NRR E-mail Capture - Acceptance Review - Hatch Revise NFPA 805 LAR (L-2022-LLF-0000)
ML22116A149
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 04/26/2022
From: Dawnmathews Kalathiveettil
NRC/NRR/DORL/LPL2-1
To: Enfinger T
Southern Nuclear Operating Co
References
L-2022-LLF-0000
Download: ML22116A149 (3)


Text

From:

Kalathiveettil, Dawnmathews Sent:

Tuesday, April 26, 2022 12:08 PM To:

Enfinger, Timothy Lee Cc:

Joyce, Ryan M.; Markley, Michael; Lamb, John

Subject:

Acceptance Review - Hatch Revise NFPA 805 LAR (L-2022-LLF-0000)

Importance:

High Good Afternoon Tim, By letter dated March 31, 2022 (Agencywide Documents and Access Management System (ADAMS) Accession No. ML22090A278), Southern Nuclear Operating Company (SNC, the licensee) submitted a license amendment request (LAR) for Edwin I. Hatch Nuclear Plant (HNP), Units 1 and 2. The proposed LAR revises Renewed Facility Operating License (RFOL)

No. NPF-5 for HNP Unit 1 and RFOL No. DPR-57 for HNP Unit 2 to reference an updated Table S-2 that reflects additional plant modifications necessary to comply with the National Fire Protection Association Standard (NFPA) 805 program at HNP.

The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this LAR. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an application for an amendment to a license including the technical specifications must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.

The NRC staff has reviewed your LAR and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment.

Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.

Based on the information provided in your submittal and the pre-submittal meetings held on January 26, 2021, and October 5, 2021 (ADAMS Accession Nos. ML21028A053 and ML21278A557, respectively), the NRC staff has estimated that this licensing request will take approximately 100 hours0.00116 days <br />0.0278 hours <br />1.653439e-4 weeks <br />3.805e-5 months <br /> to complete. The NRC staff expects to complete this review on April 26, 2023. If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, the reasons for the changes, along with the new estimates, will be communicated during the routine interactions with the assigned project manager.

These estimates are based on the NRC staffs initial review of the application and they could change, due to several factors including requests for additional information, unanticipated addition of scope to the review, and review by NRC advisory committees or hearing-related activities. Additional delay may occur if the submittal is provided to the NRC in advance or in parallel with industry program initiatives or pilot applications.

If you have any questions, please contact me.

Best Regards, Dawnmathews T. Kalathiveettil Project Manager Plant Licensing Branch (LPL 2-1)

Division of Operating Reactor Licensing - O8 C02 Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Office Phone: 301-415-5905 Email: Dawnmathews.Kalathiveettil@nrc.gov

Hearing Identifier:

NRR_DRMA Email Number:

1611 Mail Envelope Properties (BY5PR09MB566621B48EE0FD8653AF541B97FB9)

Subject:

Acceptance Review - Hatch Revise NFPA 805 LAR (L-2022-LLF-0000)

Sent Date:

4/26/2022 12:07:56 PM Received Date:

4/26/2022 12:07:00 PM From:

Kalathiveettil, Dawnmathews Created By:

Dawnmathews.Kalathiveettil@nrc.gov Recipients:

"Joyce, Ryan M." <RMJOYCE@southernco.com>

Tracking Status: None "Markley, Michael" <Michael.Markley@nrc.gov>

Tracking Status: None "Lamb, John" <John.Lamb@nrc.gov>

Tracking Status: None "Enfinger, Timothy Lee" <TLENFING@SOUTHERNCO.COM>

Tracking Status: None Post Office:

BY5PR09MB5666.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 3978 4/26/2022 12:07:00 PM Options Priority:

High Return Notification:

No Reply Requested:

No Sensitivity:

Normal Expiration Date: