| | title = Perry Nuclear Power Plant, Unit 1 - Correction of Typographical Error Incurred During Prior License Amendment No. 162 | | | title = Correction of Typographical Error Incurred During Prior License Amendment No. 162 |
| | author name = Green K J | | | author name = Green K |
| | author affiliation = NRC/NRR/DORL/LPLIII-1 | | | author affiliation = NRC/NRR/DORL/LPLIII-1 |
| | addressee name = Harkness E J | | | addressee name = Harkness E |
| | addressee affiliation = FirstEnergy Nuclear Operating Co | | | addressee affiliation = FirstEnergy Nuclear Operating Co |
| | docket = 05000440 | | | docket = 05000440 |
| | license number = NPF-058 | | | license number = NPF-058 |
| | contact person = Green K J | | | contact person = Green K |
| | document type = Letter, Technical Specifications | | | document type = Letter, Technical Specifications |
| | page count = 5 | | | page count = 5 |
| | | project = |
| | | stage = Other |
| }} | | }} |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 Mr. Ernest J. Harkness Site Vice President September 2, 2015 FirstEnergy Nuclear Operating Company Mail Stop A-PY-A290 P.O. Box 97, 10 Center Road Perry, OH 44081-0097 | | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 September 2, 2015 Mr. Ernest J. Harkness Site Vice President FirstEnergy Nuclear Operating Company Mail Stop A-PY-A290 P.O. Box 97, 10 Center Road Perry, OH 44081-0097 |
|
| |
|
| ==SUBJECT:== | | ==SUBJECT:== |
| PERRY NUCLEAR POWER PLANT, UNIT NO. 1 -CORRECTION OF TYPOGRAPHICAL ERROR INCURRED DURING PRIOR LICENSE AMENDMENT NO. 162 | | PERRY NUCLEAR POWER PLANT, UNIT NO. 1 - CORRECTION OF TYPOGRAPHICAL ERROR INCURRED DURING PRIOR LICENSE AMENDMENT NO. 162 |
|
| |
|
| ==Dear Mr. Harkness:== | | ==Dear Mr. Harkness:== |
|
| |
|
| By letter dated March 3, 2013 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML 13052A706), the U.S. Nuclear Regulatory Commission (NRC) issued Amendment No. 162 to Facility Operating License No. NPF-58 for Perry Nuclear Power Plant, Unit No. 1. The amendment revised surveillance requirements (SRs) in technical specification (TS) 3.8.1, "AC Sources -Operating," by excluding Division 3 from current mode restrictions. | | By letter dated March 3, 2013 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML13052A706), the U.S. Nuclear Regulatory Commission (NRC) issued Amendment No. 162 to Facility Operating License No. NPF-58 for Perry Nuclear Power Plant, Unit No. 1. The amendment revised surveillance requirements (SRs) in technical specification (TS) 3.8.1, "AC Sources - Operating," by excluding Division 3 from current mode restrictions. |
| During its review of a separate amendment request to adopt Technical Specifications Task Force (TSTF)-425, "Relocate Surveillance Frequencies to Licensee Control -RITSTF Initiative 5b," the NRC staff identified an error in SR 3.8.1.10 that was inadvertently introduced during the issuance of Amendment No. 162. Specifically, the Note in SR 3.8.1.10 should have read, "This Surveillance shall not be performed in MODE 1 or 2 (not applicable to Division 3). However, credit may be taken for unplanned events that satisfy this SR." The term "DG" was inadvertently added to the parenthetical " ... (not applicable to Division 3 DG) ... " during the issuance of the amendment. | | During its review of a separate amendment request to adopt Technical Specifications Task Force (TSTF)-425, "Relocate Surveillance Frequencies to Licensee Control - RITSTF Initiative 5b," the NRC staff identified an error in SR 3.8.1.10 that was inadvertently introduced during the issuance of Amendment No. 162. Specifically, the Note in SR 3.8.1.10 should have read, "This Surveillance shall not be performed in MODE 1 or 2 (not applicable to Division 3). However, credit may be taken for unplanned events that satisfy this SR." The term "DG" was inadvertently added to the parenthetical " ... (not applicable to Division 3 DG) ... " during the issuance of the amendment. |
| The purpose of this letter is to issue a correction to TS Page 3.8-8 to reflect the correct wording originally requested by FirstEnergy Nuclear Operating Company in its license amendment request dated July 3, 2012 (ADAMS Accession No. ML 12188A001). | | The purpose of this letter is to issue a correction to TS Page 3.8-8 to reflect the correct wording originally requested by FirstEnergy Nuclear Operating Company in its license amendment request dated July 3, 2012 (ADAMS Accession No. ML12188A001). Enclosed please find corrected TS Page 3.8-8 for Amendment No. 162 to Facility Operating License NPF-58 for Perry Nuclear Power Plant, Unit No. 1. |
| Enclosed please find corrected TS Page 3.8-8 for Amendment No. 162 to Facility Operating License NPF-58 for Perry Nuclear Power Plant, Unit No. 1. The NRC staff has determined that the error was introduced during the preparation of the license amendment and is entirely editorial in nature. The proposed correction does not change any of the conclusions in the safety evaluation associated with Amendment No. 162 and does not affect the associated notice to the public. | | The NRC staff has determined that the error was introduced during the preparation of the license amendment and is entirely editorial in nature. The proposed correction does not change any of the conclusions in the safety evaluation associated with Amendment No. 162 and does not affect the associated notice to the public. |
| E. Harkness If you have any questions regarding this matter, please contact me at (301) 415-1627. | | |
| Docket No. 50-440 | | E. Harkness If you have any questions regarding this matter, please contact me at (301) 415-1627. |
| | Sincerely, Kimberly J. Green, Senior Project Manager Plant Licensing Branch 111-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-440 |
|
| |
|
| ==Enclosure:== | | ==Enclosure:== |
|
| |
|
| Corrected TS Page 3.8-8 issued with Amendment No. 162 cc w/encl: Distribution via Listserv Sincerely, Kimberly J. Green, Senior Project Manager Plant Licensing Branch 111-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation ENCLOSURE PERRY NUCLEAR POWER PLANT, UNIT NO. 1 DOCKET NO. 50-440 CORRECTED PAGE TO LICENSE AMENDMENT NO. 162 FACILITY OPERATING LICENSE NO. NPF-58 TECHNICAL SPECIFICATION PAGE 3.8-8 AC Sources-Operating | | Corrected TS Page 3.8-8 issued with Amendment No. 162 cc w/encl: Distribution via Listserv |
|
| |
|
| ====3.8.1 SURVEILLANCE====
| | ENCLOSURE PERRY NUCLEAR POWER PLANT, UNIT NO. 1 DOCKET NO. 50-440 CORRECTED PAGE TO LICENSE AMENDMENT NO. 162 FACILITY OPERATING LICENSE NO. NPF-58 TECHNICAL SPECIFICATION PAGE 3.8-8 |
|
| |
|
| REQUIREMENTS (continued) | | AC Sources-Operating 3.8.1 SURVEILLANCE REQUIREMENTS (continued) |
| SR 3.8.1. 9 SURVEILLANCE | | SURVEILLANCE FREQUENCY SR 3.8.1. 9 -------------~---NOTES-------------------- |
| : 1. This Surveillance shall not be performed in MODE 1 or 2 (not applicable to Division 3). However. credit may be taken for unplanned events that satisfy this SR. 2. If performed with DG synchronized with offsite power. it shall be performed at a power factor 0.9. FREQUENCY Verify each DG rejects a load greater *than 24 months or equal to its associated single largest post-accident load. | | : 1. This Surveillance shall not be performed in MODE 1 or 2 (not applicable to Division 3). However. |
| load rejection. | | credit may be taken for unplanned events that satisfy this SR. |
| engine speed is maintained less than nominal plus 75% of the difference between nomi-na 1 speed and the overspeed trip setpoint. | | : 2. If performed with DG synchronized with offsite power. it shall be performed at a power factor ~ 0.9. |
| or 15% above nominal. whichever is less. SR 3.8.1.10 This Surveillance shall not be performed in MODE*l or 2 (not applicable to Division 3). However. credit may be taken for unplanned events that satisfy this SR. Verify each DG operating at a power factor 24 months 0.9 does not trip and voltage is maintained 4784 V for Division 1 and 2 OGs and 5000 V for Division 3 OG during and following a load rejection of a load 5600 kW for Division 1 and 2 DGs and 2600 kW for Division 3 DG. (continued) | | Verify each DG rejects a load greater *than 24 months or equal to its associated single largest post-accident load. Followin~ load rejection. engine speed is maintained less than nominal plus 75% of the difference between nomi-na 1 speed and the overspeed trip setpoint. or 15% above nominal. |
| PERRY -UN IT 1 3.8-8 Amendment No. 162 E. Harkness If you have any questions regarding this matter, please contact me at (301) 415-1627. | | whichever is less. |
| Docket No. 50-440
| | SR 3.8.1.10 -----------------NOTE--------------------- |
| | | This Surveillance shall not be performed in MODE*l or 2 (not applicable to Division 3). |
| ==Enclosure:==
| | However. credit may be taken for unplanned events that satisfy this SR. |
| | Verify each DG operating at a power factor 24 months |
| | ~ 0.9 does not trip and voltage is maintained ~ 4784 V for Division 1 and 2 OGs and ~ 5000 V for Division 3 OG during and following a load rejection of a load |
| | ~ 5600 kW for Division 1 and 2 DGs and |
| | ~ 2600 kW for Division 3 DG. |
| | (continued) |
| | PERRY - UN IT 1 3.8-8 Amendment No. 162 Corrected by letter dated September 2, 2015 |
|
| |
|
| Corrected TS Page 3.8-8 issued with Amendment No. 162 cc w/encl: Distribution via Listserv DISTRIBUTION:
| | ML15243A153 OFFICE DORL/LPL3-1 /PM DORL/LPL3-1 /LA DORL/LPL3-1 /BC DORL/LPL3-1/PM NAME KGreen MHenderson DPelton KGreen DATE 9/02/2015 9/01/2015 9/02/2015 9/02/2015}} |
| PUBLIC LPL3-1 R/F RidsAcrsAcnw_MailCTR Resource RidsNrrDorllpl3-1 Resource Sincerely, IRA/ Kimberly J. Green, Senior Project Manager Plant Licensing Branch 111-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation RidsNrrPMPerry Resource RidsNrrLAMHenderson Resource RidsRgn3MailCenter Resource RecordsAmend Resource ADAMS Accession No.: ML15243A153 OFFICE DORL/LPL3-1
| |
| /PM DORL/LPL3-1 | |
| /LA DORL/LPL3-1 | |
| /BC DORL/LPL3-1/PM NAME KGreen MHenderson DPelton KGreen DATE 9/02/2015 9/01/2015 9/02/2015 9/02/2015 OFFICIAL RECORD COPY}} | |
Similar Documents at Perry |
---|
Category:Letter
MONTHYEARL-24-226, License Renewal Application for the Perry Nuclear Power Plant Revision O - Response to Requests for Confirmatory Information (Rcls) - Set 12024-10-31031 October 2024 License Renewal Application for the Perry Nuclear Power Plant Revision O - Response to Requests for Confirmatory Information (Rcls) - Set 1 IR 05000440/20240032024-10-30030 October 2024 Integrated Inspection Report 05000440/2024003 and 07200069/2024001 L-24-179, License Renewal Application for the Perry Nuclear Power Plant Revision 0 - Supplement 52024-10-21021 October 2024 License Renewal Application for the Perry Nuclear Power Plant Revision 0 - Supplement 5 L-24-208, License Renewal Application for the Perry Nuclear Power Plant - Responses to Request for Additional Information - Round 1 (Set 2)2024-10-0202 October 2024 License Renewal Application for the Perry Nuclear Power Plant - Responses to Request for Additional Information - Round 1 (Set 2) ML24134A1522024-09-17017 September 2024 Exemption from the Requirements of 10 CFR 50.71(e)(4) Final Safety Analysis Report Update Schedule (EPID L-2024-LLE-0005) - Letter L-24-207, License Renewal Application for the Perry Nuclear Power Plant-Response to Request for Additional Information - Set 12024-09-16016 September 2024 License Renewal Application for the Perry Nuclear Power Plant-Response to Request for Additional Information - Set 1 ML24225A0512024-09-13013 September 2024 Issuance of Alternative Request VR-9, Revision 0, Associated with the Fourth 10-Year Inservice Testing Interval ML24256A0872024-09-11011 September 2024 Fws to NRC, Concurrence with Endangered Species Act Nlaa Determinations for Perry License Renewal L-24-201, Spent Fuel Storage Cask Registration2024-09-0909 September 2024 Spent Fuel Storage Cask Registration ML24249A0862024-09-0606 September 2024 Letter to Regina Gasco-Bentley, Chairperson_ Re. NOA of the Draft Site-Specific EIS and Finding of No Historic Properties Affected by Perry Plant Unit 1 Lr ML24166A0172024-09-0606 September 2024 Ltr. to Glenna Wallace, Chief, Eastern Shawnee Tribe of Oklahoma; Re., NOA of the Draft Site-Specific EIS and Finding of No Historic Properties Affected by Perry Plant Unit 1 Lr ML24249A0782024-09-0606 September 2024 Ltr. to Kenneth Meshigaud, Chairperson, _ Re., NOA of the Draft Site-Specific EIS and Finding of No Historic Properties Affected by Perry Plant Unit 1 Lr ML24249A0752024-09-0606 September 2024 Letter to Charles Diebold, Chief_ Re. NOA of the Draft Site-Specific EIS and Finding of No Historic Properties Affected by Perry Plant Unit 1 Lr ML24247A0212024-09-0606 September 2024 NRC Request for Concurrence with Endangered Species Act Determinations for Perry License Renewal, Issuance of Draft Supplemental Environmental Impact Statement, and Opportunity for Public Comment (Consultation Code: 2024-0006782) ML24249A0882024-09-0606 September 2024 Letter to Rickey Armstrong, President_ Re. NOA of the Draft Site-Specific EIS and Finding of No Historic Properties Affected by Perry Plant Unit 1 Lr ML24250A0412024-09-0606 September 2024 Fws to NRC, Perry Nuclear Plant, Unit 1, License Renewal List of Threatened and Endangered Species That May Occur in Your Proposed Project Location or May Be Affected ML24249A0762024-09-0606 September 2024 Letter to Douglas Lankford, Chief_ Re. NOA of the Draft Site-Specific EIS and Finding of No Historic Properties Affected by Perry Plant Unit 1 Lr L-24-200, License Renewal Application for Revision to Supplement 4 for Editorial Corrections2024-09-0505 September 2024 License Renewal Application for Revision to Supplement 4 for Editorial Corrections ML24228A1702024-09-0303 September 2024 Ltr to Rod L. Penfield-Perry Nuclear Power Plant Unit 1-Notice of Avail of the Draft Supp 61 to the GEIS for License Renew of Nuclear Plants ML24228A1712024-09-0303 September 2024 Ltr to Brian Dickens, EPA-Perry Nuclear Power Plant Unit 1-Notice of Avail of the Draft Supp 61 to the GEIS for License Renew of Nuclear Plants L-24-188, Submittal of Quality Assurance Program Manual, Revision 302024-08-27027 August 2024 Submittal of Quality Assurance Program Manual, Revision 30 ML24240A1482024-08-27027 August 2024 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML24239A7782024-08-26026 August 2024 Aging Management Audit - Perry Unit 1 - License Renewal Application August 26 2024 L-24-190, Spent Fuel Storage Cask Registration2024-08-26026 August 2024 Spent Fuel Storage Cask Registration IR 05000440/20240052024-08-22022 August 2024 Updated Inspection Plan for Perry Nuclear Power Plant (Report 05000440/2024005) L-24-174, Response to Perry Nuclear Power Plant License Renewal Environmental Report Severe Accident Mitigation Alternatives 2nd Round Request for Additional Information2024-08-15015 August 2024 Response to Perry Nuclear Power Plant License Renewal Environmental Report Severe Accident Mitigation Alternatives 2nd Round Request for Additional Information L-24-186, Response to RAI for Exemption Request from 10 CFR 50.71(e)(4) Final Safety Analysis Update Schedule2024-08-15015 August 2024 Response to RAI for Exemption Request from 10 CFR 50.71(e)(4) Final Safety Analysis Update Schedule IR 05000440/20240022024-08-0808 August 2024 Integrated Inspection Report 05000440/2024002 L-24-178, License Renewal Application Revision O - Supplement 42024-08-0808 August 2024 License Renewal Application Revision O - Supplement 4 L-24-189, License Renewal Application for Revision O - Supplement 12024-08-0707 August 2024 License Renewal Application for Revision O - Supplement 1 L-24-171, Spent Fuel Storage Cask Registration2024-07-30030 July 2024 Spent Fuel Storage Cask Registration ML24150A2022024-07-25025 July 2024 Letter to Rod L. Penfield-Perry Nuclear Power Plant Unit 1-License Renewal Scoping Summary Rpt L-24-108, License Renewal Application, Revision 0 - Supplement 32024-07-24024 July 2024 License Renewal Application, Revision 0 - Supplement 3 05000440/LER-2024-003, Technical Specification Required Shutdown Due to Increase in RCS Unidentified Leakage2024-07-15015 July 2024 Technical Specification Required Shutdown Due to Increase in RCS Unidentified Leakage IR 05000440/20244012024-07-0909 July 2024 Security Baseline Inspection Report 05000440/2024401 L-24-020, License Renewal Application for the Perry Nuclear Power Plant Revision 0, Supplement 22024-06-27027 June 2024 License Renewal Application for the Perry Nuclear Power Plant Revision 0, Supplement 2 05000440/LER-2024-002, Reactor Water Clean Up Leak Detection Loss of Safety Function2024-06-27027 June 2024 Reactor Water Clean Up Leak Detection Loss of Safety Function L-24-036, Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models2024-06-27027 June 2024 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models 05000440/LER-2024-001, Operation of the Residual Heat Removal Loops B and C Alternate Keep Fill Configuration Was Prohibited by Technical Specifications and Resulted in an Unanalyzed Condition2024-06-20020 June 2024 Operation of the Residual Heat Removal Loops B and C Alternate Keep Fill Configuration Was Prohibited by Technical Specifications and Resulted in an Unanalyzed Condition IR 05000440/20240112024-06-17017 June 2024 Fire Protection Team Inspection Report 05000440/2024011 ML24157A3782024-06-0606 June 2024 – Revised Request for Information for NRC License Renewal Inspection: Inspection Report 05000440/2024010 ML24141A1632024-05-20020 May 2024 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection L-24-116, Response to License Renewal Environmental Report Severe Accident Mitigation Alternatives Requests for Additional Information and Request for Clarification2024-05-16016 May 2024 Response to License Renewal Environmental Report Severe Accident Mitigation Alternatives Requests for Additional Information and Request for Clarification L-24-085, Nudear Power Plant, Submittal of Emergency Plan, Revision 622024-05-0606 May 2024 Nudear Power Plant, Submittal of Emergency Plan, Revision 62 L-24-103, Response to NRC Regulatory Issue Summary 2024-01, Preparation & Scheduling of Operator Licensing Exams2024-05-0202 May 2024 Response to NRC Regulatory Issue Summary 2024-01, Preparation & Scheduling of Operator Licensing Exams ML24117A1222024-04-26026 April 2024 Confirmation of Initial License Examination IR 05000440/20240012024-04-24024 April 2024 Integrated Inspection Report 05000440/2024001 L-24-097, Submittal of 2023 Annual Radiological Effluent Release Report2024-04-22022 April 2024 Submittal of 2023 Annual Radiological Effluent Release Report L-24-096, Submittal of Annual Radiological Environmental Operating Report2024-04-22022 April 2024 Submittal of Annual Radiological Environmental Operating Report ML24095A3282024-04-19019 April 2024 License Renewal Revised Schedule Letter 2024-09-09
[Table view] Category:Technical Specifications
MONTHYEARML23353A0012024-02-21021 February 2024 – Issuance of Amendment No. 202 to Adopt TSTF-276, Revision 2, Revise DG Full Load Rejection Test ML22210A0102022-09-16016 September 2022 Energy Harbor Fleet- Issuance of Amendments Regarding Adoption of TSTF 554, Revise Reactor Coolant Leakage Requirements ML21361A2172021-12-20020 December 2021 Supplemental Information for Revision 22 to Updated Safety Analysis Report, Revision 13 to Technical Specification Bases TS Bases ML21271A0782021-11-0505 November 2021 Issuance of Amendment No. 195 Regarding the Adoption of TSTF-230, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling ML21307A1762021-10-28028 October 2021 2 to Updated Safety Analysis Report, Chapter 16, Technical Specifications ML21158A2122021-07-12012 July 2021 Issuance of Amendment No. 194 Regarding the Adoption of TSTF-002, Relocate the 10 Year Sediment Cleaning of the Fuel Oil Storage Tank to Licensee Control ML21035A1702021-03-0101 March 2021 Issuance of Amendment No. 192, Regarding Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements ML20099A1022020-05-22022 May 2020 Issuance of Amendment No. 188, Regarding Revision to Technical Specifications to Adopt TSTF-564, Safety Limit (Minimum Critical Power Ratio) MCPR ML17325B6902018-01-18018 January 2018 Issuance of Amendment Concerning Adoption of Technical Specification Task Force (TSTF) Traveler 400-A, Revision 1, Clarify SR on Bypass of DG Automatic Trips (CAC No. MF9855, EPID L-2017-LLA-0246) (L-17-089) ML17305A2132017-10-23023 October 2017 Perry Nuclear Power Plant Revision 20 to Updated Final Safety Analysis Report, Chapter 16, Technical Specifications ML15307A3492016-02-23023 February 2016 Issuance of Amendment Concerning Adoption of TSTF-425, Relocate Surveillance Frequencies to Licensee Control (CAC No. MF3720) (L-14-106) ML15243A1532015-09-0202 September 2015 Correction of Typographical Error Incurred During Prior License Amendment No. 162 ML15201A5292015-08-17017 August 2015 Issuance of Amendment Concerning Technical Specification 3.8.4 DC Sources - Operating (TAC No. MF5298) (L-14-271) ML15160A0282015-06-23023 June 2015 Issuance of Amendment Concerning Adoption of TSTF-535, Revise Shutdown Margin Definition to Address Advanced Fuel Designs (TAC No. MF4791)(L-14-137) ML15141A4822015-06-12012 June 2015 Issuance of Amendment Concerning Changes to Pressure Temperature Curves (TAC No. MF4351)(L-14-150) ML15133A5022015-06-10010 June 2015 Issuance of Amendment Concerning Extension of Cyber Security Milestone 8 (TAC No. MF5557)(L-14-421) L-11-338, Supplemental Information for License Amendment Request Regarding Offsite Electric Power System Acceptability Until December 12, 20112011-10-17017 October 2011 Supplemental Information for License Amendment Request Regarding Offsite Electric Power System Acceptability Until December 12, 2011 L-11-333, Supplemental Information for License Amendment Request Regarding Offsite Electric Power System Acceptability Until December 12, 20112011-10-13013 October 2011 Supplemental Information for License Amendment Request Regarding Offsite Electric Power System Acceptability Until December 12, 2011 L-11-322, License Amendment Request Regarding Use of a Delayed Access Circuit as a Required Offsite Circuit in Technical Specification 3.8.1, AC Sources - Operating.2011-10-0303 October 2011 License Amendment Request Regarding Use of a Delayed Access Circuit as a Required Offsite Circuit in Technical Specification 3.8.1, AC Sources - Operating. ML1116608152011-06-16016 June 2011 Correction Letter License Amendment No. 157 L-10-201, License Amendment Request to Revised Technical Specification 3.1.4, Control Rod Scram Times, to Incorporate TSTF-460, Revision 02010-12-15015 December 2010 License Amendment Request to Revised Technical Specification 3.1.4, Control Rod Scram Times, to Incorporate TSTF-460, Revision 0 ML1029804462010-10-21021 October 2010 License Amendment Request to Modify Technical Specification 2.1.1, Reactor Core Sls, to Incorporate Revised Safety Limit Minimum Critical Power Ratio Values L-09-025, ISFSI, and Perry, Application for Technical Specification (TS) Change for Adoption of TSTF-511 Revision 0, Eliminate Working Hour Restrictions from TS 5.2.2 to Support Compliance with 10 CFR Part 26.2009-03-25025 March 2009 ISFSI, and Perry, Application for Technical Specification (TS) Change for Adoption of TSTF-511 Revision 0, Eliminate Working Hour Restrictions from TS 5.2.2 to Support Compliance with 10 CFR Part 26. ML0824608772008-08-28028 August 2008 Tech Spec Page for Amendment 150 TSTF-476, Improved Banked Position Withdrawal Sequence Control Rod Insertion Process, Per the Consolidated Line Item Improvement Process ML0817503002008-06-19019 June 2008 TS Pages - Issuance of Amendment Revise TSs 3.6.1, 3.6.4 and 3.6.5 ML0811905752008-04-25025 April 2008 TS Pages - Issuance of Amendment No. TSTF-448, Revision 3, Control Room Habitability. ML0726808522007-09-18018 September 2007 License Amendment Request Regarding Control Room Envelope Habitability in Accordance with TSTF-448, Revision 3, Using the Consolidated Line Item Improvement Process ML0725505472007-09-0505 September 2007 License Amendment Request to Revise Technical Specification 3.6.1, 3.6.4, and 3.6.5 for Containment and Drywell Isolation Device ML0721102792007-07-30030 July 2007 Tech Spec Pages for Amendment 147 to Clarify Technical Specification Requirements Related to Annulus Exhaust Gas Treatment (Aegt) System ML0719402902007-07-12012 July 2007 Technical Specifications, Issuance of Amendment ASTM Standards for Fuel Oil Testing ML0717704662007-06-22022 June 2007 Tech Spec Page for Amendment 145 Scram Discharge Volume Vent and Drain Valves ML0717202522007-06-14014 June 2007 Beaver and Perry, Technical Specifications, Issuance of Amendments Modification of Technical Specification Requirements for Inoperable Snubbers ML0713403922007-05-0909 May 2007 Technical Specifications (Ts), Revise TS 5.5.7, Ventilation Filter Test Program, to Correct Referenced Flow Units ML0712005032007-04-30030 April 2007 Tech Spec Pages for Amendment 142 Regarding Emergency Diesel Generator Surveillance Testing Voltage and Frequency Limits ML0712102912007-04-27027 April 2007 Technical Specifications, Issuance of Amendment Revise TS to Change the Frequency of the Mode 5 Intermediate Range Monitoring Instrumentation Channel Functional Test L-06-172, Units 1 and 2, License Amendment Requests to Add LCO 3.0.8 on the Inoperability of Snubbers Using the Consolidated Line Item Improvement Process2007-01-11011 January 2007 Units 1 and 2, License Amendment Requests to Add LCO 3.0.8 on the Inoperability of Snubbers Using the Consolidated Line Item Improvement Process ML0700904852006-12-29029 December 2006 Application for a Technical Specification Improvement to Revise Technical Specification 3.1.8, Scram Discharge Volume (SDV) Vent and Drain Valves, Using the Consolidated Line Item Improvement Process ML0629704472006-10-13013 October 2006 License Amendment Request to Eliminate Unnecessary Reporting Requirements in the Operating License and the Administrative Controls Section of the Technical Specifications ML0618700962006-06-30030 June 2006 Technical Specification, Modifies the Existing TS 3.3.1.3, Oscillation Power Range Monitor (OPRM) Instrumentation, Surveillance Requirement 3.3.1.3.5 ML0615903492006-06-0101 June 2006 License Amendment Request - Revise Mode 3 Hot Shutdown Requirements to Add a Note Addressing Situations When Both Residual Heat Removal (RHR) Shutdown Cooling Subsystems Are Inoperable ML0615903292006-06-0101 June 2006 License Amendment Request - Revise Mode 4 Residual Heat Removal Shutdown Cooling Requirements to Add a Default Condition Addressing Situations When Condition a Cannot Be Met within Its Completion Time ML0605404392006-02-14014 February 2006 Amendment Request to Revise Technical Specification 3.3.1.1 Intermediate Range Monitoring Instrumentation Mode 5 Channel Functional Testing Surveillance Frequency from 7 Days to 31 Days ML0605306202006-02-10010 February 2006 License Amendment Request to Revise Required Action B.1 in the Emergency Core Cooling System Instrumentation Technical Specification to Be Consistent with the Improved Standard Technical Specifications ML0529903232005-10-14014 October 2005 Submittal of Technical Specification Bases, Revision 5 ML0522902522005-08-16016 August 2005 Tech Spec Pages for Amendment 136 Elimination of Monthly Operating Reports and Occupational Radiation Exposure Reports ML0512501942005-04-19019 April 2005 4/19/05, Perry - TS Pages - Issuance of Amendment Elimination of Requirements for Hydrogen Recombiners and Hydrogen Monitors Using the Consolidated Line Item Improvement Process ML0509600872005-03-31031 March 2005 Tech Spec Pages for Amendment 134 Single Recirculation Loop Operation ML0504505712005-02-10010 February 2005 Tech Spec Pages for Amendment 133 Testing of Safety/Relief Valves ML0503503642005-02-0303 February 2005 Technical Specification Pages Revision of the Minimum Critical Power Ratio Safety Limit ML0419401992004-07-0909 July 2004 Technical Specifications, Issuance of Amendment Regarding Primary Containment and Drywell Isolation Instrumentation to Increase the Analytical Limit for Detected Temperature 2024-02-21
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 September 2, 2015 Mr. Ernest J. Harkness Site Vice President FirstEnergy Nuclear Operating Company Mail Stop A-PY-A290 P.O. Box 97, 10 Center Road Perry, OH 44081-0097
SUBJECT:
PERRY NUCLEAR POWER PLANT, UNIT NO. 1 - CORRECTION OF TYPOGRAPHICAL ERROR INCURRED DURING PRIOR LICENSE AMENDMENT NO. 162
Dear Mr. Harkness:
By letter dated March 3, 2013 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML13052A706), the U.S. Nuclear Regulatory Commission (NRC) issued Amendment No. 162 to Facility Operating License No. NPF-58 for Perry Nuclear Power Plant, Unit No. 1. The amendment revised surveillance requirements (SRs) in technical specification (TS) 3.8.1, "AC Sources - Operating," by excluding Division 3 from current mode restrictions.
During its review of a separate amendment request to adopt Technical Specifications Task Force (TSTF)-425, "Relocate Surveillance Frequencies to Licensee Control - RITSTF Initiative 5b," the NRC staff identified an error in SR 3.8.1.10 that was inadvertently introduced during the issuance of Amendment No. 162. Specifically, the Note in SR 3.8.1.10 should have read, "This Surveillance shall not be performed in MODE 1 or 2 (not applicable to Division 3). However, credit may be taken for unplanned events that satisfy this SR." The term "DG" was inadvertently added to the parenthetical " ... (not applicable to Division 3 DG) ... " during the issuance of the amendment.
The purpose of this letter is to issue a correction to TS Page 3.8-8 to reflect the correct wording originally requested by FirstEnergy Nuclear Operating Company in its license amendment request dated July 3, 2012 (ADAMS Accession No. ML12188A001). Enclosed please find corrected TS Page 3.8-8 for Amendment No. 162 to Facility Operating License NPF-58 for Perry Nuclear Power Plant, Unit No. 1.
The NRC staff has determined that the error was introduced during the preparation of the license amendment and is entirely editorial in nature. The proposed correction does not change any of the conclusions in the safety evaluation associated with Amendment No. 162 and does not affect the associated notice to the public.
E. Harkness If you have any questions regarding this matter, please contact me at (301) 415-1627.
Sincerely, Kimberly J. Green, Senior Project Manager Plant Licensing Branch 111-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-440
Enclosure:
Corrected TS Page 3.8-8 issued with Amendment No. 162 cc w/encl: Distribution via Listserv
ENCLOSURE PERRY NUCLEAR POWER PLANT, UNIT NO. 1 DOCKET NO. 50-440 CORRECTED PAGE TO LICENSE AMENDMENT NO. 162 FACILITY OPERATING LICENSE NO. NPF-58 TECHNICAL SPECIFICATION PAGE 3.8-8
AC Sources-Operating 3.8.1 SURVEILLANCE REQUIREMENTS (continued)
SURVEILLANCE FREQUENCY SR 3.8.1. 9 -------------~---NOTES--------------------
- 1. This Surveillance shall not be performed in MODE 1 or 2 (not applicable to Division 3). However.
credit may be taken for unplanned events that satisfy this SR.
- 2. If performed with DG synchronized with offsite power. it shall be performed at a power factor ~ 0.9.
Verify each DG rejects a load greater *than 24 months or equal to its associated single largest post-accident load. Followin~ load rejection. engine speed is maintained less than nominal plus 75% of the difference between nomi-na 1 speed and the overspeed trip setpoint. or 15% above nominal.
whichever is less.
SR 3.8.1.10 -----------------NOTE---------------------
This Surveillance shall not be performed in MODE*l or 2 (not applicable to Division 3).
However. credit may be taken for unplanned events that satisfy this SR.
Verify each DG operating at a power factor 24 months
~ 0.9 does not trip and voltage is maintained ~ 4784 V for Division 1 and 2 OGs and ~ 5000 V for Division 3 OG during and following a load rejection of a load
~ 5600 kW for Division 1 and 2 DGs and
~ 2600 kW for Division 3 DG.
(continued)
PERRY - UN IT 1 3.8-8 Amendment No. 162 Corrected by letter dated September 2, 2015