{{#Wiki_filter:NRC T"'9UTION FOR PART 50 DOCK M ATERI AL
{{#Wiki_filter:*
**.~(TEMPOR ARY FORM)
* NRC     T"'9UTION FOR PART 50 DOCK                 M ATERI AL
'CONTROL NO:
                      .~                                 (TEMPOR ARY FORM)                                                   '
->.-FILE: It:01DE :: nErenT r FROM: Met. Edison co.
                                                                    -
DATE OF DOC DATE REC D LTR TWX RPT OTHER f**c.' ,,h * '
CONTROL NO:
.'.12-26-75 1-2-76 xx'TO: ORIG CC OTHER SENT AEC POR I?E NRC 1 sigried SENT LOCAL PDR CLASS UNCLASS PROPINFO INPUT NO CYS REC'D DOCKET NO:
                                                                                            -
Ic<''1 50-289 DESCRIPTION: Ler reporting A0-50-289/75-43 dn ENCLOSURES:
                                                                      >.
12-13-75 .re out of spec serp.oing"for a reactor building 30 psig c.hannel pressu:
FILE: It:01DE :: nErenT r DATE OF DOC         DATE REC D       LTR     TWX     RPT       OTHER FROM: Met. Edison co.
e g g]ppgtg switch....
      '
.., j cmum PLANT N AME:
f**c   .' ,,h * '         .   '.       12-26-75         1-2-76             xx CC   OTHER         SENT AEC POR             I?
Three Mile Ilsand Unit 1
TO:                                                    ORIG 1 sigried                               SENT LOCAL PDR             E NRC CLASS       UNCLASS           PROPINFO               INPUT         NO CYS REC'D             DOCKET NO:
, FOR ACTION /INFORMATION Dnt 1-5-76 BUTLER (L)
                                                                              '
SCHWENCER (L) ZIEM ANN (L)
Ic<
REG AN (E)
                                      '
W/ Copies W/ Copics W/ Cc::ics W/ Copies CLARK (L)STOLZ (L)DICKER (E)
1                       50-289 DESCRIPTION: Ler reporting A0-50-289/75-43 dn ENCLOSURES:
LE AR (L)W/ Coods W/ Cocies W/ Cocies W/ Copies PARR (L)VASSALLO (L)
12-13-75 .re out of spec serp.oing"for a reactor building 30 psig c.hannel pressu: e switch....                                                                           ..       g g]ppgtg j
KNIGHTON (E)
cmum
SPELS W/ Copies.W/ Copies W/ Copics W/ Copics KNIEL (L)PUPPLE (L)
                                        ,
YOUNGBLOOD (E) 842ID W/ Copics V// Copies W/ Cooics W$opies INTERNAL DISTRIBUTION
PLANT N AME:           Three Mile Ilsand Unit 1                               ,
.KREG H En TECH REVIEW DENTON LIC ASST A/T IN D W r.c r u n
FOR ACTION /INFORMATION               Dnt       1-5-76 BUTLER (L)                       SCHWENCER (L) ZIEM ANN (L)                     REG AN (E)
,.ScriRO E D E R 7uRIMES R. DIGGS (L)
W/ Copies                       W/ Copics           W/ Cc::ics               W/ Copies CLARK (L)                       STOLZ (L)             DICKER   (E)             LE AR (L)
SRAITHAN f OGC, ROOM P 506A A1ACCARY GAMMILL H. GF ARIN (L)
W/ Coods                       W/ Cocies           W/ Cocies               W/ Copies PARR (L)                       VASSALLO (L)           KNIGHTON (E)           SPELS W/ Copies                     .W/ Copies             W/ Copics               W/ Copics KNIEL (L)                       PUPPLE (L)             YOUNGBLOOD (E) 842ID W/ Copics                     V// Copies           W/ Cooics                 W$opies
SALTZMAN GOSSICK/ STAFF KNIGHT KASTNER E. GOULBOURNE (L)
.                                                      INTERNAL DISTRIBUTION TECH REVIEW           DENTON                   LIC ASST                   A/T IN D KREG H En                                                                      R. DIGGS  (L)                SRAITHAN
MELTZ CASE PAWLICKl BALLARD P. KREUTZER (E) f SHAO SPANGLER J. LEE (L)
                              ,.ScriRO E D E R f W r.c r u n                                          7uRIMES                                               SALTZMAN OGC, ROOM P 506A A1ACCARY                             GAMMILL             H. GF ARIN (L)
PLANS _BOYD** . STE L LO' M. RUSHBRCCK (L)
GOSSICK/ STAFF                 KNIGHT                 KASTNER             E. GOULBOURNE (L)               MELTZ f CASE                             PAWLICKl               BALLARD             P. KREUTZER (E)
MCDONALD , S. REED (E)
SHAO                   SPANGLER             J. LEE (L)                     PLANS _
CHAPMAN MOOR E (L)
BOYD                  ** ,. STE L LO'                                     M. RUSHBRCCK (L)               MCDONALD MOOR E (L)                                            ENVIRO-              S. REED   (E)                   CHAPMAN
**fHOUSTON ENVIRO-M. SERVICE (L)
                            **fHOUSTON
DUBE (Ltr)
                            **,.NOVAK                                                                          DUBE (Ltr)
,.NOVAK MULLER DEYOUNG (L)
DEYOUNG (L)                                           MULLER              M. SERVICE    (L)
**SKOVHOLT (L)
                                ,.ROSS                   DICKER               S. SHEPPARD (L)                 E. COUP E SKOVHOLT (L)                                                                                              PET ERSON GOLLER (L) (Ltr)           f lPPOLITO                 KN'GHTON             M. SLATER (E)
,.ROSS DICKER S. SHEPPARD (L)
P. COLLINS                   .fTEDESCO               YOUNGBLOOD H. SMITH (L)                             HARTFIELD     (2)
E. COUP E GOLLER (L) (Ltr) lPPOLITO KN'GHTON M. SLATER (E)
DENISE                       J. COLLINS             REGAN               S. TEETS (L)                   KLECKER REG OPR                       LAIN AS               PROJECT LDR         G. WILLI AMS (E)               EISENHUT
PET ERSON f P. COLLINS.fTEDESCO YOUNGBLOOD H. SMITH (L)
          ~
HARTFIELD (2)
/Fil E &TEGION (2)                   BENAROYA                                   V. WILSON   (L)             *WIGGiNTON f.MIPC/PE- (3)                   ,,VOLLMER               HARLESS           Vil. INGRAM (L)                   F. WILLIAMS STEELE                                                                     M. DtmCAll M               - MAN   /UO          _
DENISE J. COLLINS REGAN S. TEETS (L)
EXTERNAL DISTRIBUTION                                                     _
KLECKER REG OPR LAIN AS PROJECT LDR G. WILLI AMS (E)
    <1 - LOCAL POR uarrisburg, Pa.                                                               1 - PDR SAN /LA/NY p1 - TIC (ABERNATHY) (1)(2)(10) - N ATION AL LABS 1 - W. PENNINGTON, Rm E 201 GT                   1 - BROOKHAVEN NAT LAS f 1 - NSIC (BUCHANAN)                                                                          1 - G. U LRIKSON. O RN L 1 - ASLB                                  1 - CONSU LTANTS 1 - Newton Anderson                             NEWM ARK /SLUME/AG B ASI AN               1 - AGMED (RUTH GUSSMATM N6 ACRS SE :T TO LIO .*.SST R. Ingram 1-3-76                                                         Rm B 127 GT -
EISENHUT/Fil E &TEGION (2)
        ** SEND ONLY TEN DAY RE102TS                                  1490 09i -                 i- s. o. RuNxLES. Rm e 'c:
BENAROYA V. WILSON (L)
GT c
*WIGGiNTON
y                                      7910240.            'p y f
~f.MIPC/PE- (3)
 
,,VOLLMER HARLESS Vil. INGRAM (L)
                            ~^                   ~                   ~~
F. WILLIAMS STEELE M. DtmCAll M- MAN /UO_EXTERNAL DISTRIBUTION
  .
_uarrisburg, Pa.
          ..
<1 - LOCAL POR p1 - TIC (ABERNATHY) (1)(2)(10) - N ATION AL LABS 1 - PDR SAN /LA/NY 1 - NSIC (BUCHANAN) 1 - W. PENNINGTON, Rm E 201 GT 1 - BROOKHAVEN NAT LAS 1 - ASLB 1 - CONSU LTANTS 1 - G. U LRIKSON. O RN L f 1 - Newton Anderson NEWM ARK /SLUME/AG B ASI AN 1 - AGMED (RUTH GUSSMATM Rm B 127 GT -
L4fef
N6 ACRS SE :T TO LIO .*.SST R. Ingram 1-3-76 1490 09i -
                                              @ ~~q.-tm     ~~~                  Reiu!atcry Docket Rie METROPOLITAN EDISON COMPANY
i- s. o. RuNxLES. Rm e 'c:
_ _ _
** SEND ONLY TEN DAY RE102TS GT'p y f c 7910240.y
_ _ . . _ _
.~^~~~..L4fef@ ~~q.-tm Reiu!atcry Docket Rie
POST OFFICE BOX 542     READING, PENNSYLVANI A 19603                                 TELEPHONE 215 - 92N601
~~~METROPOLITAN EDISON COMPANY
                                                                                              '
_ _ __ _ . . _ _
N December 26, 1975             <' c ,           . ,
POST OFFICE BOX 542 READING, PENNSYLVANI A 19603 TELEPHONE 215 - 92N601 N'December 26, 1975
GQL f        --
<' c ,. ,. ;[^N.4 GQL f.f--' . ? f. R $ / [l)
                                                                          .f              . ;[^N.4
#'^s//n.>-,<lI. "U 197$ g b Director I-~-1 g*h M$3 sNE%T.'-:Iuclear Reactor Ecgulation
                                                                  #'
: h b,,h /gA h ,%N U. S. Nuclear Regula'ory Cc:::=ission
                                                                                                                ^  s
"*Washington, D.C.
                                                              //
20555 ws.p  
                                                                    <l n.' . I? .f."UR $ / [l)
                                                                                    -
                                                                                                                      ,
Director                                       -~-
I                    1                   197$ g  -  b
:Iuclear Reactor Ecgulation                  :
g*h         M h      $3 sNE%   N T   .'
U. S. Nuclear Regula'ory Cc:::=ission           "
* h ,%
Washington, D.C. 20555                                 b,,h /gA          ws.                       p


==Dear Sir:==
==Dear Sir:==
'g ! i n s g/Decket :To. 50-EM'' '
g
                                                                  'g ! i n s     /
Decket :To. 50-EM'' '
Opers. ting License No. DPR-50 In acecrdance with the Technical Specificatiens of our Three Mile Island Nuclear Station Unit 1 (TMI-1), we are reporting the following abner =al occurrence.
Opers. ting License No. DPR-50 In acecrdance with the Technical Specificatiens of our Three Mile Island Nuclear Station Unit 1 (TMI-1), we are reporting the following abner =al occurrence.
(1) Report Nu=ber: A0 50-289/75 h3 (2a) Report Date:
(1) Report Nu=ber: A0 50-289/75 h3 (2a) Report Date:       December 26, 1975 (2b) Occurrence Date: December 18, 1975 (3) Facility: Three Mile Island Nuclear Station Unit 1 (h) Identification of Occurrence:
December 26, 1975 (2b) Occurrence Date: December 18, 1975 (3) Facility: Three Mile Island Nuclear Station Unit 1 (h) Identification of Occurrence:
Title: Out-of-Specificatien Setpoint for a Reactor Building 30 psig Channel Pressure Switch Tvpe:     An abnormal occurrence as defined by the Technical Specifications, paragraph 1.8a, in that the trip setpcint for one of the six (6) pressure switches for the Reacter Building 30 psig channels was fcund to be less conservative than the setpoint listed in Technical Specification 3.5.3.1.                                                                       ,
Title: Out-of-Specificatien Setpoint for a Reactor Building 30 psig Channel Pressure Switch Tvpe: An abnormal occurrence as defined by the Technical Specifications, paragraph 1.8a, in that the trip setpcint for one of the six (6) pressure switches for the Reacter Building 30 psig channels was fcund to be less conservative than the setpoint listed in Technical Specification 3.5.3.1.
(5) Conditions Prior to Occurrence:
, (5) Conditions Prior to Occurrence:
The reactor was at cold shutdem conditien with major plant parameters as follevs:
The reactor was at cold shutdem conditien with major plant parameters as follevs: Power: Cere: 0 ", Elec.: 0 M'ie RC Flev: 0 lbs/hr.14]Cil-RC Pressure: O psig 1490 092 '..,.-,'RC Temp.: 150 F PRZR Level:
Power:       Cere: 0 ",
L2 inches PR2R Te=p.:
Elec.: 0 M'ie RC Flev:     0 lbs/hr.                                                 14]Cil-RC Pressure: O psig 1490 092
1500F (6) Description of Occurrence:
 
Cn Dece=ber 18, 1975, while conducting the Refueling Interval Reactor Building 30 psig Channels Surveillance Tes;, cne or the six (6) pressure switches was found to trip at a pressure less conservative than the trip setpcint listed in Technical Specificatien 3.5 31.
.
The required and actual trip setpoints for the pressure switch out-of-specification, PS-290, were < 30 pais and 30 5 psig respectively.
      '.
_The cut-of-specification pressure switch was recalibrated and retested and the resulting trip setpoint was verified as being within Technical Specification limits. The remaining five (5) similar pressure switches were determined to be within the Technical Specification limits.
                ,
                                                    '    ,.-
RC Temp.: 150 F PRZR Level:   L2 inches PR2R Te=p.:   1500F (6) Description of Occurrence:
Cn Dece=ber 18, 1975, while conducting the Refueling Interval Reactor Building 30 psig Channels Surveillance Tes;, cne or the six (6) pressure switches was found to trip at a pressure less conservative than the trip setpcint listed in Technical Specificatien 3.5 31.     The required and actual trip setpoints for the pressure switch out-of-specification, PS-290, were < 30 pais and 30 5 psig respectively.
_
The cut-of-specification pressure switch was recalibrated and retested and the resulting trip setpoint was verified as being within Technical Specification limits. The remaining five (5) similar pressure switches were determined to be within the Technical Specification limits.
(7) Designation of Apparent Cause of Occurrence:
(7) Designation of Apparent Cause of Occurrence:
The cause of this occurrence has been determined to te material in that the out-of-specification trip setpoint was due to ciner calibraticn drift experienced in the associated pressure switch, PS-290.
The cause of this occurrence has been determined to te material in that the out-of-specification trip setpoint was due to ciner calibraticn drift experienced in the associated pressure switch, PS-290. This pressure switch was last calibrated en January 15, 1974.
This pressure switch was last calibrated en January 15, 1974.
(8) Analysis of the Occurrence:
(8) Analysis of the Occurrence:
It has been determined that this occurrence did not constitute a threat to the health and safety of the public in that the setpoints for the other five (5) Reactor Building 30 psig channels pressure switches were within the Technical Specifications 11=its end .tuld have performed their protective function had an overpressure condition occurred.
It has been determined that this occurrence did not constitute a threat to the health and safety of the public in that the setpoints for the other five (5) Reactor Building 30 psig channels pressure switches were within the Technical Specifications 11=its end .tuld have performed their protective function had an overpressure condition occurred.
(9) Corrective Action:
(9) Corrective Action:
In addition to the i= mediate action described above, the Plant Operaticns Review Cc=rittee evaluated the present ncminal setpv.at and determined that
In addition to the i= mediate action described above, the Plant Operaticns
-it is sufficiently conservative. Since subsequent refueling intervals vill be shorter than the present initial cycle, these pressure switches vill be calibrated more frequently, with resultant less chance of setpcint drift beyond the Technical Spec!fications limits.
  -          Review Cc=rittee evaluated the present ncminal setpv.at and determined that it is sufficiently conservative. Since subsequent refueling intervals vill be shorter than the present initial cycle, these pressure switches vill be calibrated more frequently, with resultant less chance of setpcint drift beyond the Technical Spec!fications limits.
(10) Failure Data:
(10) Failure Data:
Square D Co. Pressure Switch Type 9013 - AMG5 Form "R" 1490 093 0-100 psig Range
Square D Co. Pressure Switch Type 9013 - AMG5 Form "R" 0-100 psig Range
+ 25 Accuracy  
              + 25 Accuracy 1490 093
.,-3--.--. . . .Similar Occurrences: Ncne Sincerely, si , R. C. Arncid Vice President RCA:JFE:tas ec: Office of Inspection and Enforcement, Region 1 1490 094}}
 
                                  ,
  .
.
  -
    -
                -
                                                    . . . .
Similar Occurrences: Ncne Sincerely, si           ,
R. C. Arncid Vice President RCA:JFE:tas ec: Office of Inspection and Enforcement, Region 1 1490 094}}

Revision as of 13:25, 19 October 2019

Abnormal Occurrence 50-289/75-43:on 751218,one of Six Pressure Switches Tripped at Less Conservative Limits than Tech Specs During Channels Surveillance Test.Caused by Calibr Drift in Associated Pressure Switch PS-290
ML19210A158
Person / Time
Site: Three Mile Island Constellation icon.png
Issue date: 12/26/1975
From: Arnold R
METROPOLITAN EDISON CO.
To:
References
GQL-0159, GQL-159, NUDOCS 7910240883
Download: ML19210A158 (4)


Text

  • NRC T"'9UTION FOR PART 50 DOCK M ATERI AL

.~ (TEMPOR ARY FORM) '

-

CONTROL NO:

-

>.

FILE: It:01DE :: nErenT r DATE OF DOC DATE REC D LTR TWX RPT OTHER FROM: Met. Edison co.

'

f**c .' ,,h * ' . '. 12-26-75 1-2-76 xx CC OTHER SENT AEC POR I?

TO: ORIG 1 sigried SENT LOCAL PDR E NRC CLASS UNCLASS PROPINFO INPUT NO CYS REC'D DOCKET NO:

'

Ic<

'

1 50-289 DESCRIPTION: Ler reporting A0-50-289/75-43 dn ENCLOSURES:

12-13-75 .re out of spec serp.oing"for a reactor building 30 psig c.hannel pressu: e switch.... .. g g]ppgtg j

cmum

,

PLANT N AME: Three Mile Ilsand Unit 1 ,

FOR ACTION /INFORMATION Dnt 1-5-76 BUTLER (L) SCHWENCER (L) ZIEM ANN (L) REG AN (E)

W/ Copies W/ Copics W/ Cc::ics W/ Copies CLARK (L) STOLZ (L) DICKER (E) LE AR (L)

W/ Coods W/ Cocies W/ Cocies W/ Copies PARR (L) VASSALLO (L) KNIGHTON (E) SPELS W/ Copies .W/ Copies W/ Copics W/ Copics KNIEL (L) PUPPLE (L) YOUNGBLOOD (E) 842ID W/ Copics V// Copies W/ Cooics W$opies

. INTERNAL DISTRIBUTION TECH REVIEW DENTON LIC ASST A/T IN D KREG H En R. DIGGS (L) SRAITHAN

,.ScriRO E D E R f W r.c r u n 7uRIMES SALTZMAN OGC, ROOM P 506A A1ACCARY GAMMILL H. GF ARIN (L)

GOSSICK/ STAFF KNIGHT KASTNER E. GOULBOURNE (L) MELTZ f CASE PAWLICKl BALLARD P. KREUTZER (E)

SHAO SPANGLER J. LEE (L) PLANS _

BOYD ** ,. STE L LO' M. RUSHBRCCK (L) MCDONALD MOOR E (L) ENVIRO- S. REED (E) CHAPMAN

    • fHOUSTON
    • ,.NOVAK DUBE (Ltr)

DEYOUNG (L) MULLER M. SERVICE (L)

,.ROSS DICKER S. SHEPPARD (L) E. COUP E SKOVHOLT (L) PET ERSON GOLLER (L) (Ltr) f lPPOLITO KN'GHTON M. SLATER (E)

P. COLLINS .fTEDESCO YOUNGBLOOD H. SMITH (L) HARTFIELD (2)

DENISE J. COLLINS REGAN S. TEETS (L) KLECKER REG OPR LAIN AS PROJECT LDR G. WILLI AMS (E) EISENHUT

~

/Fil E &TEGION (2) BENAROYA V. WILSON (L) *WIGGiNTON f.MIPC/PE- (3) ,,VOLLMER HARLESS Vil. INGRAM (L) F. WILLIAMS STEELE M. DtmCAll M - MAN /UO _

EXTERNAL DISTRIBUTION _

<1 - LOCAL POR uarrisburg, Pa. 1 - PDR SAN /LA/NY p1 - TIC (ABERNATHY) (1)(2)(10) - N ATION AL LABS 1 - W. PENNINGTON, Rm E 201 GT 1 - BROOKHAVEN NAT LAS f 1 - NSIC (BUCHANAN) 1 - G. U LRIKSON. O RN L 1 - ASLB 1 - CONSU LTANTS 1 - Newton Anderson NEWM ARK /SLUME/AG B ASI AN 1 - AGMED (RUTH GUSSMATM N6 ACRS SE :T TO LIO .*.SST R. Ingram 1-3-76 Rm B 127 GT -

    • SEND ONLY TEN DAY RE102TS 1490 09i - i- s. o. RuNxLES. Rm e 'c:

GT c

y 7910240. 'p y f

~^ ~ ~~

.

..

L4fef

@ ~~q.-tm ~~~ Reiu!atcry Docket Rie METROPOLITAN EDISON COMPANY

_ _ _

_ _ . . _ _

POST OFFICE BOX 542 READING, PENNSYLVANI A 19603 TELEPHONE 215 - 92N601

'

N December 26, 1975 <' c , . ,

GQL f --

.f . ;[^N.4

  1. '

^ s

//

<l n.> ' . I? .f."UR $ / [l)

-

,

Director -~-

I 1 197$ g - b

Iuclear Reactor Ecgulation  :

g*h M h $3 sNE% N T .'

U. S. Nuclear Regula'ory Cc:::=ission "

  • h ,%

Washington, D.C. 20555 b,,h /gA ws. p

Dear Sir:

g

'g ! i n s /

Decket :To. 50-EM '

Opers. ting License No. DPR-50 In acecrdance with the Technical Specificatiens of our Three Mile Island Nuclear Station Unit 1 (TMI-1), we are reporting the following abner =al occurrence.

(1) Report Nu=ber: A0 50-289/75 h3 (2a) Report Date: December 26, 1975 (2b) Occurrence Date: December 18, 1975 (3) Facility: Three Mile Island Nuclear Station Unit 1 (h) Identification of Occurrence:

Title: Out-of-Specificatien Setpoint for a Reactor Building 30 psig Channel Pressure Switch Tvpe: An abnormal occurrence as defined by the Technical Specifications, paragraph 1.8a, in that the trip setpcint for one of the six (6) pressure switches for the Reacter Building 30 psig channels was fcund to be less conservative than the setpoint listed in Technical Specification 3.5.3.1. ,

(5) Conditions Prior to Occurrence:

The reactor was at cold shutdem conditien with major plant parameters as follevs:

Power: Cere: 0 ",

Elec.: 0 M'ie RC Flev: 0 lbs/hr. 14]Cil-RC Pressure: O psig 1490 092

.

'.

,

' ,.-

RC Temp.: 150 F PRZR Level: L2 inches PR2R Te=p.: 1500F (6) Description of Occurrence:

Cn Dece=ber 18, 1975, while conducting the Refueling Interval Reactor Building 30 psig Channels Surveillance Tes;, cne or the six (6) pressure switches was found to trip at a pressure less conservative than the trip setpcint listed in Technical Specificatien 3.5 31. The required and actual trip setpoints for the pressure switch out-of-specification, PS-290, were < 30 pais and 30 5 psig respectively.

_

The cut-of-specification pressure switch was recalibrated and retested and the resulting trip setpoint was verified as being within Technical Specification limits. The remaining five (5) similar pressure switches were determined to be within the Technical Specification limits.

(7) Designation of Apparent Cause of Occurrence:

The cause of this occurrence has been determined to te material in that the out-of-specification trip setpoint was due to ciner calibraticn drift experienced in the associated pressure switch, PS-290. This pressure switch was last calibrated en January 15, 1974.

(8) Analysis of the Occurrence:

It has been determined that this occurrence did not constitute a threat to the health and safety of the public in that the setpoints for the other five (5) Reactor Building 30 psig channels pressure switches were within the Technical Specifications 11=its end .tuld have performed their protective function had an overpressure condition occurred.

(9) Corrective Action:

In addition to the i= mediate action described above, the Plant Operaticns

- Review Cc=rittee evaluated the present ncminal setpv.at and determined that it is sufficiently conservative. Since subsequent refueling intervals vill be shorter than the present initial cycle, these pressure switches vill be calibrated more frequently, with resultant less chance of setpcint drift beyond the Technical Spec!fications limits.

(10) Failure Data:

Square D Co. Pressure Switch Type 9013 - AMG5 Form "R" 0-100 psig Range

+ 25 Accuracy 1490 093

,

.

.

-

-

-

. . . .

Similar Occurrences: Ncne Sincerely, si ,

R. C. Arncid Vice President RCA:JFE:tas ec: Office of Inspection and Enforcement, Region 1 1490 094