Inspection / Activity Plan Page 1 of 2 09/01/2011 08:52:16 Report 22 09/01/2011 - 12/31/2012 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Hatch PI&R

- PROBLEM IDENTIFICATION AND RESOLUTION 5

1, 2 IP Problem Identification and Resolution 71152B 09/12/2011 09/16/2011 1, 2 IP Problem Identification and Resolution 71152B 09/26/2011 09/30/2011 PSB1EP

- EMERGENCY PREPAREDNESS EXERCISE 5

1, 2 IP Exercise Evaluation 7111401 10/31/2011 11/04/2011 1, 2 IP Emergency Action Level and Emergency Plan Changes 7111404 10/31/2011 11/04/2011 1, 2 IP Performance Indicator Verification 71151 10/31/2011 11/04/2011 PSB1-RP

- PUBLIC RADIATION PROTECTION BASELINE 4

1, 2 IP Radioactive Gaseous and Liquid Effluent Treatment 71124.06 01/09/2012 01/13/2012 1, 2 IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 71124.08 01/09/2012 01/13/2012 1, 2 IP Performance Indicator Verification 71151 01/09/2012 01/13/2012 7111108

- HATCH U1 ISI 1

1, 2 IP Inservice Inspection Activities - BWR 7111108G 02/20/2012 02/24/2012 LR71003

- PHASE 1: POST APPROVAL LIC RENEWAL 2

1 IP Post-Approval Site Inspection for License Renewal 71003 02/27/2012 03/02/2012 PSB1-RP

- RADIOLOGICAL HAZARDS ASSESEMENT 1

1, 2 IP Radiological Hazard Assessment and Exposure Controls 71124.01 02/27/2012 03/02/2012 TI-177

- TI-177 3

1, 2 IP Managing Gas Accumulation In Emergency Core Cooling, Decay Heat Removal & Containment Spray System 2515/177 04/02/2012 04/06/2012 OL EXAM

- INITIAL EXAM PREP 3

1 HATCH / JUNE 2012 EXAM AT POWER FACILITIES V23374 05/28/2012 06/01/2012 CDBI

- COMPONENT DESIGN BASES INSPECTION 6

1, 2 IP Component Design Bases Inspection 7111121 06/04/2012 06/08/2012 1, 2 IP Component Design Bases Inspection 7111121 06/25/2012 06/29/2012 1, 2 IP Component Design Bases Inspection 7111121 07/09/2012 07/13/2012 1, 2 IP Component Design Bases Inspection 7111121 07/23/2012 07/27/2012 OL EXAM

- INITIAL EXAM - WEEK 1 3

1 HATCH / JUNE 2012 EXAM AT POWER FACILITIES V23374 06/18/2012 06/22/2012 OL EXAM

- INITIAL EXAM - WEEK 2 3

1 HATCH / JUNE 2012 EXAM AT POWER FACILITIES V23374 06/25/2012 06/29/2012 OL RQ

- REQUAL INSPECTION 2

1, 2 IP Licensed Operator Requalification Program 7111111B 09/17/2012 09/21/2012 PSB1EP

- EMERGENCY PREPAREDNESS INSPECTION 1

1, 2 IP Alert and Notification System Testing 7111402 11/26/2012 11/30/2012 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Enclosure

Inspection / Activity Plan Page 2 of 2 09/01/2011 08:52:16 Report 22 09/01/2011 - 12/31/2012 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Hatch PSB1EP

- EMERGENCY PREPAREDNESS INSPECTION 1

1, 2 IP Emergency Preparedness Organization Staffing and Augmentation System 7111403 11/26/2012 11/30/2012 1, 2 IP Emergency Action Level and Emergency Plan Changes 7111404 11/26/2012 11/30/2012 1, 2 IP Correction of Emergency Preparedness Weaknesses and Deficiencies 7111405 11/26/2012 11/30/2012 1, 2 IP Performance Indicator Verification 71151 11/26/2012 11/30/2012 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.