| {{#Wiki_filter: UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 April 20, 2017 | | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 April 20, 2017 Mr. Anthony Vitale Site Vice-President, IPEC Entergy Nuclear Operations, Inc. |
| | | 450 Broadway, GSB PO Box 249 Buchanan, NY 10511-0249 |
| Mr. Anthony Vitale Site Vice-President, IPEC Entergy Nuclear Operations, Inc. | |
| 450 Broadway, GSB PO Box 249 Buchanan, NY 10511-0249 | |
|
| |
|
| ==SUBJECT:== | | ==SUBJECT:== |
| REQUESTS FOR ADDITIONAL INFORMATION FOR THE REVIEW OF THE INDIAN POINT LICENSE RENEWAL APPLICATION RAI SET 2017-03 (CAC NOS. MD5407 AND MD5408) | | REQUESTS FOR ADDITIONAL INFORMATION FOR THE REVIEW OF THE INDIAN POINT LICENSE RENEWAL APPLICATION RAI SET 2017-03 (CAC NOS. MD5407 AND MD5408) |
|
| |
|
| ==Dear Mr. Vitale:== | | ==Dear Mr. Vitale:== |
|
| |
|
| By letter dated April 30, 2007, Entergy Nuclear Operations, Inc. submitted an application pursuant to Title 10 of the Code of Federal Regulations (10 CFR) Part 54, to renew the operating license DPR-26 and DPR-64 for Indian Point Nuclear Generating, Unit Nos. 2 and 3, for review by the U.S. Nuclear Regulatory Commission (NRC or the staff). The staff is reviewing the information contained in the license renewal application and has identified, in the enclosure, areas where additional information is needed to complete the review. This request for additional information was discussed with Richard Burroni, and a mutually agreeable date for the response is within 30 days from the date of this letter. If you have any questions, please contact me at 301-415-6332 or e-mail william.burton@nrc.gov. | | By letter dated April 30, 2007, Entergy Nuclear Operations, Inc. submitted an application pursuant to Title 10 of the Code of Federal Regulations (10 CFR) Part 54, to renew the operating license DPR-26 and DPR-64 for Indian Point Nuclear Generating, Unit Nos. 2 and 3, for review by the U.S. Nuclear Regulatory Commission (NRC or the staff). The staff is reviewing the information contained in the license renewal application and has identified, in the enclosure, areas where additional information is needed to complete the review. |
| Sincerely, /RA/ William Burton, Senior Project Manager Project Management and Guidance Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-247 and 50-286 | | This request for additional information was discussed with Richard Burroni, and a mutually agreeable date for the response is within 30 days from the date of this letter. If you have any questions, please contact me at 301-415-6332 or e-mail william.burton@nrc.gov. |
| | Sincerely, |
| | /RA/ |
| | William Burton, Senior Project Manager Project Management and Guidance Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-247 and 50-286 |
|
| |
|
| ==Enclosure:== | | ==Enclosure:== |
| Requests for Additional Information
| |
|
| |
|
| cc w/encl: Listserv | | Requests for Additional Information cc w/encl: Listserv |
|
| |
|
| ==SUBJECT:==
| | ML17088A405 OFFICE LA:DLR PM:RPGB:DLR BC:RPGB:DLR PM: RSRG:DLR NAME YEdmonds WBurton SBloom WBurton DATE 3/29/17 4/11/17 4/20/17 4/20/17 |
| REQUESTS FOR ADDITIONAL INFORMATION FOR THE REVIEW OF THE INDIAN POINT LICENSE RENEWAL APPLICATION RAI SET 2017-03 (CAC NOS. MD5407 AND MD5408)
| | |
| DISTRIBUTION: HARD COPY: DLR RF E-MAIL: PUBLICRidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRarb Resource RidsNrrDlrRasb Resource RidsNrrDlrRerb Resource RidsNrrDlrRpgb Resource RidsOgcMailCenter Resource RidsNrrPMIndianPoint Resource ----------------------------------------------- SBloom DMorey BWittick WBurton WHolston ABuford SCuadrado JGavula BAllik AMink DPickett STurk, OGC DRoth, OGC BHarris, OGC SBurnell, OPA DMcIntyre, OPA JWeil, OPA MGray, RI GDentel, RI DJackson, RI MModes, RI NSheehan, RI OPA DScrenci, RI OPA SRich, RI rlouie@entergy.com rburron@entergy.com avitale@entergy.com rwalpol@entergy.com ADAMS Accession No. ML17088A405 OFFICE LA:DLR PM:RPGB:DLR BC:RPGB:DLR PM: RSRG:DLR NAME YEdmonds WBurton SBloom WBurton DATE 3/29/17 4/11/17 4/20/17 4/20/17 OFFICIAL RECORD COPY Enclosure INDIAN POINT LICENSE RENEWAL APPLICATION (LRA) REQUESTS FOR ADDITIONAL INFORMATION (RAI) RAI B.1.2-1 Background Section 54.21(a)(3) of 10 CFR requires the applicant to demonstrate that the effects of aging for structures and components will be adequately managed so that the intended function(s) will be maintained consistent with the current licensing basis for the period of extended operation. As described in SRP-LR, an applicant may demonstrate compliance with 10 CFR 54.21(a)(3) by referencing the GALL Report and when evaluation of the matter in the GALL Report applies to the plant. GALL Report AMP XI.M18 states: Degradation of pressure boundary closure bolting due to crack initiation, loss of preload, or loss of material may result in leakage from the mating surfaces or joint connections of pressure boundary components. Periodic inspection of pressure boundary components for signs of leakage ensures that age-related degradation of closure bolting is detected and corrected before component leakage becomes excessive. Accordingly, pressure retaining bolted connections should be inspected at least once per refueling cycle. LRA Section B.1.2 states that the Bolting Integrity Program includes "periodic inspection of closure bolting for signs of leakage that may be due to-loss of preload." However, from its review of the program implementing document during the onsite audit, the staff determined that the program did not appear to manage loss of preload. The staff identified this concern in Audit Items 241 and 270. In response to Audit Items 241 and 270, by letter dated December 18, 2007, the applicant stated that the program will manage loss of preload. The applicant revised LRA Table 3.4.1, Item 3.4.1-22, Table 3.3.1, Item 3.3.1-45, and Table 3.2.1, Item 3.2.1-24, to state "the Bolting Integrity Program manages loss of preload for all bolting" in the respective systems. In addition, the applicant revised Commitment #2 to state "[t]he Bolting Integrity Program manages loss of preload and loss of material for all external bolting."
| | INDIAN POINT LICENSE RENEWAL APPLICATION (LRA) |
| | REQUESTS FOR ADDITIONAL INFORMATION (RAI) |
| | RAI B.1.2-1 |
|
| |
|
| Issue It is not clear what methods will be used to detect leakage that would indicate loss of preload of closure bolting. If visual inspections will be used, the staff notes that while visual inspections would be capable of detecting leakage of liquid-filled systems, visual inspection may not be sufficient to detect leakage for air- or gas-filled systems. | | ===Background=== |
| | Section 54.21(a)(3) of 10 CFR requires the applicant to demonstrate that the effects of aging for structures and components will be adequately managed so that the intended function(s) will be maintained consistent with the current licensing basis for the period of extended operation. As described in SRP-LR, an applicant may demonstrate compliance with 10 CFR 54.21(a)(3) by referencing the GALL Report and when evaluation of the matter in the GALL Report applies to the plant. |
| | GALL Report AMP XI.M18 states: |
| | Degradation of pressure boundary closure bolting due to crack initiation, loss of preload, or loss of material may result in leakage from the mating surfaces or joint connections of pressure boundary components. Periodic inspection of pressure boundary components for signs of leakage ensures that age-related degradation of closure bolting is detected and corrected before component leakage becomes excessive. Accordingly, pressure retaining bolted connections should be inspected at least once per refueling cycle. |
| | LRA Section B.1.2 states that the Bolting Integrity Program includes periodic inspection of closure bolting for signs of leakage that may be due toloss of preload. However, from its review of the program implementing document during the onsite audit, the staff determined that the program did not appear to manage loss of preload. The staff identified this concern in Audit Items 241 and 270. In response to Audit Items 241 and 270, by letter dated December 18, 2007, the applicant stated that the program will manage loss of preload. The applicant revised LRA Table 3.4.1, Item 3.4.1-22, Table 3.3.1, Item 3.3.1-45, and Table 3.2.1, Item 3.2.1-24, to state the Bolting Integrity Program manages loss of preload for all bolting in the respective systems. In addition, the applicant revised Commitment #2 to state [t]he Bolting Integrity Program manages loss of preload and loss of material for all external bolting. |
| | Issue It is not clear what methods will be used to detect leakage that would indicate loss of preload of closure bolting. If visual inspections will be used, the staff notes that while visual inspections would be capable of detecting leakage of liquid-filled systems, visual inspection may not be sufficient to detect leakage for air- or gas-filled systems. |
| | LRA Table 3.3.2-4-IP2 (and IP3), Compressed Air System, is an example of a system that cites the Bolting Integrity Program to manage aging effects associated with closure bolting that could be or are air-filled or gas-filled. Based on a review of LRA Section B.1.2 and SER Section 3.0.3.2.2, Bolting Integrity, it is not clear how aging effects for closure bolting installed in air-filled or gas-filled systems will be effectively managed because in these systems there is typically limited or no visual signs of leakage. |
| | Enclosure |
|
| |
|
| LRA Table 3.3.2-4-IP2 (and IP3), "Compressed Air System," is an example of a system that cites the Bolting Integrity Program to manage aging effects associated with closure bolting that could be or are air-filled or gas-filled. Based on a review of LRA Section B.1.2 and SER Section 3.0.3.2.2, "Bolting Integrity," it is not clear how aging effects for closure bolting installed in air-filled or gas-filled systems will be effectively managed because in these systems there is typically limited or no visual signs of leakage. Request 1. List the in-scope systems that have portions that are air-filled and gas-filled for which aging effects associated with closure bolting are being managed by the Bolting Integrity Program. 2. State how the aging effects will be managed.
| | Request |
| : 3. State any enhancements to plant-specific procedures and/or to the Bolting Integrity Program necessary to incorporate how these aging effects are managed. | | : 1. List the in-scope systems that have portions that are air-filled and gas-filled for which aging effects associated with closure bolting are being managed by the Bolting Integrity Program. |
| }} | | : 2. State how the aging effects will be managed. |
| | : 3. State any enhancements to plant-specific procedures and/or to the Bolting Integrity Program necessary to incorporate how these aging effects are managed.}} |
Letter Sequence RAI |
---|
|
Initiation
- Request, Request, Request
- Acceptance, Acceptance, Acceptance, Acceptance
- Supplement, Supplement, Supplement, Supplement, Supplement, Supplement
Results
Other: ML15327A213, ML16133A459, ML16133A499, ML17101A697, ML17207A165, ML17256A286, ML18212A032, ML18212A185, NL-16-138, Amendment 18 to License Renewal Application, NL-17-005, Actions Concerning License Renewal Commitments 41 and 42 in Response to LR-ISG-2016-01, Changes to Aging Management Guidance for Various Steam Generator Components., NL-17-019, Amendment to License Renewal Application - Reflecting Shortened License Renewal Terms, NL-17-157, Amendment 19 to License Renewal Application (LRA)
|
MONTHYEARML15344A4362015-12-10010 December 2015 Lr Hearing - (External_Sender) Draft Audit Plan Edits Project stage: Request ML15327A2132015-12-21021 December 2015 Plan for the Regulatory Audit of the Service Water Integrity and Fire Water System Aging Management Programs Pertaining to the Indian Point Nuclear Generating Unit Nos. 2 and 3 LRA Project stage: Other ML15351A2032015-12-30030 December 2015 Summary of Conference Call Held on December 9, 2015, Between the NRC and Entergy Nuclear Operations, Inc. Concerning the Draft Audit Plan for the Service Water Integrity and Fire Water System Aging Management Programs Project stage: Draft Other ML16133A4592016-06-15015 June 2016 Service Water and Fire Water Systems Aging Management Programs Audit Report for the Indian Point Nuclear Generating Unit Nos. 2 and 3 License Renewal Application Project stage: Other ML16133A4992016-06-21021 June 2016 Summary of Telephone Conference Call Held Between NRC and Entergy Concerning the Indian Point LRA Safety Review Project stage: Other ML16138A1942016-07-25025 July 2016 Request for Additional Information for the Review of License Renewal Application, Set 2016-01 Project stage: RAI ML16208A2772016-07-26026 July 2016 Lr Hearing - RAI Set 2016-01 Project stage: Request NL-16-122, Reply to Request for Additional Information for the Review of License Renewal Application, Set 2016-01 (CAC Nos. MD5407 and MD5408)2016-12-0202 December 2016 Reply to Request for Additional Information for the Review of License Renewal Application, Set 2016-01 (CAC Nos. MD5407 and MD5408) Project stage: Response to RAI NL-16-138, Amendment 18 to License Renewal Application2016-12-15015 December 2016 Amendment 18 to License Renewal Application Project stage: Other NL-17-005, Actions Concerning License Renewal Commitments 41 and 42 in Response to LR-ISG-2016-01, Changes to Aging Management Guidance for Various Steam Generator Components.2017-01-17017 January 2017 Actions Concerning License Renewal Commitments 41 and 42 in Response to LR-ISG-2016-01, Changes to Aging Management Guidance for Various Steam Generator Components. Project stage: Other NL-17-019, Amendment to License Renewal Application - Reflecting Shortened License Renewal Terms2017-02-0808 February 2017 Amendment to License Renewal Application - Reflecting Shortened License Renewal Terms Project stage: Other ML17046A2312017-03-0808 March 2017 Request for Additional Information for the Review of the Indian Point License Renewal - Set 2017-01 Project stage: RAI ML17082A3112017-04-11011 April 2017 Summary of Clarification Call with Entergy Regarding Follow-Up RAIs on ISG-2012-02 Project stage: RAI ML17088A3272017-04-19019 April 2017 Requests for Additional Information for the Review of the Indian Point License Renewal Application RAI Set 2017-02 (CAC Nos. MD5407 and MD5408) Project stage: RAI ML17088A4052017-04-20020 April 2017 Requests for Additional Information for the Review of the Indian Point License Renewal Application RAI Set 2017-3 (CAC Nos. MD5407 and MD5408) Project stage: RAI ML17101A6972017-04-25025 April 2017 License Renewal Clarification Call on Baffle Bolt Rai'S Project stage: Other NL-17-052, Reply to Request for Additional Information for the Review of the License Renewal Application, Set 2017-012017-05-0808 May 2017 Reply to Request for Additional Information for the Review of the License Renewal Application, Set 2017-01 Project stage: Response to RAI NL-17-053, Reply to Request for Additional Information for the Review of the Indian Point License Renewal Application RAI Set 2017-03 (CAC Nos. MD5407 and MD5408)2017-05-18018 May 2017 Reply to Request for Additional Information for the Review of the Indian Point License Renewal Application RAI Set 2017-03 (CAC Nos. MD5407 and MD5408) Project stage: Response to RAI NL-17-060, Reply to Requests for Additional Information for the Review of the Indian Point License Renewal Application RAI Set 2017-02 (CAC Nos. MD5407 and MD5408)2017-05-19019 May 2017 Reply to Requests for Additional Information for the Review of the Indian Point License Renewal Application RAI Set 2017-02 (CAC Nos. MD5407 and MD5408) Project stage: Response to RAI ML17128A3352017-05-23023 May 2017 Summary of Telephone Conference Call Between the NRC and Entergy Concerning RAIs Pertaining to IP2 and IP3 Project stage: RAI NL-17-061, Reply to Requests for Additional Information for the Review of the License Renewal Application RAI Set 2017-042017-05-24024 May 2017 Reply to Requests for Additional Information for the Review of the License Renewal Application RAI Set 2017-04 Project stage: Response to RAI NL-17-069, Reply to Requests for Additional Information for the Review of the Indian Point Nuclear Generating Unit Nos. 2 and 3, License Renewal Application RAI Set 2017-05 (CAC Nos. MD5407 and MD5408)2017-06-0808 June 2017 Reply to Requests for Additional Information for the Review of the Indian Point Nuclear Generating Unit Nos. 2 and 3, License Renewal Application RAI Set 2017-05 (CAC Nos. MD5407 and MD5408) Project stage: Response to RAI NL-17-074, Supplemental Information Regarding Reply to Request for Additional Information Set 2017-01 for the Review of the License Renewal Application (LRA)2017-06-27027 June 2017 Supplemental Information Regarding Reply to Request for Additional Information Set 2017-01 for the Review of the License Renewal Application (LRA) Project stage: Response to RAI ML17170A2862017-06-27027 June 2017 RAI Set 2017-06 Project stage: RAI ML17160A1652017-06-27027 June 2017 Summary of Telephone Conference Call Held on May 31,2017, Between the NRC and Entergy Nuclear Operations Inc. Concerning Requests for Additional Information Pertaining to the Indian Point, License Renewal Application (TAC Nos. MD5407/MD5408 Project stage: RAI NL-17-084, Reply to Requests for Additional Information for the Review of the License Renewal Application. Re RAI Set 2017-062017-07-27027 July 2017 Reply to Requests for Additional Information for the Review of the License Renewal Application. Re RAI Set 2017-06 Project stage: Response to RAI NL-17-092, Amended Response to Request for Additional Information Question RAI 3.3.2-17-IP3-1 Re License Renewal Application RAI Set 2017-052017-07-27027 July 2017 Amended Response to Request for Additional Information Question RAI 3.3.2-17-IP3-1 Re License Renewal Application RAI Set 2017-05 Project stage: Response to RAI ML17207A1652017-09-0101 September 2017 License Renewal Audit Plan Regarding the Service Water Integrity Program Project stage: Other ML17250A2442017-09-20020 September 2017 Audit Report for IP Swi - Aug 2017 Project stage: Acceptance Review ML17191A4562017-09-20020 September 2017 06/08/2017 Telecon Summary Related to Indian Point License Renewal RAIs Associated with ISG-2016-01 Project stage: RAI ML17180A5032017-09-21021 September 2017 04/19/2017 Summary of Teleconference with Entergy Nuclear Operations, Inc., Concerning Request for Additional Information Pertaining to the Indian Point Unit Nos. 2 and 3 License Renewal Application Project stage: RAI ML17256A2862017-09-25025 September 2017 Summary of Telephone Call on 09/06/17, Between NRC and Entergy Concerning Next Steps from the Site Audit on 08/1-3/17 Project stage: Other NL-17-127, Supplemental Information Regarding the Service Water Integrity Aging Management Program for the Review of the Indian Point Nuclear Generating Unit Nos. 2 and 3 License Renewal Application (LRA) (CAC Nos. MD5407 and MD5408)2017-11-0808 November 2017 Supplemental Information Regarding the Service Water Integrity Aging Management Program for the Review of the Indian Point Nuclear Generating Unit Nos. 2 and 3 License Renewal Application (LRA) (CAC Nos. MD5407 and MD5408) Project stage: Supplement NL-17-155, Re-Submittal of Supplemental Information Regarding the Service Water Integrity Aging Management Program for the Review of the Indian Point Nuclear Generating Unit Nos. 2 and 3 License Renewal Application (LRA)2017-12-14014 December 2017 Re-Submittal of Supplemental Information Regarding the Service Water Integrity Aging Management Program for the Review of the Indian Point Nuclear Generating Unit Nos. 2 and 3 License Renewal Application (LRA) Project stage: Supplement NL-17-157, Amendment 19 to License Renewal Application (LRA)2017-12-14014 December 2017 Amendment 19 to License Renewal Application (LRA) Project stage: Other NL-17-161, Supplemental Information Regarding the Service Water Integrity Aging Management Program for the Review of the Indian Point Nuclear Generating Units 2 and 3 License Renewal Application (LRA) (CAC Nos. MD5407 and MD5408)2017-12-21021 December 2017 Supplemental Information Regarding the Service Water Integrity Aging Management Program for the Review of the Indian Point Nuclear Generating Units 2 and 3 License Renewal Application (LRA) (CAC Nos. MD5407 and MD5408) Project stage: Supplement NL-18-010, Supplemental Information Regarding the Review of the License Renewal Application2018-02-26026 February 2018 Supplemental Information Regarding the Review of the License Renewal Application Project stage: Supplement ML18107A7592018-04-30030 April 2018 NUREG-1437, Suppl. 38, Vol. 5, Generic Environmental Impact Statement for License Renewal of Nuclear Plants Supplement 38 Regarding Indian Port Nuclear Generating Unit Nos. 2 and 3 Final. Project stage: Acceptance Review NL-18-030, Supplemental Information Associated with Amendment 19 to the License Renewal Application (LRA)2018-05-0808 May 2018 Supplemental Information Associated with Amendment 19 to the License Renewal Application (LRA) Project stage: Supplement NL-18-044, Supplemental Information Regarding the Review of the License Renewal Application2018-06-25025 June 2018 Supplemental Information Regarding the Review of the License Renewal Application Project stage: Supplement ML18200A3332018-08-0101 August 2018 NUREG-1930, Supp 3, Safety Evaluation Report Related to the License Renewal of Indian Point Nuclear Generating Plant, Units 2 and 3. Project stage: Approval ML18211A4842018-08-0707 August 2018 to NUREG-1930, Safety Evaluation Report Related to the License Renewal of Indian Point Nuclear Generating Plant, Units 2 and 3. Project stage: Approval ML18211A5842018-09-17017 September 2018 Issuance of Renewed Facility Operating License Nos. DPR 26 and DPR-64 for Indian Point Nuclear Generating Unit Nos. 2 and 3 (CAC Nos. MD5407 and MD5408) Project stage: Request ML18212A1882018-09-17017 September 2018 Renewed License Appendix C Project stage: Acceptance Review ML18212A1852018-09-17017 September 2018 Renewed Facility Operating License DPR-26, Technical Specifications, Appendix B Project stage: Other ML18212A1812018-09-17017 September 2018 Renewed Facility Operating License DPR-26, Technical Specifications, Appendix a Project stage: Acceptance Review ML18212A0322018-09-17017 September 2018 Records of Decision for the Indian Point Renewed Licenses Project stage: Other ML18211A5962018-09-17017 September 2018 Transmittal Letter - Issuance of Renewed Facility Operating License Nos. DPR-26 and DPR-64 for Indian Point Nuclear Generating Unit Nos. 2 and 3 (CAC Nos. MD5407 and MD5408) Project stage: Approval ML18211A5782018-09-17017 September 2018 Federal Register Notice - Announcing the Issuance of the Indian Point Renewed Licenses Project stage: Approval ML18213A1142018-09-17017 September 2018 Renewed Facility Operating License Project stage: Other 2017-04-25
[Table View] |
|
---|
Category:Letter
MONTHYEARML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status IR 05000003/20240022024-08-0606 August 2024 NRC Inspection Report 05000003/2024002, 05000247/2024002, 05000286/2024002 PNP 2024-030, Update Report for Holtec Decommissioning International Fleet Decommissioning Quality Assurance Program Rev. 3 and Palisades Transitioning Quality Assurance Plan, Rev 02024-08-0202 August 2024 Update Report for Holtec Decommissioning International Fleet Decommissioning Quality Assurance Program Rev. 3 and Palisades Transitioning Quality Assurance Plan, Rev 0 ML24171A0122024-06-18018 June 2024 Reply to a Notice of Violation EA-24-037 ML24156A1162024-06-0404 June 2024 Correction - Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities IR 05000003/20240052024-05-21021 May 2024 And 3 - NRC Inspection Report Nos. 05000003/2024005, 05000247/2024005, 05000286/2024005, 07200051/2024001, and Notice of Violation ML24128A0632024-05-0707 May 2024 Submittal of 2023 Annual Radiological Environmental Operating Report L-24-009, HDI Annual Occupational Radiation Exposure Data Reports - 20232024-04-29029 April 2024 HDI Annual Occupational Radiation Exposure Data Reports - 2023 ML24116A2412024-04-25025 April 2024 Annual Environmental Protection Plan Report ML24114A2282024-04-23023 April 2024 Annual Radioactive Effluent Release Report L-24-007, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations – Holtec Decommissioning International, LLC (HDI)2024-03-29029 March 2024 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations – Holtec Decommissioning International, LLC (HDI) ML24080A1722024-03-20020 March 2024 Reply to a Notice of Violation EA-2024-010 IR 05000003/20240012024-03-20020 March 2024 NRC Inspection Report Nos. 05000003/2024001, 05000247/2024001, and 05000286/2024001 (Cover Letter Only) ML24045A0882024-02-22022 February 2024 Correction to the Technical Specifications to Reflect Appropriate Pages Removed and Retained by Previous License Amendments ML24053A0642024-02-22022 February 2024 2023 Annual Fitness for Duty Program Performance Data Report and Fatigue Management Program Data Report IR 05000003/20230042024-02-22022 February 2024 NRC Inspection Report Nos. 05000003/2023004, 05000247/2023004, 05000286/2023004, and 07200051/2023004 and Notice of Violation ML24011A1982024-01-12012 January 2024 ISFSI, Notice of Organization Change for Site Vice President ML23342A1082024-01-0909 January 2024 – Independent Spent Fuel Storage Installation Security Inspection Plan ML23353A1742023-12-19019 December 2023 ISFSI, Emergency Plan, Revision 23-04 L-23-019, Proof of Financial Protection 10 CFR 140.152023-12-18018 December 2023 Proof of Financial Protection 10 CFR 140.15 ML23326A1322023-12-0505 December 2023 Issuance of Amendment No. 67, 300 & 276 to Implement the Independent Spent Fuel Storage Installation Only Emergency Plan ML23339A0442023-12-0505 December 2023 Issuance of Amendment No. 68, 301 and 277 Regarding Changes to Implement the Independent Spent Fuel Storage Installation Physical Security Plan ML23338A2262023-12-0404 December 2023 Signed Amendment No. 27 to Indemnity Agreement No. B-19 ML23356A0212023-12-0101 December 2023 American Nuclear Insurers, Secondary Financial Protection (SFP) Program ML23242A2772023-11-30030 November 2023 NRC Letter Issuance - IP LAR for Units 2 and 3 Renewed Facility Licenses and PDTS to Reflect Permanent Removal of Spent Fuel from SFPs ML23338A0482023-11-30030 November 2023 ISFSI, Report of Changes to Physical Security, Training and Qualification, Safeguards Contingency Plan, and ISFSI Security Program, Revision 28 ML22339A1572023-11-27027 November 2023 Letter - Indian Point - Ea/Fonsi Request for Exemptions from Certain Emergency Planning Requirements for 10 CFR 50.47 and 10 CFR Part 50, Appendix E IR 05000003/20230032023-11-21021 November 2023 NRC Inspection Report Nos. 05000003/2023003, 05000247/2023003, 05000286/2023003, and 07200051/2023003 ML23100A1252023-11-17017 November 2023 Letter and Enclosure 1 - Issuance Indian Point Energy Center Units 1, 2, and 3 Exemption for Offsite Primary and Secondary Liability Insurance Indemnity Agreement ML23100A1172023-11-17017 November 2023 NRC Response - Indian Point Energy Center Generating Units 1, 2, and 3 Letter with Enclosures Regarding Changes to Remove the Cyber Security Plan License Condition ML23050A0032023-11-17017 November 2023 Letter - Issuance Indian Point Unit 2 License Amendment Request to Modify Tech Specs for Staffing Requirements Following Spent Fuel Transfer to Dry Storage ML23100A1432023-11-16016 November 2023 Letter - Issuance Indian Point Energy Center Generating Units 1, 2, and 3 Exemption Concerning Onsite Property Damage Insurance (Docket Nos. 50-003, 50-247, 50-286) L-23-012, Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point2023-11-13013 November 2023 Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point ML23064A0002023-11-13013 November 2023 NRC Issuance for Approval-Indian Point EC Units 1, 2 and 3 Emergency Plan and Emergency Action Level Scheme Amendments ML23306A0992023-11-0202 November 2023 And Indian Point Energy Center, Notification of Changes in Schedule in Accordance with 10 CFR 50.82(a)(7) ML23063A1432023-11-0101 November 2023 Letter - Issuance Holtec Request for Indian Point Energy Center Generating Units 1, 2, and 3 Exemptions from Certain Emergency Planning Requirements of 10 CFR 50.47 and Part 50 ML23292A0262023-10-19019 October 2023 LTR-23-0211-RI Thomas Congdon, Executive Deputy, Department of Public Service, Chair, Indian Point Decommissioning Oversight Board, Letter Independent Spent Fuel Storage Installation Inspection and Office of the Inspector General Report-RI ML23289A1582023-10-16016 October 2023 Decommissioning International - Registration of Spent Fuel Casks and Notification of Permanent Removal of All Indian Point Unit 3 Spent Fuel Assemblies from the Spent Fuel Pit ML23270A0082023-09-27027 September 2023 Registration of Spent Fuel Casks ML23237A5712023-09-22022 September 2023 09-22-2023 Letter to Dwaine Perry, Chief, Ramapo Munsee Nation, from Chair Hanson, Responds to Letter Regarding Opposition of the Release and Dumping of Radioactive Waste from Indian Point Nuclear Power Plant Into the Hudson River ML23242A2182023-09-12012 September 2023 IPEC – NRC Response to the Town of New Windsor, Ny Board Certified Motion Letter Regarding Treated Water Release from IP Site (Dockets 50-003, 50-247, 50-286) ML23250A0812023-09-0707 September 2023 Registration of Spent Fuel Casks ML23255A0142023-08-31031 August 2023 LTR-23-0211 Thomas Congdon, Executive Deputy, Department of Public Service, Chair, Indian Point Decommissioning Oversight Board, Letter Independent Spent Fuel Storage Installation Inspection and Office of the Inspector General Report IR 05000003/20230022023-08-22022 August 2023 NRC Inspection Report 05000003/2023002, 05000247/2023002, 05000286/2023002, and 07200051/2023002 ML23227A1852023-08-15015 August 2023 Request for a Revised Approval Date Regarding the Indian Point Energy Center Permanently Defueled Emergency Plan and Emergency Action Level Scheme ML23222A1442023-08-10010 August 2023 Registration of Spent Fuel Casks ML23208A1642023-07-26026 July 2023 Village of Croton-on-Hudson New York Letter Dated 7-26-23 Re Holtec Wastewater ML23200A0422023-07-19019 July 2023 Registration of Spent Fuel Casks ML23235A0602023-07-17017 July 2023 LTR-23-0194 Dwaine Perry, Chief, Ramapo Munsee Nation, Ltr Opposition of the Release and Dumping of Radioactive Waste from Indian Point Nuclear Power Plant Into the Hudson River 2024-09-18
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML23171B0442023-06-23023 June 2023 Enclosure - Indian Point Energy Center - Request for Additional Information for Independent Spent Fuel Storage Installation Facility-Only Emergency Plan License Amendment ML22292A2402022-10-21021 October 2022 RAIs for Master Dtf Agreement on IP1 IP2 10 18 2022 ML22103A2442022-04-13013 April 2022 Attachment - Request for Additional Information - License Amendment Request to Revise Emergency Plan and Emergency Action Level Scheme for Permanently Defueled Condition for Indian Point Energy Center ML22104A0352022-04-13013 April 2022 Request for Additional Information Related to Exemption Request from Emergency Planning Holtec Decommissioning International, LLC Indian Point Energy Center ML22006A0452022-01-0505 January 2022 PSDAR RAIs Final ML21337A2952021-12-0303 December 2021 Subsequent Request for Additional Information License Amendment Request to Revise Licensing Basis for New Auxiliary Lifting Device (E-mail Dated 12/3/2021) ML21183A1602021-06-30030 June 2021 Update Request for Additional Information - Indian Point Energy Center Quality Assurance Program Manual (06/30/2021 E-mail) ML21138A9412021-05-18018 May 2021 Request for Additional Information - Indian Point Energy Center Quality Assurance Program Manual (05/18/2021 E-mail) ML21112A2672021-04-22022 April 2021 Subsequent Request for Additional Information License Amendment Request to Revise Licensing Basis for New Auxiliary Lifting Device (Public Redacted Version) ML21019A5672021-01-19019 January 2021 Second Round Request for Additional Information License Amendment Request to Revise Licensing Basis for New Auxiliary Lifting Device ML21013A0152021-01-12012 January 2021 Draft Request for Additional Information (E-mail Dated 1/12/2021) License Amendment Request to Revise Licensing Basis for New Auxiliary Lifting Device ML20268C2352020-09-24024 September 2020 Request for Additional Information (E-mail Dated 9/24/20) License Amendment Request to Revise Licensing Basis for New Auxiliary Lifting Device ML20233B0152020-08-20020 August 2020 Request for Additional Information (E-mail Dated 8/20/20) License Amendment Request to Revise Licensing Basis for New Auxiliary Lifting Device ML20190A2342020-07-0808 July 2020 Request for Additional Information - Application for Order Consenting to Transfers of Control of Licenses (07/08/2020 E-mail) ML20190A1502020-06-25025 June 2020 (06/25/2020 E-mail) Draft Request for Additional Information Application for Order Consenting to Transfers of Control of Licenses ML20106F2492020-04-15015 April 2020 E-mail (04/15/2020) Request for Additional Information Exemption Request from 10 CFR Appendix R, Section Iii.H Due to COVID-19 Pandemic ML20070J7902020-03-10010 March 2020 Request for Information to Support Triennial Baseline Design-Basis Capability of Power-Operated Valves Inspection; Inspection Report 05000286/2020012 ML19045A6252019-02-14014 February 2019 Request for Additional Information - Proposed License Amendment Request Regarding Storage of Fresh and Spent Nuclear Fuel in the Spent Fuel Pool - 2/14/19 E-mail from R.Guzman to M.Mirzai NL-18-053, Response to Request for Additional Information Regarding Relief Request IP3-ISI-RR-11 for Reactor Vessel Weld Inservice Inspection Frequency Extension2018-07-18018 July 2018 Response to Request for Additional Information Regarding Relief Request IP3-ISI-RR-11 for Reactor Vessel Weld Inservice Inspection Frequency Extension ML18155A4842018-06-0404 June 2018 Request for Additional Information Regarding Relief Request IP3-ISI-RR-11, E-mail from R.Guzman to C.Mackaman ML18143B6792018-05-23023 May 2018 Request for Additional Information Regarding LAR for One-Time Extension of the Containment Leakage Rate Test - Email from R.Guzman to M.Mirzai ML18094B0922018-04-0505 April 2018 Enclosurequest for Additional Information (Letter to B. S. Ford RAI Regarding Entergy Operations, Inc.'S Decommissioning Funding Plan Update for ISFSI Docket Nos.: 72-43, 72-51, 72-1044, 72-07, 72-12, and 72-59) ML17296A2352017-10-23023 October 2017 Request for Additional Information -10/23/17 E-mail from R.Guzman to R.Louie Cyber Security Plan Milestone 8 Implementation Schedule (CAC Nos. MF9656, MF9657, MF9658; EPID: L-2017-LLA-0217) ML17277B5482017-10-0303 October 2017 Request for Additional Information - Relief Request IP2-ISI-RR-20 Regarding Weld Examination ML17219A1062017-08-10010 August 2017 Request for Additional Information Regarding Inter-Unit Transfer of Spent Fuel - Shielded Transfer Canister Requests for Additional Information ML17200A0852017-07-19019 July 2017 Request for Additional Information Regarding the Connection of Non-Seismic Boric Acid Recovery System to RWST Seismic Piping ML17197A0002017-07-17017 July 2017 Request for Additional Information Regarding Inter-Unit Transfer of Spent Fuel ML17170A2862017-06-27027 June 2017 RAI Set 2017-06 ML17103A4182017-04-25025 April 2017 Baffle Bolt Rais. Requests for Additional Information for the Review of the Indian Point License Renewal Application (TAC Nos. MD5407 and MD5408) ML17088A4052017-04-20020 April 2017 Requests for Additional Information for the Review of the Indian Point License Renewal Application RAI Set 2017-3 (CAC Nos. MD5407 and MD5408) ML17088A3272017-04-19019 April 2017 Requests for Additional Information for the Review of the Indian Point License Renewal Application RAI Set 2017-02 (CAC Nos. MD5407 and MD5408) ML17100A1282017-04-11011 April 2017 Supplemental Information Needed for Acceptance of Requested Licensing Action Amendment of Inter Unit Transfer of Spent Fuel ML17046A2312017-03-0808 March 2017 Request for Additional Information for the Review of the Indian Point License Renewal - Set 2017-01 ML16232A1192016-09-12012 September 2016 Request for Additional Information for the Review of the Indian Point Nuclear Generating Units Nos. 2 and 3, License Renewal Application Environmental Review - Severe Accident Mitigation Alternatives (CAC Nos. MD5411 and MD5412) ML16138A1942016-07-25025 July 2016 Request for Additional Information for the Review of License Renewal Application, Set 2016-01 ML16139A0302016-06-10010 June 2016 Request for Additional Information Regarding Conditional Exemption from End-of-Line Moderator Temperature Coefficient Measurement ML16112A2262016-04-26026 April 2016 Request for Additional Information Regarding Relief Request IP2-ISI-RR-02 Alternative Examination Volume Required by Code Case N-729-1 ML16041A5782016-02-18018 February 2016 Request for Additional Information Related to License Amendment Request Regarding Moderator Temperature Coefficient Measurement Change ML16005A6292016-01-14014 January 2016 Request for Additional Information Regarding Relief Request IP2-RR-19 ML16013A0642016-01-13013 January 2016 NRR E-mail Capture - Request for Additional Information Entergy CNRO-2015-00023 - Revision to Entergy Quality Assurance Program Manual (Fleet Submittal CAC Nos. MF7086-MF7097) ML15341A1662015-12-0707 December 2015 NRR E-mail Capture - Entergy Fleet RR-EN-15-1, Request for Additional Information (CACs MF6341-MF6349) ML15148A4032015-06-29029 June 2015 Request for Additional Information Regarding the Spent Fuel Pool Criticality Analysis ML15156B2742015-06-16016 June 2015 Request for Additional Information Regarding Request to Permanently Extend the Frequency of the Containment Integrated Leak Rate Test ML15125A0972015-05-0606 May 2015 Request for Additional Information Regarding License Amendment to Permanently Extend the Frequency of the Containment Integrated Leak Rate Test ML15071A1012015-05-0404 May 2015 Request for Additional Information for the Review of the Indian Point Nuclear Generating Unit Nos. 2 and 3, License Renewal Application, Set 2015-01 (TAC Nos. MD5407 and MD5408) ML15103A2592015-04-28028 April 2015 Request for Additional Information Regarding the Proposed License Amendment to Extend the Containment Type a Leak Rate Testing Frequency to 15 Years ML15104A5412015-04-22022 April 2015 Request for Additional Information for the Review of the Indian Point Nuclear Generating Unit Nos. 2 and 3, License Renewal Application Environmental Review (TAC Nos. MD5411 and MD5412) ML15072A4172015-03-17017 March 2015 Request for Additional Information Regarding Extension of the Containment Type a Leak Rate Testing Frequency to 15 Years ML14329B2452015-02-18018 February 2015 Request for Additional Information for the Review of the Indian Point Nuclear Generating Units 2 and 3, License Renewal Application Environmental Review (TAC Nos. MD5411 and MD5412) CNRO-2015-00008, Responses to NRC Request for Additional Information Regarding Change in Corporate Form of Entergy Nuclear Holding Company2015-02-18018 February 2015 Responses to NRC Request for Additional Information Regarding Change in Corporate Form of Entergy Nuclear Holding Company 2023-06-23
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 April 20, 2017 Mr. Anthony Vitale Site Vice-President, IPEC Entergy Nuclear Operations, Inc.
450 Broadway, GSB PO Box 249 Buchanan, NY 10511-0249
SUBJECT:
REQUESTS FOR ADDITIONAL INFORMATION FOR THE REVIEW OF THE INDIAN POINT LICENSE RENEWAL APPLICATION RAI SET 2017-03 (CAC NOS. MD5407 AND MD5408)
Dear Mr. Vitale:
By letter dated April 30, 2007, Entergy Nuclear Operations, Inc. submitted an application pursuant to Title 10 of the Code of Federal Regulations (10 CFR) Part 54, to renew the operating license DPR-26 and DPR-64 for Indian Point Nuclear Generating, Unit Nos. 2 and 3, for review by the U.S. Nuclear Regulatory Commission (NRC or the staff). The staff is reviewing the information contained in the license renewal application and has identified, in the enclosure, areas where additional information is needed to complete the review.
This request for additional information was discussed with Richard Burroni, and a mutually agreeable date for the response is within 30 days from the date of this letter. If you have any questions, please contact me at 301-415-6332 or e-mail william.burton@nrc.gov.
Sincerely,
/RA/
William Burton, Senior Project Manager Project Management and Guidance Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-247 and 50-286
Enclosure:
Requests for Additional Information cc w/encl: Listserv
ML17088A405 OFFICE LA:DLR PM:RPGB:DLR BC:RPGB:DLR PM: RSRG:DLR NAME YEdmonds WBurton SBloom WBurton DATE 3/29/17 4/11/17 4/20/17 4/20/17
INDIAN POINT LICENSE RENEWAL APPLICATION (LRA)
REQUESTS FOR ADDITIONAL INFORMATION (RAI)
RAI B.1.2-1
Background
Section 54.21(a)(3) of 10 CFR requires the applicant to demonstrate that the effects of aging for structures and components will be adequately managed so that the intended function(s) will be maintained consistent with the current licensing basis for the period of extended operation. As described in SRP-LR, an applicant may demonstrate compliance with 10 CFR 54.21(a)(3) by referencing the GALL Report and when evaluation of the matter in the GALL Report applies to the plant.
GALL Report AMP XI.M18 states:
Degradation of pressure boundary closure bolting due to crack initiation, loss of preload, or loss of material may result in leakage from the mating surfaces or joint connections of pressure boundary components. Periodic inspection of pressure boundary components for signs of leakage ensures that age-related degradation of closure bolting is detected and corrected before component leakage becomes excessive. Accordingly, pressure retaining bolted connections should be inspected at least once per refueling cycle.
LRA Section B.1.2 states that the Bolting Integrity Program includes periodic inspection of closure bolting for signs of leakage that may be due toloss of preload. However, from its review of the program implementing document during the onsite audit, the staff determined that the program did not appear to manage loss of preload. The staff identified this concern in Audit Items 241 and 270. In response to Audit Items 241 and 270, by letter dated December 18, 2007, the applicant stated that the program will manage loss of preload. The applicant revised LRA Table 3.4.1, Item 3.4.1-22, Table 3.3.1, Item 3.3.1-45, and Table 3.2.1, Item 3.2.1-24, to state the Bolting Integrity Program manages loss of preload for all bolting in the respective systems. In addition, the applicant revised Commitment #2 to state [t]he Bolting Integrity Program manages loss of preload and loss of material for all external bolting.
Issue It is not clear what methods will be used to detect leakage that would indicate loss of preload of closure bolting. If visual inspections will be used, the staff notes that while visual inspections would be capable of detecting leakage of liquid-filled systems, visual inspection may not be sufficient to detect leakage for air- or gas-filled systems.
LRA Table 3.3.2-4-IP2 (and IP3), Compressed Air System, is an example of a system that cites the Bolting Integrity Program to manage aging effects associated with closure bolting that could be or are air-filled or gas-filled. Based on a review of LRA Section B.1.2 and SER Section 3.0.3.2.2, Bolting Integrity, it is not clear how aging effects for closure bolting installed in air-filled or gas-filled systems will be effectively managed because in these systems there is typically limited or no visual signs of leakage.
Enclosure
Request
- 1. List the in-scope systems that have portions that are air-filled and gas-filled for which aging effects associated with closure bolting are being managed by the Bolting Integrity Program.
- 2. State how the aging effects will be managed.
- 3. State any enhancements to plant-specific procedures and/or to the Bolting Integrity Program necessary to incorporate how these aging effects are managed.