ML24009A111

From kanterella
Jump to navigation Jump to search

NRR E-mail Capture - Acceptance Review - Hatch 1&2 LAR - Revise TS 3.7.1 & 3.7.2 to Adopt Risk-Informed Completion Times for RHRSW and Psw Systems (L-2023-LLA-0169)
ML24009A111
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 01/09/2024
From: Andrea Johnson
Plant Licensing Branch II
To: Quarles A
Southern Nuclear Operating Co
References
L-2023-LLA-0169
Download: ML24009A111 (3)


Text

From:

Andrea Johnson Sent:

Tuesday, January 9, 2024 9:32 AM To:

Quarles, Adam Graham; Joyce, Ryan M.

Cc:

John Lamb; Dawnmathews Kalathiveettil; Zach Turner

Subject:

Acceptance Review - Hatch 1&2 LAR - Revise TS 3.7.1 & 3.7.2 to Adopt Risk-Informed Completion Times for RHRSW and PSW Systems (L-2023-LLA-0169)

Adam, By letter dated December 6, 2023 (Agencywide Documents and Access Management System Accession No. ML23340A223), Southern Nuclear Operating Company (SNC, the licensee) submitted a license amendment request (LAR) for Edwin I. Hatch Nuclear Power Plant (Hatch),

Units 1 and 2. The proposed LAR would modify Technical Specification (TS) requirements to permit the use of Risk-Informed Completion Times (RICTs) for the condition of one pump inoperable for TS 3.7.1, Residual Heat Removal Service Water (RHRSW) System, and for TS 3.7.2, Plant Service Water (PSW) System and Ultimate Heat Sink (UHS).

The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this LAR. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an application for an amendment to a license (including the technical specifications) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.

The NRC staff has reviewed your LAR and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed LAR in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.

Based on the information provided in your submittal and discussions during the pre-licensing meeting on August 2, 2023 (ML23244A031), the NRC staff has estimated that this LAR will take approximately 450 hours0.00521 days <br />0.125 hours <br />7.440476e-4 weeks <br />1.71225e-4 months <br /> to complete. The NRC staff expects to complete this review by approximately January 9, 2025. If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, the reasons for the changes, along with the new estimates, will be communicated during the routine interactions with the assigned project manager.

These estimates are based on the NRC staffs initial review of the LAR and they could change, due to several factors including requests for additional information, unanticipated addition of

scope to the review, and review by NRC advisory committees or hearing-related activities.

Additional delay may occur if the submittal is provided to the NRC in advance or in parallel with industry program initiatives or pilot applications.

If you have any immediate questions regarding this LAR, please contact me. Otherwise, you may contact the lead Project Manager for this LAR, Dawnmathews.Kalathiveettil@nrc.gov.

Andrea M. Johnson, Project Manager Plant Licensing Branch II-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation (301) 415-2890

Hearing Identifier:

NRR_DRMA Email Number:

2363 Mail Envelope Properties (BY5PR09MB4867FA14E6331558EDDC3E99976A2)

Subject:

Acceptance Review - Hatch 1&2 LAR - Revise TS 3.7.1 & 3.7.2 to Adopt Risk-Informed Completion Times for RHRSW and PSW Systems (L-2023-LLA-0169)

Sent Date:

1/9/2024 9:32:16 AM Received Date:

1/9/2024 9:32:00 AM From:

Andrea Johnson Created By:

Andrea.Johnson@nrc.gov Recipients:

"John Lamb" <John.Lamb@nrc.gov>

Tracking Status: None "Dawnmathews Kalathiveettil" <Dawnmathews.Kalathiveettil@nrc.gov>

Tracking Status: None "Zach Turner" <Zachary.Turner@nrc.gov>

Tracking Status: None "Quarles, Adam Graham" <AGQUARLE@southernco.com>

Tracking Status: None "Joyce, Ryan M." <RMJOYCE@southernco.com>

Tracking Status: None Post Office:

BY5PR09MB4867.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 3902 1/9/2024 9:32:00 AM Options Priority:

Normal Return Notification:

No Reply Requested:

No Sensitivity:

Normal Expiration Date: