ML082260341: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 3: Line 3:
| issue date = 08/06/2008
| issue date = 08/06/2008
| title = Inservice Inspection Program Third Interval, First Period, Refueling Outage 16 Owner'S Activity Report
| title = Inservice Inspection Program Third Interval, First Period, Refueling Outage 16 Owner'S Activity Report
| author name = Flannigan R D
| author name = Flannigan R
| author affiliation = Wolf Creek Nuclear Operating Corp
| author affiliation = Wolf Creek Nuclear Operating Corp
| addressee name =  
| addressee name =  

Revision as of 08:15, 12 July 2019

Inservice Inspection Program Third Interval, First Period, Refueling Outage 16 Owner'S Activity Report
ML082260341
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 08/06/2008
From: Flannigan R
Wolf Creek
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
RA 08-0073
Download: ML082260341 (5)


Text

WLF CREEK'NUCLEAR OPERATING CORPORATION August 6, 2008 Richard D. Flannigan Manager Regulatory Affairs RA 08-0073 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555

Subject:

Docket No. 50-482: Inservice Inspection Program Third Interval, First Period, Refueling Outage 16 Owner's Activity Report Gentlemen:

Enclosed is Wolf Creek Nuclear Operating Corporation's (WCNOC's)

Owner's Activity Report (Form OAR-i, Report Number WCRE-16, 13-P1-RF16) for inservice inspections performed prior to and during Wolf Creek Generating Station's (WCGS) sixteenth refueling outage (RF16) that concluded on May 14, 2008. RF16 was the second outage of the first period of the third interval of the WCNOC Inservice Inspection Program. The enclosed report is submitted pursuant to the requirements of paragraph IWA-6240 of the 1998 Edition through 2000 Addenda of Section Xl of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code and ASME Code Case N-532-4.There are no commitments contained within this letter.If you have any questions concerning this matter, please contact me at (620) 364-4117 or Ms. Diane Hooper at (620) 364-4041.Sincerely, Richard D. Flannigan RDF/rlt Enclosure cc: E. E. Collins (NRC), w/e V. G. Gaddy (NRC) w/e B. K. Singal (NRC), w/e A 7 Senior Resident Inspector (NRC), w/e P.O. Box 411 / Burlington, KS 66839 / Phone: (620) 364-8831 An Equal Opportunity Employer M/F/HC/VET FORM OAR-I OWNER'S ACTIVITY REPORT Report Number WCRE-16, 13-P1-RF16 Plant Wolf Creek Generatina Station, 1550 Oxen Lane Northeast, Burlington, Kansas 66839 Unit No. 1 Co (if applicable)

Current inspection interval 3rd Current inspection period 1st mmercial service date 9-3-1985 Refueling outage no. RF-16 (1st, 2nd, 3rd, 4th, other)(1st, 2.d, 3rd)Edition and Addenda of Section XI applicable to the inspection plans 1998 Edition through 2000 Addenda Date and revision of inspection plans WCRE-16 Rev. 3, dated 2-26-2008 Edition and Addenda of Section Xl applicable to repair/replacement activities, if different than the inspection plans same Code Cases used: See Attachment 1 (if applicable)

CERTIFICATE OF CONFORMANCE I certify that (a) the statements made in this report are correct; (b) the examinations and tests meet the Inspection Plan as required by the ASME Code,Section XI; and (c) the repair/replacement activities and evaluations supporting the completion of RF-16 (refueling outage number)conform to the requirements of Section X1.S~ianed *d A 4 5'&'l;- " r Date ,.4/gf 9'," "y A 7 0----Owner Ro¥Owner's Designee, Title .CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Kansas and employed by The Hartford Steam Boiler Inspection and Insurance Co. of Connecticut of Hartford, CT have inspected the items described in this Owner's Activity Report, and state that, to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI. " By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair/replacement activities and evaluation described in this report. Furthermore, neither the Inspector nor his employer shall be liable in any mane or any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

= 2, Commissions NB 12882ANII KS601 , tnpector's Signature National Beard, State, Province, and Endorsements Date

-OAR-I 13-P1-RF-16 Page 1 of 4 TABLE I ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRED EVALUATION FOR CONTINUED SERVICE xamination Item Description Evaluation Descr itegory and-m Number None OAR-]13-PI-RF-16 Page 2 of 4

ý , , I" I , " TABLE 2 ABSTRACT OF REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE Code Item Description of Work Date Repair/Replacement Class Description Completed Plan Number 3 American Air Remove one leaking cooling coil SN 906768- 01/24/2007 2007-001 Filter Cooling Coil H6 from service by cutting off nozzles and-SGN01D blind flanging the supply and return header connections.

3 Aerofin Cooling Repaired leak in cooling coil. 07/09/2007 2007-012 Coil -SGL1 1A 3 Velan Gate Valve Replace existing valve EFHV0091 with like 09/26/2007 2007-045-EFHV0091 kind design valve due to erosion/corrosion causing wedge to separate from the stem.3 Carrier Cooling Repaired leak in cooling coil. 07/30/2008 2007-052 Coil -SGL09A 3 Applied Eng. Co. Due to identified pitting and a pin hole leak, 12/10/2007 2007-054 Pipe Manifold -replace a section of 6" pipe, by cutting and SGN01D welding, on the SGN01D 6" return manifold outlet header.3 American Repaired South Water Box internal fillet weld, 07/30/2008 2007-065 Standard Heat on the slip-on flange attached to the shell, due Exchanger

-to corrosion pitting.EKJ04A 3 Carrier Cooling Repaired leak in cooling coil. 07/30/2008 2007-072 Coil -SGL1 1 B 3 Carrier Cooling Repaired leak in cooling coil. 07/29/2008 2008-005 Coil -SGL12A 1 Pacific Scientific

-Replace snubber due to aging management; 07/11/2008 2008-018 Pipe Support -snubber failed acceleration test after removal.EC04R022611 3 Aerofin Cooling Repaired leaks in cooling coil. 7/31/2008 2008-031 Coil -SGL11A OAR-1 13-P1-RF-16 Page 3 of 4 ATTACHMENT 1 Code Cases used: N-460 N-552 N-623 N-652 N-695 N-532-4 N-566-2 N-624 N-658 N-700 N-533-1 N-616 N-639 N-685 OAR-]13-PI-RF-16 Page 4 of 4