeguards CS & SI Pumps Recirc Valve

1MOV659, Revision 18

61740 Sh. 1, Containment Liner Plan, Elevation and Penetrations, Revision 22

61740 Sh. 2, Containment Structure Penetrations, Revision 8

2151 Sh. 1, Appendix R Separation Requirements Aux. Bldg. & Containment Structure Floor

Plan at El. 27, Revision 10

2731 Sh. 1, Safety Injection and Containment Spray Systems, Revision 84

63076 Sh. 31, Reactor Safeguards CS and SI Pumps, Recirc Valves 2MOV659, Revision 14

63076 Sh. 31A, Reactor Safeguards CS and SI Pumps, Recirc Valves 2MOV660, Revision 2

64311, Simplified System Drawing - Safety Injection and Containment Spray, Revision 14

64316, Containment and Penetration Room Ventilation SL-065A, Revision 12

84311, Safety Injection and Containment Spray System, Revision 15

ECP-16-0462-CN-001, Update Fairbanks Morse EDG Trip Circuit Design, Revision 0

ECP-16-0462-CN-006, Update Fairbanks Morse EDG Trip Circuit Design, Revision 0

ECP-16-0462-PCN-1002-CN-005, Update Fairbanks Morse EDG Trip Circuit Design, Revision 0

N2010-FCU-4-FAB Sh. 5, Auxiliary Feedwater Pump Room Emergency Cooler/Fan Coil Unit

Fabrication Drawing, Revision 1

Engineering Evaluations

1MOV4144, MIDACALC Results - AC Motor Operated GL96-05 Gate Valve, Revision 2

Comments on Calculation CA07773, AFW Pump Room SR Ventilation Gothic Evaluation and

Unit Sizing, dated 4/27/12

ECP-12-000318, AFW Pump Room Emergency Ventilation System, Revision 0

ECP-14-000064 Form 7 and 7A, Design Change Technical Evaluation, Revision 3

ECP-14-000064 Form 9, Installation Testing Instructions, Revision 4

ECP-14-000159-015-7-01, Form 7, Design Change Technical Evaluation, Revision 3

ECP-14-000159-015-7A-01, Form 7A, Design Change Technical Evaluation Continuation,

Revision 8

ECP-14-000159-5059-01, AFW Pump Room Emergency Ventilation System Upgrade 50.59

Screen, Revision 9

ECP-15-000023, Technical Evaluation for Connection Resistance Methodology, Revision 0

ECP-15-000727, Raise RAS Setpoint, Revision 2

ECP-16-000353, Enable RWT Outlet MOVs 4142 and 4143 to Close Automatically on a RAS,

Revision 0

ECP-16-000462, Update Fairbanks Morse Trip Circuit Design, Revision 0

ECP-17-000523, Vortexing in the Refueling Water Tank Technical Evaluation, Revision 0

ES-001, Flooding, Revision 5

ES-034, Electrical Device Settings, Revision 1

ES199801327, MOV Pressure Locking Evaluation, Revision 0

Operability Evaluation 17-002, 2CV5171: 21 ECCS Cooler Outlet Control Valve, Revision 0

Project No. 11562-061, AFW Pump Room Elevated Temperature Issue - NRC Comment

Resolution, Revision 0

QL00847, Barrier Function Table, Revision 2

SE00558, Automatic Closure of the RWT Outlet Valve MOVs 50.59 Evaluation, Revision 0

Maintenance Work Orders

C12023668 C91408624 C92543727 C92967907 C93609295

C20072161 C91426157 C92813807 C93110332 C93622647

C20074962 C91909242 C92935353 C93445185 C93640623

C20074963 C91910467 C92957877 C93466890 C93644323

C20083624 C91944763 C92957878 C93476179 C93644324

C90728304 C91945787 C92957879 C93509570

C90767769 C92413803 C92957880 C93549452

Miscellaneous

004, 4160 VAC Electrical Power Distribution System Description, Revision 3

2, Auxiliary Building Ventilation System Description, Revision 7

2-1401, CCNPP Protective Relaying Setting Sheet, Revision 3

2-1410/2/SB2, CCNPP Protective Relaying Setting Sheet, Revision 2

2-1414, CCNPP Protective Relaying Setting Sheet, Revision 3

A116, NRR Letter: Request for Additional Information Regarding Generic Letter 2004-02, dated

7/23/10

Fairbanks Morse Owners Group, Maintenance Guidelines, Voltage Regulator and Excitation

System Maintenance Recommendations, Revision 4

Master Calibration Data Package for 2-PS-4779, dated 2/3/17

Normal and Special (Abnormal) Operations Procedures

1C10-ALM, ESFAS 13 Alarm Manual, Revision 51

1C19-ALM, 13KV & 4KV Essential Feeder Bkrs Contr Board Alarm Manual, Revision 40

1C62/2C62/2C61, 1B/2A/2B Diesel Generator Alarm Manual, Revision 10

AOP-3B, Abnormal Shutdown Cooling Conditions, Revision 30

AOP-71, Loss of 4KV, 480 Volt or 208/120 Volt Instrument Bus Power, Revision 33

EOP-3, Loss of All Feedwater, Revision 23

EOP-5, Loss of Coolant Accident, Revision 30

EOP-8, Functional Recovery Procedure, Revision 41

OI-3A, Safety Injection and Containment Spray, Unit 2, Revision 35

OI-11A, Condensate System, Revision 43

OI-21A, 2A Diesel Generator Operating Instructions, Revision 25

OI-22G, Penetration Room Exhaust System, Revision 6

OI-26A, 125 Volt Vital DC, Revision 21

OI-27C, 4.16 KV System, Revision 28

OI-32A, Auxiliary Feedwater System, Unit 1, Revision 39

OI-32A, Auxiliary Feedwater System, Unit 2, Revision 32

OP-6, PreStartup Checkoff, Revision 53

Operating Experience

NRC Information Notice 2014-03: Turbine-Driven Auxiliary Feedwater Pump Overspeed Trip

Mechanism Issues, dated 2/25/14

Report of Defect per 10CFR21, Basler Electric SBSR Automatic Voltage Regulator Card Solder

Joints, dated 9/21/07

Procedures

BUS-014K, 4 KV Buses 13 and 14 Inspection, Testing and Cleaning, Revision 1

E-10, Testing and Adjustment of Agastat Relays, Revision 5

ER-AA-200-1001, Equipment Classification, Revision 4

ER-CA-450, Structure and System Walkdowns, Revision 0

FTE-59, Periodic Maintenance, Calibration and Functional Testing of Protective Relays,

Revision 8

FTM-11, Rotating Equipment Vibration Monitoring, Revision 3

HVAC-03, Inspection and Replacement of V-Belts, Revision 8

LS-AA-104, Exelon 50.59 Review Process, Revision 10

LS-AA-104-1000, 50.59 Resource Manual, Revision 12

MN-1-209, Predictive Maintenance Program, Revision 7

NSWP-S-06, Core Drilling, Revision 1

OP-CA-102-106, Operator Response Time Program at Calvert Cliffs, Revision 6

TURB-04, AFW Turbine Overspeed Trip Adjustment, Revision 5

Risk and Margin Management

Plant Risk Information e-Book for Calvert Cliffs Nuclear Power Plant, dated 3/1/17

Risk-Informed Inspection Notebook for Calvert Cliffs Nuclear Power Plant Units 1 and 2,

Revision 2.1a

System Health Reports, System Walkdowns, & Trending

HPSI Pump IST Trend Data, dated 1/20/98 - 2/6/18

Auxiliary Feedwater (System 036) System Health Report, dated 7/25/18

High Pressure Injection (System 052) System Health Report, dated 7/23/18

MRFF/MPFF Report Data, 2013 - 2017

Unit 1 and Unit 2 AFW Pump Room Temperature Logs, 7/31/17 - 8/10/18

Vendor Technical Manuals & Specifications

2400-206-1006, GE Magne-Blast Circuit Breaker Instructions GEI-88771D, Revision 0

15138-002-1001, Installation and Operating Instructions for GNB Lead-Calcium Batteries,

Revision 8

ES200800209, Borg-Warner High Pressure Heat Exchanger, dated 11/1/84

Installation, Operation and Maintenance for Bingham Pump Type MSD, dated 11/1/84

VTD 12083-010-1017, Terry Corporation Std Instructions, Section 7, dated 12/9/91