Line 2: |
Line 2: |
| | number = ML18087A359 | | | number = ML18087A359 |
| | issue date = 03/27/2018 | | | issue date = 03/27/2018 |
| | title = Hatch 2018002 Eff & REMP Emailed Information and Doc Request | | | title = Eff & REMP Emailed Information and Doc Request |
| | author name = Kellner R | | | author name = Kellner R |
| | author affiliation = NRC/RGN-II | | | author affiliation = NRC/RGN-II |
| | addressee name = Collins C J | | | addressee name = Collins C |
| | addressee affiliation = Southern Nuclear Operating Co, Inc | | | addressee affiliation = Southern Nuclear Operating Co, Inc |
| | docket = 05000321, 05000366 | | | docket = 05000321, 05000366 |
Line 16: |
Line 16: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:From:Kellner, RobertTo:Collins, Carl JamesCc:Pursley, William; Bonser, Brian | | {{#Wiki_filter:ML# 18087A359 18018087A35918 From: Kellner, Robert To: Collins, Carl James Cc: Pursley, William; Bonser, Brian |
|
| |
|
| ==Subject:== | | ==Subject:== |
| Hatch RP Inspection Document Request - May 2018Date:Tuesday, March 27, 2018 7:03:00 AMAttachments:Hatch_2018002 Eff & REMP Information and Document Request.pdfJimmy,Unless there has been a change since we were on-site in February, I presume you will bethe licensing point of contact for the upcoming NRC Radiation Safety Inspection scheduledfor the week of May 21 - 25, 2018 at the Hatch Nuclear Plant. Attached is the InitialInformation Request and a Document Request List.The NRC inspectors who will be on-site during the inspection are myself, and WilliamPursley. Both of us should still be up to date on our Southern Company site accesstraining. | | Hatch RP Inspection Document Request - May 2018 Date: Tuesday, March 27, 2018 7:03:00 AM Attachments: Hatch_2018002 Eff & REMP Information and Document Request.pdf |
| Please let me know that you received this request. If there are any questions about thisinspection, or the material requested, please contact me via email, by phone number, or atthe address included below.Regards, BobRobert KellnerSenior Health PhysicistUSNRC/Region II/DRS/EB3 Marquis One Tower Suite 1200 245 Peachtree Center Ave, NE Atlanta, GA 30303-1257 (404)997-4508 Hatch Nuclear Plant Radiation Safety Baseline Inspection Initial Information Request Inspection Report: 2018002 During the week of May 21 - 25, 2018, the NRC will perform a baseline Radiation Safety Inspection at Hatch Nuclear Plant (NRC Inspection Procedures 71124.06, 71124.07 and 71151). Experience has shown that this inspection is resource-intensive for both the NRC inspectors and your staff. In order to minimize the impact to your onsite resources and to ensure a productive inspection, we are requesting in advance documents needed for this activity. It is important that all of these documents are up-to-date, and complete, thereby minimizing the number of additional documents requested during the preparation, and/or the onsite portions of the inspection. The NRC requests that these documents be provided to the inspectors no later than May 11, 2018. If there are any questions about this inspection or the material requested, please contact the lead inspector, Robert Kellner at 404-997-4508, or the Plant Support Branch 1 Chief, Brian Bonser at 404-997-4653. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, "Public inspections, exemptions, requests for withholding," a copy of this document will be available electronically for public inspection in the NRC Public Document Room, or from the Publicly Available Records component of NRC's Agencywide Documents Access and Management System (ADAMS); accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html. PAPERWORK REDUCTION ACT STATEMENT This document does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget under control numbers 3150-0008, 3150-0011, 3150-0014, 3150-0044, and 3150-0135. PUBLIC PROTECTION NOTIFICATION The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement, unless the requesting document displays a currently valid Office of Management and Budget control number. | | : Jimmy, Unless there has been a change since we were on-site in February, I presume you will be the licensing point of contact for the upcoming NRC Radiation Safety Inspection scheduled for the week of May 21 - 25, 2018 at the Hatch Nuclear Plant. Attached is the Initial Information Request and a Document Request List. |
| Page 2 of 5 Document Request List Occupational and Public Radiation Safety Cornerstone Licensee: Hatch Nuclear Plant Docket Number: 50-321 and 50-366 Inspection Dates: May 21 - 25, 2018 Documents Due to Region II by: May 11, 2018 Inspection Procedures: IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment IP 71124.07 Radiological Environmental Monitoring Program IP 71151 Performance Indicator Verification Lead Inspector: Robert Kellner Senior Health Physicist USNRC/Region II/DRS/PSB1 Marquis One Tower, Suite 1200 245 Peachtree Center Ave, NE Atlanta, GA 30303-1257 (404) 997-4508 robert.kellner@nrc.gov Note: The current version of these documents is expected unless specified otherwise. Electronic media is preferred if readily available. [Note that the inspectors cannot accept data provided on USB or "flash" drives due to NRC IT security policies.] Please organize the information as it is arranged below to the extent possible. During the inspection, the inspectors may request additional documents. If there are questions regarding the documents requested, or if the documents cannot be provided by the due date, please do not hesitate to contact the lead inspector. Documentation for these inspection procedures, are requested from June 1, 2016 to the present, unless otherwise noted. This reflects the last time these areas were inspected. We would prefer as much of the information as possible in electronic form. An index of the CD contents is also helpful. For those items requesting a list of documents/areas, the inspector will select documents/areas from the list for on-site review. Miscellaneous 1. Telephone numbers of primary site contact(s) for each inspection area including name(s) and telephone numbers. 2. Plant Chemistry, and Radiation Protection organizational charts, including personnel involved in effluent sampling and reporting, Radiological Environmental Monitoring Program (REMP) sampling and reporting. 3. Corrective Action Program procedures 4. Schedule of routine effluent and REMP sampling activities during the week of inspection (e.g., stacks sampled on Monday, REMP run Tuesday). 5. Results of the most recent 10 CFR Part 61 analytical results and characterization of major radioactive waste streams (e.g. Dry Active Waste (DAW), filters, primary resin, etc.)
| | The NRC inspectors who will be on-site during the inspection are myself, and William Pursley. Both of us should still be up to date on our Southern Company site access training. |
| Page 3 of 5 71124.06 - Radioactive Gaseous and Liquid Effluent Treatment (Last Inspected June 2016) 1. Site and corporate procedures associated with implementing the effluent monitoring and controls program. Procedures should include those that address: a. Sample collection and analysis b. Radiation monitor alarm and release set-point determinations c. Release permit preparation d. On and off-site dose evaluations and dose calculations e. Calibration and quality control (QC) activities for sample counting instruments f. Countroom High Purity Germanium Detector calibration and QC checks 2. Offsite Dose Calculation Manual (ODCM) and a list of changes included in the last revision. 3. List of permitted effluent release points, including release points from on-site surface water bodies (as applicable) 4. Methodology/procedure used for determining effluent stack/vent flow rates 5. List of liquid and gaseous effluent monitors listed as out-of-service (OOS) for > 24 hours since June 1, 2016, including any special reports submitted to the NRC as a result of effluent monitor operability. 6. List of all unmonitored spills, leaks, or unexpected liquid/gaseous discharges since June 1, 2016. If applicable, provide the Licensee Event Report (LER), event report, and/or special report. 7. List of non-radioactive systems that have become contaminated and any 10 CFR 50.59 evaluations performed, since June 1, 2016. 8. List of any changes to the effluent release points or effluent treatment systems, and associated 10 CFR 50.59 documentation, since June 1, 2016. 9. Material condition surveillance records for liquid and gaseous effluent treatment system components not readily accessible, including those inaccessible due to radiological conditions (e.g. in-service & spent resin tanks, waste evaporator systems, waste gas hold-up tanks, etc.). 10. Effluent release permits for continuous gaseous, batch gaseous, continuous liquid, and/or batch liquid releases indicating the current and year to date off-site dose. Only provide permits for the latest release within each category. 11. Results of on-site counting lab inter-laboratory comparison program since June 1, 2016. 12. Results of the last two surveillances/tests of the auxiliary building and control room ventilation systems, including system flow monitoring instrumentation calibration, HEPA filter testing, and charcoal filter tests. 13. System health reports for radiological effluent/process monitoring systems since June 1, 2016. 14. The last two calibration records for the following effluent monitors: Reactor Building Vent Stack (Normal range particulate and gaseous) Main Stack (Off-Gas Vent Pipe) Radiation Monitor (Normal range) Liquid radwaste effluent radiation monitor Standby gas treatment system (SGTS) radiation monitors (Unit 2) 15. The last two calibration records for the following Post Accident/high range effluent monitors: Reactor Building Vent Stack (Accident range particulate and gaseous) Main Stack (Off-Gas Vent Pipe) Radiation Monitor (Accident range) Primary Containment Post-Accident radiation monitors (Unit 1 and Unit 2) | | Please let me know that you received this request. If there are any questions about this inspection, or the material requested, please contact me via email, by phone number, or at the address included below. |
| Page 4 of 5 16. Calibration source certifications for sources used to calibrate the monitors in items 14 and 15 above, including traceability to NIST to the primary calibration. 17. Audit and self-assessment documents generated since June 1, 2016, related to liquid and gaseous effluent treatment and monitoring, unmonitored spills, leaks, or effluent discharges, or the groundwater monitoring program. 18. List of Corrective Action Program (CAP) documents (CRs, NCRs, PIPs, etc.) generated since June 1, 2016, related to liquid and gaseous effluent treatment and monitoring, unmonitored spills, leaks, or effluent discharges, or the groundwater monitoring program. This should be a list of corrective action documents containing a CR number and brief description, not full CRs. 71124.07 - Radiological Environmental Monitoring Program (Last Inspected June 2016) 1. Site and corporate procedures associated with radiological environmental monitoring, including: a. Collection, preparation, and analysis of environmental samples including air, Thermoluminescent Dosimeter (TLD) stations, ground and surface water, sediment, vegetation, milk, fish, etc. b. Calibration and maintenance of air and water sampling equipment. c. Land use census d. Calibration and quality control (QC) activities for sample counting instruments. e. Calibration, operation, maintenance, and routine surveillances of meteorological monitoring instruments (wind speed & direction, air temperature, etc.). 2. Site and corporate procedures associated with implementing the ground water monitoring program and the voluntary ground water protection initiative. Procedures should include those that address: a. Groundwater monitoring and reporting of spills/leaks b. Buried piping c. Sampling and monitoring program to detect leaks from contaminated, or potentially contaminated, systems, structures, or components (SSCs). 3. List of SSCs that contain, or could contain, licensed material for which there is a credible mechanism for the radioactive material (RAM) to reach ground water (e.g. SSC risk ranking matrix). 4. Summary of any leaks and/or spills that have occurred since June 1, 2016, (i.e. additions to the 10 CFR 50.75(g) file). 5. List of changes to the REMP (sample locations, sample frequency, type of samples, etc.) since June 1, 2016. 6. Calibration and maintenance records for REMP air and composite water samplers since June 1, 2016. 7. Inter-laboratory comparison program results since June 1, 2016 (in-house and vendor laboratory). 8. Last two calibration/surveillance/maintenance records for the meteorological monitoring instruments (wind speed, wind direction, and air temperature). 9. Data recovery report for meteorological monitoring instruments since June 1, 2016. 10. Groundwater monitoring results since June 1, 2016. 11. Results of environmental TLD monitoring since June 1, 2016. 12. List of changes to the written groundwater monitoring program for identifying/controlling contaminated spills/leaks since June 1, 2016. 13. List of onsite surface water bodies (e.g., ponds, retention basins, lakes) that contain or potentially contain radioactivity. | | : Regards, Bob Robert Kellner Senior Health Physicist USNRC/Region II/DRS/EB3 Marquis One Tower Suite 1200 245 Peachtree Center Ave, NE Atlanta, GA 30303-1257 (404) 997-4508 |
| Page 5 of 5 14. Audit and self-assessment documents generated since June 1, 2016, related to REMP. The data should include any reviews conducted of vendor activities and their facilities (e.g., environmental lab). 15. List of CAP documents (CRs, NCRs, PIPs, etc.) generated since June 1, 2016, related to REMP. The data should include any reviews conducted of vendor activities and their facilities (e.g., environmental lab, out of service air sampler, missing environmental TLD, etc.). This should be a list of corrective action documents containing a CR number and brief description, not full CRs. 71151 - Performance Indicator Verification (Last inspected March 2017) 1. Procedures for gathering and reporting NRC Performance Indicator (PI) data, including any applicable "desktop guides". 2. Monthly/Quarterly Performance Indicator (PI) reports and copies of associated CAP documents, for Occupational Exposure Control Effectiveness and Radiological Effluent Technical Specifications/ Offsite Dose Calculation Manual (RETS/ODCM) Radiological Effluent Occurrences since March 1, 2017. 3. Most recent gaseous effluent release permits and liquid effluent release permits, which specify the quarterly and annual curies released by isotope, and the associated public dose assessment. 4. List of all electronic dosimeter (ED) dose rate alarms and all ED dose alarms since March 1, 2017. 5. List of all CAP documents (CRs, NCRs, PIPs, etc.) since March 1, 2017 using keywords such as high radiation area (HRA), locked high radiation area (LHRA), very high radiation area (VHRA), unintended dose, unlocked LHRA door, etc. 6. Audit and self-assessment documents generated since March 1, 2017, related to Performance Indicators. 7. List of CAP documents (CRs, NCRs, PIPs, etc.) since March 1, 2017, using keywords such as abnormal, unmonitored, unplanned effluent release, etc. This should be a list of corrective action documents containing a CR number and brief description, not full CRs. Assistance Requested During On-Site Inspection Notification of any routine or special effluent sampling activities to be completed during the inspection week. Accompany sampling technician on the weekly REMP sample run. Licensing or Health Physics assistance coordinating walkdowns of the meteorological tower, ventilation systems, and waste processing systems. Inspector Contact Information: Mailing Address: Robert Kellner U.S. Nuclear Regulatory Commission Sr. Health Physicist US NRC Region II (404) 997-4508 ATTN: Mr. Robert Kellner robert.kellner@nrc.gov 245 Peachtree Center Ave., N.E Suite 1200 Atlanta, GA 30303 | | |
| }} | | Hatch Nuclear Plant Radiation Safety Baseline Inspection Initial Information Request Inspection Report: 2018002 During the week of May 21 - 25, 2018, the NRC will perform a baseline Radiation Safety Inspection at Hatch Nuclear Plant (NRC Inspection Procedures 71124.06, 71124.07 and 71151). |
| | Experience has shown that this inspection is resource-intensive for both the NRC inspectors and your staff. In order to minimize the impact to your onsite resources and to ensure a productive inspection, we are requesting in advance documents needed for this activity. It is important that all of these documents are up-to-date, and complete, thereby minimizing the number of additional documents requested during the preparation, and/or the onsite portions of the inspection. The NRC requests that these documents be provided to the inspectors no later than May 11, 2018. |
| | If there are any questions about this inspection or the material requested, please contact the lead inspector, Robert Kellner at 404-997-4508, or the Plant Support Branch 1 Chief, Brian Bonser at 404-997-4653. |
| | In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public inspections, exemptions, requests for withholding, a copy of this document will be available electronically for public inspection in the NRC Public Document Room, or from the Publicly Available Records component of NRC's Agencywide Documents Access and Management System (ADAMS); accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html. |
| | PAPERWORK REDUCTION ACT STATEMENT This document does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget under control numbers 3150-0008, 3150-0011, 3150-0014, 3150-0044, and 3150-0135. |
| | PUBLIC PROTECTION NOTIFICATION The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement, unless the requesting document displays a currently valid Office of Management and Budget control number. |
| | |
| | Document Request List Occupational and Public Radiation Safety Cornerstone Licensee: Hatch Nuclear Plant Docket Number: 50-321 and 50-366 Inspection Dates: May 21 - 25, 2018 Documents Due to Region II by: May 11, 2018 Inspection Procedures: IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment IP 71124.07 Radiological Environmental Monitoring Program IP 71151 Performance Indicator Verification Lead Inspector: Robert Kellner Senior Health Physicist USNRC/Region II/DRS/PSB1 Marquis One Tower, Suite 1200 245 Peachtree Center Ave, NE Atlanta, GA 30303-1257 (404) 997-4508 robert.kellner@nrc.gov Note: The current version of these documents is expected unless specified otherwise. |
| | Electronic media is preferred if readily available. [Note that the inspectors cannot accept data provided on USB or flash drives due to NRC IT security policies.] Please organize the information as it is arranged below to the extent possible. During the inspection, the inspectors may request additional documents. If there are questions regarding the documents requested, or if the documents cannot be provided by the due date, please do not hesitate to contact the lead inspector. |
| | Documentation for these inspection procedures, are requested from June 1, 2016 to the present, unless otherwise noted. This reflects the last time these areas were inspected. We would prefer as much of the information as possible in electronic form. An index of the CD contents is also helpful. For those items requesting a list of documents/areas, the inspector will select documents/areas from the list for on-site review. |
| | Miscellaneous |
| | : 1. Telephone numbers of primary site contact(s) for each inspection area including name(s) and telephone numbers. |
| | : 2. Plant Chemistry, and Radiation Protection organizational charts, including personnel involved in effluent sampling and reporting, Radiological Environmental Monitoring Program (REMP) sampling and reporting. |
| | : 3. Corrective Action Program procedures |
| | : 4. Schedule of routine effluent and REMP sampling activities during the week of inspection (e.g., stacks sampled on Monday, REMP run Tuesday). |
| | : 5. Results of the most recent 10 CFR Part 61 analytical results and characterization of major radioactive waste streams (e.g. Dry Active Waste (DAW), filters, primary resin, etc.) |
| | Page 2 of 5 |
| | |
| | 71124.06 - Radioactive Gaseous and Liquid Effluent Treatment (Last Inspected June 2016) |
| | : 1. Site and corporate procedures associated with implementing the effluent monitoring and controls program. Procedures should include those that address: |
| | : a. Sample collection and analysis |
| | : b. Radiation monitor alarm and release set-point determinations |
| | : c. Release permit preparation |
| | : d. On and off-site dose evaluations and dose calculations |
| | : e. Calibration and quality control (QC) activities for sample counting instruments |
| | : f. Countroom High Purity Germanium Detector calibration and QC checks |
| | : 2. Offsite Dose Calculation Manual (ODCM) and a list of changes included in the last revision. |
| | : 3. List of permitted effluent release points, including release points from on-site surface water bodies (as applicable) |
| | : 4. Methodology/procedure used for determining effluent stack/vent flow rates |
| | : 5. List of liquid and gaseous effluent monitors listed as out-of-service (OOS) for > 24 hours since June 1, 2016, including any special reports submitted to the NRC as a result of effluent monitor operability. |
| | : 6. List of all unmonitored spills, leaks, or unexpected liquid/gaseous discharges since June 1, 2016. If applicable, provide the Licensee Event Report (LER), event report, and/or special report. |
| | : 7. List of non-radioactive systems that have become contaminated and any 10 CFR 50.59 evaluations performed, since June 1, 2016. |
| | : 8. List of any changes to the effluent release points or effluent treatment systems, and associated 10 CFR 50.59 documentation, since June 1, 2016. |
| | : 9. Material condition surveillance records for liquid and gaseous effluent treatment system components not readily accessible, including those inaccessible due to radiological conditions (e.g. in-service & spent resin tanks, waste evaporator systems, waste gas hold-up tanks, etc.). |
| | : 10. Effluent release permits for continuous gaseous, batch gaseous, continuous liquid, and/or batch liquid releases indicating the current and year to date off-site dose. Only provide permits for the latest release within each category. |
| | : 11. Results of on-site counting lab inter-laboratory comparison program since June 1, 2016. |
| | : 12. Results of the last two surveillances/tests of the auxiliary building and control room ventilation systems, including system flow monitoring instrumentation calibration, HEPA filter testing, and charcoal filter tests. |
| | : 13. System health reports for radiological effluent/process monitoring systems since June 1, 2016. |
| | : 14. The last two calibration records for the following effluent monitors: |
| | * Reactor Building Vent Stack (Normal range particulate and gaseous) |
| | * Main Stack (Off-Gas Vent Pipe) Radiation Monitor (Normal range) |
| | * Liquid radwaste effluent radiation monitor |
| | * Standby gas treatment system (SGTS) radiation monitors (Unit 2) |
| | : 15. The last two calibration records for the following Post Accident/high range effluent monitors: |
| | * Reactor Building Vent Stack (Accident range particulate and gaseous) |
| | * Main Stack (Off-Gas Vent Pipe) Radiation Monitor (Accident range) |
| | * Primary Containment Post-Accident radiation monitors (Unit 1 and Unit 2) |
| | Page 3 of 5 |
| | : 16. Calibration source certifications for sources used to calibrate the monitors in items 14 and 15 above, including traceability to NIST to the primary calibration. |
| | : 17. Audit and self-assessment documents generated since June 1, 2016, related to liquid and gaseous effluent treatment and monitoring, unmonitored spills, leaks, or effluent discharges, or the groundwater monitoring program. |
| | : 18. List of Corrective Action Program (CAP) documents (CRs, NCRs, PIPs, etc.) generated since June 1, 2016, related to liquid and gaseous effluent treatment and monitoring, unmonitored spills, leaks, or effluent discharges, or the groundwater monitoring program. |
| | This should be a list of corrective action documents containing a CR number and brief description, not full CRs. |
| | 71124.07 - Radiological Environmental Monitoring Program (Last Inspected June 2016) |
| | : 1. Site and corporate procedures associated with radiological environmental monitoring, including: |
| | : a. Collection, preparation, and analysis of environmental samples including air, Thermoluminescent Dosimeter (TLD) stations, ground and surface water, sediment, vegetation, milk, fish, etc. |
| | : b. Calibration and maintenance of air and water sampling equipment. |
| | : c. Land use census |
| | : d. Calibration and quality control (QC) activities for sample counting instruments. |
| | : e. Calibration, operation, maintenance, and routine surveillances of meteorological monitoring instruments (wind speed & direction, air temperature, etc.). |
| | : 2. Site and corporate procedures associated with implementing the ground water monitoring program and the voluntary ground water protection initiative. Procedures should include those that address: |
| | : a. Groundwater monitoring and reporting of spills/leaks |
| | : b. Buried piping |
| | : c. Sampling and monitoring program to detect leaks from contaminated, or potentially contaminated, systems, structures, or components (SSCs). |
| | : 3. List of SSCs that contain, or could contain, licensed material for which there is a credible mechanism for the radioactive material (RAM) to reach ground water (e.g. SSC risk ranking matrix). |
| | : 4. Summary of any leaks and/or spills that have occurred since June 1, 2016, (i.e. additions to the 10 CFR 50.75(g) file). |
| | : 5. List of changes to the REMP (sample locations, sample frequency, type of samples, etc.) |
| | since June 1, 2016. |
| | : 6. Calibration and maintenance records for REMP air and composite water samplers since June 1, 2016. |
| | : 7. Inter-laboratory comparison program results since June 1, 2016 (in-house and vendor laboratory). |
| | : 8. Last two calibration/surveillance/maintenance records for the meteorological monitoring instruments (wind speed, wind direction, and air temperature). |
| | : 9. Data recovery report for meteorological monitoring instruments since June 1, 2016. |
| | : 10. Groundwater monitoring results since June 1, 2016. |
| | : 11. Results of environmental TLD monitoring since June 1, 2016. |
| | : 12. List of changes to the written groundwater monitoring program for identifying/controlling contaminated spills/leaks since June 1, 2016. |
| | : 13. List of onsite surface water bodies (e.g., ponds, retention basins, lakes) that contain or potentially contain radioactivity. |
| | Page 4 of 5 |
| | : 14. Audit and self-assessment documents generated since June 1, 2016, related to REMP. |
| | The data should include any reviews conducted of vendor activities and their facilities (e.g., environmental lab). |
| | : 15. List of CAP documents (CRs, NCRs, PIPs, etc.) generated since June 1, 2016, related to REMP. The data should include any reviews conducted of vendor activities and their facilities (e.g., environmental lab, out of service air sampler, missing environmental TLD, etc.). This should be a list of corrective action documents containing a CR number and brief description, not full CRs. |
| | 71151 - Performance Indicator Verification (Last inspected March 2017) |
| | : 1. Procedures for gathering and reporting NRC Performance Indicator (PI) data, including any applicable desktop guides. |
| | : 2. Monthly/Quarterly Performance Indicator (PI) reports and copies of associated CAP documents, for Occupational Exposure Control Effectiveness and Radiological Effluent Technical Specifications/ Offsite Dose Calculation Manual (RETS/ODCM) Radiological Effluent Occurrences since March 1, 2017. |
| | : 3. Most recent gaseous effluent release permits and liquid effluent release permits, which specify the quarterly and annual curies released by isotope, and the associated public dose assessment. |
| | : 4. List of all electronic dosimeter (ED) dose rate alarms and all ED dose alarms since March 1, 2017. |
| | : 5. List of all CAP documents (CRs, NCRs, PIPs, etc.) since March 1, 2017 using keywords such as high radiation area (HRA), locked high radiation area (LHRA), very high radiation area (VHRA), unintended dose, unlocked LHRA door, etc. |
| | : 6. Audit and self-assessment documents generated since March 1, 2017, related to Performance Indicators. |
| | : 7. List of CAP documents (CRs, NCRs, PIPs, etc.) since March 1, 2017, using keywords such as abnormal, unmonitored, unplanned effluent release, etc. This should be a list of corrective action documents containing a CR number and brief description, not full CRs. |
| | Assistance Requested During On-Site Inspection |
| | * Notification of any routine or special effluent sampling activities to be completed during the inspection week. |
| | * Accompany sampling technician on the weekly REMP sample run. |
| | * Licensing or Health Physics assistance coordinating walkdowns of the meteorological tower, ventilation systems, and waste processing systems. |
| | Inspector Contact Information: Mailing Address: |
| | Robert Kellner U.S. Nuclear Regulatory Commission Sr. Health Physicist US NRC Region II (404) 997-4508 ATTN: Mr. Robert Kellner robert.kellner@nrc.gov 245 Peachtree Center Ave., N.E Suite 1200 Atlanta, GA 30303 Page 5 of 5}} |
Similar Documents at Hatch |
---|
Category:E-Mail
MONTHYEARML24281A1362024-10-0707 October 2024 NRR E-mail Capture - (External_Sender) Acceptance Review - Hatchs Revise Technical Specifications to Adopt TSTF-591 LAR (L-2024-LLA-0122) ML24278A0052024-10-0303 October 2024 Document Request for Hatch Nuclear Plant - IP 92702 Follow-Up Radiation Protection Inspection - Inspection Report 2024-04 ML24249A1362024-09-0404 September 2024 EN 57304 - Westinghouse Electric Company, LLC, Final Report - No Embedded Files. Notification of the Potential Existence of Defects Pursuant to 10 CFR Part 21 ML24211A0162024-07-26026 July 2024 NRR E-mail Capture - Request for Additional Information - Hatch, Units 1 and 2, Revise TS SRs (3.4.3.1 & 3.1.7.7) to Increase SRV Setpoints LAR ML24194A0032024-07-11011 July 2024 NRR E-mail Capture - Fyi - Acceptance Review - Farley, Hatch, and Vogtle 1 and 2 - Alternative Request for Code Case N-572 ML24193A1182024-07-10010 July 2024 Email to SNC with RAI for Hatch Exemption Request ML24170A9362024-06-18018 June 2024 NRR E-mail Capture - Fyi - Change to Estimated Completion Date for the SNC Fleet Physical Barrier Exemptions (L-2023-LLE-0018 and L-2023-LLE-0021) ML24142A4992024-05-21021 May 2024 NRR E-mail Capture - Acceptance Review - Farley and Hatch - LAR to Revise TS 1.1 and Add Online Monitoring (OLM) Program (L-2024-LLA-0058) ML24138A1582024-05-17017 May 2024 NRR E-mail Capture - (External_Sender) Acceptance Review - Hatchs Revise TS Surveillance Requirements to Increase SRV Setpoints LAR (L-2024-LLA-0054) ML24100A4402024-04-0909 April 2024 NRR E-mail Capture - (External_Sender) RAI - Hatch, Units 1 and 2, Revise Technical Specifications to Adopt Extended RICTs for RHRSW and Psw Systems LAR ML24100A0072024-04-0808 April 2024 NRR E-mail Capture - (External_Sender) for Your Comments - State of Georgia - Hatch Units 1 and 2 - Relax Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs ML24082A1212024-03-21021 March 2024 NRR E-mail Capture - (External_Sender) Re Acceptance Review - Hatchs Adopt Alternative Seismic Method for 50.69 Categorization of SSCs LAR (L-2024-LLA-0017) ML24067A0702024-03-0707 March 2024 NRR E-mail Capture - Change in Estimated Review Completion for Hatch Revise TS Table 1.1-1 (Modes) LAR (L-2022-LLA-0120) ML24009A1112024-01-0909 January 2024 NRR E-mail Capture - Acceptance Review - Hatch 1&2 LAR - Revise TS 3.7.1 & 3.7.2 to Adopt Risk-Informed Completion Times for RHRSW and Psw Systems (L-2023-LLA-0169) ML23354A2032023-12-18018 December 2023 Document Request for Hatch Nuclear Plant - Radiation Protection Inspection - Inspection Report 2024-01 ML23264A0142023-09-14014 September 2023 NRR E-mail Capture - (External_Sender) Draft Round-2 RAI - Hatch, Units 1 and 2, Revise TS 1.1-1 Modes LAR ML23249A2082023-09-0606 September 2023 NRR E-mail Capture - Change in Estimated Review Schedule and Level of Effort for Hatch 'Revise TS Table 1.1-1 (Modes)' LAR (L-2022-LLA-0120) ML23223A0142023-08-10010 August 2023 NRR E-mail Capture - Acceptance Review - SNC Fleet Exemption to 10 CFR 73.2, Physical Barriers ML23198A1552023-07-17017 July 2023 NRR E-mail Capture - for Your Action - Request for Additional Information (RAI) - Hatch, Farley, and Vogtle, Units 1 and 2 Quality Assurance Topical Report (QATR) Submittal Dated June 15, 2023 ML23135A0922023-05-11011 May 2023 NRR E-mail Capture - Acceptance Review - SNC Fleet Request to Use Specific Provision of a Later Edition of the ASME BPV Code, Section XI (L-2023-LLR-0016) ML23073A0252023-03-13013 March 2023 NRR E-mail Capture - Fyi - Closeout the Evacuation Time Estimate (ETE) Reviews for SNC Fleet ML23065A0922023-03-0505 March 2023 NRR E-mail Capture - Revised Estimate Hours and Completion Date - Hatch RPV Head Closure Bolts LAR (L-2022-LLA-0120) ML23033A0952023-02-0202 February 2023 NRR E-mail Capture - (External_Sender) Re for Your Comments - State of Georgia - Hatch Units 1 and 2 - Relax Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs ML23033A0282023-01-30030 January 2023 NRR E-mail Capture - Revised Estimates for Hatch RPV Studs LAR ML23026A0132023-01-19019 January 2023 NRR E-mail Capture - Revised Estimates for Hatch RPV Studs LAR ML23018A1872023-01-17017 January 2023 2023 HNP CGD Inspection Information Request ML23006A0662023-01-0505 January 2023 NRR E-mail Capture - (External_Sender) for Your Comments - State of Georgia - Hatch Units 1 and 2 - Revise NFPA-805 License Amendment Request ML22355A2082022-12-21021 December 2022 NRR E-mail Capture - RAI - Hatch, Units 1 and 2, Reactor Pressure Vessel 'Rpv Head Studs' LAR ML23006A0252022-12-13013 December 2022 NRR E-mail Capture - (External_Sender) for Your Comments - State of Georgia - Hatch Units 1 and 2 - TSTF-208 License Amendment Request ML22341A1212022-12-0606 December 2022 NRR E-mail Capture - Recap of Takeaways from Hatch Audit on Dec 1, 2022 ML23026A2372022-11-16016 November 2022 2023001 Hatch RP RFI Final ML22305A7032022-11-0101 November 2022 NRR E-mail Capture - Potential Audit for Hatch'S 'Rpv Head Studs' LAR ML22258A1532022-09-15015 September 2022 NRR E-mail Capture - Acceptance Review - Hatch Closure Studs in TS Table 1.1-1 Modes LAR (L-2022-LLA-0120) ML22251A1322022-09-0808 September 2022 NRR E-mail Capture - Fyi - Hatch TSTF-505 LAR ML22208A1332022-07-26026 July 2022 NRR E-mail Capture - RAI - Hatch, Units 1 and 2, TSTF-208 LAR ML22207B8532022-07-25025 July 2022 NRR E-mail Capture - RCI - Hatch, Units 1 and 2, Revision to NFPA-805 LAR ML22157A3542022-06-0606 June 2022 NRR E-mail Capture - RAI - Hatch, Units 1 and 2, TSTF-505 LAR ML22157A3552022-06-0606 June 2022 NRR E-mail Capture - Revised Estimates - Hatch TSTF-505 LAR ML22140A1192022-05-20020 May 2022 NRR E-mail Capture - RAIs - Hatch, Units 1 and 2, TSTF-505 LAR ML22138A4122022-05-18018 May 2022 NRR E-mail Capture - Acceptance Review - Hatch TSTF-208 LAR (L-2022-LLA-0045) ML22140A1182022-05-13013 May 2022 NRR E-mail Capture - for Your Action: Hatch TSTF-505 - Follow Up from Audit Question 12 ML22116A1492022-04-26026 April 2022 NRR E-mail Capture - Acceptance Review - Hatch Revise NFPA 805 LAR (L-2022-LLF-0000) ML22055A6652022-02-24024 February 2022 NRR E-mail Capture - Acceptance Review - Hatch TSTF-580 LAR (L-2022-LLA-0022) ML22018A0272022-01-18018 January 2022 2022 All RFI Responses - Exercise and Program Inspections - Revl ML21357A0912021-12-23023 December 2021 NRR E-mail Capture - Acceptance Review - Hatch TSTF-207-A LAR (L-2021-LLA-0219) ML21354A5942021-12-20020 December 2021 NRR E-mail Capture - Acceptance Review - Hatch TSTF-227 and TSTF-297 LAR (L-2021-LLA-0227) ML21347A9002021-12-13013 December 2021 NRR E-mail Capture - Updated Request: Additional Request for SNC to Place Document on the Portal ML21347A8532021-12-13013 December 2021 NRR E-mail Capture - Required: Hatch TSTF-505 LAR - Audit Plan - Additional Documents to Be Uploaded to the Portal ML21363A0872021-12-0606 December 2021 NRR E-mail Capture - (External_Sender) Question - Hatch - Eliminate Automatic Main Steam Line Isolation on High Turbine Building Area Temperature (L-2021-LLA-0188) ML21321A3812021-11-16016 November 2021 NRR E-mail Capture - Acceptance Review - Hatch TSTF-505 LAR (L-2021-LLA-0199) 2024-09-04
[Table view] Category:Inspection Plan
MONTHYEARIR 05000032/20240112024-04-25025 April 2024 Notification of Edwin I. Hatch Nuclear Plant - Comprehensive Engineering Team Inspection (CETI) Baseline Inspection Report 0500032/2024011 and 05000366/2024011 IR 05000321/20230062024-02-28028 February 2024 Annual Assessment Letter Edwin I. Hatch Nuclear Plant Units 1 and 2 - Nrc Inspection Report 05000321/2023006 and 05000366/2023006 IR 05000321/20230052023-08-27027 August 2023 Updated Inspection Plan for Edwin I. Hatch Nuclear Plant, Units 1 & 2 - Report 05000321/2023005 and 05000366/2023005 ML23201A0292023-07-20020 July 2023 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection IR 05000321/20220062023-03-0101 March 2023 Annual Assessment Letter Edwin I. Hatch Nuclear Plant, Units 1 and 2 - NRC Inspection Report 05000321/2022006 and 05000366/2022006 IR 05000321/20220052022-08-23023 August 2022 Updated Inspection Plan for Edwin I. Hatch Nuclear Plant, Units and 2 Report 05000321/2022005 and 05000366/2022005 ML22073A0842022-03-21021 March 2022 an NRC Fire Protection Team Inspection (NRC Inspection Report Nos. 05000321/2022011 and 05000366/2022011) and Request for Information IR 05000321/20210062022-03-0202 March 2022 Annual Assessment Letter for Erwin I. Hatch Nuclear Plant, Units 1 and 2 (Report No. 05000321/2021006 and 05000366/2021006) ML22025A2142022-01-21021 January 2022 Plant Hatch 2022001 RP Baseline Inspection Information Request ML22018A0292022-01-18018 January 2022 Region 2 RFI - 2022 Program Inspections IR 05000321/20210052021-08-23023 August 2021 Updated Inspection Plan for Edwin I. Hatch Nuclear Plant, Units 1 and 2 (Report 05000321/2021005 and 05000366/2021005) ML21207A1072021-07-26026 July 2021 Biennial Problem Identification and Resolution Inspection Report 05000321/2021010 and 05000366/2021010 IR 05000321/20200062021-03-0303 March 2021 Annual Assessment Letter for Edwin I. Hatch Nuclear Plant - Report 05000321/2020006 and 05000366/2020006 ML21013A4112021-01-13013 January 2021 Notification of Edwin I. Hatch Nuclear Plant Design Bases Assurance Inspection U.S. Nuclear Regulatory Commission Inspection Report 05000321/2021010 and 05000366/2021010 ML20338A3472020-12-0202 December 2020 Notification of Inspection and Request for Information ML20239A7462020-08-25025 August 2020 Rif Letter to Plant Hatch Simulator Inspection 41502 ML20027B4162020-01-27027 January 2020 Notification of Inspection and Request for Information IR 05000321/20190052019-08-27027 August 2019 Updated Inspection Plan for Edwin I. Hatch Nuclear Plant Reports 05000321/2019005 and 05000366/2019005 IR 05000321/20180062019-03-0404 March 2019 Annual Assessment Letter for Edwin I. Hatch - Report 05000321/2018006 and 05000366/2018006 ML19044A6002019-02-13013 February 2019 Notification of Conduct of a Triennial Fire Protection Baseline Inspection (NRC Inspection Report Nos. 0500021/2019011 and 05000366/2019011) IR 05000021/20190112019-02-13013 February 2019 Notification of Conduct of a Triennial Fire Protection Baseline Inspection (NRC Inspection Report Nos. 0500021/2019011 and 05000366/2019011) ML19016A3422019-01-10010 January 2019 U2 ISI 2019001 RFI - Bcc ML19008A2872018-12-20020 December 2018 RP Document Request ML18298A0982018-10-24024 October 2018 Emergency Preparedness Program Inspection Request for Information IR 05000321/20180052018-08-23023 August 2018 Updated Inspection Plan for Edwin I. Hatch Nuclear Plant Units 1 and 2 - NRC Inspection Reports 05000321/2018005 and 05000366/2018005 ML18087A3592018-03-27027 March 2018 Eff & REMP Emailed Information and Doc Request ML18059A1402018-02-28028 February 2018 EOC Assessment Letter IR 05000321/20170052017-08-28028 August 2017 Updated Inspection Plan for Edwin I. Hatch Nuclear Plant, Units 1 and 2 - NRC Report 05000321/2017005 and 05000366/2017005 ML17142A2202017-05-19019 May 2017 Emergency Preparedness Inspection and Request for Information Dated: May 19, 2017 IR 05000321/20160062017-03-0101 March 2017 Annual Assessment Letter for Edwin I. Hatch Nuclear Plant Units 1 and 2 (Report 05000321/2016006 and 05000366/2016006) ML17021A0002017-01-20020 January 2017 Notification of Inspection and Request for Information IR 05000321/20160052016-08-31031 August 2016 Mid-Cycle Assessment Letter for Edwin I. Hatch Nuclear Plant Units 1 and 2 - NRC Inspection Report 05000321/2016005 and 05000366/2016005 ML16062A1842016-03-0202 March 2016 Annual Assessment Letter ML16014A7052016-01-14014 January 2016 Notification of Conduct of a Triennial Fire Protection Baseline Inspection (NRC Inspection Report Nos.0500321/2016007 and 05000366/2016007) ML16011A3542016-01-11011 January 2016 Notification of Inspection and Request for Information IR 05000321/20150052015-09-0101 September 2015 Mid-Cycle Assessment Letter for Edwin I. Hatch Nuclear Plant Unit 1 and Unit 2 (NRC Inspection Report 05000321/2015005 and 05000366/2015005) IR 05000321/20140012015-03-0404 March 2015 Annual Assessment Letter for Edwin I. Hatch Nuclear Plant Unit 1 and Unit 2 (NRC Inspection Report 05000321/2014001 and 05000366/2014001) ML14245A1692014-09-0202 September 2014 Mid-Cycle Letter IR 05000321/20130012014-03-0404 March 2014 Annual Assessment Letter for Edwin I. Hatch Nuclear Plant Unit 1 and Unit 2 (NRC Inspection Report 05000321/2013001 and 05000366/2013001) ML14009A2382014-01-0909 January 2014 Notification of Inspection and Request for Information ML13246A1152013-09-0303 September 2013 Mid Cycle Assessment Letter ML13175A3312013-06-24024 June 2013 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection IR 05000321/20120012013-03-0404 March 2013 Annual Assessment Letter for Edwin I. Hatch Nuclear Plant Unit 1 and Unit 2 (NRC Inspection Report 05000321/2012001 and 366/2012001) IR 05000321/20120062012-09-0404 September 2012 Mid-Cycle Performance Review and Inspection Plan Edwin I. Hatch Nuclear Plant (IR 05000321-12-006, 05000366-12-006) ML12065A2302012-03-0505 March 2012 Report 22 ML1124403852011-09-0101 September 2011 Report 22 - Hatch ML1106302392011-03-0404 March 2011 Inspection/Activity Plan, 01/01/2011 - 06/30/2012, Report 22 ML1024406352010-09-0101 September 2010 09/01/2010 - 12/31/2011, Report 22 ML1024406322010-09-0101 September 2010 Mid Cycle Letter ML1006209002010-03-0303 March 2010 Enclosure - Hatch Inspection/Activity Plan Report 22, 2009 2024-04-25
[Table view] Category:Letter
MONTHYEARML24292A1602024-10-22022 October 2024 Request for Withholding Information from Public Disclosure License Amendment Request to Revise Technical Specification Surveillance Requirements to Increase Safety/Relief Valve Setpoints ML24290A0792024-10-18018 October 2024 SLR Environmental Preapplication Meeting Summary IR 05000321/20244012024-10-10010 October 2024 Security Baseline Inspection Report 05000321-2024401 and 05000366-2024401 ML24256A0282024-09-12012 September 2024 2024 Hatch Requal Inspection Corporate Notification Letter NL-23-0930, Application to Revise Technical Specifications to Adopt TSTF-591, Revise Risk Informed Completion Time (RICT) Program2024-09-11011 September 2024 Application to Revise Technical Specifications to Adopt TSTF-591, Revise Risk Informed Completion Time (RICT) Program NL-24-0337, Interim 10 CFR 21.21(a)(2) Report Regarding Operation Technology, Inc., ETAP Software Error in Transient Stability Program2024-09-0909 September 2024 Interim 10 CFR 21.21(a)(2) Report Regarding Operation Technology, Inc., ETAP Software Error in Transient Stability Program ML24249A1362024-09-0404 September 2024 EN 57304 - Westinghouse Electric Company, LLC, Final Report - No Embedded Files. Notification of the Potential Existence of Defects Pursuant to 10 CFR Part 21 NL-24-0334, 0 to the Updated Final Safety Analysis Report, Technical Specifications Bases Changes, Technical Requirements Manual Changes, License Renewal 10 CFR 54 .37(b) Changes, 10 CFR 50.59 Summary Report & Revised Nrc2024-09-0303 September 2024 0 to the Updated Final Safety Analysis Report, Technical Specifications Bases Changes, Technical Requirements Manual Changes, License Renewal 10 CFR 54 .37(b) Changes, 10 CFR 50.59 Summary Report & Revised Nrc IR 05000321/20240912024-08-27027 August 2024 NRC Investigation Report 2-2023-003 and NOV - NRC Inspection Report 05000321/2024091 and 05000366/2024091 IR 05000321/20240052024-08-26026 August 2024 Updated Inspection Plan for Edwin I. Hatch Nuclear Plant, Units 1 and 2 - Report 05000321/2024005 and 05000366/2024005 NL-24-0313, Application to Revise Technical Specifications Surveillance Requirements to Increase Safety/Relief Valves Setpoint Response to Request for Additional Information2024-08-23023 August 2024 Application to Revise Technical Specifications Surveillance Requirements to Increase Safety/Relief Valves Setpoint Response to Request for Additional Information IR 05000321/20240022024-08-0808 August 2024 Edwin I Hatch Nuclear Plants, Units 1 and 2 – Integrated Inspection Report 05000321-2024002 and 05000366-2024002 NL-24-0290, Response to Request for Additional Information Related to Request for Specific Exemption2024-07-26026 July 2024 Response to Request for Additional Information Related to Request for Specific Exemption NL-24-0276, Post-Audit Supplement to License Amendment Request to Revise Renewed Facility Operating Licenses to Adopt an Alternative Seismic Method for Categorization of Structures, Systems, and Components2024-07-26026 July 2024 Post-Audit Supplement to License Amendment Request to Revise Renewed Facility Operating Licenses to Adopt an Alternative Seismic Method for Categorization of Structures, Systems, and Components NL-24-0261, 10 CFR 50.46 ECCS Evaluation Model Annual Report for 20232024-07-19019 July 2024 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2023 ML24198A1252024-07-16016 July 2024 Edwin I Hatch Nuclear Plant Units 1 - 2 Notification of Conduct of Title 10 of the Code of Federal Regulations 50 NL-24-0260, Inservice Inspection Program Owner’S Activity Report (OAR-1) for Refueling Outage 1R312024-07-0909 July 2024 Inservice Inspection Program Owner’S Activity Report (OAR-1) for Refueling Outage 1R31 NL-24-0240, Reactor Core Isolation Cooling (RCIC) System Inoperable Due to Mispositioned Link2024-07-0303 July 2024 Reactor Core Isolation Cooling (RCIC) System Inoperable Due to Mispositioned Link NL-24-0237, Incorrectly Installed Temporary Modification Results in Multiple Conditions Prohibited by Plant Technical Specifications2024-07-0303 July 2024 Incorrectly Installed Temporary Modification Results in Multiple Conditions Prohibited by Plant Technical Specifications NL-24-0143, Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement Activities in2024-06-27027 June 2024 Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement Activities in NL-24-0239, Response to Apparent Violation in NRC Inspection Report 05000321, 366/2024090: EA-23-1392024-06-17017 June 2024 Response to Apparent Violation in NRC Inspection Report 05000321, 366/2024090: EA-23-139 ML24163A0532024-06-14014 June 2024 Audit Plan - Alternative Seismic Method LAR ML24149A0492024-06-0404 June 2024 SNC Fleet - Regulatory Audit in Support of Review of the License Amendment Request to Revise TS 1.1, Use and Application Definitions, and Add New Technical Specification 5.5.21 and 5.5.17, Online Monitoring Program, NL-24-0148, Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis2024-06-0404 June 2024 Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis NL-24-0202, SNC Response to Regulatory Issue Summary 2024-01: Preparation and Scheduling of Operator Licensing Examinations2024-05-24024 May 2024 SNC Response to Regulatory Issue Summary 2024-01: Preparation and Scheduling of Operator Licensing Examinations IR 05000321/20240902024-05-15015 May 2024 NRC Inspection Report 05000321-2024090 and 05000366-2024090, Investigation Report 2-2023-003; and Apparent Violation NL-24-0191, Annual Radiological Environmental Operating Reports for 20232024-05-10010 May 2024 Annual Radiological Environmental Operating Reports for 2023 NL-24-0166, Manual Reactor Trip Due to Loss of Feedwater2024-05-0909 May 2024 Manual Reactor Trip Due to Loss of Feedwater NL-24-0195, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times for Residual Heat Removal Service Water.2024-05-0707 May 2024 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times for Residual Heat Removal Service Water. NL-24-0064, Units 1 & 2 and Hatch Nuclear Plant - Units 1 & 2 License Amendment Request to Revise Technical Specification 1.1 and Add Online Monitoring Program to Technical Specification 5.52024-05-0303 May 2024 Units 1 & 2 and Hatch Nuclear Plant - Units 1 & 2 License Amendment Request to Revise Technical Specification 1.1 and Add Online Monitoring Program to Technical Specification 5.5 NL-24-0165, Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 20232024-04-25025 April 2024 Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 2023 IR 05000032/20240112024-04-25025 April 2024 Notification of Edwin I. Hatch Nuclear Plant - Comprehensive Engineering Team Inspection (CETI) Baseline Inspection Report 0500032/2024011 and 05000366/2024011 NL-24-0157, Incorrectly Installed Temporary Modification Results in a Condition Prohibited by Plant Technical Specifications2024-04-24024 April 2024 Incorrectly Installed Temporary Modification Results in a Condition Prohibited by Plant Technical Specifications IR 05000321/20240012024-04-22022 April 2024 Integrated Inspection Report 05000321/2024001 and 05000366/2024001 NL-24-0026, Application to Revise Technical Specifications Surveillance Requirements to Increase Safety/Relief Valves Setpoint2024-04-19019 April 2024 Application to Revise Technical Specifications Surveillance Requirements to Increase Safety/Relief Valves Setpoint NL-24-0144, Primary Containment Penetration Exceeded Maximum Allowable Primary Containment Leakage Rate (La)2024-04-0909 April 2024 Primary Containment Penetration Exceeded Maximum Allowable Primary Containment Leakage Rate (La) NL-24-0115, Response to Request for Additional Information Exemption Requests for Physical.2024-04-0404 April 2024 Response to Request for Additional Information Exemption Requests for Physical. NL-24-0116, Nuclear Property Insurance Coverage as of April 1, 2024 and Licensee Guarantees of Payment of Deferred.2024-03-29029 March 2024 Nuclear Property Insurance Coverage as of April 1, 2024 and Licensee Guarantees of Payment of Deferred. NL-24-0062, Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis2024-03-12012 March 2024 Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis ML24069A0012024-03-0909 March 2024 – Correction of Amendment No. 266 Regarding License Amendment Request Regarding Relocation of Specific Surveillance Frequencies to a Licensee-Controlled Program (TSTF-425, Revision 3) NL-24-0089, Correction of Technical Specification Omission2024-03-0909 March 2024 Correction of Technical Specification Omission ML24047A0362024-03-0404 March 2024 Response to Hatch and Vogtle FOF Dates Change Request (2025) NL-24-0061, Cycle 32 Core Operating Limits Report Version 12024-03-0101 March 2024 Cycle 32 Core Operating Limits Report Version 1 IR 05000321/20230062024-02-28028 February 2024 Annual Assessment Letter Edwin I. Hatch Nuclear Plant Units 1 and 2 - Nrc Inspection Report 05000321/2023006 and 05000366/2023006 NL-24-0067, 10 CFR 72.48(d)(2) Biennial Report2024-02-26026 February 2024 10 CFR 72.48(d)(2) Biennial Report NL-24-0051, License Amendment Request to Revise Renewed Facility Operating Licenses to Adopt an Alternative Seismic Method for Categorization of Structures, Systems, and Components2024-02-20020 February 2024 License Amendment Request to Revise Renewed Facility Operating Licenses to Adopt an Alternative Seismic Method for Categorization of Structures, Systems, and Components NL-24-0042, Response to Request for Additional Information Exemption Requests for Physical Barriers2024-02-13013 February 2024 Response to Request for Additional Information Exemption Requests for Physical Barriers NL-24-0033, Response to Question for Withholding Information from Public Disclosure Exemption Requests for Physical Barriers2024-02-0505 February 2024 Response to Question for Withholding Information from Public Disclosure Exemption Requests for Physical Barriers IR 05000321/20230042024-01-31031 January 2024 Integrated Inspection Report 05000321/2023004 and 05000366/2023004 NL-24-0014, Revised Response to Request for Additional Information Regarding License Amendment Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical.2024-01-30030 January 2024 Revised Response to Request for Additional Information Regarding License Amendment Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical. 2024-09-09
[Table view] |
Text
ML# 18087A359 18018087A35918 From: Kellner, Robert To: Collins, Carl James Cc: Pursley, William; Bonser, Brian
Subject:
Hatch RP Inspection Document Request - May 2018 Date: Tuesday, March 27, 2018 7:03:00 AM Attachments: Hatch_2018002 Eff & REMP Information and Document Request.pdf
- Jimmy, Unless there has been a change since we were on-site in February, I presume you will be the licensing point of contact for the upcoming NRC Radiation Safety Inspection scheduled for the week of May 21 - 25, 2018 at the Hatch Nuclear Plant. Attached is the Initial Information Request and a Document Request List.
The NRC inspectors who will be on-site during the inspection are myself, and William Pursley. Both of us should still be up to date on our Southern Company site access training.
Please let me know that you received this request. If there are any questions about this inspection, or the material requested, please contact me via email, by phone number, or at the address included below.
- Regards, Bob Robert Kellner Senior Health Physicist USNRC/Region II/DRS/EB3 Marquis One Tower Suite 1200 245 Peachtree Center Ave, NE Atlanta, GA 30303-1257 (404) 997-4508
Hatch Nuclear Plant Radiation Safety Baseline Inspection Initial Information Request Inspection Report: 2018002 During the week of May 21 - 25, 2018, the NRC will perform a baseline Radiation Safety Inspection at Hatch Nuclear Plant (NRC Inspection Procedures 71124.06, 71124.07 and 71151).
Experience has shown that this inspection is resource-intensive for both the NRC inspectors and your staff. In order to minimize the impact to your onsite resources and to ensure a productive inspection, we are requesting in advance documents needed for this activity. It is important that all of these documents are up-to-date, and complete, thereby minimizing the number of additional documents requested during the preparation, and/or the onsite portions of the inspection. The NRC requests that these documents be provided to the inspectors no later than May 11, 2018.
If there are any questions about this inspection or the material requested, please contact the lead inspector, Robert Kellner at 404-997-4508, or the Plant Support Branch 1 Chief, Brian Bonser at 404-997-4653.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public inspections, exemptions, requests for withholding, a copy of this document will be available electronically for public inspection in the NRC Public Document Room, or from the Publicly Available Records component of NRC's Agencywide Documents Access and Management System (ADAMS); accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.
PAPERWORK REDUCTION ACT STATEMENT This document does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget under control numbers 3150-0008, 3150-0011, 3150-0014, 3150-0044, and 3150-0135.
PUBLIC PROTECTION NOTIFICATION The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement, unless the requesting document displays a currently valid Office of Management and Budget control number.
Document Request List Occupational and Public Radiation Safety Cornerstone Licensee: Hatch Nuclear Plant Docket Number: 50-321 and 50-366 Inspection Dates: May 21 - 25, 2018 Documents Due to Region II by: May 11, 2018 Inspection Procedures: IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment IP 71124.07 Radiological Environmental Monitoring Program IP 71151 Performance Indicator Verification Lead Inspector: Robert Kellner Senior Health Physicist USNRC/Region II/DRS/PSB1 Marquis One Tower, Suite 1200 245 Peachtree Center Ave, NE Atlanta, GA 30303-1257 (404) 997-4508 robert.kellner@nrc.gov Note: The current version of these documents is expected unless specified otherwise.
Electronic media is preferred if readily available. [Note that the inspectors cannot accept data provided on USB or flash drives due to NRC IT security policies.] Please organize the information as it is arranged below to the extent possible. During the inspection, the inspectors may request additional documents. If there are questions regarding the documents requested, or if the documents cannot be provided by the due date, please do not hesitate to contact the lead inspector.
Documentation for these inspection procedures, are requested from June 1, 2016 to the present, unless otherwise noted. This reflects the last time these areas were inspected. We would prefer as much of the information as possible in electronic form. An index of the CD contents is also helpful. For those items requesting a list of documents/areas, the inspector will select documents/areas from the list for on-site review.
Miscellaneous
- 1. Telephone numbers of primary site contact(s) for each inspection area including name(s) and telephone numbers.
- 2. Plant Chemistry, and Radiation Protection organizational charts, including personnel involved in effluent sampling and reporting, Radiological Environmental Monitoring Program (REMP) sampling and reporting.
- 3. Corrective Action Program procedures
- 4. Schedule of routine effluent and REMP sampling activities during the week of inspection (e.g., stacks sampled on Monday, REMP run Tuesday).
- 5. Results of the most recent 10 CFR Part 61 analytical results and characterization of major radioactive waste streams (e.g. Dry Active Waste (DAW), filters, primary resin, etc.)
Page 2 of 5
71124.06 - Radioactive Gaseous and Liquid Effluent Treatment (Last Inspected June 2016)
- 1. Site and corporate procedures associated with implementing the effluent monitoring and controls program. Procedures should include those that address:
- a. Sample collection and analysis
- b. Radiation monitor alarm and release set-point determinations
- c. Release permit preparation
- d. On and off-site dose evaluations and dose calculations
- e. Calibration and quality control (QC) activities for sample counting instruments
- f. Countroom High Purity Germanium Detector calibration and QC checks
- 2. Offsite Dose Calculation Manual (ODCM) and a list of changes included in the last revision.
- 3. List of permitted effluent release points, including release points from on-site surface water bodies (as applicable)
- 4. Methodology/procedure used for determining effluent stack/vent flow rates
- 5. List of liquid and gaseous effluent monitors listed as out-of-service (OOS) for > 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> since June 1, 2016, including any special reports submitted to the NRC as a result of effluent monitor operability.
- 6. List of all unmonitored spills, leaks, or unexpected liquid/gaseous discharges since June 1, 2016. If applicable, provide the Licensee Event Report (LER), event report, and/or special report.
- 7. List of non-radioactive systems that have become contaminated and any 10 CFR 50.59 evaluations performed, since June 1, 2016.
- 8. List of any changes to the effluent release points or effluent treatment systems, and associated 10 CFR 50.59 documentation, since June 1, 2016.
- 9. Material condition surveillance records for liquid and gaseous effluent treatment system components not readily accessible, including those inaccessible due to radiological conditions (e.g. in-service & spent resin tanks, waste evaporator systems, waste gas hold-up tanks, etc.).
- 10. Effluent release permits for continuous gaseous, batch gaseous, continuous liquid, and/or batch liquid releases indicating the current and year to date off-site dose. Only provide permits for the latest release within each category.
- 11. Results of on-site counting lab inter-laboratory comparison program since June 1, 2016.
- 12. Results of the last two surveillances/tests of the auxiliary building and control room ventilation systems, including system flow monitoring instrumentation calibration, HEPA filter testing, and charcoal filter tests.
- 13. System health reports for radiological effluent/process monitoring systems since June 1, 2016.
- 14. The last two calibration records for the following effluent monitors:
- Reactor Building Vent Stack (Normal range particulate and gaseous)
- Main Stack (Off-Gas Vent Pipe) Radiation Monitor (Normal range)
- Liquid radwaste effluent radiation monitor
- 15. The last two calibration records for the following Post Accident/high range effluent monitors:
- Reactor Building Vent Stack (Accident range particulate and gaseous)
- Main Stack (Off-Gas Vent Pipe) Radiation Monitor (Accident range)
Page 3 of 5
- 16. Calibration source certifications for sources used to calibrate the monitors in items 14 and 15 above, including traceability to NIST to the primary calibration.
- 17. Audit and self-assessment documents generated since June 1, 2016, related to liquid and gaseous effluent treatment and monitoring, unmonitored spills, leaks, or effluent discharges, or the groundwater monitoring program.
- 18. List of Corrective Action Program (CAP) documents (CRs, NCRs, PIPs, etc.) generated since June 1, 2016, related to liquid and gaseous effluent treatment and monitoring, unmonitored spills, leaks, or effluent discharges, or the groundwater monitoring program.
This should be a list of corrective action documents containing a CR number and brief description, not full CRs.
71124.07 - Radiological Environmental Monitoring Program (Last Inspected June 2016)
- 1. Site and corporate procedures associated with radiological environmental monitoring, including:
- a. Collection, preparation, and analysis of environmental samples including air, Thermoluminescent Dosimeter (TLD) stations, ground and surface water, sediment, vegetation, milk, fish, etc.
- b. Calibration and maintenance of air and water sampling equipment.
- c. Land use census
- d. Calibration and quality control (QC) activities for sample counting instruments.
- e. Calibration, operation, maintenance, and routine surveillances of meteorological monitoring instruments (wind speed & direction, air temperature, etc.).
- 2. Site and corporate procedures associated with implementing the ground water monitoring program and the voluntary ground water protection initiative. Procedures should include those that address:
- a. Groundwater monitoring and reporting of spills/leaks
- b. Buried piping
- c. Sampling and monitoring program to detect leaks from contaminated, or potentially contaminated, systems, structures, or components (SSCs).
- 3. List of SSCs that contain, or could contain, licensed material for which there is a credible mechanism for the radioactive material (RAM) to reach ground water (e.g. SSC risk ranking matrix).
- 4. Summary of any leaks and/or spills that have occurred since June 1, 2016, (i.e. additions to the 10 CFR 50.75(g) file).
- 5. List of changes to the REMP (sample locations, sample frequency, type of samples, etc.)
since June 1, 2016.
- 6. Calibration and maintenance records for REMP air and composite water samplers since June 1, 2016.
- 7. Inter-laboratory comparison program results since June 1, 2016 (in-house and vendor laboratory).
- 8. Last two calibration/surveillance/maintenance records for the meteorological monitoring instruments (wind speed, wind direction, and air temperature).
- 9. Data recovery report for meteorological monitoring instruments since June 1, 2016.
- 10. Groundwater monitoring results since June 1, 2016.
- 11. Results of environmental TLD monitoring since June 1, 2016.
- 12. List of changes to the written groundwater monitoring program for identifying/controlling contaminated spills/leaks since June 1, 2016.
- 13. List of onsite surface water bodies (e.g., ponds, retention basins, lakes) that contain or potentially contain radioactivity.
Page 4 of 5
- 14. Audit and self-assessment documents generated since June 1, 2016, related to REMP.
The data should include any reviews conducted of vendor activities and their facilities (e.g., environmental lab).
- 15. List of CAP documents (CRs, NCRs, PIPs, etc.) generated since June 1, 2016, related to REMP. The data should include any reviews conducted of vendor activities and their facilities (e.g., environmental lab, out of service air sampler, missing environmental TLD, etc.). This should be a list of corrective action documents containing a CR number and brief description, not full CRs.
71151 - Performance Indicator Verification (Last inspected March 2017)
- 1. Procedures for gathering and reporting NRC Performance Indicator (PI) data, including any applicable desktop guides.
- 2. Monthly/Quarterly Performance Indicator (PI) reports and copies of associated CAP documents, for Occupational Exposure Control Effectiveness and Radiological Effluent Technical Specifications/ Offsite Dose Calculation Manual (RETS/ODCM) Radiological Effluent Occurrences since March 1, 2017.
- 3. Most recent gaseous effluent release permits and liquid effluent release permits, which specify the quarterly and annual curies released by isotope, and the associated public dose assessment.
- 4. List of all electronic dosimeter (ED) dose rate alarms and all ED dose alarms since March 1, 2017.
- 5. List of all CAP documents (CRs, NCRs, PIPs, etc.) since March 1, 2017 using keywords such as high radiation area (HRA), locked high radiation area (LHRA), very high radiation area (VHRA), unintended dose, unlocked LHRA door, etc.
- 6. Audit and self-assessment documents generated since March 1, 2017, related to Performance Indicators.
- 7. List of CAP documents (CRs, NCRs, PIPs, etc.) since March 1, 2017, using keywords such as abnormal, unmonitored, unplanned effluent release, etc. This should be a list of corrective action documents containing a CR number and brief description, not full CRs.
Assistance Requested During On-Site Inspection
- Notification of any routine or special effluent sampling activities to be completed during the inspection week.
- Accompany sampling technician on the weekly REMP sample run.
- Licensing or Health Physics assistance coordinating walkdowns of the meteorological tower, ventilation systems, and waste processing systems.
Inspector Contact Information: Mailing Address:
Robert Kellner U.S. Nuclear Regulatory Commission Sr. Health Physicist US NRC Region II (404) 997-4508 ATTN: Mr. Robert Kellner robert.kellner@nrc.gov 245 Peachtree Center Ave., N.E Suite 1200 Atlanta, GA 30303 Page 5 of 5