Line 3: |
Line 3: |
| | issue date = 04/24/2012 | | | issue date = 04/24/2012 |
| | title = IR 05000255-12-009, on 3/12/2012-3/16/2012, Palisades Nuclear Plant, Routine Post-License-Renewal Approval Site Inspection | | | title = IR 05000255-12-009, on 3/12/2012-3/16/2012, Palisades Nuclear Plant, Routine Post-License-Renewal Approval Site Inspection |
| | author name = Stone A M | | | author name = Stone A |
| | author affiliation = NRC/RGN-III/DRS/EB2 | | | author affiliation = NRC/RGN-III/DRS/EB2 |
| | addressee name = Vitale A | | | addressee name = Vitale A |
Line 18: |
Line 18: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter: | | {{#Wiki_filter:April 24, 2012 |
| [[Issue date::April 24, 2012]]
| |
|
| |
|
| Mr. Anthony Vitale Vice-President, Operations Entergy Nuclear Operations, Inc.
| | ==SUBJECT:== |
| | | PALISADES NUCLEAR PLANT POST-APPROVAL SITE INSPECTION FOR LICENSE RENEWAL, INSPECTION REPORT 05000255/2012009(DRS) |
| Palisades Nuclear Plant 27780 Blue Star Memorial Highway Covert, MI 49043-9530
| |
| | |
| SUBJECT: PALISADES NUCLEAR PLANT POST-APPROVAL SITE INSPECTION FOR LICENSE RENEWAL, INSPECTION REPORT 05000255/2012009(DRS) | |
|
| |
|
| ==Dear Mr. Vitale:== | | ==Dear Mr. Vitale:== |
| On March 16, 2012, the U. S. Nuclear Regulatory Commission (NRC) completed Phase III of the Post-Approval Site Inspection for License Renewal at your Palisades Nuclear Plant. The enclosed report documents the inspection activities, which were discussed on March 16, 2012, with Mr. B. Davis, Engineering Director, and other members of your staff. This inspection was an examination of activities conducted under your renewed license as they relate to the completion of commitments made during the renewal license application process and compliance with the Commission's rules and regulations and the conditions of your operating license. Within these areas, the inspection involved examination of selected procedures and representative records, observations of activities, and interviews with personnel. On the basis of the sample selected for review, no findings were identified. The NRC staff did not identify any instances of incomplete commitments with respect to timeliness or adequacy. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosures will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Record s System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). | | On March 16, 2012, the U. S. Nuclear Regulatory Commission (NRC) completed Phase III of the Post-Approval Site Inspection for License Renewal at your Palisades Nuclear Plant. The enclosed report documents the inspection activities, which were discussed on March 16, 2012, with Mr. B. Davis, Engineering Director, and other members of your staff. This inspection was an examination of activities conducted under your renewed license as they relate to the completion of commitments made during the renewal license application process and compliance with the Commission's rules and regulations and the conditions of your operating license. Within these areas, the inspection involved examination of selected procedures and representative records, observations of activities, and interviews with personnel. On the basis of the sample selected for review, no findings were identified. The NRC staff did not identify any instances of incomplete commitments with respect to timeliness or adequacy. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosures will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Record s System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). |
|
| |
|
| Sincerely,/RA by S. Sheldon for/ | | Sincerely, |
| | /RA by S. Sheldon for/ |
| Ann Marie Stone, Chief Engineering Branch 2 Division of Reactor Safety Docket No. 50-255; 72-007 License No. DPR-20 | | Ann Marie Stone, Chief Engineering Branch 2 Division of Reactor Safety Docket No. 50-255; 72-007 License No. DPR-20 |
|
| |
|
| ===Enclosure:=== | | ===Enclosure:=== |
| Inspection Report 05000255/2012009 | | Inspection Report 05000255/2012009 w/Attachment: Supplemental Information |
|
| |
|
| ===w/Attachment:===
| | REGION III Docket No: 50-255 License No: DPR-20 Report No: 05000255/2012009 Licensee: Entergy Nuclear Operations, Inc. |
| Supplemental Information cc w/encl: Distribution via ListServŽ Enclosure U.S. NUCLEAR REGULATORY COMMISSION REGION III Docket No: 50-255 License No: DPR-20 Report No: 05000255/2012009 Licensee: Entergy Nuclear Operations, Inc.
| |
|
| |
|
| Facility: Palisades Nuclear Plant Location: Covert, MI Dates: March 12-16, 2012 Inspectors: C. Brown, Reactor Engineer (Lead) S. Sheldon, Senior Reactor Engineer Approved by: Ann Marie Stone, Chief Engineering Branch 2 | | Facility: Palisades Nuclear Plant Location: Covert, MI Dates: March 12-16, 2012 Inspectors: C. Brown, Reactor Engineer (Lead) S. Sheldon, Senior Reactor Engineer Approved by: Ann Marie Stone, Chief Engineering Branch 2 |
Line 153: |
Line 149: |
| Open and | | Open and |
| ===Closed=== | | ===Closed=== |
| : None
| | |
| : 2
| | None |
| | |
| | 2 |
| ==LIST OF DOCUMENTS REVIEWED== | | ==LIST OF DOCUMENTS REVIEWED== |
| The following is a list of documents reviewed during the inspection. | | The following is a list of documents reviewed during the inspection. |
| : Inclusion on this list does not imply that the NRC inspectors reviewed the documents in their entirety, but rather, that selected sections of portions of the documents were evaluated as part of the overall inspection effort. | | : Inclusion on this list does |
| : Inclusion of a document on this list does not imply NRC acceptance of the document or any part of it, unless this is stated in the body of the inspection report. CALCULATIONS AND EVALUATIONS
| |
| : Number Description or Title Revision EA-EC24931-
| |
| : Engineering Analysis of Component
| |
| : KBF-901-E350 1 PLP-RPT-11-
| |
| : 00013 Establishment of Alert and Action Level Thicknesses for the Aging Management of the Inner Shell of Diesel Oil Storage
| |
| : Tank, T-10A
| |
| : PLP-RPT-2010-00014 Review of Fire Protection AMP for License Renewal Implementation
| |
| : PLP-RPT-2011-00006 Miscellaneous Tank Minimum Wall Thickness Evaluation 0
| |
| : PLP-RPT-2011-00008 Perform an Evaluation of Inspection Opportunities Prior to License Renewal per Commitment
| |
| : LO-LAR-2009-244-38
| |
| : PLP-RPT-2012-00021 Fatigue Monitoring Program Cycle 21 Report 0
| |
| : PLP-RPT-2012-00023 Fatigue Monitoring Program Summary Report 0 CORRECTIVE ACTION DOCUMENTS GENERATED DUE TO THE INSPECTION
| |
| : Number Description or Title Date
| |
| : CR-HQN-2012-00333 Failure to Evaluate
| |
| : RIS 2011-05
| |
| : 03/14/12 CR-PLP-2012-
| |
| : 01734 NRC Identified Erroneous Assumption in Calculation PLP-RPT-
| |
| : 11-00013, Revision 1
| |
| : 03/15/12 CR-PLP-2012-
| |
| : 01738 Error Discovered in
| |
| : PLP-RPT-12-00023, Fatigue Monitoring Program Summary Report, Revision 0
| |
| : 03/15/12 CORRECTIVE ACTION DOCUMENTS REVIEWED
| |
| : Number Description or Title Date
| |
| : CR-PLP-2010-
| |
| : 04836 Documentation of NDE Reports 10/11/10 CR-PLP-2010-
| |
| : 283 Inadequate Procedure Adherence Using Borescope for
| |
| : VT-1 10/19/10 CR-PLP-2010-
| |
| : 05624 Calibration Standard Used for Boroscopic Inspections Performed for the One Time Inspection Program is Not Appropriate for the Surface Being Inspected.
| |
| : 10/25/10 CR-PLP-2011-
| |
| : 00402 Oil Analysis Frequency Does not Match PMID
| |
| : 50083897 Frequency Requirements
| |
| : 01/26/11 CR-PLP-2011-
| |
| : 00428 Diesel Generator Fuel Oil Day Tanks T*25A and T*25B are not Sampled Quarterly for Particulate.
| |
| : 01/27/11
| |
| : CR-PLP-2011-Design Calculation EA*EC24931 04 Uses an Improper Design 01/28/11
| |
| : 300433 Input to Determine the Remaining Service Life of Piping Component KBF*901*E350 (Elbow). CR-PLP-2011-
| |
| : 00464 Auxiliary Feedwater Pump/Turbine Oil Sample Points are Not Specifically Identified
| |
| : 01/31/11 CR-PLP-2011-
| |
| : 00480 PM Activities for the Bottom Thickness Measurements of the Diesel Fuel Oil Tanks do not Include Limits for the UT
| |
| : Evaluation
| |
| : 01/31/11 CR*PLP-2011-
| |
| : 00602 Determine Applicability of 10
| |
| : CFR 54.37(a) Record Keeping Requirements to Palisades and Entergy Fleet.
| |
| : 2/07/11 CR-PLP-2011-
| |
| : 00676 Effectiveness of Operating Experience Use by Aging Management Program Owners
| |
| : 2/11/11 CR-PLP-2011-
| |
| : 00676 NRC Questioned How Effectively Operating Experience Is Being Assimilated by Aging Management Program Owners
| |
| : 2/11/11 CR-PLP-2011-
| |
| : 00680 Failure to Evaluate the Results of NDE Inspections of the Fuel Oil Storage Tanks
| |
| : 2/11/11 CR-PLP-2011-
| |
| : 00684 Failure to Take Adequate Corrective Actions to Removal of Water From
| |
| : 2/11/11 CR-PLP-2011-
| |
| : 00745 Buried Piping Opportunistic Inspections, Report to Address the Last 10 years' Worth of Inspections was not Comprehensive and does not Meet the Documentation Requirements of
| |
| : CFR 54.37(a).
| |
| : 2/15/11 CR-PLP-2011-
| |
| : 00887 Palisades Oil Sampling and Analysis not in Accordance with FSAR Section 1.9.1.24
| |
| : 2/23/11 CR-PLP-2011-
| |
| : 00916 Documentation of Main Feedwater Pump Oil Analysis for Elevated Particle Count Could not be Provided to the NRC
| |
| : 2/24/11 CR-PLP-2011-
| |
| : 00983 Incorporate T-926 into the Buried Services Corrosion Monitoring Aging Management Program as a Tank that Could
| |
| | |
| be Exposed to Soil/Sand on its Exterior
| |
| : 2/28/11 CR-PLP-2011-
| |
| : 01109 During Eddy Current Testing of E-31B, DG 1-2 Lube Oil Cooler, Two Tubes Were Identified as Having Dents
| |
| : 03/07/11 CR-PLP-2011-
| |
| : 01110 During Eddy Current Testing of E-22B, Five Tubes did not Meet Acceptance Criteria
| |
| : 03/07/11 CR-PLP-2011-
| |
| : 00676, CA 7 Issue a Training Evaluation for Aging Management, Aging Lessons Learned, and Evolving Aging Program Requirements
| |
| : 03/09/11 CR-PLP-2011-
| |
| : 270 Revise
| |
| : EM-27 to List Internal Oil Coolers as Separate Components for the Purpose of Aging Management
| |
| : 03/15/11 CR-PLP-2011-
| |
| : 01331 Administrative CR to Document that Certain Valid Information Submitted in 2005 Could Now be Viewed as Inaccurate
| |
| : 03/18/11 MISCELLANEOUS
| |
| : Number Description or Title Date
| |
| : 12-PAL-0002 Evaluation/Screening of Boric Acid Leakage for CR-PLP-2012-
| |
| : 00094/CR-PLP-2012-00114
| |
| : 2/09/12 12-PAL-0020 Evaluation/Screening of Boric Acid Leakage for CR-PLP-2012-
| |
| : 00122 02/08/12 12-PAL-0025 Evaluation/Screening of Boric Acid Leakage for CR-PLP-2012-
| |
| : 256 02/09/12 12-PAL-0027 Evaluation/Screening of Boric Acid Leakage for CR-PLP-2012-
| |
| : 00729 03/12/12 12-PAL-0032 Evaluation/Screening of Boric Acid Leakage for CR-PLP-2012-
| |
| : 00736 03/12/12
| |
| : Number Description or Title Date or Revision CR-PLP-2011-
| |
| : 05603 Maintenance Rule (a)(1) Action Plan for Roof Structures 0
| |
| : ENO7-PN1-01 K6B EDG Lube Oil and Jacket Water Coolers Inspection Report 03/11/11
| |
| : LO-WTPLP-2012-00025,
| |
| : CA 46 Ensure a Snapshot Assessment for the Renewed License Program in the 2014 CA&A Assessment Calendar
| |
| : 03/16/12
| |
| : LR-AMPBD-19-OCCW Open Cycle Cooling Water Program 2 PROCEDURES
| |
| : Number Description or Title Revision M 1-L-A Engineering Specification For A Pressurizer Assembly 3
| |
| : EN-DC-324 Preventive Maintenance Program 7 EN-FAP-OU-
| |
| : 104 Refueling Outage Scope Identification and Control 0
| |
| : EN-WM-101 On-Line Work Management Process 7
| |
| : EN-OE-100 Operating Experience Program 14
| |
| : EM-32-02 Fatigue Monitoring Program 1
| |
| : EM-09-24 Service Water and Fire Protection Inspection Program 3
| |
| : EM-27 Lubrication Analysis and Monitoring 12
| |
| : EM-09-16 Heat Exchanger Condition Assessment Program 9
| |
| : EM-09-15 Raw Water Corrosion Program 7
| |
| : COP-22A Diesel Fuel Oil Testing Program 16
| |
| : SEP-AMP-PLP-002 Aging Management Assessment for Failed or Degraded Equipment
| |
| : SEP-LUB-PLP-001 Lubrication Analysis and Monitoring 0
| |
| : SEP-RLP-PLP-001 Palisades Renewed License Program Section
| |
| : 0
| |
| : SOP-1B Primary Coolant System - Cooldown 11 3.26 Implementation of Palisades Renewed License Requirements 3 10.41 Site Procedure and Policy Processes 46 WORK DOCUMENTS
| |
| : Number Description or Title Date or Revision
| |
| : 51630153-01 Model
| |
| : WO-OPS D/G DY
| |
| : TKS 03/10/08
| |
| : 52038838 01 T-926, FWP Fuel Oil Tank, Clean, Inspect, and Perform
| |
| : NDE 05/12/11
| |
| : 52276276 01 T-40, Diesel Fire Pump P-41 Day Tank
| |
| : PM 03/09/12
| |
| : 52337039 08 T-91, Utility Water Storage Tank Internal Inspection 02/16/12 PMID 26363 SYENG084 000 AUDITS, ASSESSMENTS AND
| |
| : SELF-ASSESSMENTS
| |
| : Number Description or Title Revision
| |
| : LO-PLPLO-2010-00132 Palisades NRC IP71003 Phase III Inspection Readiness 09/15/2011
| |
| ==LIST OF ACRONYMS==
| |
| : [[USED]] [[]]
| |
| : [[ADAMS]] [[Agency wide Document Access Management System]]
| |
| : [[AMP]] [[Aging Management Program]]
| |
| : [[AMR]] [[Aging Management Review]]
| |
| : [[CAP]] [[Corrective Action Program]]
| |
| : [[CFR]] [[Code of Federal Regulations]]
| |
| : [[CR]] [[Condition Report]]
| |
| : [[CRG]] [[Condition Review Group]]
| |
| : [[DFP]] [[Diesel Fire Pump]]
| |
| : [[DRS]] [[Division of Reactor Safety]]
| |
| : [[EDG]] [[Emergency Diesel Generator]]
| |
| : [[ENO]] [[Entergy Nuclear Operations]]
| |
| : [[FAC]] [[Flow Accelerated Corrosion]]
| |
| : [[FMP]] [[Fatigue Monitoring Program]]
| |
| : [[FSAR]] [[Final Safety Analysis Report]]
| |
| : [[GALL]] [[Generic Aging Lessons Learned]]
| |
| : [[IMC]] [[Inspection Manual Chapter]]
| |
| : [[IP]] [[Inspection Procedure]]
| |
| : [[IR]] [[Inspection Report]]
| |
| : [[LR]] [[License Renewal]]
| |
| : [[LRA]] [[License Renewal Application]]
| |
| : [[NCV]] [[Non-Cited Violation]]
| |
| : [[NEI]] [[Nuclear Energy Institute]]
| |
| : [[NRC]] [[]]
| |
| : [[U.S.]] [[Nuclear Regulatory Commission]]
| |
| : [[OE]] [[Operating Experience]]
| |
| : [[PARS]] [[Publicly Available Records]]
| |
| : [[PI&R]] [[Problem Identification and Resolution]]
| |
| : [[PM]] [[Preventive Maintenance]]
| |
| : [[PTS]] [[Pressurized Thermal Shock]]
| |
| : [[RV]] [[Reactor Vessel]]
| |
| : [[RVI]] [[Reactor Vessel Internals]]
| |
| : [[SSC]] [[Structure, System, and Component]]
| |
| URI Unresolved Item
| |
| : [[WO]] [[Work Order]]
| |
| : [[A.]] [[Vitale -2- In accordance with 10]]
| |
| : [[CFR]] [[2.390 of the NRC's "Rules of Practice," a copy of this letter, its enclosure, and your response (if any), will be available electronically for public inspection in the]]
| |
| : [[NRC]] [[Public Document Room or from the Publicly Available Records System (]]
| |
| : [[PARS]] [[) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the]]
| |
| : [[NRC]] [[Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Sincerely, /]]
| |
| RA by S. Sheldon for/
| |
| | |
| Ann Marie Stone, Chief
| |
| Engineering Branch 2 Division of Reactor Safety Docket No. 50-255; 72-007 License No.
| |
| : [[DPR]] [[-20 Enclosure: Inspection Report 05000255/2012009 w/Attachment: Supplemental Information cc w/encl: Distribution via ListServŽ]]
| |
| }} | | }} |
|
---|
Category:Inspection Report
MONTHYEARIR 05000255/20230032023-10-0404 October 2023 NRC Inspection Report No. 05000255/2023003(DRSS)-Holtec Decommissioning International, LLC, Palisades Nuclear Plant IR 05000255/20230022023-07-19019 July 2023 NRC Inspection Report 05000255/2023002 DRSS-Holtec Decommissioning International, LLC, Palisades Nuclear Plant IR 05000255/20220032022-12-28028 December 2022 NRC Inspection Report No. 05000255/2022003(DRSS); 07200007/2022001 (Drss) Holtec Decommissioning International, LLC, Palisades Nuclear Plant IR 05000255/20224012022-11-0909 November 2022 Decommissioning Palisades Nuclear Plant - Decommissioning Security Inspection Report 05000255/2022401 IR 05000255/20220022022-08-0303 August 2022 Integrated Inspection Report 05000255/2022002 IR 05000255/20220012022-05-13013 May 2022 Integrated Inspection Report 05000255/2022001 IR 05000255/20220102022-04-0101 April 2022 Triennial Inspection of Evaluation of Changes, Tests and Experiments Baseline Inspection Report 05000255/2022010 IR 05000255/20210062022-03-0202 March 2022 Annual Assessment Letter for Palisades Nuclear Plant, Unit 1, (Report 05000255/2021006) IR 05000255/20210102022-02-24024 February 2022 Triennial Fire Protection Inspection Report 05000255/2021010 IR 05000255/20210042022-02-0808 February 2022 Integrated Inspection Report 05000255/2021004 and Exercise of Enforcement Discretion IR 05000255/20214042021-11-15015 November 2021 NRC Independent Spent Fuel Storage Installation Security Inspection Report 05000255/2021404 and 07200007/2021401 IR 05000255/20210032021-11-0303 November 2021 Integrated Inspection Report 05000255/2021003 IR 05000255/20214032021-10-21021 October 2021 Material Control and Accounting Program Inspection Report 05000255/2021403 IR 05000255/20214022021-10-0606 October 2021 Security Baseline Inspection Report 05000255/2021402 IR 05000255/20210052021-09-0101 September 2021 Updated Inspection Plan for Palisades Nuclear Plant (Report 05000255/2021005) IR 05000255/20210022021-08-10010 August 2021 Integrated Inspection Report 05000255/2021002 ML21197A0322021-07-21021 July 2021 Review of the Fall 2020 Steam Generator Tube Inspection Report IR 05000255/20210012021-05-12012 May 2021 Integrated Inspection Report 05000255/2021001 IR 05000255/20214012021-04-14014 April 2021 Security Baseline Inspection Report 05000255/2021401 IR 05000255/20200062021-03-0404 March 2021 Annual Assessment Letter for Palisades Nuclear Plant (Report 05000255/2020006) IR 05000255/20200042021-02-11011 February 2021 Integrated Inspection Report 05000255/2020004 IR 05000255/20204012021-01-0606 January 2021 Security Baseline Inspection Report 05000255/2020401 ML20342A1812020-12-10010 December 2020 Security Inspection Report Cover Letter 05000255/2020420 IR 05000255/20204202020-12-10010 December 2020 Security Inspection Report 05000255/2020420 IR 05000255/20204022020-11-30030 November 2020 Cyber Security Inspection Report 05000255/2020402 IR 05000255/20205012020-11-20020 November 2020 Emergency Preparedness Inspection Report 05000255/2020501 IR 05000255/20200032020-11-13013 November 2020 Integrated Inspection Report 05000255/2020003 IR 05000255/20200052020-09-0101 September 2020 Updated Inspection Plan for Palisades Nuclear Plant (Report 05000255/2020005) IR 05000255/20200102020-08-24024 August 2020 Biennial Problem Identification and Resolution Inspection Report 05000255/2020010 IR 05000255/20203012020-08-13013 August 2020 NRC Initial License Examination Report 05000255/2020301 IR 05000255/20200022020-08-11011 August 2020 Integrated Inspection Report 05000255/2020002 and Exercise of Enforcement Discretion IR 05000255/20010082020-05-12012 May 2020 Final ASP Analysis - Palisades (IR 050002552001008) IR 05000255/20200012020-05-12012 May 2020 Integrated Inspection Report 05000255/2020001 IR 05000255/20200112020-04-21021 April 2020 Design Basis Assurance Inspection (Teams) Inspection Report 05000255/2020011 IR 05000254/20204012020-03-23023 March 2020 Security Baseline Inspection Report 05000254/2020401 and 05000265/2020401 IR 05000255/20190062020-03-0303 March 2020 Annual Assessment Letter Palisades Nuclear Plant (Report 05000255/2019006) IR 05000255/20190042020-01-28028 January 2020 Integrated Inspection Report 05000255/2019004 and 07200007/2019001 ML19357A2752019-12-23023 December 2019 Request for Information for an NRC Triennial Baseline Design Bases Assurance Inspection (Team); Inspection Report 05000255/2020011 IR 05000255/20190112019-11-27027 November 2019 Triennial Inspection of Evaluation of Changes, Tests and Experiments Baseline Inspection Report 05000255/2019011 IR 05000255/20194112019-11-25025 November 2019 Security Baseline Inspection Report 05000255/2019411 and Independent Spent Fuel Storage Security Inspection Report 07200007/2019401 (Cover Letter Only) (DRS-M.Ziolkowski) IR 05000255/20190032019-11-14014 November 2019 Integrated Inspection Report 05000255/2019003 IR 05000255/20190102019-10-29029 October 2019 Reissue - Palisades Nuclear Plant - Design Basis Assurance Inspection (Programs) Inspection Report 05000255/2019010 ML19294A2872019-10-21021 October 2019 Design Basis Assurance Inspection (Programs) Inspection Report 05000255/2019010 IR 05000255/20190052019-08-28028 August 2019 Updated Inspection Plan for Palisades Nuclear Plant, Unit 1 (Report 05000255/2019005) ML19210D4022019-07-29029 July 2019 Ltr. 07/29/19 Palisades Nuclear Plant - Information Request for NRC Triennial Evaluations of Changes, Tests, and Experiments (50.59) Baseline Inspection; Inspection Report 05000255/2019011 (DRS-D.Szwarc) IR 05000255/20190022019-07-26026 July 2019 Integrated Inspection Report 05000255/2019002 IR 05000255/20194102019-06-0404 June 2019 NRC Security Baseline Inspection Report 05000255/2019410 (Cover Letter Only) (DRS-N.Egan) IR 05000255/20190012019-05-10010 May 2019 Errata - Palisades Nuclear Plant, Unit 1 - NRC Integrated Inspection Report 05000255/2019001 ML19123A1742019-05-0303 May 2019 NRC Integrated Inspection Report 05000255/2019001 IR 05000255/20150032019-04-11011 April 2019 Errata - Palisades Nuclear Plant, NRC Integrated Inspection Report 05000255/2015003 (DRS-K.Stoedter) 2023-07-19
[Table view] Category:Letter
MONTHYEARML24022A1172024-01-23023 January 2024 Acceptance of Requested Licensing Action Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations ML24012A2422024-01-16016 January 2024 Acceptance of Requested Licensing Action License Transfer Request ML23236A0042023-12-27027 December 2023 Issuance of Amendment 274 Re Changes to Perm Defueled Emergency Plan and Perm Defueled Emergency Action Level Scheme ML23355A1242023-12-26026 December 2023 Withdrawal of an Amendment Request Re License Amendment Request to Revise License Condition to Eliminate Cyber Security Plan Requirements ML23192A0772023-12-26026 December 2023 Letter Exemption from the Requirements of 10 CFR 140.11(a)(4) Concerning Offsite Primary and Secondary Liability Insurance ML23191A5222023-12-22022 December 2023 Exemption Letter from the Requirements of 10 CFR 50.54(W)(1) Concerning Onsite Property Damage Insurance (EPID - L-2022-LLE-0032) ML23263A9772023-12-22022 December 2023 Exemption from Certain Emergency Planning Requirements and Related Safety Evaluation ML23354A2602023-12-21021 December 2023 Reference Simulator Inspection Request for Information L-23-019, Proof of Financial Protection 10 CFR 140.152023-12-18018 December 2023 Proof of Financial Protection 10 CFR 140.15 PNP 2023-030, License Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations2023-12-14014 December 2023 License Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations PNP 2023-035, Withdrawal of License Amendment Request - Revise License Condition to Eliminate Cyber Security Plan Requirements2023-12-12012 December 2023 Withdrawal of License Amendment Request - Revise License Condition to Eliminate Cyber Security Plan Requirements PNP 2023-028, Application for Order Consenting to Transfer of Control of License and Approving Conforming License Amendments2023-12-0606 December 2023 Application for Order Consenting to Transfer of Control of License and Approving Conforming License Amendments L-23-012, Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point2023-11-13013 November 2023 Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point ML23291A4402023-11-0303 November 2023 Acceptance of Requested Licensing Action Request for Exemption from 10 CFR 50.82(a)(2) to Support Reauthorization of Power Operations IR 05000255/20230032023-10-0404 October 2023 NRC Inspection Report No. 05000255/2023003(DRSS)-Holtec Decommissioning International, LLC, Palisades Nuclear Plant ML23275A0012023-10-0202 October 2023 Request for Withholding Information from Public Disclosure for Palisades Nuclear Plant PNP 2023-025, Request for Exemption from Certain Termination of License Requirements of 10 CFR 50.822023-09-28028 September 2023 Request for Exemption from Certain Termination of License Requirements of 10 CFR 50.82 PNP 2023-026, Pre-Submittal Meeting Presentation - Palisades Nuclear Plant License Transfer Application to Support Resumption of Power Operations2023-09-28028 September 2023 Pre-Submittal Meeting Presentation - Palisades Nuclear Plant License Transfer Application to Support Resumption of Power Operations PNP 2023-023, Special Report High Range Noble Gas Monitor Inoperable2023-08-0909 August 2023 Special Report High Range Noble Gas Monitor Inoperable ML23215A2302023-08-0303 August 2023 Notice of Organization Change - Chief Nuclear Officer IR 05000255/20230022023-07-19019 July 2023 NRC Inspection Report 05000255/2023002 DRSS-Holtec Decommissioning International, LLC, Palisades Nuclear Plant ML23087A0362023-05-0202 May 2023 PSDAR Review Letter ML23117A2172023-05-0101 May 2023 Safety Evaluation for Quality Assurance Program Manual Reduction in Commitment PNP 2023-018, 2022 Annual Non-Radiological Environmental Operating Report2023-04-25025 April 2023 2022 Annual Non-Radiological Environmental Operating Report L-23-004, HDI Annual Occupational Radiation Exposure Data Reports - 20222023-04-24024 April 2023 HDI Annual Occupational Radiation Exposure Data Reports - 2022 PNP 2023-007, and Big Rock Point, 2022 Annual Radioactive Effluent Release and Waste Disposal Reports2023-04-19019 April 2023 and Big Rock Point, 2022 Annual Radioactive Effluent Release and Waste Disposal Reports PNP 2023-008, 2022 Radiological Environmental Operating Report2023-04-18018 April 2023 2022 Radiological Environmental Operating Report L-23-003, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-31031 March 2023 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations PNP 2023-002, 6 to Updated Final Safety Analysis Report2023-03-31031 March 2023 6 to Updated Final Safety Analysis Report ML23088A0382023-03-29029 March 2023 Stations 1, 2, & 3, Palisades Nuclear Plant, and Big Rock Point - Nuclear Onsite Property Damage Insurance PNP 2023-006, Report of Changes to Security Plan, Revision 202023-03-29029 March 2023 Report of Changes to Security Plan, Revision 20 PNP 2023-012, Presentation on Regulatory Path to Reauthorize Power Operations2023-03-16016 March 2023 Presentation on Regulatory Path to Reauthorize Power Operations ML23038A0982023-03-15015 March 2023 Request for Withholding Information from Public Disclosure ML23095A0642023-03-14014 March 2023 American Nuclear Insurers, Notice of Cancellation Rescinded PNP 2023-001, Regulatory Path to Reauthorize Power Operations2023-03-13013 March 2023 Regulatory Path to Reauthorize Power Operations PNP 2023-004, Report of Changes to Palisades Nuclear Plant Technical Specification Bases2023-03-0808 March 2023 Report of Changes to Palisades Nuclear Plant Technical Specification Bases PNP 2023-005, Response to Palisades Nuclear Plant - Request for Additional Information Related to the Post-Shutdown Decommissioning Activities Report2023-03-0101 March 2023 Response to Palisades Nuclear Plant - Request for Additional Information Related to the Post-Shutdown Decommissioning Activities Report ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities ML23052A1092023-02-17017 February 2023 FEMA Letter to NRC, Proposed Commission Paper Language for Palisades Nuclear Plant Emergency Plan Decommissioning Exemption Request ML23032A3992023-02-0101 February 2023 Regulatory Path to Reauthorize Power Operations IR 05000255/20220032022-12-28028 December 2022 NRC Inspection Report No. 05000255/2022003(DRSS); 07200007/2022001 (Drss) Holtec Decommissioning International, LLC, Palisades Nuclear Plant L-22-042, Oyster, Pilgrim, Indian Point, Palisades and Big Rock Point - Proof of Financial Protection 10 CFR 140.152022-12-14014 December 2022 Oyster, Pilgrim, Indian Point, Palisades and Big Rock Point - Proof of Financial Protection 10 CFR 140.15 PNP 2022-037, Report of Changes to Security Plan, Revision 192022-12-14014 December 2022 Report of Changes to Security Plan, Revision 19 ML22321A2852022-11-17017 November 2022 LLC Master Decommissioning Trust Agreement for Palisades Nuclear Plant IR 05000255/20224012022-11-0909 November 2022 Decommissioning Palisades Nuclear Plant - Decommissioning Security Inspection Report 05000255/2022401 PNP 2022-036, Response to Request for Additional Information Regarding License Amendment Request for Proposed Permanently Defueled Emergency Plan and Permanently Defueled Emergency Action Level Scheme2022-11-0808 November 2022 Response to Request for Additional Information Regarding License Amendment Request for Proposed Permanently Defueled Emergency Plan and Permanently Defueled Emergency Action Level Scheme PNP 2022-035, International - Notification of Commitment Cancellations for Remaining Activities Related to Beyond-Design-Basis Seismic Hazard Reevaluations2022-11-0202 November 2022 International - Notification of Commitment Cancellations for Remaining Activities Related to Beyond-Design-Basis Seismic Hazard Reevaluations PNP 2022-024, Request for Exemption from 10 CFR 140.11(a)(4) Concerning Primary and Secondary Liability Insurance2022-10-26026 October 2022 Request for Exemption from 10 CFR 140.11(a)(4) Concerning Primary and Secondary Liability Insurance PNP 2022-026, Request for Exemption from 10 CFR 50.54(w)(1) Concerning Onsite Property Damage Insurance2022-10-26026 October 2022 Request for Exemption from 10 CFR 50.54(w)(1) Concerning Onsite Property Damage Insurance ML22292A2572022-10-25025 October 2022 Permanently Defueled Emergency Plan License Amendment RAI Letter 2024-01-23
[Table view] |
Text
April 24, 2012
SUBJECT:
PALISADES NUCLEAR PLANT POST-APPROVAL SITE INSPECTION FOR LICENSE RENEWAL, INSPECTION REPORT 05000255/2012009(DRS)
Dear Mr. Vitale:
On March 16, 2012, the U. S. Nuclear Regulatory Commission (NRC) completed Phase III of the Post-Approval Site Inspection for License Renewal at your Palisades Nuclear Plant. The enclosed report documents the inspection activities, which were discussed on March 16, 2012, with Mr. B. Davis, Engineering Director, and other members of your staff. This inspection was an examination of activities conducted under your renewed license as they relate to the completion of commitments made during the renewal license application process and compliance with the Commission's rules and regulations and the conditions of your operating license. Within these areas, the inspection involved examination of selected procedures and representative records, observations of activities, and interviews with personnel. On the basis of the sample selected for review, no findings were identified. The NRC staff did not identify any instances of incomplete commitments with respect to timeliness or adequacy. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosures will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Record s System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA by S. Sheldon for/
Ann Marie Stone, Chief Engineering Branch 2 Division of Reactor Safety Docket No. 50-255;72-007 License No. DPR-20
Enclosure:
Inspection Report 05000255/2012009 w/Attachment: Supplemental Information
REGION III Docket No: 50-255 License No: DPR-20 Report No: 05000255/2012009 Licensee: Entergy Nuclear Operations, Inc.
Facility: Palisades Nuclear Plant Location: Covert, MI Dates: March 12-16, 2012 Inspectors: C. Brown, Reactor Engineer (Lead) S. Sheldon, Senior Reactor Engineer Approved by: Ann Marie Stone, Chief Engineering Branch 2
Division of Reactor Safety 1 Enclosure
SUMMARY OF FINDINGS
IR 05000255/2012009; 3/12/2012-3/16/2012; Palisades Nuclear Plant; Routine Post-License-Renewal Approval Site Inspection. This report covers a 1-week inspection by region based inspectors. No findings of significance were identified. The NRC's program for overseeing the safe operation of commercial nuclear power reactors is described in NUREG-1649, "R eactor Oversight Process," Revision 4, dated December 2006.
A. NRC-Identified
and Self-Revealed Findings No findings were identified.
B. Licensee-Identified Violations
No violations of significance were identified.
REPORT DETAILS
OTHER ACTIVITIES
4OA5 Other Activities
.1 Post-Approval Site Inspection for License Renewal (Phase III) - Inspection Procedure
71003
a. Inspection Scope
The inspectors reviewed the licensee's extent-of-condition and extent-of-cause investigations, and the corrective actions that resulted from the open condition reports (CRs) initiated during the previous Post-Approval Site Inspection for License Renewal (Inspection Report (IR) 05000255/2011008). Particular emphasis was placed on the five findings with three associated Non-Cited Violations (NCVs). The inspectors also reviewed the results and actions from self-assessment activities in regards to aging management. The inspectors reviewed work activities, associated with aging management programs, completed between March 2011 and this inspection; the licensee's use of operating experience (OE) related to aging management; and the integration of aging management program (AMP) into the licensee's routine programs, practices, and work activities, particularly in the corrective action program (CAP).
Due to questions on the licensee's fatigue monitoring program (FMP) requirements and activities from IR 05000255/2012007, completed on February 17, 2012, the inspectors continued reviewing the FMP during this inspection.
b. Assessment
- (1) Condition Reports from IR 2011008 Findings The inspectors conducted interviews and reviewed CAP actions for each finding, and associated NCV (if applicable), including supporting documents and completed surveillance records or work items for the following:
- (a) Failure to Assure Adequate Resolution for Remote Visual Examinations (NCV 05000255/2011008-01);
- (b) Test Results for Diesel Fuel Oil Tanks Not Evaluated (NCV 05000255/2011008-02);
- (c) Tank T-10A Not Age Managed for Effect of Identified Water (NCV 05000255/2011008-03);
- (d) Flow Accelerated Corrosion Program Acceptance Limits Not in Accordance with Design Standard (FIN 05000255/2011008-04); and
- (e) Failure to Implement Adequate Oil Sampling and Analysis Aging Management Program (FIN 05000255/2011008-05).
Observations The inspectors found the assessments and corrective actions for the findings to be adequate. The licensee had taken reasonable corrective actions to ensure meeting and continuing to integrate the AMP commitments into the existing programs. Specific measures had been taken to address each of the deficiencies associated with the individual findings.
Findings No findings of significance were identified.
- (2) Other CRs Initiated as a Result of IR 2011008 The inspectors reviewed the resolution of CRs initiated as a result of the previous inspection. The inspectors reviewed the completed evaluations, and the corrective actions for proper prioritization, (root cause, apparent cause, and common cause) and probable effectiveness, especially as to addressing aging issues.
Findings No findings of significance were identified.
- (3) Self-Assessments The inspectors assessed the licensee staff's ability to identify and enter issues into the CA program, prioritize and evaluate issues, and implement effective corrective actions through efforts from self-assessments. Specifically, the inspectors reviewed Snapshot Assessment, LO-PLPLO-2010-00132 CA-1, "Palisades NRC IP71003 Phase III Inspection Readiness," dated September 11, 2011, for aging management aspects, as well as the overall self-assessment effort.
Observations The inspectors found the snapshot assessment to be thorough and insightful. The licensee identified that previous corrective actions (CAs) had not been effective and had initiated new CRs to address the deficiencies. The new CRs were detailed and addressed the aging management aspects appropriately.
Findings No findings of significance were identified.
- (4) AMP Work Activities Completed from March 2011 to Present The inspectors reviewed the completed individual work items associated with AMPs, particularly for ties to the AMPs and for the integration of the AMP requirements into the routine planning and work order evolutions. The items reviewed included five boric acid evaluation/screenings; emergency diesel generator (EDG) jacket water and lube oil cooler inspection (and the associated CRs); a Maintenance Rule (a)(1) plan for roof structures; 2011 3 rd quarter oil sampling and analysis reports; Fatigue Monitoring Program Summary Reports and Summary Cycle Reports for Cycles 19, 20, and 21; two fuel oil monitoring and maintenance work orders; and a utility water storage tank, T-91, internal inspection work order.
Observations The inspectors found the work activities to be thorough and complete. However, it was not always clear that the activity was tied to an aging management commitment. For example, the lube oil sampling and analysis program was driven solely through the licensee's pre-existing preplanned preventive maintenance items (PMs). There was no clear identification that the PMs were fulfilling aging management commitments and no clear requirements to review AMP commitments before changing or eliminating the PMs. Additionally, the boric acid evaluations had no discernible connection to the associated AMPs. Based on the observations in this area, the inspectors had a concern for how the licensee ensured that aging management activities would not be delayed, changed, or cancelled without the program owner and/or management involvement. This concern is addressed in Section 4OA5.1.b(6) below.
Findings No findings of significance were identified.
- (5) Use of Operating Experience in Aging Management The inspectors reviewed the licensee's implementation of the facility's operating experience (OE) program. Specifically, the inspectors reviewed implementing OE program procedures and completed evaluations of aging management OE issues and events, and interviewed individuals with respect to the use of OE with respect to aging management. The inspectors' review was to determine whether the licensee was
effectively integrating aging management OE into the performance of daily activities, whether evaluations of issues were proper, whether the licensee's program was sufficient to prevent future occurrences of previous industry events, and whether the licensee effectively used the information in developing departmental assessments and facility audits. The inspectors looked particularly at the licensee's handling of of the following:
- IN 2011-20, "Concrete Degradation Concrete Degradation By Alkali-Silica Reaction";
- Regulatory Issue Summary (RIS) 2011-05, "Information On Revision 2 To The Generic Aging Lessons Learned Report For License Renewal Of Nuclear Power Plants";
- RIS 2011-14, "Metal Fatigue Analysis Performed By Computer Software."
Observations With one exception, the inspectors determined that the licensee was adequately reviewing and incorporating aging management OE into the plants processes, procedures, and work activities. However, the site had not evaluated RIS 2011-05.
The inspectors noted that RIS 2011-005 was screened by the fleet OE team on July 13, 2011, and was distributed to each Entergy site. An OE Written Action (NRC-RIS-2011-05-A2-IPC-0001) was initiated and work task LO-WTIPC-2011-00029 5 Enclosure CA 116 was assigned to corporate licensing to review the RIS. The work task was subsequently closed to a headquarters condition report (CR-HQN-2011-01045). The response CA 6 to CR-HQN-2011-01045 assigned reviews of RIS 2011-005, in the Entergy OE process, to fleet license renewal personnel. At the time of this inspection, the evaluation of RIS 2011-05 had not been completed. The licensee initiated CR-HQN-2012-00333 to document the delay in the OE evaluation of RIS 2011-005.
Findings No findings of significance were identified.
- (6) Integration of Aging Management Program Commitments into Routine Processes Due to concerns developed during the inspection (Item
- (4) above), the inspectors reviewed how the licensee incorporated the aging management commitments into the everyday activities; particularly as to how the review for aging concerns would become a standard review question and assimilated into the licensee's review process.
Observations The inspectors reviewed the AMP commitments and the procedures governing how aging management issues were controlled to ensure no items could be delayed, cancelled, or deferred without the program owner's, supervisor's, or manager's knowledge and concurrence. The inspectors also interviewed the AMP single point of contact and several program owners. The inspectors did not observe a clear, readily discernible tie between the implementing work items and aging management commitments. However, carefully reviewing all of the governing procedures and documents revealed that the tie to aging management was established and that AMP commitments had to be reviewed before any of the items could be revised or discarded.
During the review, the inspectors noted that a code had been established in the CAP to note aging issues on any CR reviewed by t he condition review group(CRG); however, no specific item in the review process had been established to examine every CR for any possible lessons learned or impact on aging management. In response to this question, the licensee added a specific item to the CRG package checklist to ensure that CRs involving aging management are trended correctly.
Findings No findings of significance were identified.
- (7) Fatigue Monitoring Program The Fatigue Monitoring Program (FMP) ensures that limits on the fatigue usage are not exceeded by monitoring and tracking selected cyclic transients. The program provides cycle counting activities for confirming analyt ically derived cumulative usage values.
As documented in the Palisades Nuclear Plant - Problem Identification and Resolution Inspection Report 05000255/2012007, the inspectors were concerned with the timeliness of actions associated with approving the use of a software program in the Fatigue Monitoring program. The inspectors also questioned the adequacy of the program for ensuring thermal cycles tracking. Inspection of these items continued during this current inspection.
Observations The inspectors consulted with the NRR staff to determine the specific commitments for the Palisades FMP. Subsequently, the inspectors interviewed personnel, reviewed the pressurizer design specification, reviewed procedures, and reviewed PLP-RPT-12-00023, "Fatigue Monitoring Program Summary Report," Revision 0, and determined that the licensee was meeting the AMP commitment for the fatigue monitoring program.
Findings No findings of significance were identified.
4OA6 Management Meetings
.1 Exit Meeting Summary
On March 16, 2012, the inspectors presented the inspection results to Mr. B. Davis and other members of the licensee staff. The inspectors confirmed that none of the potential report input discussed was considered proprietary. ATTACHMENT:
SUPPLEMENTAL INFORMATION
KEY POINTS OF CONTACT
Licensee
- W. Archibald, Chemistry
- B. Davis, Engineering Director
- M. Cimock, Sr. Programs Engineer
- T. Davis, Licensing
- J. Erickson, Licensing
- J. Kuemin, Licensing
- N. Lane, Projects Manager
- J. Miksa, Programs Engineering Manager
- C. Plachta, Quality Assurance Manager
LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED
Discussed
- 05000255/2011008-01 NCV Failure to Assure Adequate Resolution for Remote Visual Examinations (Section 4OA5.1 b.(1)(a))
- 05000255/2011008-02 NCV Test Results for Diesel Fuel Oil Tanks Not Evaluated. (Section 4OA5.1 b.(1)(b))
- 05000255/2011008-03 NCV Tank T-10A Not Age Managed for Effect of Identified Water. (Section 4OA5.1 b.(1)(c))
- 05000255/2011008-04 FIN Flow Accelerated Corrosion Program Acceptance Limits Not in Accordance with Design Standard (Section 4OA5.1 b.(1)(d))
- 05000255/2011008-05 FIN
Failure to Implement Adequate Oil Sampling and Analysis Aging Management Program. (Section 4OA5.1 b.(1)(e))
Open and
Closed
None
2
LIST OF DOCUMENTS REVIEWED
The following is a list of documents reviewed during the inspection.
- Inclusion on this list does