Abnormal Occurrence 75-29:on 750827,reactor Bldg Supply Valve AH-V-1D Failed to Fully Close.Investigation Into Cause Underway
ML19210A186
Person / Time
Site: Crane Constellation icon.png
Issue date: 08/27/1975
From: Colitz J
METROPOLITAN EDISON CO.
To:
References
NUDOCS 7910240908
Download: ML19210A186 (2)


Text

.c.

.n, s.

s-Y,;//**'?!

.} ~

m r.z.,./ ~..

l

.?..

w

~

s,

..m..

41ETROPOUTAN: EDISC COMPANY suasmanorce.wnErusucuramtsconrouno.v

TELEPHONE 717 944-4041 s

Augusti27U1975

~.;

~

- l-

., r

.- +- -

[

s t

DNEg$lb[@NhY a

jY PMg.

~

f"-

.,c-

[Yh.

i Mr.. J. P. O'"eilly

+

Directorate of Re'guintory Operations Region 1 nuclear. Reculatory.Ccanission 631 Park Ave = e

  • ~

King of P ussia. : Pennsylvania '19406 Operating License;DPR-50 Docket 50-289

.=

Subject:

A3 corral Cecm rence Mo. 'A0.75-29 s

Dear Mr. O'Ra111y:

'l - 7

+

This telegram is to confirm the conversatic'.bebeen.Bert Davis (Region 1-n MRC) and J. J. Colitz (tInit 1 Superintendent..Eree Milo. Island Nuclear Station) at 1650 hcurs on 27 August 1975.

The following re:crt is su!:c2itted in accordance with paragraph 1.8.d (page.1-6) of the Technical Specifications.

On August 27,1975 at C000 hours while placing various cessponents in the required pretest ecsitien for a periodic E. S. test, <. e valve : position indkatier, for Reactor riuilding Furg) Supply. Valve AH-V-ID indi cated that the valve was coc fully c1csed.

The operater atte:oted to open the valve, which is the rmuired pretest position, t:ut the valve did not fully open.

Re operator then closed the. valve by use of the close pushbutton and the valve fully closed.

~

.. ~ '

The other rerc:ce !:ailding. purge supply isolatten' valve Ni-V-IC was

.ve.-ified as closed and.was. tested to insure cperability..

.i

.e -

.~

!;p ~ t'..:_y.

i-. ;

"s

\\ gy s

\\ fgh-c,

..o 3 --

,.MR,.... T%. ;

.. 'i

-. e..

^

f'*,,

t.,..

-k.~

_ y. l ~

~

... m.

102 5? }. }

f ::lr.%.

8/27/75 2-AD 75-29 J. P. C'E.tiliv An inves'.icati n is presently underway to determine the cause of the valve tcifur.ction and necessary corrective action will be taken upon determinatico of cause of c:alfunction.

It shculd be noted that on August 26. 1975 a Reactor Building Purge was terminatc'J at =2045. At this tica the AH-V-ID valve position indication showed. Sat the valve was not fully closed.

Valve position folicwing purge tc-.intien was physically verified by an operator who erroneously

. judged tat AH-VID was fully closed.

Very truly yours, Coli Unit 'l S::;erintentant Three Mile Island Nuclear Station

~