ML19210A243

From kanterella
Jump to navigation Jump to search
Abnormal Occurrence 75-19:on 750618,less Conservative Variable Low Reactor Coolant Sys Pressure Trip Setpoint for One Channel of Reactor Protection Sys Violated Tech Specs. Caused by Instrument Drift for Channel C Setpoint Calibr
ML19210A243
Person / Time
Site: Three Mile Island Constellation icon.png
Issue date: 06/19/1975
From: Herbein J
METROPOLITAN EDISON CO.
To:
Shared Package
ML19210A238 List:
References
NUDOCS 7910240954
Download: ML19210A243 (1)


Text

_ _ _ _ . . _ .

ALZ2/tmLJ 3M-METROPOUTAN EDJSON COMPANY suestounvorcruenarvoucununesecarouncu POS7 OFFICE BOX 480 MIDDLFTOWN. PENNSYLVANIA 17057 TELEPHONE 717 944-4041

~

June 19, 1975 Mr. J.P. O'Reilly, Director Directorate of Regulatory Operations Region I D q9lD q[D)pq .

  • d g\ " jj 'g"g['2 ' "

631 Park Avenue i d

g King of Prussla. Pa. 19406 ~ #

Operating License DPR-50 L%cket 50-289

Subject:

Abnomal occurence so. AD 75-19

Dear Mr. O'Reilly:

This telegram is to confirm the telecon between tee Spessard (Region 7-URO), and J.J. Colitz (TMI tinit ! Superintendent) at 1700 hours0.0197 days <br />0.472 hours <br />0.00281 weeks <br />6.4685e-4 months <br />. June 19. 1975.

Violation of Technical Scecification 2.3.1 in that the variable low reactor coolent System pressure trip setpoint for one RPS channel was found to be less conservative than the setpoint listed in Table 2.3.1 (Page 2-9) of the Technical Specificatinns.

The required and actual trip point for the channel cut of specification was as follows:

Table 2.3-1 Trip Actual Trip Point Setpoint at 5900 F. Measured at the Channel (16.25 T out - 7756) Bistable C 1831.5 1831.2 The variable low macter coolant system presswe trip setpoints for all four RPS channels were being tested to determine instrument drift as specified in Abnormal Occurence Report hisdeer A0 50-289/75-16. The setpoints for caannels A,8 and D were found to be within Technical Specification limits.

The out-of-specification channel has been ncalibrated and retestad, and the re-salting trip setpoint was verified as being within Technical Specification limits.

Very truly yours, ff?!

J.G. erbein

- Station Superintendent TMI Naclear Station JGiffdb 1476 q9rJc

,