MONTHYEARML24302A0672024-10-25025 October 2024 NRR E-mail Capture - (External_Sender) for Your Comments - State of Georgia - Hatch Units 1 and 2 - Revise Technical Specifications to Increase Safety/Relief Valve (S/Rv) Setpoints License Amendment Request (LAR) ML24290A1552024-10-16016 October 2024 NRR E-mail Capture - for Your Action - RAI - Farley, Hatch, and Vogtle 1 and 2 - Proposed Alternative Request for Code Case N-572 ML24220A2502024-10-15015 October 2024 Email to Ryan Joyce Re Decision on the Hatch Exemption ML24220A2472024-10-11011 October 2024 Email to Ryan Joyce Re Availability of EA-FONSI for Hatch Exemption ML24281A1362024-10-0707 October 2024 NRR E-mail Capture - (External_Sender) Acceptance Review - Hatchs Revise Technical Specifications to Adopt TSTF-591 LAR (L-2024-LLA-0122) ML24278A0052024-10-0303 October 2024 Document Request for Hatch Nuclear Plant - IP 92702 Follow-Up Radiation Protection Inspection - Inspection Report 2024-04 ML24249A1362024-09-0404 September 2024 EN 57304 - Westinghouse Electric Company, LLC, Final Report - No Embedded Files. Notification of the Potential Existence of Defects Pursuant to 10 CFR Part 21 ML24211A0162024-07-26026 July 2024 NRR E-mail Capture - Request for Additional Information - Hatch, Units 1 and 2, Revise TS SRs (3.4.3.1 & 3.1.7.7) to Increase SRV Setpoints LAR ML24194A0032024-07-11011 July 2024 NRR E-mail Capture - Fyi - Acceptance Review - Farley, Hatch, and Vogtle 1 and 2 - Alternative Request for Code Case N-572 ML24193A1182024-07-10010 July 2024 Email to SNC with RAI for Hatch Exemption Request ML24170A9362024-06-18018 June 2024 NRR E-mail Capture - Fyi - Change to Estimated Completion Date for the SNC Fleet Physical Barrier Exemptions (L-2023-LLE-0018 and L-2023-LLE-0021) ML24142A4992024-05-21021 May 2024 NRR E-mail Capture - Acceptance Review - Farley and Hatch - LAR to Revise TS 1.1 and Add Online Monitoring (OLM) Program (L-2024-LLA-0058) ML24138A1582024-05-17017 May 2024 NRR E-mail Capture - (External_Sender) Acceptance Review - Hatchs Revise TS Surveillance Requirements to Increase SRV Setpoints LAR (L-2024-LLA-0054) ML24100A4402024-04-0909 April 2024 NRR E-mail Capture - (External_Sender) RAI - Hatch, Units 1 and 2, Revise Technical Specifications to Adopt Extended RICTs for RHRSW and Psw Systems LAR ML24100A0072024-04-0808 April 2024 NRR E-mail Capture - (External_Sender) for Your Comments - State of Georgia - Hatch Units 1 and 2 - Relax Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs ML24082A1212024-03-21021 March 2024 NRR E-mail Capture - (External_Sender) Re Acceptance Review - Hatchs Adopt Alternative Seismic Method for 50.69 Categorization of SSCs LAR (L-2024-LLA-0017) ML24067A0702024-03-0707 March 2024 NRR E-mail Capture - Change in Estimated Review Completion for Hatch Revise TS Table 1.1-1 (Modes) LAR (L-2022-LLA-0120) ML24009A1112024-01-0909 January 2024 NRR E-mail Capture - Acceptance Review - Hatch 1&2 LAR - Revise TS 3.7.1 & 3.7.2 to Adopt Risk-Informed Completion Times for RHRSW and Psw Systems (L-2023-LLA-0169) ML23354A2032023-12-18018 December 2023 Document Request for Hatch Nuclear Plant - Radiation Protection Inspection - Inspection Report 2024-01 ML23264A0142023-09-14014 September 2023 NRR E-mail Capture - (External_Sender) Draft Round-2 RAI - Hatch, Units 1 and 2, Revise TS 1.1-1 Modes LAR ML23249A2082023-09-0606 September 2023 NRR E-mail Capture - Change in Estimated Review Schedule and Level of Effort for Hatch Revise TS Table 1.1-1 (Modes) LAR (L-2022-LLA-0120) ML23223A0142023-08-10010 August 2023 NRR E-mail Capture - Acceptance Review - SNC Fleet Exemption to 10 CFR 73.2, Physical Barriers ML23198A1552023-07-17017 July 2023 NRR E-mail Capture - for Your Action - Request for Additional Information (RAI) - Hatch, Farley, and Vogtle, Units 1 and 2 Quality Assurance Topical Report (QATR) Submittal Dated June 15, 2023 ML23135A0922023-05-11011 May 2023 NRR E-mail Capture - Acceptance Review - SNC Fleet Request to Use Specific Provision of a Later Edition of the ASME BPV Code, Section XI (L-2023-LLR-0016) ML23073A0252023-03-13013 March 2023 NRR E-mail Capture - Fyi - Closeout the Evacuation Time Estimate (ETE) Reviews for SNC Fleet ML23065A0922023-03-0505 March 2023 NRR E-mail Capture - Revised Estimate Hours and Completion Date - Hatch RPV Head Closure Bolts LAR (L-2022-LLA-0120) ML23033A0952023-02-0202 February 2023 NRR E-mail Capture - (External_Sender) Re for Your Comments - State of Georgia - Hatch Units 1 and 2 - Relax Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs ML23033A0282023-01-30030 January 2023 NRR E-mail Capture - Revised Estimates for Hatch RPV Studs LAR ML23026A0132023-01-19019 January 2023 NRR E-mail Capture - Revised Estimates for Hatch RPV Studs LAR ML23018A1872023-01-17017 January 2023 2023 HNP CGD Inspection Information Request ML23006A0662023-01-0505 January 2023 NRR E-mail Capture - (External_Sender) for Your Comments - State of Georgia - Hatch Units 1 and 2 - Revise NFPA-805 License Amendment Request ML22355A2082022-12-21021 December 2022 NRR E-mail Capture - RAI - Hatch, Units 1 and 2, Reactor Pressure Vessel RPV Head Studs LAR ML23006A0252022-12-13013 December 2022 NRR E-mail Capture - (External_Sender) for Your Comments - State of Georgia - Hatch Units 1 and 2 - TSTF-208 License Amendment Request ML22341A1212022-12-0606 December 2022 NRR E-mail Capture - Recap of Takeaways from Hatch Audit on Dec 1, 2022 ML23026A2372022-11-16016 November 2022 2023001 Hatch RP RFI Final ML22305A7032022-11-0101 November 2022 NRR E-mail Capture - Potential Audit for Hatchs RPV Head Studs LAR ML22258A1532022-09-15015 September 2022 NRR E-mail Capture - Acceptance Review - Hatch Closure Studs in TS Table 1.1-1 Modes LAR (L-2022-LLA-0120) ML22251A1322022-09-0808 September 2022 NRR E-mail Capture - Fyi - Hatch TSTF-505 LAR ML22208A1332022-07-26026 July 2022 NRR E-mail Capture - RAI - Hatch, Units 1 and 2, TSTF-208 LAR ML22207B8532022-07-25025 July 2022 NRR E-mail Capture - RCI - Hatch, Units 1 and 2, Revision to NFPA-805 LAR ML22157A3552022-06-0606 June 2022 NRR E-mail Capture - Revised Estimates - Hatch TSTF-505 LAR ML22157A3542022-06-0606 June 2022 NRR E-mail Capture - RAI - Hatch, Units 1 and 2, TSTF-505 LAR ML22140A1192022-05-20020 May 2022 NRR E-mail Capture - RAIs - Hatch, Units 1 and 2, TSTF-505 LAR ML22138A4122022-05-18018 May 2022 NRR E-mail Capture - Acceptance Review - Hatch TSTF-208 LAR (L-2022-LLA-0045) ML22140A1182022-05-13013 May 2022 NRR E-mail Capture - for Your Action: Hatch TSTF-505 - Follow Up from Audit Question 12 ML22116A1492022-04-26026 April 2022 NRR E-mail Capture - Acceptance Review - Hatch Revise NFPA 805 LAR (L-2022-LLF-0000) ML22055A6652022-02-24024 February 2022 NRR E-mail Capture - Acceptance Review - Hatch TSTF-580 LAR (L-2022-LLA-0022) ML22018A0272022-01-18018 January 2022 2022 All RFI Responses - Exercise and Program Inspections - Revl ML21357A0912021-12-23023 December 2021 NRR E-mail Capture - Acceptance Review - Hatch TSTF-207-A LAR (L-2021-LLA-0219) 2024-09-04
[Table view] Category:Inspection Plan
MONTHYEARIR 05000032/20240112024-04-25025 April 2024 Notification of Edwin I. Hatch Nuclear Plant - Comprehensive Engineering Team Inspection (CETI) Baseline Inspection Report 0500032/2024011 and 05000366/2024011 IR 05000321/20230062024-02-28028 February 2024 Annual Assessment Letter Edwin I. Hatch Nuclear Plant Units 1 and 2 - Nrc Inspection Report 05000321/2023006 and 05000366/2023006 IR 05000321/20230052023-08-27027 August 2023 Updated Inspection Plan for Edwin I. Hatch Nuclear Plant, Units 1 & 2 - Report 05000321/2023005 and 05000366/2023005 ML23201A0292023-07-20020 July 2023 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection IR 05000321/20220062023-03-0101 March 2023 Annual Assessment Letter Edwin I. Hatch Nuclear Plant, Units 1 and 2 - NRC Inspection Report 05000321/2022006 and 05000366/2022006 IR 05000321/20220052022-08-23023 August 2022 Updated Inspection Plan for Edwin I. Hatch Nuclear Plant, Units and 2 Report 05000321/2022005 and 05000366/2022005 ML22073A0842022-03-21021 March 2022 An NRC Fire Protection Team Inspection (NRC Inspection Report Nos. 05000321/2022011 and 05000366/2022011) and Request for Information IR 05000321/20210062022-03-0202 March 2022 Annual Assessment Letter for Erwin I. Hatch Nuclear Plant, Units 1 and 2 (Report No. 05000321/2021006 and 05000366/2021006) ML22025A2142022-01-21021 January 2022 Plant Hatch 2022001 RP Baseline Inspection Information Request ML22018A0292022-01-18018 January 2022 Region 2 RFI - 2022 Program Inspections IR 05000321/20210052021-08-23023 August 2021 Updated Inspection Plan for Edwin I. Hatch Nuclear Plant, Units 1 and 2 (Report 05000321/2021005 and 05000366/2021005) ML21207A1072021-07-26026 July 2021 Biennial Problem Identification and Resolution Inspection Report 05000321/2021010 and 05000366/2021010 IR 05000321/20200062021-03-0303 March 2021 Annual Assessment Letter for Edwin I. Hatch Nuclear Plant - Report 05000321/2020006 and 05000366/2020006 ML21013A4112021-01-13013 January 2021 Notification of Edwin I. Hatch Nuclear Plant Design Bases Assurance Inspection U.S. Nuclear Regulatory Commission Inspection Report 05000321/2021010 and 05000366/2021010 ML20338A3472020-12-0202 December 2020 Notification of Inspection and Request for Information ML20239A7462020-08-25025 August 2020 Rif Letter to Plant Hatch Simulator Inspection 41502 ML20027B4162020-01-27027 January 2020 Notification of Inspection and Request for Information IR 05000321/20190052019-08-27027 August 2019 Updated Inspection Plan for Edwin I. Hatch Nuclear Plant Reports 05000321/2019005 and 05000366/2019005 IR 05000321/20180062019-03-0404 March 2019 Annual Assessment Letter for Edwin I. Hatch - Report 05000321/2018006 and 05000366/2018006 ML19044A6002019-02-13013 February 2019 Notification of Conduct of a Triennial Fire Protection Baseline Inspection (NRC Inspection Report Nos. 0500021/2019011 and 05000366/2019011) IR 05000021/20190112019-02-13013 February 2019 Notification of Conduct of a Triennial Fire Protection Baseline Inspection (NRC Inspection Report Nos. 0500021/2019011 and 05000366/2019011) ML19016A3422019-01-10010 January 2019 U2 ISI 2019001 RFI - Bcc ML19008A2872018-12-20020 December 2018 RP Document Request ML18298A0982018-10-24024 October 2018 Emergency Preparedness Program Inspection Request for Information IR 05000321/20180052018-08-23023 August 2018 Updated Inspection Plan for Edwin I. Hatch Nuclear Plant Units 1 and 2 - NRC Inspection Reports 05000321/2018005 and 05000366/2018005 ML18087A3592018-03-27027 March 2018 Eff & REMP Emailed Information and Doc Request ML18059A1402018-02-28028 February 2018 EOC Assessment Letter IR 05000321/20170052017-08-28028 August 2017 Updated Inspection Plan for Edwin I. Hatch Nuclear Plant, Units 1 and 2 - NRC Report 05000321/2017005 and 05000366/2017005 ML17142A2202017-05-19019 May 2017 Emergency Preparedness Inspection and Request for Information Dated: May 19, 2017 IR 05000321/20160062017-03-0101 March 2017 Annual Assessment Letter for Edwin I. Hatch Nuclear Plant Units 1 and 2 (Report 05000321/2016006 and 05000366/2016006) ML17021A0002017-01-20020 January 2017 Notification of Inspection and Request for Information IR 05000321/20160052016-08-31031 August 2016 Mid-Cycle Assessment Letter for Edwin I. Hatch Nuclear Plant Units 1 and 2 - NRC Inspection Report 05000321/2016005 and 05000366/2016005 ML16062A1842016-03-0202 March 2016 Annual Assessment Letter ML16014A7052016-01-14014 January 2016 Notification of Conduct of a Triennial Fire Protection Baseline Inspection (NRC Inspection Report Nos.0500321/2016007 and 05000366/2016007) ML16011A3542016-01-11011 January 2016 Notification of Inspection and Request for Information IR 05000321/20150052015-09-0101 September 2015 Mid-Cycle Assessment Letter for Edwin I. Hatch Nuclear Plant Unit 1 and Unit 2 (NRC Inspection Report 05000321/2015005 and 05000366/2015005) IR 05000321/20140012015-03-0404 March 2015 Annual Assessment Letter for Edwin I. Hatch Nuclear Plant Unit 1 and Unit 2 (NRC Inspection Report 05000321/2014001 and 05000366/2014001) ML14245A1692014-09-0202 September 2014 Mid-Cycle Letter IR 05000321/20130012014-03-0404 March 2014 Annual Assessment Letter for Edwin I. Hatch Nuclear Plant Unit 1 and Unit 2 (NRC Inspection Report 05000321/2013001 and 05000366/2013001) ML14009A2382014-01-0909 January 2014 Notification of Inspection and Request for Information ML13246A1152013-09-0303 September 2013 Mid Cycle Assessment Letter ML13175A3312013-06-24024 June 2013 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection IR 05000321/20120012013-03-0404 March 2013 Annual Assessment Letter for Edwin I. Hatch Nuclear Plant Unit 1 and Unit 2 (NRC Inspection Report 05000321/2012001 and 366/2012001) IR 05000321/20120062012-09-0404 September 2012 Mid-Cycle Performance Review and Inspection Plan Edwin I. Hatch Nuclear Plant (IR 05000321-12-006, 05000366-12-006) ML12065A2302012-03-0505 March 2012 Report 22 ML1124403852011-09-0101 September 2011 Report 22 - Hatch ML1106302392011-03-0404 March 2011 Inspection/Activity Plan, 01/01/2011 - 06/30/2012, Report 22 ML1024406352010-09-0101 September 2010 09/01/2010 - 12/31/2011, Report 22 ML1024406322010-09-0101 September 2010 Mid Cycle Letter ML1006209002010-03-0303 March 2010 Enclosure - Hatch Inspection/Activity Plan Report 22, 2009 2024-04-25
[Table view] |
Text
ML19008A287 Pursley, William From: Pursley, William Sent: Thursday, December 20, 2018 12:04 PM To: 'PAMOTHEN@SOUTHERNCO.COM'; 'Collins, Carl James' Cc: 'Foskey, Colleen'; 'Taylor, Stephen Lynn'
Subject:
Plant Hatch Occupational Radiation Safety Baseline Inspection 2019001 Document Request Attachments: HAT 2019001 RP Doc Request.pdf Paul/Jimmy, Attached is the information request for the upcoming Hatch RP Occupational Baseline Inspection beginning Feb 4, 2019. In addition to myself, Wade Loo and Carmen Dykes will be with me the first week. Only Carmen and I will there the second week. Please let me know that you received this request via phone or email. Also, if you have any questions or need clarification on any of the information requested, do not hesitate to contact me.
Jimmy. We learned at Vogtle that if the information is put into one large Zip file. We can access and download all the files using Certrec.
- Regards, Bill William Pursley USNRC RII Health Physicist 404 997-4517 1
Hatch Nuclear Plant Southern Nuclear Operating Co., Inc.
Radiation Safety Baseline Inspection Initial Information Request Inspection Report: 2019001 During the weeks of February 4- 8 and February 25 - March 1, 2019, the NRC will perform a baseline Radiation Safety Inspection at Hatch Nuclear Plant (NRC Inspection Procedures 71124.01, 71124.02, 71124.03, 71124.04, 71124.05 and the radiation safety sections of 71152).
Experience has shown that this inspection is resource-intensive for both the NRC inspectors and your staff. In order to minimize the impact to your onsite resources and to ensure a productive inspection, we are requesting in advance documents needed for this activity. It is important that all of these documents are up-to-date, and complete, thereby minimizing the number of additional documents requested during the preparation, and/or the onsite portions of the inspection. The NRC requests that these documents be provided to the inspectors no later than January, 2019.
If there are any questions about this inspection or the material requested, please contact the lead inspector, William Pursley at 404-997-4517, or the Plant Support Branch 1 Chief, Brian Bonser at 404-997-4653.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public inspections, exemptions, requests for withholding, a copy of this document will be available electronically for public inspection in the NRC Public Document Room, or from the Publicly Available Records component of NRC's Agencywide Documents Access and Management System (ADAMS); accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.
PAPERWORK REDUCTION ACT STATEMENT This document does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget under control numbers 3150-0008, 3150-0011, 3150-0014, 3150-0044, and 3150-0135.
PUBLIC PROTECTION NOTIFICATION The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement, unless the requesting document displays a currently valid Office of Management and Budget control number.
Document Request List Licensee: Hatch Nuclear Plant Docket Numbers: 05000321 and 366 Inspection Dates: February 4 - 8 and February 25 - March 1, 2019 Documents Due to Region II by: January 23, 2019 Inspection Procedures (IPs): 71124.01 Radiological Hazard Assessment and Exposure Controls 71124.02 Occupational ALARA Planning and Controls 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 71124.04 Occupational Dose Assessment 71124.05 Radiation Monitoring Instrumentation 71151 Performance Indicator Verification Lead Inspector: William Pursley Health Physicist US NRC Region II (404) 997-4517 William.Pursley@nrc.gov Note: The current version of these documents is expected unless specified otherwise.
Electronic media is preferred if readily available. Note that the inspectors cannot accept data provided on USB or flash drives due to NRC IT security policies. Please organize the information as it is arranged below to the extent possible. Experience has shown that a poorly organized CD leads to a less efficient inspection and places additional burden on licensee staff. Pay particular attention to the date ranges for the items requested as they may change from item to item. If there are questions regarding the documents requested, or if the documents cannot be provided by the due date, please do not hesitate to contact the lead inspector.
Documentation for the inspection procedures from March 1, 2017 to the present is requested for all procedures, except 71124.01 and 71151, which should be from March 1, 2018 to present. This reflects the last time these areas were inspected. We would prefer as much of the information as possible in electronic form. An index to the CD contents is also helpful. For those items requesting a list of documents/areas, the inspector will select documents/areas from the list for on-site review.
Miscellaneous
- 1. Listing of primary site contact(s) for each inspection area including name(s) and telephone numbers.
- 2. List of Radiation Protection (RP) Procedures
- 3. Schedule of major maintenance/work activities during the weeks of the inspection.
- 4. Most recent 10 CFR Part 61 analytical results for plant radioactive waste streams.
- 5. All internal and external RP program assessments since March 1, 2017.
- 6. Corrective Action Program (CAP) procedure(s)
Page 2 of 5
71124.01 - Radiological Hazard Assessment and Exposure Controls (Last Inspected February 2018)
- 1. List of active routine and 1R21 outage Radiation Work Permits (RWPs).
- 2. Copies of RP Procedures for access and key controls, posting, labeling, surveys, RWPs and ED setpoints, contamination control, release of material and personnel from the RCA, diving, high risk activities and any RP procedures for specific plant evolutions (eg.
Crudburst, Resin Transfer, Rx Head Movement, etc.).
- 3. Copies of the last two routine surveys from the ISFSI facility, U1 & U2 RHR rooms and Containment Penetration Rooms.
- 4. Copy of radioactive source inventory, most recent leak test survey and any National Source Tracking System (NSTS) transactions since March 1 2018.
- 5. List of all non-fuel items stored in spent fuel pool.
- 6. List of CAP report numbers and brief descriptions for issues related to RP controls, radworker or RP tech human performance, posting and surveys generated since March 1, 2018.
71124.02 - ALARA Planning and Controls (Last Inspected February of 2017)
- 1. Site and/or corporate ALARA Program and all associated procedures for maintaining dose ALARA including permanent and temporary shielding processes.
- 2. List of top five dose jobs for the upcoming U2 outage and associated ALARA planning packages.
- 3. ALARA planning and reviews conducted for the last ISFSI campaign
- 4. 2018 annual ALARA report and most recent refueling outage report.
- 5. Completed ALARA packages for the last outage for five work activities that had the greatest collective dose, and/or presented significant radiological risk.
- 6. ALARA goals for 2019.
- 7. ALARA Committee meeting minutes associated with HNP2 preps.
- 8. Plant source term reduction strategy and results achieved since March 1, 2017.
- 9. List of CAP report numbers and brief descriptions generated since March 1, 2017 related to the ALARA program.
71124.03 - In-Plant Airborne Radioactivity Control and Mitigation (Last Inspected February of 2017)
- 1. Site and corporate procedures/manuals associated with airborne radiation monitoring instrumentation use, maintenance and setpoint determination.
- 2. Site and corporate procedures/manuals for all plant respiratory protection equipment in use.
- 3. Copies of vendor certifications for plant personnel qualified to service SCBA equipment if applicable.
- 4. Records of certification of air quality for equipment used to provide breathing air for air-supplied respirators and/or filling SCBA bottles since March 1, 2017.
Page 3 of 5
- 5. Two most recent surveillances on the installed ventilation systems for the Refueling Zone HVAC System and the Main Control Room Environmental Control System (MCRECS) including flow verifications and filter efficiencies as well as the basis for setpoints for the radiation monitors in these systems/facilities:
- 6. List of CAP report numbers and brief descriptions generated since March 1, 2017 involving airborne radiation monitoring, plant ventilation equipment used to identify or mitigate plant airborne radioactive material and respiratory protection equipment.
71124.04: Occupational Dose Assessment (Last Inspected February of 2017)
- 1. Site and corporate Procedures/Guidance Documents for internal and external dose monitoring/evaluation.
- 2. The plants prospective evaluation, if applicable, determining if monitoring is required by 10CFR 20.1502.
- 3. The last two DLR/ED correlations.
- 4. On site passive area radiation monitoring data/evaluations demonstrating compliance with 10 CFR 20.1502 for unmonitored personnel.
- 5. Most recent evaluations of neutron spectra for the ISFSI and containment at power.
- 6. List of individuals and exposures for individuals receiving >500 mrem TEDE, >100 mrem neutron, >10 mrem CEDE and >500 mrem SDE in 2017 and 2018.
- 7. National Voluntary Laboratory Accreditation Program (NVLAP) accreditation documentation for current dosimetry used by the site.
- 8. List of all personnel contamination events, dispersed contamination/discrete particles, identified since March 1, 2017. [Note: only a listing should be provided for use by the inspectors to select a sample of issues for in-depth review during the onsite inspection].
- 9. List CAP document numbers and brief descriptions generated since March 1, 2017, for internal or external dosimetry issues/events.
71124.05 - Radiation Monitoring Instrumentation (Last Inspected February 2017)
- 1. Provide a list of current portable instruments including electronic dosimetry on site and the procedures/guidance documents for their use, issue and calibration.
- 2. Procedures/Guidance documents for use and calibration of countroom and fixed contamination monitoring equipment and the sites evaluation of the internal dose sensitivity of the exit portal monitors.
- 3. Procedures/Guidance and the most recent calibration of the portable instrument calibrator.
- 4. The last two records of WBC calibration.
- 5. Interlaboratory crosscheck results for countroom equipment
- 6. The last two calibration records for the Unit 2 Drywell High-range Area Monitor and calibration source documentation including paperwork showing traceability to a National Institute of Standards & Technology (NIST) standard and/or traceability to the primary calibration, as applicable.
- 7. List of the area radiation monitors and setpoints currently in service. Several will be selected for on-site review of the calibration records.
Page 4 of 5
- 8. Latest system health report for the Radiation Monitoring system.
- 9. List of CAP report numbers and brief descriptions generated since March 1, 2017, related to portable and fixed instruments, area radiation monitors, CAMs, WBCs, and count room instruments.
71151 - Performance Indicator (PI) Verification (Last Inspected February 2018)
- 1. Site procedures/manuals for gathering and reporting PI data.
- 2. Monthly/Quarterly PI reports since March 1, 2018, and copies of associated corrective action reports for any RETS/ODCM Radiological Effluent occurrences.
- 3. List of all corrective action documents since March 1, 2018, using keywords such as: HRA, LHRA, VHRA, unintended dose, unlocked door, etc.
- 4. List of all electronic dosimeter (ED) dose rate alarms and ED dose alarms since November 1, 2017 which includes dose or dose rate alarm received, and the alarm setpoint(s).
- 5. List of condition reports (e.g. NCRs, CRs, ARs etc.) generated since March 1, 2018, using keywords abnormal/ unmonitored effluent release, etc.
Inspector Contact Information: Mailing Address:
William Pursley U.S. Nuclear Regulatory Commission Health Physicist US NRC Region II (404) 997-4517 ATTN: Mr. William Pursley William.Pursley@nrc.gov 245 Peachtree Center Ave., N.E Suite 1200 Atlanta, GA 30303 Page 5 of 5