ML17307A283: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(5 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML17307A283
| number = ML17307A283
| issue date = 11/03/2017
| issue date = 11/03/2017
| title = Sequoyah, Units 1 and 2 - Updated Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations
| title = Updated Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations
| author name = Williams A L
| author name = Williams A
| author affiliation = Tennessee Valley Authority
| author affiliation = Tennessee Valley Authority
| addressee name =  
| addressee name =  
Line 14: Line 14:
| page count = 4
| page count = 4
}}
}}
See also: [[followed by::RIS 2017-03]]


=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter:Tennessee Valley Authority, Sequoyah Nuclear Plant, P.O. Box 2000, Soddy Daisy, Tennessee 37384 November 3, 2017 10CFR50.4 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Sequoyah Nuclear Plant, Units 1 and 2 Renewed Facility Operating License Nos. DPR-77 and DPR-79 NRC Docket Nos. 50-327 and 50-328
}}
 
==Subject:==
Updated Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations
 
==Reference:==
: 1. NRC Regulatory Issue Summary 2017-03, "Preparation and Scheduling of Operator Licensing Examinations," dated April 5, 2017
: 2. TVA letter to NRC, "Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations," dated May 4, 2017 Nuclear Regulatory Commission's (NRC) Regulatory Issue Summary (RIS) 2017-03 (Reference 1) requested specific information regarding the Sequoyah Nuclear Plant's (SQN) projected operator licensing examination schedules and the estimated number of applicants.
The enclosure to this letter provides updated information to addresses the NRC's request and provides an estimate of the examination requirements for SQN on NRC Form 536, "Operator Licensing Examination Data." The information provided in this enclosure updates the information previously provided in Reference 2.
There are no commitments contained in this submittal. Should you require additional information regarding this matter, please contact Mr. Michael McBrearty, SQN Licensing Manager at (423)843-7170.
SincerelyT) nthony L. Williams Site Vice President Sequoyah Nuclear Plant
 
==Enclosure:==
NRC Form 536, Operator Licensing Examination Data printed on recycled paper
 
U.S. Nuclear Regulatory Commission Page 2 November 3, 2017 cc (Enclosure)
NRC Regional Administrator - Region II NRC Senior Resident Inspector - Sequoyah Nuclear Plant
 
ENCLOSURE NRC Form 536 Operator Licensing Examination Data Tennessee Valley Authority Sequoyah Nuclear Plant NRC Docket Nos. 50-327 and 50-328
 
NRC FORM 536            U. S. NUCLEAR REGULATORY COMMISSION  APPROVED BY OMB: NO. 3150-0131                                        EXPIRES: 10/31/2017 (05-2016)
Estimated burdenper responseto comply with thisvoluntary information collection request:1 hour. This
            *\a#*<<          OPERATOR LICENSING information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden estimate to the FOIA, Privacy, and Information Collections Branch (T-5 VBfW                EXAMINATION DATA                F53), U.S. Nuclear Regulatory Commission, Washington, DC20555-0001, or by e-mail to lnfocoilects.Resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503. Ifa means
              *****                                            used to imposean information collection does not display a currently valid OMB control number, the NRC maynotconduct or sponsor, and a personis hotrequired to respond to,the information collection.
FACILITY                                                                                                  NRC REGION Sequoyah Unit 1 and Unit 2                                                                                Region II A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER              CY    18            CY    19                                CY 20                                    CY 21 ESTIMATED NUMBER OF LICENSEE-PREPARED                  0                    0                                          1                                        0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED                  0                    0                                        0                                        0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAM I NATIONS PROPOSED NUMBER              CY    18            CY  19                            CY 20                                    CY 21 NUMBER OF REACTOR OPERATORS 0                    0                                        10                                        0 NUMBER OF SENIOR REACTOR OPERATORS - INSTANT 0                    0                                        5                                        0 NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE 0                    0                                        3                                        0 NUMBER OF SENIOR REACTOR OPERATORS - LIMITED 0                    0                                        0                                        0 PROPOSED DATES PRIMARY DATE                N/A                  N/A                                  Mar 2020                                      N/A ALTERNATE DATE                N/A                  N/A                                  Apr 2020                                      N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED CY      18                                                        CY        20 NUMBER MARCH                SEPTEMBER                          MARCH                                        SEPTEMBER ESTIMATED NUMBER OF                                      15                                                                                    15 CANDIDATES NRC FORM 536 (05-2016)}}

Latest revision as of 10:01, 29 October 2019

Updated Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations
ML17307A283
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 11/03/2017
From: Anthony Williams
Tennessee Valley Authority
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
RIS-17-003
Download: ML17307A283 (4)


Text

Tennessee Valley Authority, Sequoyah Nuclear Plant, P.O. Box 2000, Soddy Daisy, Tennessee 37384 November 3, 2017 10CFR50.4 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Sequoyah Nuclear Plant, Units 1 and 2 Renewed Facility Operating License Nos. DPR-77 and DPR-79 NRC Docket Nos. 50-327 and 50-328

Subject:

Updated Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations

Reference:

1. NRC Regulatory Issue Summary 2017-03, "Preparation and Scheduling of Operator Licensing Examinations," dated April 5, 2017
2. TVA letter to NRC, "Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations," dated May 4, 2017 Nuclear Regulatory Commission's (NRC) Regulatory Issue Summary (RIS) 2017-03 (Reference 1) requested specific information regarding the Sequoyah Nuclear Plant's (SQN) projected operator licensing examination schedules and the estimated number of applicants.

The enclosure to this letter provides updated information to addresses the NRC's request and provides an estimate of the examination requirements for SQN on NRC Form 536, "Operator Licensing Examination Data." The information provided in this enclosure updates the information previously provided in Reference 2.

There are no commitments contained in this submittal. Should you require additional information regarding this matter, please contact Mr. Michael McBrearty, SQN Licensing Manager at (423)843-7170.

SincerelyT) nthony L. Williams Site Vice President Sequoyah Nuclear Plant

Enclosure:

NRC Form 536, Operator Licensing Examination Data printed on recycled paper

U.S. Nuclear Regulatory Commission Page 2 November 3, 2017 cc (Enclosure)

NRC Regional Administrator - Region II NRC Senior Resident Inspector - Sequoyah Nuclear Plant

ENCLOSURE NRC Form 536 Operator Licensing Examination Data Tennessee Valley Authority Sequoyah Nuclear Plant NRC Docket Nos. 50-327 and 50-328

NRC FORM 536 U. S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10/31/2017 (05-2016)

Estimated burdenper responseto comply with thisvoluntary information collection request:1 hour. This

  • \a#*<< OPERATOR LICENSING information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden estimate to the FOIA, Privacy, and Information Collections Branch (T-5 VBfW EXAMINATION DATA F53), U.S. Nuclear Regulatory Commission, Washington, DC20555-0001, or by e-mail to lnfocoilects.Resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503. Ifa means
          • used to imposean information collection does not display a currently valid OMB control number, the NRC maynotconduct or sponsor, and a personis hotrequired to respond to,the information collection.

FACILITY NRC REGION Sequoyah Unit 1 and Unit 2 Region II A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 18 CY 19 CY 20 CY 21 ESTIMATED NUMBER OF LICENSEE-PREPARED 0 0 1 0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAM I NATIONS PROPOSED NUMBER CY 18 CY 19 CY 20 CY 21 NUMBER OF REACTOR OPERATORS 0 0 10 0 NUMBER OF SENIOR REACTOR OPERATORS - INSTANT 0 0 5 0 NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE 0 0 3 0 NUMBER OF SENIOR REACTOR OPERATORS - LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE N/A N/A Mar 2020 N/A ALTERNATE DATE N/A N/A Apr 2020 N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED CY 18 CY 20 NUMBER MARCH SEPTEMBER MARCH SEPTEMBER ESTIMATED NUMBER OF 15 15 CANDIDATES NRC FORM 536 (05-2016)