Report 22 - Hatch
ML112440385
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 09/01/2011
From:
NRC/RGN-II/DRP/RPB2
To:
Shared Package
ML112440378 List:
References
Download: ML112440385 (2)


Text

Page 1 of 2 Hatch 09/01/2011 08:52:16 Inspection / Activity Plan Report 22 09/01/2011 - 12/31/2012 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site PI&R - PROBLEM IDENTIFICATION AND RESOLUTION 5 1, 2 09/12/2011 09/16/2011 IP 71152B Problem Identification and Resolution 1, 2 09/26/2011 09/30/2011 IP 71152B Problem Identification and Resolution PSB1EP - EMERGENCY PREPAREDNESS EXERCISE 5 1, 2 10/31/2011 11/04/2011 IP 7111401 Exercise Evaluation 1, 2 10/31/2011 11/04/2011 IP 7111404 Emergency Action Level and Emergency Plan Changes 1, 2 10/31/2011 11/04/2011 IP 71151 Performance Indicator Verification PSB1-RP - PUBLIC RADIATION PROTECTION BASELINE 4 1, 2 01/09/2012 01/13/2012 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 1, 2 01/09/2012 01/13/2012 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 1, 2 01/09/2012 01/13/2012 IP 71151 Performance Indicator Verification 7111108 - HATCH U1 ISI 1 1, 2 02/20/2012 02/24/2012 IP 7111108G Inservice Inspection Activities - BWR LR71003 - PHASE 1: POST APPROVAL LIC RENEWAL 2 1 02/27/2012 03/02/2012 IP 71003 Post-Approval Site Inspection for License Renewal PSB1-RP - RADIOLOGICAL HAZARDS ASSESEMENT 1 1, 2 02/27/2012 03/02/2012 IP 71124.01 Radiological Hazard Assessment and Exposure Controls TI-177 - TI-177 3 1, 2 04/02/2012 04/06/2012 IP 2515/177 Managing Gas Accumulation In Emergency Core Cooling, Decay Heat Removal & Containment Spray System OL EXAM - INITIAL EXAM PREP 3 1 05/28/2012 06/01/2012 V23374 HATCH / JUNE 2012 EXAM AT POWER FACILITIES CDBI - COMPONENT DESIGN BASES INSPECTION 6 1, 2 06/04/2012 06/08/2012 IP 7111121 Component Design Bases Inspection 1, 2 06/25/2012 06/29/2012 IP 7111121 Component Design Bases Inspection 1, 2 07/09/2012 07/13/2012 IP 7111121 Component Design Bases Inspection 1, 2 07/23/2012 07/27/2012 IP 7111121 Component Design Bases Inspection OL EXAM - INITIAL EXAM - WEEK 1 3 1 06/18/2012 06/22/2012 V23374 HATCH / JUNE 2012 EXAM AT POWER FACILITIES OL EXAM - INITIAL EXAM - WEEK 2 3 1 06/25/2012 06/29/2012 V23374 HATCH / JUNE 2012 EXAM AT POWER FACILITIES OL RQ - REQUAL INSPECTION 2 1, 2 09/17/2012 09/21/2012 IP 7111111B Licensed Operator Requalification Program PSB1EP - EMERGENCY PREPAREDNESS INSPECTION 1 1, 2 11/26/2012 11/30/2012 IP 7111402 Alert and Notification System Testing This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures. Enclosure

Page 2 of 2 Hatch 09/01/2011 08:52:16 Inspection / Activity Plan Report 22 09/01/2011 - 12/31/2012 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site PSB1EP - EMERGENCY PREPAREDNESS INSPECTION 1 1, 2 11/26/2012 11/30/2012 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 1, 2 11/26/2012 11/30/2012 IP 7111404 Emergency Action Level and Emergency Plan Changes 1, 2 11/26/2012 11/30/2012 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 1, 2 11/26/2012 11/30/2012 IP 71151 Performance Indicator Verification This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures. Enclosure