ML19210A190
| ML19210A190 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 08/21/1975 |
| From: | Coalitz J METROPOLITAN EDISON CO. |
| To: | |
| Shared Package | |
| ML19210A188 | List: |
| References | |
| NUDOCS 7910240912 | |
| Download: ML19210A190 (1) | |
Text
.
~
/
4
) Z- ~
f.' 'I C:.2T;'CPCLITAN ED;SCN CC::..*ANY suasioianvoraturast ruaticuritzritscoaronario:
7ST OFFICE BOX 480 MIDDLETOWN. PENNSYLVANIA 17057 TELEPHONE 717-G44-4041 August.21. 1975 Mr.. J.P. O'Reillv. Director a rm n,m am..
}I jgu.
ctorate of Regulatory D
631 Park Avenue-King of Prussia, Pa.
19405 Operating License DpR-50 Docket 50-289
Subject:
Abnormal. Occurrence No. A0 75-27 s
Dear Mr. O'Reilly -
This telegram is to confirm the telecon between Lee Spessard (Region I-NRC),
and J.J. Colitz (THE Unit 1 Superintendent) at 1430 hours0.0166 days <br />0.397 hours <br />0.00236 weeks <br />5.44115e-4 months <br /> 21' August 1975.
The following report is submitted in accordance with paragraph 6.7.2.a.2
. (page 6-11) of the-Technical Specifications.
On August 21, 1975, during a routine inspection of the Auxiliary Building, a pin hole leak was found in the socket weld joint where the A Maketo Pump suction line vent connects to the pu:::p suction header.
This is consic;ared an Abnamal Occurrence degredation of a boundary designed to contain radioactive liquid.
The leak is being repaired and a hydroslater test will be perfomed' following weld repair of the vent line.
An investigation is being conducted into the reasons for recurring f-" Tc7f'
~
in the vent line to header connection weld.
On completion of 'the imutigation appropriate corrective action will be initiated.
Very truly yours.
J.J. Colitz Unit 1. Superintendent 1476 188 0M 791024