Inspection / Activity Plan Page 1 of 2 03/04/2011 08:55:21 Report 22 01/01/2011 - 06/30/2012 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Hatch PSB1-RP

- RP OCCUPATIONAL WEEK 1 3

1, 2 IP Verification of Licensee Responses to NRC Requirement for Inventories of Materials Tracked in NSTS 2515/179 03/28/2011 04/01/2011 1, 2 IP Radiological Hazard Assessment and Exposure Controls 71124.01 03/28/2011 04/01/2011 1, 2 IP Occupational ALARA Planning and Controls 71124.02 03/28/2011 04/01/2011 1, 2 IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 03/28/2011 04/01/2011 1, 2 IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 71124.08 03/28/2011 04/01/2011 EB3 ISI

- UNIT 2 INSERVICE INSPECTION 1

2 IP Inservice Inspection Activities - BWR 7111108G 04/04/2011 04/08/2011 PSB1-RP

- RP-OCCUPATIONAL WEEK 2 4

1, 2 IP Verification of Licensee Responses to NRC Requirement for Inventories of Materials Tracked in NSTS 2515/179 04/11/2011 04/15/2011 1, 2 IP Radiological Hazard Assessment and Exposure Controls 71124.01 04/11/2011 04/15/2011 1, 2 IP Occupational ALARA Planning and Controls 71124.02 04/11/2011 04/15/2011 1, 2 IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 04/11/2011 04/15/2011 1, 2 IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 71124.08 04/11/2011 04/15/2011 1, 2 IP Performance Indicator Verification 71151 04/11/2011 04/15/2011 OL EXAM

- INITIAL EXAM PREP 5

1 HATCH/JUNE 2011 EXAM AT POWER FACILITIES V23345 05/16/2011 05/20/2011 OL EXAM

- INITIAL EXAM - WEEK 1 5

1 HATCH/JUNE 2011 EXAM AT POWER FACILITIES V23345 06/06/2011 06/10/2011 OL EXAM

- INITIAL EXAM - WEEK 2 5

1 HATCH/JUNE 2011 EXAM AT POWER FACILITIES V23345 06/13/2011 06/17/2011 PI&R

- PROBLEM IDENTIFICATION AND RESOLUTION 5

1, 2 IP Identification and Resolution of Problems 71152B 09/12/2011 09/16/2011 1, 2 IP Identification and Resolution of Problems 71152B 09/26/2011 09/30/2011 PSB1EP

- EMERGENCY PREPAREDNESS EXERCISE 3

1, 2 IP Exercise Evaluation 7111401 10/31/2011 11/04/2011 1, 2 IP Emergency Action Level and Emergency Plan Changes 7111404 10/31/2011 11/04/2011 1, 2 IP Performance Indicator Verification 71151 10/31/2011 11/04/2011 PSB1-RP

- PUBLIC RADIATION PROTECTION BASELINE 3

1, 2 IP Occupational Dose Assessment 71124.04 01/09/2012 01/13/2012 1, 2 IP Radiation Monitoring Instrumentation 71124.05 01/09/2012 01/13/2012 1, 2 IP Radioactive Gaseous and Liquid Effluent Treatment 71124.06 01/09/2012 01/13/2012 1, 2 IP Radiological Environmental Monitoring Program 71124.07 01/09/2012 01/13/2012 1, 2 IP Performance Indicator Verification 71151 01/09/2012 01/13/2012 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Enclosure

Inspection / Activity Plan Page 2 of 2 03/04/2011 08:55:21 Report 22 01/01/2011 - 06/30/2012 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Hatch EB3 ISI

- UNIT 1 INSERVICE INSPECTION 1

1 IP Inservice Inspection Activities - BWR 7111108G 02/20/2012 02/24/2012 LR71003

- PHASE 1: POST APPROVAL LIC RENEWAL 2

1 IP Post-Approval Site Inspection for License Renewal 71003 02/27/2012 03/02/2012 PSB1-RP

- RADIOLOGICAL HAZARDS ASSESEMENT 1

1, 2 IP Radiological Hazard Assessment and Exposure Controls 71124.01 02/27/2012 03/02/2012 TI-177

- TI-177 3

1, 2 IP Managing Gas Accumulation In Emergency Core Cooling, Decay Heat Removal & Containment Spray System 2515/177 04/02/2012 04/06/2012 OL EXAM

- INITIAL EXAM PREP 3

1 HATCH / JUNE 2012 EXAM AT POWER FACILITIES V23374 05/28/2012 06/01/2012 CDBI

- COMPONENT DESIGN BASES INSPECTION 6

1, 2 IP Component Design Bases Inspection 7111121 06/04/2012 06/08/2012 1, 2 IP Component Design Bases Inspection 7111121 06/25/2012 06/29/2012 OL EXAM

- INITIAL EXAM - WEEK 1 3

1 HATCH / JUNE 2012 EXAM AT POWER FACILITIES V23374 06/18/2012 06/22/2012 OL EXAM

- INITIAL EXAM - WEEK 2 3

1 HATCH / JUNE 2012 EXAM AT POWER FACILITIES V23374 06/25/2012 06/29/2012 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.