ML12065A230
| ML12065A230 | |
| Person / Time | |
|---|---|
| Site: | Hatch |
| Issue date: | 03/05/2012 |
| From: | NRC/RGN-II |
| To: | |
| References | |
| IR-11-007 | |
| Download: ML12065A230 (2) | |
Text
Page 1 of 2 03/05/2012 09:56:15 Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Hatch Inspection / Activity Plan 03/01/2012 - 06/30/2013 EB3 LR
- UNIT 1 POST APPROVAL LR - PHASE 1 2
1 IP Post-Approval Site Inspection for License Renewal 71003 02/27/2012 03/02/2012 PSB1-RP
- RADIOLOGICAL HAZARDS ASSESEMENT 1
1, 2 IP Radiological Hazard Assessment and Exposure Controls 71124.01 02/27/2012 03/02/2012 TI-177
- TI-177 3
1, 2 IP Managing Gas Accumulation In Emergency Core Cooling, Decay Heat Removal & Containment Spray System 2515/177 04/16/2012 04/20/2012 OL EXAM
- INITIAL EXAM PREP 2
1 HATCH / JUNE 2012 EXAM AT POWER FACILITIES V23374 05/28/2012 06/01/2012 CDBI
- COMPONENT DESIGN BASES INSPECTION 7
1, 2 IP Component Design Bases Inspection 7111121 06/04/2012 06/08/2012 1, 2 IP Component Design Bases Inspection 7111121 06/25/2012 06/29/2012 1, 2 IP Component Design Bases Inspection 7111121 07/09/2012 07/13/2012 1, 2 IP Component Design Bases Inspection 7111121 07/23/2012 07/27/2012 OL EXAM
- INITIAL EXAM - WEEK 1 2
1 HATCH / JUNE 2012 EXAM AT POWER FACILITIES V23374 06/18/2012 06/22/2012 OL EXAM
- INITIAL EXAM - WEEK 2 2
1 HATCH / JUNE 2012 EXAM AT POWER FACILITIES V23374 06/25/2012 06/29/2012 PSB1-RP
- PUBLIC RADIATION PROTECTION BASELINE 4
1, 2 IP Review of the Implementation of the Industry Ground Water Protection Voluntary Initiative 2515/173 07/16/2012 07/20/2012 1, 2 IP Radioactive Gaseous and Liquid Effluent Treatment 71124.06 07/16/2012 07/20/2012 1, 2 IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 71124.08 07/16/2012 07/20/2012 1, 2 IP Performance Indicator Verification 71151 07/16/2012 07/20/2012 OL RQ
- REQUAL INSPECTION 2
1, 2 IP Licensed Operator Requalification Program 7111111B 08/27/2012 08/31/2012 TI-182
- TI-182 BURIED PIPING/TANK - PHASE 1 1
1, 2 IP Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping 2515/182 09/10/2012 09/14/2012 PSB1EP
- EMERGENCY PREPAREDNESS INSPECTION 2
1, 2 IP Alert and Notification System Testing 7111402 11/26/2012 11/30/2012 1, 2 IP Emergency Preparedness Organization Staffing and Augmentation System 7111403 11/26/2012 11/30/2012 1, 2 IP Correction of Emergency Preparedness Weaknesses and Deficiencies 7111405 11/26/2012 11/30/2012 1, 2 IP Performance Indicator Verification 71151 11/26/2012 11/30/2012 MODS
- PERM MODS 50.59 INSPECTION 4
1, 2 IP Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 7111117T 01/14/2013 01/18/2013 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Page 2 of 2 03/05/2012 09:56:15 Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Hatch Inspection / Activity Plan 03/01/2012 - 06/30/2013 MODS
- PERM MODS 50.59 INSPECTION 4
1, 2 IP Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 7111117T 01/28/2013 02/01/2013 PSB1-RP
- RP OCCUPATIONAL BASELINE 4
1, 2 IP Radiological Hazard Assessment and Exposure Controls 71124.01 02/11/2013 02/15/2013 1, 2 IP Occupational ALARA Planning and Controls 71124.02 02/11/2013 02/15/2013 1, 2 IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 02/11/2013 02/15/2013 1, 2 IP Occupational Dose Assessment 71124.04 02/11/2013 02/15/2013 1, 2 IP Radiation Monitoring Instrumentation 71124.05 02/11/2013 02/15/2013 1, 2 IP Performance Indicator Verification 71151 02/11/2013 02/15/2013 ISI
- UNIT 2 INSERVICE INSPECTION 1
2 IP Inservice Inspection Activities - BWR 7111108G 02/18/2013 02/22/2013 PSB1-RP
- RP OCCUPATIONAL BASELINE WEEK2 3
1, 2 IP Radiological Hazard Assessment and Exposure Controls 71124.01 02/25/2013 03/01/2013 1, 2 IP Occupational ALARA Planning and Controls 71124.02 02/25/2013 03/01/2013 1, 2 IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 02/25/2013 03/01/2013 1, 2 IP Occupational Dose Assessment 71124.04 02/25/2013 03/01/2013 1, 2 IP Radiation Monitoring Instrumentation 71124.05 02/25/2013 03/01/2013 1, 2 IP Performance Indicator Verification 71151 02/25/2013 03/01/2013 HS
- TRIENNIAL HEAT SINK PERFORMANCE 1
1, 2 IP Heat Sink Performance 7111107T 05/06/2013 05/10/2013 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.