{{#Wiki_filter:~~SS FEB 4 pip.~:$8~FLORIDA POWER 5 LIGHT COMPANY.January.28, 1985 L-85-48 Mr.James P.O'Reilly Regi onal Administrator, Regi on I I U.S.Nuclear Regulatory
{{#Wiki_filter:~~SS FEB 4 pip.~:$8~FLORIDA POWER 5 LIGHT COMPANY.January.28, 1985 L-85-48 Mr.James P.O'Reilly Regi onal Administrator, Regi on I I U.S.Nuclear Regulatory COIIIIission 101 Marietta Street N.W., Suite 2900 Atlanta, Georgia 30303'
COIIIIission
 
101 Marietta Street N.W., Suite 2900 Atlanta, Georgia 30303'Dear Mr.O'Reilly: Re:-Turkey Point Units 3 and 4 Docket Nos.50-250 and 50-251 Ins ection Re ort 250-84-35 5 251-84-36 I~~*'lorida Power and Light Company has reviewed the subject inspection
==Dear Mr.O'Reilly:==
report"and a response is attached.Th'ere is no proprietary
Re:-Turkey Point Units 3 and 4 Docket Nos.50-250 and 50-251 Ins ection Re ort 250-84-35 5 251-84-36 I~~*'lorida Power and Light Company has reviewed the subject inspection report"and a response is attached.Th'ere is no proprietary information in the report.Very truly yours,)J.W.Williams, Jr.Group Vice President Nuclear'nergy Department JWW/JA/ms/Kl Attachment cc: Harold F.Reis, Esquire-8503040123 850219 PDR ADOCK 05000250'Q.PDR PEOPLE...SERVING PEOPLE  
information
 
in the report.Very truly yours,)J.W.Williams, Jr.Group Vice President Nuclear'nergy
Rg: Turkey Point Units 3 and 4'ocket No.50-250, 50-251 IE Ins ection Re ort 84-250-35 and 84-251-36~~OP 14004.1"Steam Generator Protection Channels" OP 14004.2"Reactor Coolant Flow Protection Channels-Periodic~Test" FINDING 1: 10 CFR 50 Appendix B, Criterion XI,"Test Control", states, in part,'that test results shall be documented and evaluated to assure that test requirements have been satisfied.
Department
~.Licensee guality Assurance Topical guality Requirement 11, Section 11.2.3, Revision 1, and equality Procedure 11.4, Revision 4, implement these.requirements.
JWW/JA/ms/Kl
Contrary to the above, test results obtained during the performance of Operating Procedure (OP)14004;2,"Reactor Coolant Flow Protection Channels-'eriodic Test", performed on November 14, 1984, and OP 14004.4,"Pressurizer Pressure and Mater Level Protection Channels-Periodic Tests:, performed on November 15, 1984, were not documented or evaluated, in that protection bistable trip data was not recorded and consequently.did not receive supervisory review or analysis.The failure to record astable trip data is a prograomati c oversight which has resulted in the completion of several additional periodic tests without a specific evaluation of the test results.RESPONSE: 1)FPL concurs with the finding..2), The normally expected values with acceptance criteria are printed in the procedure.
Attachment
Evaluation is done after the procedure is completed to ensure that hl l the steps.wef e executed.'ut-of-tolerance settings are documented in the gA Record Section.The procedures did not require documenting the"as-read" data.3)The fo11owing procedures are being upgraded by the additions of columns to record the as-found" data.OP 14004.3 OP 14004.4"TPVG and DELTA-T Protection Channels-Periodic Test" 2 t 1"Pressurizer Pressure and Mater Level Protection Channels-Periodic Test" OP 1804.1"Axial FTuux.Pod:Deviation and.Rod Position Indication System Honthly Test" Re: IE Ins ection Re ort 250-84-35 and 251-84-36 Page 2 4)The Procedures Upgrade Program is chartered to.rewrite Turkey Point Plant.~procedures.
cc: Harold F.Reis, Esquire-8503040123
One of the improvements to procedures is the addition of columns for"as-found" data and"as-left" data.The FPL approved"Writers Guide for Maintenance Procedures", O-ADH-107,'assures that when maintenance
850219 PDR ADOCK 05000250'Q.PDR PEOPLE...SERVING PEOPLE  
'procedures are updated or new procedures are written, they are reviewed for including appropriate"as-found" and:"as-left" data.~5)Full compliance for item 3 above will be achieved by Harch 15,'1985.FINDING 2: Technical Specification (TS)4.10.1 requires periodic testing of the auxiliary feedwater (AFW)pumps to verify the ability of the system to respond properly when needed.~-'"~~.~~0.'T TS 4.10.2 requires that AFW discharge valves be tested during AFW pump tests.~~TS 4.10.4 states that AFM tests shall be considered satisfactorily if control panel indication and visual observation'of the equipment demonstrate that all coayonents have operated properly.Contrary to the above, the licensee did not perform the required visual obser-vations necessary to verify that the AFM flow control discharge valves would operate as designed.These.valves should open'utomatically in response to the o'pening of any steam supply valve, modulate as necessary to maintain.flow.and shut automatically when all the steam supply, valves are shut.Additionally, the licensee failed to perform post test lineups on the AFW flow'ontrol valves and failed to'independently verify the position of these valves.'\~~RESPONSE:~.1).FPL concurs with the finding.r 2)'he procedure was inadequate because it assumed that when the steam supply valve closed that the interlock would close the associated auxiliary feedwater control valve as designed.3).Operating Procedure, OP 7304.1,"Auxiliary Feedwater System-Periodic Test" is upgraded to verify that the interlocks on the steam supply HOY operates the flow control valve open and closed: per design..The procedure has been upgraded to include verification and independent verification of final flow control'valve alignment and pos'ition.
C}}
Rg: Turkey Point Units 3 and 4'ocket No.50-250, 50-251 IE Ins ection Re ort 84-250-35 and 84-251-36~~OP 14004.1"Steam Generator Protection
Channels" OP 14004.2"Reactor Coolant Flow Protection
Channels-Periodic~Test" FINDING 1: 10 CFR 50 Appendix B, Criterion XI,"Test Control", states, in part,'that test results shall be documented
and evaluated to assure that test requirements
have been satisfied.
~.Licensee guality Assurance Topical guality Requirement
11, Section 11.2.3, Revision 1, and equality Procedure 11.4, Revision 4, implement these.requirements.
Contrary to the above, test results obtained during the performance
of Operating Procedure (OP)14004;2,"Reactor Coolant Flow Protection
Channels-'eriodic Test", performed on November 14, 1984, and OP 14004.4,"Pressurizer
Pressure and Mater Level Protection
Channels-Periodic Tests:, performed on November 15, 1984, were not documented
or evaluated, in that protection
bistable trip data was not recorded and consequently.did not receive supervisory
review or analysis.The failure to record astable trip data is a prograomati
c oversight which has resulted in the completion
of several additional
periodic tests without a specific evaluation
of the test results.RESPONSE: 1)FPL concurs with the finding..2), The normally expected values with acceptance
criteria are printed in the procedure.
Evaluation
is done after the procedure is completed to ensure that hl l the steps.wef e executed.'ut-of-tolerance
settings are documented
in the gA Record Section.The procedures
did not require documenting
the"as-read" data.3)The fo11owing procedures
are being upgraded by the additions of columns to record the as-found" data.OP 14004.3 OP 14004.4"TPVG and DELTA-T Protection
Channels-Periodic Test" 2 t 1"Pressurizer
Pressure and Mater Level Protection
Channels-Periodic Test" OP 1804.1"Axial FTuux.Pod:Deviation
and.Rod Position Indication
System Honthly Test"  
Re: IE Ins ection Re ort 250-84-35 and 251-84-36 Page 2 4)The Procedures
Upgrade Program is chartered to.rewrite
Turkey Point Plant.~procedures.
One of the improvements
to procedures
is the addition of columns for"as-found" data and"as-left" data.The FPL approved"Writers Guide for Maintenance
Procedures", O-ADH-107,'assures that when maintenance
'procedures
are updated or new procedures
are written, they are reviewed for including appropriate"as-found" and:"as-left" data.~5)Full compliance
for item 3 above will be achieved by Harch 15,'1985.FINDING 2: Technical Specification (TS)4.10.1 requires periodic testing of the auxiliary feedwater (AFW)pumps to verify the ability of the system to respond properly when needed.~-'"~~.~~0.'T TS 4.10.2 requires that AFW discharge valves be tested during AFW pump tests.~~TS 4.10.4 states that AFM tests shall be considered
satisfactorily
if control panel indication
and visual observation'of
the equipment demonstrate
that all coayonents
have operated properly.Contrary to the above, the licensee did not perform the required visual obser-vations necessary to verify that the AFM flow control discharge valves would operate as designed.These.valves should open'utomatically
in response to the o'pening of any steam supply valve, modulate as necessary to maintain.flow.and shut automatically
when all the steam supply, valves are shut.Additionally, the licensee failed to perform post test lineups on the AFW flow'ontrol valves and failed to'independently
verify the position of these valves.'\~~RESPONSE:~.1).FPL concurs with the finding.r 2)'he procedure was inadequate
because it assumed that when the steam supply valve closed that the interlock would close the associated
auxiliary feedwater control valve as designed.3).Operating Procedure, OP 7304.1,"Auxiliary
Feedwater System-Periodic Test" is upgraded to verify that the interlocks
on the steam supply HOY operates the flow control valve open and closed: per design..The procedure has been upgraded to include verification
and independent
verification
of final flow control'valve
alignment and pos'ition.
C
}}

Revision as of 07:35, 17 August 2019

Responds to NRC 841227 Ltr Re Violations Noted in Insp Repts 50-250/84-35 & 50-251/84-36.Corrective Actions:Listed Procedures Upgraded by Additions of Columns to Record as-found Data & Operating Procedure OP 7304.1 Updated
ML17346A867
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 01/28/1985
From: Williams J
FLORIDA POWER & LIGHT CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML17346A866 List:
References
L-85-48, NUDOCS 8503040123
Download: ML17346A867 (4)


Text

~~SS FEB 4 pip.~:$8~FLORIDA POWER 5 LIGHT COMPANY.January.28, 1985 L-85-48 Mr.James P.O'Reilly Regi onal Administrator, Regi on I I U.S.Nuclear Regulatory COIIIIission 101 Marietta Street N.W., Suite 2900 Atlanta, Georgia 30303'

Dear Mr.O'Reilly:

Re:-Turkey Point Units 3 and 4 Docket Nos.50-250 and 50-251 Ins ection Re ort 250-84-35 5 251-84-36 I~~*'lorida Power and Light Company has reviewed the subject inspection report"and a response is attached.Th'ere is no proprietary information in the report.Very truly yours,)J.W.Williams, Jr.Group Vice President Nuclear'nergy Department JWW/JA/ms/Kl Attachment cc: Harold F.Reis, Esquire-8503040123 850219 PDR ADOCK 05000250'Q.PDR PEOPLE...SERVING PEOPLE

Rg: Turkey Point Units 3 and 4'ocket No.50-250, 50-251 IE Ins ection Re ort 84-250-35 and 84-251-36~~OP 14004.1"Steam Generator Protection Channels" OP 14004.2"Reactor Coolant Flow Protection Channels-Periodic~Test" FINDING 1: 10 CFR 50 Appendix B, Criterion XI,"Test Control", states, in part,'that test results shall be documented and evaluated to assure that test requirements have been satisfied.

~.Licensee guality Assurance Topical guality Requirement 11, Section 11.2.3, Revision 1, and equality Procedure 11.4, Revision 4, implement these.requirements.

Contrary to the above, test results obtained during the performance of Operating Procedure (OP)14004;2,"Reactor Coolant Flow Protection Channels-'eriodic Test", performed on November 14, 1984, and OP 14004.4,"Pressurizer Pressure and Mater Level Protection Channels-Periodic Tests:, performed on November 15, 1984, were not documented or evaluated, in that protection bistable trip data was not recorded and consequently.did not receive supervisory review or analysis.The failure to record astable trip data is a prograomati c oversight which has resulted in the completion of several additional periodic tests without a specific evaluation of the test results.RESPONSE: 1)FPL concurs with the finding..2), The normally expected values with acceptance criteria are printed in the procedure.

Evaluation is done after the procedure is completed to ensure that hl l the steps.wef e executed.'ut-of-tolerance settings are documented in the gA Record Section.The procedures did not require documenting the"as-read" data.3)The fo11owing procedures are being upgraded by the additions of columns to record the as-found" data.OP 14004.3 OP 14004.4"TPVG and DELTA-T Protection Channels-Periodic Test" 2 t 1"Pressurizer Pressure and Mater Level Protection Channels-Periodic Test" OP 1804.1"Axial FTuux.Pod:Deviation and.Rod Position Indication System Honthly Test" Re: IE Ins ection Re ort 250-84-35 and 251-84-36 Page 2 4)The Procedures Upgrade Program is chartered to.rewrite Turkey Point Plant.~procedures.

One of the improvements to procedures is the addition of columns for"as-found" data and"as-left" data.The FPL approved"Writers Guide for Maintenance Procedures", O-ADH-107,'assures that when maintenance

'procedures are updated or new procedures are written, they are reviewed for including appropriate"as-found" and:"as-left" data.~5)Full compliance for item 3 above will be achieved by Harch 15,'1985.FINDING 2: Technical Specification (TS)4.10.1 requires periodic testing of the auxiliary feedwater (AFW)pumps to verify the ability of the system to respond properly when needed.~-'"~~.~~0.'T TS 4.10.2 requires that AFW discharge valves be tested during AFW pump tests.~~TS 4.10.4 states that AFM tests shall be considered satisfactorily if control panel indication and visual observation'of the equipment demonstrate that all coayonents have operated properly.Contrary to the above, the licensee did not perform the required visual obser-vations necessary to verify that the AFM flow control discharge valves would operate as designed.These.valves should open'utomatically in response to the o'pening of any steam supply valve, modulate as necessary to maintain.flow.and shut automatically when all the steam supply, valves are shut.Additionally, the licensee failed to perform post test lineups on the AFW flow'ontrol valves and failed to'independently verify the position of these valves.'\~~RESPONSE:~.1).FPL concurs with the finding.r 2)'he procedure was inadequate because it assumed that when the steam supply valve closed that the interlock would close the associated auxiliary feedwater control valve as designed.3).Operating Procedure, OP 7304.1,"Auxiliary Feedwater System-Periodic Test" is upgraded to verify that the interlocks on the steam supply HOY operates the flow control valve open and closed: per design..The procedure has been upgraded to include verification and independent verification of final flow control'valve alignment and pos'ition.

C