IR 05000321/2019005

From kanterella
Jump to navigation Jump to search
Updated Inspection Plan for Edwin I. Hatch Nuclear Plant Reports 05000321/2019005 and 05000366/2019005
ML19239A344
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 08/27/2019
From: Alan Blamey
NRC/RGN-II, Division Reactor Projects II, NRC/RGN-II/DRP/RPB2
To: Gayheart C
Southern Nuclear Operating Co
Geanette D
References
IR 2019005
Download: ML19239A344 (6)


Text

ust 27, 2019

SUBJECT:

UPDATED INSPECTION PLAN FOR EDWIN I. HATCH NUCLEAR PLANT REPORTS 05000321/2019005 AND 05000366/2019005

Dear Ms. Gayheart:

The enclosed inspection plan lists the inspections scheduled through June 30, 2021, for Edwin I. Hatch Nuclear Plant Units 1 and 2. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. You should be aware that the agency is pursuing potential changes to the ROP, including changes to engineering inspections (SECY-18-0113, Recommendations for Modifying the Reactor Oversight Process Engineering Inspections), and other changes to the baseline inspection program described in SECY-19-0067, Recommendations for Enhancing the Reactor Oversight Process. Should these changes to the ROP be implemented, the engineering and other region-based inspections are subject to change in scope, as well as schedule, beginning in January 2020. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.

The NRC will conduct Temporary Instruction (Tl) 2515/194, "Inspection of the Licensee's Implementation of Industry Initiative Associated With the Open Phase Condition Design Vulnerabilities In Electric Power Systems (NRC Bulletin 2012-01)," during the week of November 18, 2019.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Please contact me at (404) 997- 4415 with any questions you have regarding this letter.

Sincerely,

/RA/

Alan Blamey, Chief Reactor Projects Branch 2 Division of Reactor Projects Docket Nos.: 50-321, 50-366 License Nos.: DPR-57 and NPF-5 Enclosure(s):

Hatch Inspection Activity Plan Report (9/1/2019 - 6/30/2021)

cc Distribution via ListServ SUBJECT: UPDATED INSPECTION PLAN FOR EDWIN I. HATCH NUCLEAR PLANT REPORTS 05000321/2019005 AND 05000366/2019005 dated August 27, 2019 DISTRIBUTION:

M. Kowal, RII OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMHatchResource ROP Assessment ROP Reports Institute of Nuclear Power Operations (INPO)

ADAMS Accession Number: ML19239A344 OFFICE RII:DRP RII:DRP NAME DMasPenaranda ABlamey DATE 8/27/2019 8/27/2019 OFFICIAL AGENCY RECORD

Enclosure

3