Letter Sequence Approval |
---|
EPID:L-2022-LLF-0000, License Amendment Request to Revise the NFPA 805 Fire Protection Program. with Attachments 3 to 5 (Approved, Closed) |
|
|
Similar Documents at Hatch |
---|
Category:E-Mail
MONTHYEARML24302A0672024-10-25025 October 2024 NRR E-mail Capture - (External_Sender) for Your Comments - State of Georgia - Hatch Units 1 and 2 - Revise Technical Specifications to Increase Safety/Relief Valve (S/Rv) Setpoints License Amendment Request (LAR) ML24290A1552024-10-16016 October 2024 NRR E-mail Capture - for Your Action - RAI - Farley, Hatch, and Vogtle 1 and 2 - Proposed Alternative Request for Code Case N-572 ML24220A2502024-10-15015 October 2024 Email to Ryan Joyce Re Decision on the Hatch Exemption ML24220A2472024-10-11011 October 2024 Email to Ryan Joyce Re Availability of EA-FONSI for Hatch Exemption ML24281A1362024-10-0707 October 2024 NRR E-mail Capture - (External_Sender) Acceptance Review - Hatchs Revise Technical Specifications to Adopt TSTF-591 LAR (L-2024-LLA-0122) ML24278A0052024-10-0303 October 2024 Document Request for Hatch Nuclear Plant - IP 92702 Follow-Up Radiation Protection Inspection - Inspection Report 2024-04 ML24249A1362024-09-0404 September 2024 EN 57304 - Westinghouse Electric Company, LLC, Final Report - No Embedded Files. Notification of the Potential Existence of Defects Pursuant to 10 CFR Part 21 ML24211A0162024-07-26026 July 2024 NRR E-mail Capture - Request for Additional Information - Hatch, Units 1 and 2, Revise TS SRs (3.4.3.1 & 3.1.7.7) to Increase SRV Setpoints LAR ML24194A0032024-07-11011 July 2024 NRR E-mail Capture - Fyi - Acceptance Review - Farley, Hatch, and Vogtle 1 and 2 - Alternative Request for Code Case N-572 ML24193A1182024-07-10010 July 2024 Email to SNC with RAI for Hatch Exemption Request ML24170A9362024-06-18018 June 2024 NRR E-mail Capture - Fyi - Change to Estimated Completion Date for the SNC Fleet Physical Barrier Exemptions (L-2023-LLE-0018 and L-2023-LLE-0021) ML24142A4992024-05-21021 May 2024 NRR E-mail Capture - Acceptance Review - Farley and Hatch - LAR to Revise TS 1.1 and Add Online Monitoring (OLM) Program (L-2024-LLA-0058) ML24138A1582024-05-17017 May 2024 NRR E-mail Capture - (External_Sender) Acceptance Review - Hatchs Revise TS Surveillance Requirements to Increase SRV Setpoints LAR (L-2024-LLA-0054) ML24100A4402024-04-0909 April 2024 NRR E-mail Capture - (External_Sender) RAI - Hatch, Units 1 and 2, Revise Technical Specifications to Adopt Extended RICTs for RHRSW and Psw Systems LAR ML24100A0072024-04-0808 April 2024 NRR E-mail Capture - (External_Sender) for Your Comments - State of Georgia - Hatch Units 1 and 2 - Relax Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs ML24082A1212024-03-21021 March 2024 NRR E-mail Capture - (External_Sender) Re Acceptance Review - Hatchs Adopt Alternative Seismic Method for 50.69 Categorization of SSCs LAR (L-2024-LLA-0017) ML24067A0702024-03-0707 March 2024 NRR E-mail Capture - Change in Estimated Review Completion for Hatch Revise TS Table 1.1-1 (Modes) LAR (L-2022-LLA-0120) ML24009A1112024-01-0909 January 2024 NRR E-mail Capture - Acceptance Review - Hatch 1&2 LAR - Revise TS 3.7.1 & 3.7.2 to Adopt Risk-Informed Completion Times for RHRSW and Psw Systems (L-2023-LLA-0169) ML23354A2032023-12-18018 December 2023 Document Request for Hatch Nuclear Plant - Radiation Protection Inspection - Inspection Report 2024-01 ML23264A0142023-09-14014 September 2023 NRR E-mail Capture - (External_Sender) Draft Round-2 RAI - Hatch, Units 1 and 2, Revise TS 1.1-1 Modes LAR ML23249A2082023-09-0606 September 2023 NRR E-mail Capture - Change in Estimated Review Schedule and Level of Effort for Hatch Revise TS Table 1.1-1 (Modes) LAR (L-2022-LLA-0120) ML23223A0142023-08-10010 August 2023 NRR E-mail Capture - Acceptance Review - SNC Fleet Exemption to 10 CFR 73.2, Physical Barriers ML23198A1552023-07-17017 July 2023 NRR E-mail Capture - for Your Action - Request for Additional Information (RAI) - Hatch, Farley, and Vogtle, Units 1 and 2 Quality Assurance Topical Report (QATR) Submittal Dated June 15, 2023 ML23135A0922023-05-11011 May 2023 NRR E-mail Capture - Acceptance Review - SNC Fleet Request to Use Specific Provision of a Later Edition of the ASME BPV Code, Section XI (L-2023-LLR-0016) ML23073A0252023-03-13013 March 2023 NRR E-mail Capture - Fyi - Closeout the Evacuation Time Estimate (ETE) Reviews for SNC Fleet ML23065A0922023-03-0505 March 2023 NRR E-mail Capture - Revised Estimate Hours and Completion Date - Hatch RPV Head Closure Bolts LAR (L-2022-LLA-0120) ML23033A0952023-02-0202 February 2023 NRR E-mail Capture - (External_Sender) Re for Your Comments - State of Georgia - Hatch Units 1 and 2 - Relax Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs ML23033A0282023-01-30030 January 2023 NRR E-mail Capture - Revised Estimates for Hatch RPV Studs LAR ML23026A0132023-01-19019 January 2023 NRR E-mail Capture - Revised Estimates for Hatch RPV Studs LAR ML23018A1872023-01-17017 January 2023 2023 HNP CGD Inspection Information Request ML23006A0662023-01-0505 January 2023 NRR E-mail Capture - (External_Sender) for Your Comments - State of Georgia - Hatch Units 1 and 2 - Revise NFPA-805 License Amendment Request ML22355A2082022-12-21021 December 2022 NRR E-mail Capture - RAI - Hatch, Units 1 and 2, Reactor Pressure Vessel RPV Head Studs LAR ML23006A0252022-12-13013 December 2022 NRR E-mail Capture - (External_Sender) for Your Comments - State of Georgia - Hatch Units 1 and 2 - TSTF-208 License Amendment Request ML22341A1212022-12-0606 December 2022 NRR E-mail Capture - Recap of Takeaways from Hatch Audit on Dec 1, 2022 ML23026A2372022-11-16016 November 2022 2023001 Hatch RP RFI Final ML22305A7032022-11-0101 November 2022 NRR E-mail Capture - Potential Audit for Hatchs RPV Head Studs LAR ML22258A1532022-09-15015 September 2022 NRR E-mail Capture - Acceptance Review - Hatch Closure Studs in TS Table 1.1-1 Modes LAR (L-2022-LLA-0120) ML22251A1322022-09-0808 September 2022 NRR E-mail Capture - Fyi - Hatch TSTF-505 LAR ML22208A1332022-07-26026 July 2022 NRR E-mail Capture - RAI - Hatch, Units 1 and 2, TSTF-208 LAR ML22207B8532022-07-25025 July 2022 NRR E-mail Capture - RCI - Hatch, Units 1 and 2, Revision to NFPA-805 LAR ML22157A3552022-06-0606 June 2022 NRR E-mail Capture - Revised Estimates - Hatch TSTF-505 LAR ML22157A3542022-06-0606 June 2022 NRR E-mail Capture - RAI - Hatch, Units 1 and 2, TSTF-505 LAR ML22140A1192022-05-20020 May 2022 NRR E-mail Capture - RAIs - Hatch, Units 1 and 2, TSTF-505 LAR ML22138A4122022-05-18018 May 2022 NRR E-mail Capture - Acceptance Review - Hatch TSTF-208 LAR (L-2022-LLA-0045) ML22140A1182022-05-13013 May 2022 NRR E-mail Capture - for Your Action: Hatch TSTF-505 - Follow Up from Audit Question 12 ML22116A1492022-04-26026 April 2022 NRR E-mail Capture - Acceptance Review - Hatch Revise NFPA 805 LAR (L-2022-LLF-0000) ML22055A6652022-02-24024 February 2022 NRR E-mail Capture - Acceptance Review - Hatch TSTF-580 LAR (L-2022-LLA-0022) ML22018A0272022-01-18018 January 2022 2022 All RFI Responses - Exercise and Program Inspections - Revl ML21357A0912021-12-23023 December 2021 NRR E-mail Capture - Acceptance Review - Hatch TSTF-207-A LAR (L-2021-LLA-0219) 2024-09-04
[Table view] |
Text
From: Kalathiveettil, Dawnmathews Sent: Monday, July 25, 2022 6:18 PM To: Quarles, Adam Graham Cc: Enfinger, Timothy Lee; Chamberlain, Amy Christine; Markley, Michael; Lamb, John; Devlin-Gill, Stephanie
Subject:
RCI - Hatch, Units 1 and 2, Revision to NFPA-805 LAR (EPID: L-2022-LLF-0000)
- Adam,
By letter dated March 31, 2022 (Agencywide Documents and Access Management System (ADAMS) Accession No. ML22090A278), Southern Nuclear Operating Company (SNC, the licensee) submitted a license amendment request (LAR) for Edwin I. Hatch Nuclear Plant (HNP), Units 1 and 2.
The proposed amendment would revise Renewed Facility Operating License (RFOL) No. DPR-57 for HNP Unit 1 and RFOL No. NPF-5 for HNP Unit 2 to reference an updated Table S-2, Plant Modifications Committed. Table S-2 is an attachment to SNCs LAR submittal and the updates reflect additional plant modifications necessary to comply with the National Fire Protection Association Standard (NFPA) 805 program at HNP. Specifically, the licensee requested to revise three modifications as described in the LAR, Attachment 2, Table S-2, Plant Modifications Committed, and also add one new modification to the table. In addition, the proposed amendment would revise how Table S-2 is referenced in the Unit 1 License Condition 2.(C)(3) Fire Protection, Unit 1 License Condition 2.(C)(3)(c) Transition License Conditions, Unit 2 License Condition 2.(C)(3)(a) Fire Protection, and the Unit 2 License Condition 2.(C)(3)(a)(3), Transition License Conditions.
After reviewing the LAR, the NRC staff requests response to the request for confirmation of information (RCI) given below. During the clarification call between the NRC staff and SNC held on July 18, 2022, SNC stated that it could provide its response to the RCI within 30 days. The staff anticipates SNCs response by August 25, 2022.
If you have any questions, you can contact me at 301-415-5905.
Best Regards,
Dawnmathews T. Kalathiveettil Project Manager Plant Licensing Branch (LPL 2-1)
DORL - O8 C02 Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission
Office Phone: 301-415-5905 Email: Dawnmathews.Kalathiveettil@nrc.gov
REQUEST FOR CONFIRMATION OF INFORMATION (RCI)
RCI-01 The original item 14 in Attachment S-2, Table S-2, Plant Modifications Committed, stated that the licensee would:
Modify all fire dampers installed within NFPA 805 credited fire rated barriers that have angle frames bolted rigidly to the wall (Ref. Drawing H-40277, Units No. 1 & 2 Control, Turbine and Reactor Buildings H.V.A.C. Fire Damper Schedule) as required to meet the NFPA 90A, 1976 Edition requirements that fire dampers be installed in accordance with the conditions of their approval (UL Listing) and manufacturers instructions.
The proposed revision to item 14 in Attachment 2, Table S-2, discusses that the dampers will be fire tested, that a performance-based analysis will be performed to assess the adequacy of the fire barriers and also to determine if any additional fire damper modifications are required.
Confirm that if the analysis determines that additional fire damper modifications are required, that those modifications will be completed in accordance with the Unit 1 License Condition 2.(C)(3) and Unit 2 License Condition 2.(C)(3)(a), Fire Protection.
Hearing Identifier: NRR_DRMA Email Number: 1725
Mail Envelope Properties (BY5PR09MB5666E46C9D91E46B79354AE897959)
Subject:
RCI - Hatch, Units 1 and 2, Revision to NFPA-805 LAR (EPID: L-2022-LLF-0000)
Sent Date: 7/25/2022 6:17:47 PM Received Date: 7/25/2022 6:17:00 PM From: Kalathiveettil, Dawnmathews
Created By: Dawnmathews.Kalathiveettil@nrc.gov
Recipients:
"Enfinger, Timothy Lee" <TLENFING@SOUTHERNCO.COM>
Tracking Status: None "Chamberlain, Amy Christine" <ACCHAMBE@southernco.com>
Tracking Status: None "Markley, Michael" <Michael.Markley@nrc.gov>
Tracking Status: None "Lamb, John" <John.Lamb@nrc.gov>
Tracking Status: None "Devlin-Gill, Stephanie" <Stephanie.Devlin-Gill@nrc.gov>
Tracking Status: None "Quarles, Adam Graham" <AGQUARLE@southernco.com>
Tracking Status: None
Post Office: BY5PR09MB5666.namprd09.prod.outlook.com
Files Size Date & Time MESSAGE 3131 7/25/2022 6:17:00 PM
Options Priority: Normal Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: