{{#Wiki_filter:UNITED STATES
{{#Wiki_filter:UNITED STATES
NUCLEAR REGULATORY COMMISSION
                            NUCLEAR REGULATORY COMMISSION
REGION I 2100 RENAISSANCE BLVD., Suite 100
                                                REGION I
KING OF PRUSSIA, PA 19406
                                  2100 RENAISSANCE BLVD., Suite 100
-2713 September 28, 2017
                                    KING OF PRUSSIA, PA 19406-2713
  Mr. Richard Bologna
                                        September 28, 2017
Site Vice President  
Mr. Richard Bologna
First Energy Nuclear Operating Company
Site Vice President
Beaver Valley Power Station
First Energy Nuclear Operating Company
P. O. Box 4
Beaver Valley Power Station
Shippingport, PA 15077
P. O. Box 4
-0004 SUBJECT: BEAVER VALLEY POWER STATION UNITS 1 AND 2  
Shippingport, PA 15077-0004
- INFORMATION
SUBJECT: BEAVER VALLEY POWER STATION UNITS 1 AND 2 - INFORMATION REQUEST
REQUEST FOR THE "CYBER
            FOR THE CYBER-SECURITY BASELINE INSPECTION NOTIFICATION TO
-SECURITY" BASELINE INSPECTION NOTIFICATION TO
            PERFORM INSPECTION 05000334/2018403 AND 05000412/2018403
PERFORM INSPECTION  
Dear Mr. Bologna:
05000334/2018403 AND 05000412/2018403
On January 29, 2018, the U.S. Nuclear Regulatory Commission (NRC) will begin a baseline
  Dear Mr. Bologna
inspection in accordance with Inspection Procedure (IP) 71130.10 Cyber-Security, issued
On January 29, 2018, the U.S. Nuclear Regulatory Commission (NRC) will begin  
May 15, 2017 at the Beaver Valley Power Station, Units 1 and 2. The inspection will be
a baseline inspection in accordance with Inspection Procedure (IP)
performed to evaluate and verify your ability to meet full implementation requirements of the
71130.10 "Cyber
NRCs Cyber-Security Rule, Title 10, Code of Federal Regulations (CFR), Part 73, Section 54,
-Security ," issued May 15, 2017 at the Beaver Valley Power Station, Units 1 and 2.
Protection of Digital Computer and Communication Systems and Networks. The onsite portion
  Th e inspection will be performed to evaluate and verify your ability to meet full implementation
of the inspection will take place during the weeks of January 29-February 2, 2018, and
requirements of the  
February 12-16, 2018. Experience has shown that baseline inspections are extremely resource
NRC's Cyber
intensive, both for the NRC inspectors and the licensee staff. In order to minimize the
-Security Rule, Title
inspection impact on the site and to ensure a productive inspection for both parties, we have
10, Code of Federal Regulations
enclosed a request for documents needed for the inspection. These documents have been
(CFR), Part
divided into four groups.
73, Section
The first group specifies information necessary to assist the inspection team in choosing the
54, "Protection of Digital Computer and Communication Systems and Networks."
focus areas (i.e., sample set) to be inspected by the cyber-security Inspection Procedure. This
  The onsite portion of the inspection will take place during the weeks of
information should be made available via compact disc and delivered to the regional office no
January 29
later than October 31, 2017. The inspection team will review this information and, by
-February 2, 2018
November 17, 2017, will request the specific items that should be provided for review.
, and February 12-16, 2018. Experience has shown that baseline inspections are extremely resource intensive, both for the NRC inspectors and the licensee staff. In order to minimize the inspection impact on the site and to ensure a productive inspection for both parties, we have enclosed a request for documents needed for the inspection. These documents have b
The second group of additional requested documents will assist the inspection team in the
een divided into four groups.
evaluation of the critical systems and critical digital assets (CSs/CDAs), defensive architecture,
The first group specifies information necessary to assist the inspection team in choosing the focus areas (i.e., "sample set"
and the areas of your stations Cyber-Security Program selected for the cyber-security
) to be inspected by
inspection. This information will be requested for review in the regional office prior to the
the cyber-security Inspection  
inspection by December 11, 2017.
Procedure. This information should be made available via compact disc and delivered to the regional office no later than October 31, 2017. The inspection team will review this information and, by November 17, 2017, will request the specific items that should be provided for review
The third group of requested documents consists of those items that the inspection team will
.
review, or need access to, during the inspection.
The second group of additional requested documents will assist the inspection team in the evaluation of the critical systems and critical digital assets (CSs/CDAs), defensive architecture, and the areas of your station's
Please have this information available by the first day of the onsite inspection,
Cyber-Security Program selected for the cyber
January 29, 2018.
-security inspection. This information will be requested for review in the regional office prior to the inspection by December 11, 2017. The third grou
 
p of requested documents consists of those items that the inspection team will review, or need access to, during the inspection.
R. Bologna                                         2
  Please have this information available by the first day of the onsite inspection, January 29, 2018.
The fourth group of information is necessary to aid the inspection team in tracking issues
R. Bologna
identified as a result of the inspection. It is requested that this information be provided to the
The four th group of information is necessary to aid the inspection team in tracking issues identified as a result of the inspection. It is requested that this information be provided to the
lead inspector as the information is generated during the inspection. It is important that all of
lead inspector as the information is generated during the inspection. It is important that all of these documents are up to date and complete in order to minimize the number of additional  
these documents are up to date and complete in order to minimize the number of additional
documents requested during the preparation and/or the onsite portions of the inspection.
documents requested during the preparation and/or the onsite portions of the inspection.
   
The lead inspector for this inspection is Mr. David Werkheiser. We understand that our
The lead inspector for this inspection is Mr. David Werkheiser. We understand that our regulatory contact for this inspection is Mr. David Wacker
regulatory contact for this inspection is Mr. David Wacker of your organization. If there are any
of your organization. If there are any questions about the inspection or the material requested, please contact the lead inspector at  
questions about the inspection or the material requested, please contact the lead inspector at
610-337-5316 or via e-mail at David.Werkheiser@nrc.gov.
This letter does not contain new or amended information collection requirements subject to the
Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection
requirements were approved by the Office of Management and Budget, control number
3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a
request for information or an information collection requirement unless the requesting document
displays a currently valid Office of Management and Budget control number.
This letter and its enclosure will be available for public inspection and copying at
http://www.nrc.gov/reading-rm/adams.html and at the NRCs Public Document Room in
accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.
                                                Sincerely,
                                                /RA/
                                                Glenn T. Dentel, Chief
                                                Engineering Branch 2
                                                Division of Reactor Safety
Docket Nos. 50-334 and 50-412
License Nos. DPR-66 and NPF-73
Enclosure:
Beaver Valley Power Station, Units 1 and 2
  Cyber-Security Inspection Document Request
cc w/encl: Distribution via ListServ


610-337-5316 or via e-mail at David.Werkheiser@nrc.gov
This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995
(44 U.S.C. 3501 et seq.).  Existing information collection requirements were approved by the Office of Management and Budget, control number
3150-0011.  The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control number.
  This letter and its enclosure will be available
for public inspection and copying at http://www.nrc.gov/readi
ng-rm/adams.html
and at the NRC
's Public Document Room in accordance with 10 CFR 2.390, "Public Inspections, Exemptions, Requests for Withholding."
  Sincerely, 
/RA/  Glenn T. Dentel , Chief  Engineering Branch
2 Division of Reactor Safety
  Docket Nos.
50-334 and 50-412 License Nos.
DPR-66 and NPF
-73  Enclosure: Beaver Valley Power Station, Units 1 and 2
  Cyber-Security Inspection Document Request
 
cc w/encl:
  Distribution via ListServ 


ML17271A066
  SUNSI Review                          Non-Sensitive                      Publicly Available
                                        Sensitive                          Non-Publicly Available
OFFICE        RI DRS              RI DRS
NAME          DWerkheiser/DW      GDentel/GD
DATE          09/28/17            09/28/17
                                 
                                BEAVER VALLEY POWER STATION
                    CYBER-SECURITY INSPECTION DOCUMENT REQUEST
Inspection Report:              05000334/2018403 and 05000412/2018403
Inspection Dates:              January 29 - February 2, 2018 and February 12 - 16, 2018
Inspection Procedure:          IP 71130.10, Cyber-Security, issue date May 15, 2017
Reference:                      Guidance Document for Development of the Request for
                                Information (RFI) and Notification Letter for Full-Implementation
                                of the Cyber - Security Inspection, issue date May 25, 2017
NRC Inspectors:                David Werkheiser, Lead                    Jeff Rady
                                (610) 337-5316                            (610) 337-5380
                                David.Werkheiser@nrc.gov                  Jeff.Rady@nrc.gov
NRC Contractors:                John Walley                              Frederick Priester
                                (301) 287-3717                            (301) 230-4590
                                John.Walley@nrc.gov                      Frederick.Priester@nrc.gov
I.      Information Requested for In-Office Preparation
The initial request for information (i.e., first RFI) concentrates on providing the inspection team
with the general information necessary to select appropriate components and Cyber-Security
Program (CSP) elements to develop a site-specific inspection plan.
The first RFI is used to identify the list of critical systems and critical digital assets (CSs/CDAs)
plus operational and management (O&M) security control portions of the CSP to be chosen as
the sample set required to be inspected by the cyber-security IP. The first RFIs requested
information is specified below in Table RFI #1.
The Table RFI #1 information is requested to be provided to the regional office by
October 31, 2017, or sooner, to facilitate the selection of the specific items that will be reviewed
during the onsite inspection weeks. The inspection team will examine the returned
documentation from the first RFI and identify/select specific systems and equipment
(e.g., CSs/CDAs) to provide a more focused follow-up request to develop the second RFI.
The inspection team will submit the specific systems and equipment list to your staff by
November 17, 2017, which will identify the specific systems and equipment that will be utilized
to evaluate the CSs/CDAs, defensive architecture, and the areas of the licensees CSP selected
for the cyber-security inspection. We request that the additional information provided from the
second RFI be made available to the regional office prior to the inspection by December 11,
2017. All requests for information shall follow the Table RFI #1 and the guidance document
referenced above. The required Table RFI #1 information shall be provided on compact disc
(CD) to the lead inspector by October 31, 2017. Please provide four copies of each CD
submitted (i.e., one for each inspector/contactor). The preferred file format for all lists is a
searchable Excel spreadsheet file on a CD. These CDs should be indexed and hyper-linked to
facilitate ease of use. If you have any questions regarding this information, please call the
inspection team leader as soon as possible.
                                                  1                                          Enclosure


    ML17271A066
                                    BEAVER VALLEY POWER STATION
  SUNSI Review
                        CYBER-SECURITY INSPECTION DOCUMENT REQUEST
  Non-Sensitive  Sensitive  Publicly Available
                                                      Table RFI #1
  Non-Publicly Available
      Reference Section 3               Paragraph Number / Title:                                 Items
  OFFICE RI DRS RI DRS    NAME DWerkheiser/
          1. List all Identified Critical Systems and Critical Digital Assets                   All
DW GDentel/GD    DATE 09/28/17 09/28/17   
          2. List CDA Facility and Site Ethernet - Transmission Control Protocol / Internet     All
BEAVER VALLEY POWER STATION CYBER-SECURITY INSPECTION DOCUMENT REQUEST
              Protocol (TCP/ IP) Based Local Area Networks (LANs) and identify those LANs that
1  Enclosure  Inspection Report
              have Non-CDAs on them
:  05000 334/2018 4 0 3 and 05000 412/2018 4 0 3  Inspection Dates
          3. List CDA Facility and Site Non-Ethernet TCP / IP Based LANs including those         All
:  January 29
              Industrial Networks and Identify LANs that have Non-CDAs on them
- February 2, 2018
          4. Network Topology Diagrams (Be sure to include all Network Intrusion Detection       All
and February 12
              Systems (NIDS) and Security Information and Event Management (SIEMS) for
- 16, 2018  Inspection Procedure
              Emergency Preparedness (EP) Networks and Security Level 3 and 4 Networks)
: IP 71130.10 , "Cyber-Security ," issue date May 15, 2017
          8. List all Network Security Boundary Devices for EP Networks and all Network Security All
  Reference:  Guidance Document for Development of the Request for
              Boundary Devices for Levels 3 and 4
    Information
          9. List CDA Wireless Industrial Networks                                               All
(RFI) and Notification Letter for Full
          11. NIDS Documentation for Critical Systems that have CDAs associated with them        11.a.1)
-Implementation
                                                                                                  11.a.2)
of the Cyber - Security Inspection
          12. SIEM Documentation for Critical Systems that have CDAs associated with them        12.a.1)
, issue date May 25, 2017
                                                                                                  12.a.2)
  NRC Inspectors
          14. List EP and Security Onsite and Offsite Digital Communication Systems             All
:  David Werkheiser, Lead
          25. Cyber-Security Assessment and Cyber-Security Incident Response Teams               All
  Jeff Rady    (610) 337-5316  (610) 337-5380    David.Werkheiser@nrc.gov
    In addition to the above information please provide the following:
  Jeff.Rady@nrc.gov
        1. Electronic copy of your current Cyber Security Plan.
  NRC Contractors
        2. Electronic copy of summary of changes (if any), including any 10 CFR 50.54p
:  John Walley
              analysis to support those changes, made to the originally approved Cyber Security
    Frederick Priester
              Plan.
    (301) 287-3717  (301) 230-4590    John.Walley@nrc.gov
        3. Electronic copy of a matrix that summarizes what controls are in place to satisfy the
  Frederick.Priester@nrc.gov
              controls required by Policies and Procedures.
  I. Information Requested for In
        4. Electronic copy of the Updated Final Safety Analysis Report and technical
-Office Preparation
              specifications.
  The initial request for information (i.e., first RFI) concentrates on providing the inspection team with the general information necessary to select appropriate components and Cyber-Security Program (CSP) elements to develop a site
        5. Name(s) and phone numbers for the regulatory and technical contacts.
-specific inspection plan.
        6. Current management and engineering organizational charts.
  The first RFI is used to identify the list of critical systems and critical digital assets (CSs/CDAs) plus operational and management (O&M) security control portions of the CSP to be chosen as the "sample set" required to be inspected
  Based on this information, the inspection team will identify and select specific systems and
by the cyber-security IP.
  equipment (e.g., CSs/CDAs) from the information requested by Table RFI #1 and submit a list
  The first RFI
  of specific systems and equipment to your staff by November 17, 2017, for the second RFI
's requested information is specified below in Table RFI #1.  The Table RFI #1 information is requested to be provided to the regional office
  (i.e., Table RFI #2).
by October 31 , 2017, or sooner, to facilitate the selection of the specific items that
II.       Additional Information Requested to be Available Prior to Inspection
will be reviewed during the onsite inspection weeks
As stated above, in Section I of this enclosure, the inspection team will examine the returned
.  The inspection team
documentation requested from Table RFI #1 and submit the list of specific systems and
will examin e the returned documentation from the first RFI
equipment to your staff by November 17, 2017, for the second RFI (i.e., RFI #2).
and identify/select specific systems and equipment
The second RFI will request additional information required to evaluate the CSs/CDAs,
(e.g., CSs/CDAs) to provide a more focused follow
defensive architecture, and the areas of your stations CSP selected for the cyber-security
-up request to develop the second RFI.  The inspection team will submit the specific systems and equipment
inspection. The additional information requested for the specific systems and equipment is
list to your staff by November 17, 2017, which will identify the specific systems and equipment tha
identified in Table RFI #2. All requested information shall follow the Table RFI #2 and the
t will be utilized to evaluate the CSs/CDAs, defensive architecture, and the areas of the licensee's CSP selected for the cyber
guidance document referenced above.
-security inspection.  We request that the additional information provided from the second RFI be made available to the regional office prior to the inspection by December 11 , 2017.  All requests for information shall follow the Table RFI #1 and the guidance document referenced above.
                                                    2
  The required Table
 
RFI #1 information shall be provided on compact disc (CD) to the lead inspector by October 31, 2017.  Please provide four copies of each CD submitted (i.e., one for each inspector/contactor).  The preferred file format for all lists is a searchable Excel spreadsheet file on a CD.  These CDs should be indexed and hyper
                                BEAVER VALLEY POWER STATION
-linked to facilitate ease of use.  If you have any questions regarding this information, please call the inspection team leader as soon as possible.
                    CYBER-SECURITY INSPECTION DOCUMENT REQUEST
BEAVER VALLEY POWER STATION CYBER-SECURITY INSPECTION DOCUMENT REQUEST
The Table RFI #2 information shall be provided on CD to the lead inspector by
Table RFI #1
December 11, 2017. Please provide four copies of each CD submitted (i.e., one for each
Reference Section 3             Paragraph Number / Title:                                  
inspector/contactor). The preferred file format for all lists is a searchable Excel spreadsheet file
                       
on a CD. These CDs should be indexed and hyper-linked to facilitate ease of use. If you have
Items  1. List all Identified Critical Systems and Critical Digital Assets
any questions regarding this information, please call the inspection team leader as soon as
All 2. List CDA Facility and Site Ethernet  
possible.
- Transmission  
                                            Table RFI #2
Control Protocol / Internet
  Section 3             Paragraph Number / Title:                                         Items
Protocol (TCP/
    5. Plant Computer System Block Diagram (If Plant Computer System is selected for
IP) Based Local Area Networks (LANs) and identify those LANs that have Non-CDAs on t hem All 3. List CDA Facility and Site Non
                                                                                              All
-Ethernet TCP / IP Based LANs including those Industrial Networks and Identify LANs that have Non
        Inspection)
-CDAs on them All 4. Network Topology Diagrams (Be sure to include all Network Intrusion Detection Systems (NIDS) and Security Information and Event Management (SIEMS)  
    6. Plant Security System Block Diagram (if Security Computer System is selected for
for Emergency Preparedness (EP) Networks and Security Level 3 and 4 Networks)
                                                                                              All
All 8. List all Network Security Boundary Devi
        Inspection)
c es for EP Networks and all Network Security Boundary Devices for Levels 3 and 4
    7. Systems that are Distributed Block Diagrams (For Systems selected for Inspection)
All 9. List CDA Wireless Industrial Networks
                                                                                              All
All 11. NIDS Documentation for Critical Systems that have CDAs associated with t
    10. Host-Based Intrusion Detection System Documentation (for CDAs for Systems           10.a.1)
hem 11.a.1) 11.a.2) 12. SIEM Documentation for Critical Systems that have CDAs
        selected for Inspection)                                                            10.a.2)
associated with t
    13. List all Maintenance and Test Equipment used on CDAs for Systems Selected for
hem 12.a.1) 12.a.2) 14. List EP and Security Onsite and Offsite Digital Communication Systems
                                                                                              All
All  25. Cyber-Security Assessment and Cyber-Security Incident Response Teams
        Inspection
All  In addition to the above information please provide the following:
    15. Configuration Management
  1. Electronic copy of your current Cyber Security Plan.
                                                                                              All
2. Electronic copy of summary of changes (if any), including any 10 CFR 50.54p analysis to support those changes, made to the originally approved Cyber Security Plan. 3. Electronic copy of a matrix that summarizes what controls are in place to satisfy the controls required by Policies and Procedures.
    16. Supply Chain Management                                                             16.a.)
4. Electronic copy of the Updated Final Safety Analysis Report and technical specifications.
                                                                                            16.b.1)
5. Name(s) and phone numbers for the regulatory and technical contacts.
                                                                                            16.b.5)
6. Current management and engineering organizational chart
                                                                                            16.b.6)
s.  Based on th is information, the inspection team will identify and select specific systems and equipment (e.g., CSs/CDAs) from the information requested by Table RF I #1 and submit  
    17. Portable Media and Mobile Device Control
a list of specific systems and equipment
                                                                                              All
to your staff by November 17, 2017, for the second RFI
    18. Software Management
(i.e., Table RFI #2). II. Additional Information Requested to be Available Prior to Inspection
                                                                                              All
  As stated above, in Sectio n I of this enclosure , th e inspection team
    20. Vendor Access and Monitoring
will examin e the returned documentation requested from Table RFI #1 and submit the list of specific systems and equipment to your staff by November 17, 2017
                                                                                              All
, for the second RFI (i.e., RFI #2).   The second RFI will request additional
    21. Work Control
information required to evaluate the CSs
                                                                                              All
/CDAs, defensive architecture, and the areas of your station's
    22. Device access and Key Control
CSP selected for the cyber
                                                                                              All
-security inspection. The additional information requested for the specific systems and equipment
    23. Password / Authenticator Policy
is identified in Table
                                                                                              All
RFI #2. All requested information shall follow the Table RFI #2 and the guidance document referenced above.
    24. User Account / Credential Policy
 
                                                                                              All
BEAVER VALLEY POWER STATION CYBER-SECURITY INSPECTION DOCUMENT REQUEST
    26. Corrective Actions Since Last NRC Inspection
The Table RFI #2 information shall be provided on CD to the lead inspector by December 11, 2017. Please provide four copies of each CD submitted (i.e., one for each inspector/contactor). The preferred file format for all lists is a searchable Excel spreadsheet file  
                                                                                              All
on a CD. These CDs should be indexed and hyper
-linked to facilitate
ease of use. If you have any questions regarding this information, please call the inspection team leader as soon as possible. Table RFI #2
  Section 3                   Paragraph Number
/ Title:                                                                         Items 5. Plant Computer System Block Diagram (If Plant Computer System is  
selected for Inspection)
All 6. Plant Security System Block Diagram (if Security Computer System is  
selected for Inspection)
All 7. Systems that are Distributed Block Diagrams (For Systems selected for Inspection)
  All 10. Host-Based Intrusion Detection System Documentation (for CDAs for Systems  
selected for Inspection)
10.a.1) 10.a.2) 13. List all Maintenance and Test Equipment used on CDAs for Systems Selected for Inspection
All 15. Configuration Management
  All 16. Supply Chain Management
16.a.) 16.b.1) 16.b.5) 16.b.6) 17. Portable Media and Mobile Device Control
  All 18. Software Management
  All 20. Vendor Access and Monitoring
  All 21. Work Control
  All 22. Device access and Key Control
  All 23. Password / Authenticator Policy
  All 24. User Account / Credential Policy
  All 26. Corrective Actions Since Last NRC Inspection
  All
In addition to the above information please provide the following:
In addition to the above information please provide the following:
  The documented CSP assessment and analysis for each CDA in each of the selected system s.  
    *  The documented CSP assessment and analysis for each CDA in each of the selected
BEAVER VALLEY POWER STATION CYBER-SECURITY INSPECTION DOCUMENT REQUEST
        systems.
III. Information Requested to be Available on First Day of Inspection
                                                  3
  For the specific systems and equipment identified in this enclosure's Section II., provide the following RFI (i.e., Table 1 ST Week Onsite
 
) on a CD by January 29, 2018 , the first day of the inspection
                                  BEAVER VALLEY POWER STATION
. All requested information shall follow the
                    CYBER-SECURITY INSPECTION DOCUMENT REQUEST
Table 1 ST Week Onsite and the
III.     Information Requested to be Available on First Day of Inspection
guidance document referenced above.
For the specific systems and equipment identified in this enclosures Section II., provide the
  Please provide four copies of each CD submitted (i.e., one for each inspector/contactor). The preferred file format for all lists is a searchable Excel spreadsheet file on a  
following RFI (i.e., Table 1ST Week Onsite) on a CD by January 29, 2018, the first day of the
CD. These CDs should be indexed and hyper
inspection. All requested information shall follow the Table 1ST Week Onsite and the guidance
-linked to facilitate ease of use. If you have any questions regarding this information, please call the inspection team leader as soon as possible.
document referenced above.
  Table 1 ST Week Onsite
Please provide four copies of each CD submitted (i.e., one for each inspector/contactor). The
Section 3               Paragraph Number
preferred file format for all lists is a searchable Excel spreadsheet file on a CD. These CDs
/ Title: Items 10. Host-Based Intrusion Detection System Documentation for CDAs for Systems selected for inspection
should be indexed and hyper-linked to facilitate ease of use. If you have any questions
  10.a.3)   thru 10.a.12) 11. NIDS Documentation for Critical Systems that have CDAs associated with them
regarding this information, please call the inspection team leader as soon as possible.
  11.a.3)   thru 11.a.15) 12. SIEM Documentation for Critical Systems that have CDAs associated with them  
                                          Table 1ST Week Onsite
  12.a.3)   thru 12.a.14) 16. Supply Chain Management
  Section 3           Paragraph Number / Title:                                       Items
  16.b.2) 16.b.3) 16.b.4) 19. Cyber-Security Event Notifications
    10. Host-Based Intrusion Detection System Documentation for CDAs for Systems     10.a.3)
All  In addition to the above information please provide the following:
        selected for inspection                                                         thru
 
                                                                                      10.a.12)
1. Copies of the
                                                                                      11.a.3)
following documents do not need to be solely available to the inspection team as long as the inspectors have easy and unrestrained access to
    11. NIDS Documentation for Critical Systems that have CDAs associated with them
them. a. Original Final Safety Analysis Report Volumes; b. Original Safety Evaluation Report and Supplements;
                                                                                          thru
c. Final Safety Analysis Report Question and Answers;
                                                                                      11.a.15)
d. Quality Assurance (QA) Plan; e. Latest Individual Plant Examination for External Events / Probabilistic Risk Assessment Report; and f. Vendor Manuals
                                                                                      12.a.3)
 
    12. SIEM Documentation for Critical Systems that have CDAs associated with them
2. Assessment and Corrective Actions:
                                                                                          thru
  a. The most recent Cyber-Security QA audit and/or self
                                                                                      12.a.14)
-assessment; and
                                                                                      16.b.2)
  b. Corrective action documents (e.g., condition reports, including status of corrective actions) generate
    16. Supply Chain Management
d as a result of the most recent Cyber-Security QA audit and/or self-assessment.
                                                                                      16.b.3)
   
                                                                                      16.b.4)
BEAVER VALLEY POWER STATION CYBER-SECURITY INSPECTION DOCUMENT REQUEST
                                                                                      All
5  I V. Information Requested To Be Provided Throughout the Inspection
    19. Cyber-Security Event Notifications
  1. Copies of any corrective action documents generated as a result of the inspection team's questions or queries during th
In addition to the above information please provide the following:
e inspection.
1.       Copies of the following documents do not need to be solely available to the inspection
  2. Copies of the list of questions submitted by the inspection team members and the status/resolution of the information requested (provide
        team as long as the inspectors have easy and unrestrained access to them.
d daily during the inspection to each inspection team member).
        a. Original Final Safety Analysis Report Volumes;
  If you have any questions regarding the information requested, please contact the inspection  
        b. Original Safety Evaluation Report and Supplements;
        c. Final Safety Analysis Report Question and Answers;
        d. Quality Assurance (QA) Plan;
        e. Latest Individual Plant Examination for External Events / Probabilistic Risk
            Assessment Report; and
        f. Vendor Manuals
2.       Assessment and Corrective Actions:
        a. The most recent Cyber-Security QA audit and/or self-assessment; and
        b. Corrective action documents (e.g., condition reports, including status of corrective
            actions) generated as a result of the most recent Cyber-Security QA audit and/or
            self-assessment.
                                                    4
 
                              BEAVER VALLEY POWER STATION
                    CYBER-SECURITY INSPECTION DOCUMENT REQUEST
IV.     Information Requested To Be Provided Throughout the Inspection
        1. Copies of any corrective action documents generated as a result of the inspection
            teams questions or queries during the inspection.
        2. Copies of the list of questions submitted by the inspection team members and the
            status/resolution of the information requested (provided daily during the inspection to
            each inspection team member).
If you have any questions regarding the information requested, please contact the inspection
team leader.
team leader.
                                                  5
}}
}}

Latest revision as of 17:00, 29 October 2019

Information Request for the Cyber Security Baseline Inspection Notification to Perform Inspection 05000334/2018403 and 05000412/2018403
ML17271A066
Person / Time
Site: Beaver Valley
Issue date: 09/28/2017
From: Glenn Dentel
Engineering Region 1 Branch 2
To: Bologna R
FirstEnergy Nuclear Operating Co
Werkheiser D
References
IR 2017403
Download: ML17271A066 (8)


See also: IR 05000334/2018403

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION I

2100 RENAISSANCE BLVD., Suite 100

KING OF PRUSSIA, PA 19406-2713

September 28, 2017

Mr. Richard Bologna

Site Vice President

First Energy Nuclear Operating Company

Beaver Valley Power Station

P. O. Box 4

Shippingport, PA 15077-0004

SUBJECT: BEAVER VALLEY POWER STATION UNITS 1 AND 2 - INFORMATION REQUEST

FOR THE CYBER-SECURITY BASELINE INSPECTION NOTIFICATION TO

PERFORM INSPECTION 05000334/2018403 AND 05000412/2018403

Dear Mr. Bologna:

On January 29, 2018, the U.S. Nuclear Regulatory Commission (NRC) will begin a baseline

inspection in accordance with Inspection Procedure (IP) 71130.10 Cyber-Security, issued

May 15, 2017 at the Beaver Valley Power Station, Units 1 and 2. The inspection will be

performed to evaluate and verify your ability to meet full implementation requirements of the

NRCs Cyber-Security Rule, Title 10, Code of Federal Regulations (CFR), Part 73, Section 54,

Protection of Digital Computer and Communication Systems and Networks. The onsite portion

of the inspection will take place during the weeks of January 29-February 2, 2018, and

February 12-16, 2018. Experience has shown that baseline inspections are extremely resource

intensive, both for the NRC inspectors and the licensee staff. In order to minimize the

inspection impact on the site and to ensure a productive inspection for both parties, we have

enclosed a request for documents needed for the inspection. These documents have been

divided into four groups.

The first group specifies information necessary to assist the inspection team in choosing the

focus areas (i.e., sample set) to be inspected by the cyber-security Inspection Procedure. This

information should be made available via compact disc and delivered to the regional office no

later than October 31, 2017. The inspection team will review this information and, by

November 17, 2017, will request the specific items that should be provided for review.

The second group of additional requested documents will assist the inspection team in the

evaluation of the critical systems and critical digital assets (CSs/CDAs), defensive architecture,

and the areas of your stations Cyber-Security Program selected for the cyber-security

inspection. This information will be requested for review in the regional office prior to the

inspection by December 11, 2017.

The third group of requested documents consists of those items that the inspection team will

review, or need access to, during the inspection.

Please have this information available by the first day of the onsite inspection,

January 29, 2018.

R. Bologna 2

The fourth group of information is necessary to aid the inspection team in tracking issues

identified as a result of the inspection. It is requested that this information be provided to the

lead inspector as the information is generated during the inspection. It is important that all of

these documents are up to date and complete in order to minimize the number of additional

documents requested during the preparation and/or the onsite portions of the inspection.

The lead inspector for this inspection is Mr. David Werkheiser. We understand that our

regulatory contact for this inspection is Mr. David Wacker of your organization. If there are any

questions about the inspection or the material requested, please contact the lead inspector at

610-337-5316 or via e-mail at David.Werkheiser@nrc.gov.

This letter does not contain new or amended information collection requirements subject to the

Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection

requirements were approved by the Office of Management and Budget, control number

3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a

request for information or an information collection requirement unless the requesting document

displays a currently valid Office of Management and Budget control number.

This letter and its enclosure will be available for public inspection and copying at

http://www.nrc.gov/reading-rm/adams.html and at the NRCs Public Document Room in

accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

/RA/

Glenn T. Dentel, Chief

Engineering Branch 2

Division of Reactor Safety

Docket Nos. 50-334 and 50-412

License Nos. DPR-66 and NPF-73

Enclosure:

Beaver Valley Power Station, Units 1 and 2

Cyber-Security Inspection Document Request

cc w/encl: Distribution via ListServ

ML17271A066

SUNSI Review Non-Sensitive Publicly Available

Sensitive Non-Publicly Available

OFFICE RI DRS RI DRS

NAME DWerkheiser/DW GDentel/GD

DATE 09/28/17 09/28/17

BEAVER VALLEY POWER STATION

CYBER-SECURITY INSPECTION DOCUMENT REQUEST

Inspection Report: 05000334/2018403 and 05000412/2018403

Inspection Dates: January 29 - February 2, 2018 and February 12 - 16, 2018

Inspection Procedure: IP 71130.10, Cyber-Security, issue date May 15, 2017

Reference: Guidance Document for Development of the Request for

Information (RFI) and Notification Letter for Full-Implementation

of the Cyber - Security Inspection, issue date May 25, 2017

NRC Inspectors: David Werkheiser, Lead Jeff Rady

(610) 337-5316 (610) 337-5380

David.Werkheiser@nrc.gov Jeff.Rady@nrc.gov

NRC Contractors: John Walley Frederick Priester

(301) 287-3717 (301) 230-4590

John.Walley@nrc.gov Frederick.Priester@nrc.gov

I. Information Requested for In-Office Preparation

The initial request for information (i.e., first RFI) concentrates on providing the inspection team

with the general information necessary to select appropriate components and Cyber-Security

Program (CSP) elements to develop a site-specific inspection plan.

The first RFI is used to identify the list of critical systems and critical digital assets (CSs/CDAs)

plus operational and management (O&M) security control portions of the CSP to be chosen as

the sample set required to be inspected by the cyber-security IP. The first RFIs requested

information is specified below in Table RFI #1.

The Table RFI #1 information is requested to be provided to the regional office by

October 31, 2017, or sooner, to facilitate the selection of the specific items that will be reviewed

during the onsite inspection weeks. The inspection team will examine the returned

documentation from the first RFI and identify/select specific systems and equipment

(e.g., CSs/CDAs) to provide a more focused follow-up request to develop the second RFI.

The inspection team will submit the specific systems and equipment list to your staff by

November 17, 2017, which will identify the specific systems and equipment that will be utilized

to evaluate the CSs/CDAs, defensive architecture, and the areas of the licensees CSP selected

for the cyber-security inspection. We request that the additional information provided from the

second RFI be made available to the regional office prior to the inspection by December 11,

2017. All requests for information shall follow the Table RFI #1 and the guidance document

referenced above. The required Table RFI #1 information shall be provided on compact disc

(CD) to the lead inspector by October 31, 2017. Please provide four copies of each CD

submitted (i.e., one for each inspector/contactor). The preferred file format for all lists is a

searchable Excel spreadsheet file on a CD. These CDs should be indexed and hyper-linked to

facilitate ease of use. If you have any questions regarding this information, please call the

inspection team leader as soon as possible.

1 Enclosure

BEAVER VALLEY POWER STATION

CYBER-SECURITY INSPECTION DOCUMENT REQUEST

Table RFI #1

Reference Section 3 Paragraph Number / Title: Items

1. List all Identified Critical Systems and Critical Digital Assets All

2. List CDA Facility and Site Ethernet - Transmission Control Protocol / Internet All

Protocol (TCP/ IP) Based Local Area Networks (LANs) and identify those LANs that

have Non-CDAs on them

3. List CDA Facility and Site Non-Ethernet TCP / IP Based LANs including those All

Industrial Networks and Identify LANs that have Non-CDAs on them

4. Network Topology Diagrams (Be sure to include all Network Intrusion Detection All

Systems (NIDS) and Security Information and Event Management (SIEMS) for

Emergency Preparedness (EP) Networks and Security Level 3 and 4 Networks)

8. List all Network Security Boundary Devices for EP Networks and all Network Security All

Boundary Devices for Levels 3 and 4

9. List CDA Wireless Industrial Networks All

11. NIDS Documentation for Critical Systems that have CDAs associated with them 11.a.1)

11.a.2)

12. SIEM Documentation for Critical Systems that have CDAs associated with them 12.a.1)

12.a.2)

14. List EP and Security Onsite and Offsite Digital Communication Systems All

25. Cyber-Security Assessment and Cyber-Security Incident Response Teams All

In addition to the above information please provide the following:

1. Electronic copy of your current Cyber Security Plan.

2. Electronic copy of summary of changes (if any), including any 10 CFR 50.54p

analysis to support those changes, made to the originally approved Cyber Security

Plan.

3. Electronic copy of a matrix that summarizes what controls are in place to satisfy the

controls required by Policies and Procedures.

4. Electronic copy of the Updated Final Safety Analysis Report and technical

specifications.

5. Name(s) and phone numbers for the regulatory and technical contacts.

6. Current management and engineering organizational charts.

Based on this information, the inspection team will identify and select specific systems and

equipment (e.g., CSs/CDAs) from the information requested by Table RFI #1 and submit a list

of specific systems and equipment to your staff by November 17, 2017, for the second RFI

(i.e., Table RFI #2).

II. Additional Information Requested to be Available Prior to Inspection

As stated above, in Section I of this enclosure, the inspection team will examine the returned

documentation requested from Table RFI #1 and submit the list of specific systems and

equipment to your staff by November 17, 2017, for the second RFI (i.e., RFI #2).

The second RFI will request additional information required to evaluate the CSs/CDAs,

defensive architecture, and the areas of your stations CSP selected for the cyber-security

inspection. The additional information requested for the specific systems and equipment is

identified in Table RFI #2. All requested information shall follow the Table RFI #2 and the

guidance document referenced above.

2

BEAVER VALLEY POWER STATION

CYBER-SECURITY INSPECTION DOCUMENT REQUEST

The Table RFI #2 information shall be provided on CD to the lead inspector by

December 11, 2017. Please provide four copies of each CD submitted (i.e., one for each

inspector/contactor). The preferred file format for all lists is a searchable Excel spreadsheet file

on a CD. These CDs should be indexed and hyper-linked to facilitate ease of use. If you have

any questions regarding this information, please call the inspection team leader as soon as

possible.

Table RFI #2

Section 3 Paragraph Number / Title: Items

5. Plant Computer System Block Diagram (If Plant Computer System is selected for

All

Inspection)

6. Plant Security System Block Diagram (if Security Computer System is selected for

All

Inspection)

7. Systems that are Distributed Block Diagrams (For Systems selected for Inspection)

All

10. Host-Based Intrusion Detection System Documentation (for CDAs for Systems 10.a.1)

selected for Inspection) 10.a.2)

13. List all Maintenance and Test Equipment used on CDAs for Systems Selected for

All

Inspection

15. Configuration Management

All

16. Supply Chain Management 16.a.)

16.b.1)

16.b.5)

16.b.6)

17. Portable Media and Mobile Device Control

All

18. Software Management

All

20. Vendor Access and Monitoring

All

21. Work Control

All

22. Device access and Key Control

All

23. Password / Authenticator Policy

All

24. User Account / Credential Policy

All

26. Corrective Actions Since Last NRC Inspection

All

In addition to the above information please provide the following:

  • The documented CSP assessment and analysis for each CDA in each of the selected

systems.

3

BEAVER VALLEY POWER STATION

CYBER-SECURITY INSPECTION DOCUMENT REQUEST

III. Information Requested to be Available on First Day of Inspection

For the specific systems and equipment identified in this enclosuresSection II., provide the

following RFI (i.e., Table 1ST Week Onsite) on a CD by January 29, 2018, the first day of the

inspection. All requested information shall follow the Table 1ST Week Onsite and the guidance

document referenced above.

Please provide four copies of each CD submitted (i.e., one for each inspector/contactor). The

preferred file format for all lists is a searchable Excel spreadsheet file on a CD. These CDs

should be indexed and hyper-linked to facilitate ease of use. If you have any questions

regarding this information, please call the inspection team leader as soon as possible.

Table 1ST Week Onsite

Section 3 Paragraph Number / Title: Items

10. Host-Based Intrusion Detection System Documentation for CDAs for Systems 10.a.3)

selected for inspection thru

10.a.12)

11.a.3)

11. NIDS Documentation for Critical Systems that have CDAs associated with them

thru

11.a.15)

12.a.3)

12. SIEM Documentation for Critical Systems that have CDAs associated with them

thru

12.a.14)

16.b.2)

16. Supply Chain Management

16.b.3)

16.b.4)

All

19. Cyber-Security Event Notifications

In addition to the above information please provide the following:

1. Copies of the following documents do not need to be solely available to the inspection

team as long as the inspectors have easy and unrestrained access to them.

a. Original Final Safety Analysis Report Volumes;

b. Original Safety Evaluation Report and Supplements;

c. Final Safety Analysis Report Question and Answers;

d. Quality Assurance (QA) Plan;

e. Latest Individual Plant Examination for External Events / Probabilistic Risk

Assessment Report; and

f. Vendor Manuals

2. Assessment and Corrective Actions:

a. The most recent Cyber-Security QA audit and/or self-assessment; and

b. Corrective action documents (e.g., condition reports, including status of corrective

actions) generated as a result of the most recent Cyber-Security QA audit and/or

self-assessment.

4

BEAVER VALLEY POWER STATION

CYBER-SECURITY INSPECTION DOCUMENT REQUEST

IV. Information Requested To Be Provided Throughout the Inspection

1. Copies of any corrective action documents generated as a result of the inspection

teams questions or queries during the inspection.

2. Copies of the list of questions submitted by the inspection team members and the

status/resolution of the information requested (provided daily during the inspection to

each inspection team member).

If you have any questions regarding the information requested, please contact the inspection

team leader.

5