| issue date = 04/23/2012
| issue date = 04/23/2012
| title = 2012 Quad Cities Power Plant Initial License Examination Miscellaneous Correspondence
| title = 2012 Quad Cities Power Plant Initial License Examination Miscellaneous Correspondence
| author name = Palagi B B, Tilton C E
| author name = Palagi B, Tilton C
| author affiliation = NRC/RGN-III/DRS/OLB
| author affiliation = NRC/RGN-III/DRS/OLB
| addressee name = Pacilio M J
| addressee name = Pacilio M
| addressee affiliation = Exelon Nuclear
| addressee affiliation = Exelon Nuclear
| docket = 05000254, 05000265
| docket = 05000254, 05000265

Revision as of 17:47, 28 June 2019

2012 Quad Cities Power Plant Initial License Examination Miscellaneous Correspondence
ML12172A177
Person / Time
Site: Quad Cities  Constellation icon.png
Issue date: 04/23/2012
From: Palagi B, Caroline Tilton
NRC/RGN-III/DRS/OLB
To: Pacilio M
Exelon Nuclear
Shared Package
ML12166A570 List:
References
Download: ML12172A177 (60)


Text

{{#Wiki_filter:2012 QUAD CITIES POWER PLANT INITAL LICENSE EXAMINATION MISCELLANEOUS CORRESPONDENCE UNITED NUCLEAR REGULATORY REGION 2443 WARRENVILLE ROAD, SUITE LISLE, IL April 10, 2012 Mr. Michael J. Pacilio Senior Vice President, Exelon Generation Company, LLC President and Chief Nuclear Officer (CNO), Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555

SUBJECT:

OPERATOR LICENSING EXAMINATION APPROVAL

Dear Mr. Pacilio:

The purpose of this letter is to confirm the final arrangements for the upcoming operator licensing examinations at the Quad Cities Nuclear Power Station. The U. S. Nuclear Regulatory Commission (NRC) has completed its review of the operator license applications in connection with this examination and will separately provide a list of approved applicants to Mr. Karl Moser, Training Manager. Note that any examination waivers and application denials have been addressed in separate correspondence. The NRC has approved the subject examinations and hereby authorizes you to administer the written examinations in accordance with Revision 9 of 021, "Operator Licensing Examination Standards for Power Reactors," one day during the week of April 30, 2012. The NRC staff will administer the operating tests during the week of April 23, 2012. Please contact Mr. Bruce B. Palagi, Chief Examiner, at 630-829-9611, if you have any questions or identify any errors or changes in the license level (RO or SRO) or type of examination (partial or complete written examination and/or operating test) specified for each applicant. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access M Padlio and Management System (ADAMS), accessible from the Electronic Reading Room page of the NRC's public Web site at http://www.nrc.qov/readinq-rm/adams.html. Sincerely, IRA! Caroline Tilton, Acting Chief Operations Branch Division of Reactor Safety Docket Nos. 50-254; 50-265\ License Nos. DPR-29; DPR-30 cc: Distribution via ListServŽ M Pacilio and Management System (ADAMS), accessible from the Electronic Reading Room page of the NRC's public Web site at http://www.nrc.govlreading-rm/adams.html. Sincerely, IRA! Caroline Tilton, Acting Chief Operations Branch Division of Reactor Safety Docket Nos. 50-254; 50-265 License Nos. DPR-29; DPR-30 cc: Distribution via ListServŽ DISTRIBUTION: Breeda Reilly RidsNrrDorlLpl3-2 Resource RidsNrrPMQuadCities Resource RidsNrrDirslrib Resource Chuck Casto Cynthia Pederson Jennifer Uhle Steven Orth Jared Heck Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley Tammy Tomczak J. McHale, NRR J. R. Kweiser, DRS DOCUMENT NAME: G:\Exam Approval Ltr-Quad Cities 2012.doc To receive. a copy 0 f'thiS document. indicate in the box 'e' = Copy wlo attach/enc! "E" = opy with attac h/IN C enc" "= N 0 copy OFFICE RIII:DRS Ic RIII:DRS IN RIII:DRS IN I NAME JRKweiser:jb BBPalagi: CTilton: DATE 04/04/12 04/09/12 04/10/12 OFFICIAL RECORD UNITED NUCLEAR REGULATORY REGION 2443 WARRENVILLE ROAD, SUITE LISLE, IL January 13, 2012 Mr. Michael J. Pacilio Senior Vice President, Exelon Generation Company, LLC President and Chief Nuclear Officer (CNO), Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555 SUB..QUAD CITIES NUCLEAR POWER STATION CONFIRMATION OF INITIAL LICENSE EXAMINATION

Dear Mr. Pacilio:

In a telephone conversation on January 11,2012, between Mr. E. Pannell, Operations Training and Mr. Bruce Palagi, Chief Examiner, arrangements were made for the administration of licensing examinations at the Quad Cities Nuclear Power Station during the weeks of April 23, 2012 and April 30, 2012. In addition, the NRC will make an examination validation visit to your facility the week of April 2, 2012. As agreed upon during the telephone conversation, your staff will prepare the examinations based on the guidelines in Revision 9, Supplement 1, of NUREG-1021 , "Operator Licensing Examination Standards for Power Reactors." The NRC's regional office will discuss with your staff any changes that might be necessary before the examinations are administered. To meet the above schedule, it will be necessary for your staff to furnish the examination outlines by February 7,2012. The written examinations, operating tests, and supporting reference materials identified in Attachment 3 to ES-201 will be due by March 5, 2012. Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3>>, an authorized representative of the facility licensee shall approve the outlines, examinations, and tests before they are submitted to the NRC for review and approval. All materials shall be complete and ready to use. We request that any personal, proprietary, sensitive unclassified, or safeguards information in your response be contained in a separate enclosure and appropriately marked. Any delay in receiving the required examination and reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled. In order to conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and to make the simulation facility available on the dates noted above. In accordance with ES-302, your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final. Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered. M. Pacilio To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator license applications (Office of Management and Budget (OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024), and waiver requests (if any) (OMB approval number 3150-0090) at least 30 days before the first examination date. If the applications are not received at least 30 days before the examination date, a postponement may be necessary. Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date. This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 etseq.). These information collections were approved by the Office of Management and Budget, approval number3150-0018. The public reporting burden for this collection is estimated to average 500 hours per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of these information collections, including suggestions for reducing the burden, to the Records and FOIAlPrivacy Services Branch (T-5 F52), U. S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail to INFOCOLLECTS@NRC.GOV; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, DC 20503. The NRC may neither conduct nor sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html(the Public Electronic Reading Room). Thank you for your cooperation in this matter. Mr. Pannell has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. Bruce Palagi at 630-829-9611, or me at 9707. Sincerely, IRA! Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-254; 50-265 License Nos. DPR-29; DPR-30 cc: Distribution via ListServ M. Pacilio To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator license applications (Office of Management and Budget (OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024), and waiver requests (if any) (OMB approval number 3150-0090) at least 30 days before the first examination date. If the applications are not received at least 30 days before the examination date, a postponement may be necessary. Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date. This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0018. The public reporting burden for this collection is estimated to average 500 hours per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of these information collections, including suggestions for reducing the burden, to the Records and FOIAlPrivacy Services Branch (T-5 F52), U. S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail to INFOCOLLECTS@NRC.GOV

and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, DC 20503. The NRC may neither conduct nor sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html(the Public Electronic Reading Room}. Thank you for your cooperation in this matter. Mr. Pannell has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. Bruce Palagi at 630-829-9611, or me at 630-829-9707.

Sincerely, IRA! Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-254; 50-265 License Nos. DPR-29; DPR-30 cc: Distribution via ListServ DISTRIBUTION: See next page DOCUMENT NAME: G:\DRSIII\DRS\WORK IN PROGRESS\LTR 011312 QUA DRS OL 120-DAY LTR.DOCX To receive a copy of this document, Indicate in the concurrence box "CD = Copy without attach/encl hE" = Copy with attach/encl ION" = No copy OFFICE RIII:DRS I RIII:DRS I I BPalagi:jb NAME HPeterson il"\J\TI:: 01/12/12 01/13/12 i ..... OFFICIAL RECORD COpy I Letter to Michael J. Pacilio from Hironori Peterson dated January 13, 2012. QUAD CITIES NUCLEAR POWER STATION CONFIRMATION OF INITIAL LICENSE EXAMINATION DISTRIBUTION: Amy Snyder RidsNrrDorlLpl3-2 Resource RidsNrrPMQuadCities Resource RidsNrrDirslrib Resource Cynthia Pederson Jennifer Uhle Steven Orth Jared Heck Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley Tammy Tomczak www.exeloncorp.com Nuclear KKM-ll-OOI March 10,2011 Mr. Hironori Peterson U.S. NRC Region III 2443 Warrenville Road, Suite 210 Lisle, IL 60532-4352

Dear Mr. Peterson:

Quad Cities Generating Station requests a date change for the CY2012 Initial Operator License Examination. The current Nuclear Regulatory Commission schedule shows a start date of March 26,2012 and end date of Apri16, 2012. Quad Cities Station requests a start date of Apri123, 2012 and end date of May 4,2012. The requested change in dates is to add one month of exam development time. This is due to a month long simulator outage required to replace critical hardware components. Additionally, conversations with the Region III scheduler indicate the requested time period is available. If additional information is required, please contact me at (309) 227-4000 or Frank Schulte at (309) 227-4137. Sincerely yours, Karl K. Moser Training Director Quad Cities Nuclear Station KKMlFS/gmj cc: Letterbook MAR 2,1 UNITED NUCLEAR REGULATORY REGION 2443 WARRENVILLE ROAD, SUITE LISLE, IL June 1, 2011 Mr. Michael Pacilio Senior Vice President, Exelon Generation Company, LLC President and Chief Nuclear Officer (CNO), Exelon Nuclear 4300 Winfield Road Warrenville,lL 60555 CONFIRMATION OF INITIAL OPERATOR LICENSE EXAMINATIONS: QUAD CITIES NUCLEAR POWER STATION

Dear Mr. Pacilio:

We have received your corporate letter RS-10-130. In that letter, you requested an initial operator licensing examination be scheduled at the Quad Cities Nuclear Power Station for September 2013 and February 2015. In response, we have scheduled an initial operator licensing examination for the weeks of October 14 and 21, 2013, at the Quad Cities Nuclear Power Station. Additionally, we have scheduled an initial operator licensing exam for the week of March 23, 2015. On-site validation of these examinations is tentatively scheduled approximately three weeks prior to the examination dates. We note that you were previously scheduled for an initia.l operator licensing exam the week of March 26, 2012. Per your request, we have rescheduled this exam for the weeks of April 23 and April 30, 2012. We have scheduled an onsite validation date of April 2, 2012. In the unlikely event that we are unable to support the examination during the scheduled weeks, we will inform you immediately upon discovery of such conditions and make arrangements to administer the examination at a mutually acceptable date. We understand that your staff will develop the examinations unless we determine it is necessary for the NRC to develop an examination in which case, we will notify you immediately upon discovery of that need. Because your letter indicated that there were more than nine applicants being considered for each of these examinations, the examinations were each scheduled for two weeks. Please inform us if the number of candidates change for any examination as this will impact the examination schedule. Also, please inform us at your earliest opportunity if you discover you need to change the scheduled dates for the examinations. A supplementary letter will be sent to the training department approximately 120 days prior to the examination informing the training manager of the chief examiner's name. The letter will also outline examination security expectations, list the materials required by the NRC to conduct the examination, reconfirm the examination date, and reconfirm the number of candidates you have in the training program. M. Pacilio In accordance with 10 CFR 2.930 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publically Available Records System (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS), accessible from the NRC Web site at httg:llww.nrc.qov/readinq-rm/adams.html (the Public Electronic Reading Room). Sincerely, IRA by D. McNeil forI Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-254; 50-265 License Nos. DPR 29; DPR 30 cc: Distribution via ListServ M. Pacilio In accordance with 10 CFR 2.930 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or 'from the Publically Available Records System (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS), accessible from the NRC Web site at http://ww.nrc.gov/reading-rm/adams.html(the Public Electronic Reading Room). Sincerely, IRA by D. McNeil fori Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-254; 50-265 License Nos. DPR 29; DPR 30 cc: Distribution via ListServ DISTRIBUTION: Daniel Merzke RidsNrrDorlLpl3-2 Resource RidsNrrPMQuad Cities RidsNrrDirslrib Resource Cynthia Pederson Steven Orth Jared Heck Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley Tammy Tomczak DOCUMENT NAME: G:\DRSIII\DRS\WORK IN PROGRESS\OL EXAM CONFIRMATION LETTERS\QUA 060111 DRS OL.DOCX o Publicly Available o Non-Publicly Available o Sensitive o Non-Sensitive To receive aeopy of this document indicate in the box: "C": COpy without attachmenVenclosure "E" =COpy with attachment/enclosure "N": No copy OFFICE Rill I Rill IN I I NAME RKWalton:co HPeterson DM for DATE 06/01/2011 06/01/2011 OFFICIAL RECORD COpy

  • . 1 " ,.., r Exelon Exelon Generation www.exeloncorpcom Nuclear 4300 Winfield Road Warrcnvi11e, IL 60555 July U. S. Nuclear Regulatory ATTN: Document Control Washington, DC Braidwood Station, Units 1 and 2 Facility Operating License Nos. NPF-72 and NPF-71 NRC Docket Nos. STN 50-456 and STN 50-457 Byron Station, Units 1 and 2 Facility Operating License Nos. NPF-37 and NPF-66 NRC Dock§t Nos. STN 50-454 and STN 50-455 Clinton Power Station, Unit Facility Operating License No. NRC Docket No. Dresden Nuclear Power Station, Units 2 and 3 Facility Operating License Nos. DPR-2, (Renewed)

DPR-19 and DPR-25 NRC Docket Nos. 50-10. 50-237. and 50-249 LaSalle County Station, Units 1 and 2 Facility Operating License Nos. NPF-11 and NPF-18 NRC Dock§t Nos. 50-373 and 50-374 Limerick Generating Station, Units 1 and 2 Facility Operating License Nos. NPF-39 and NPF-85 NRC Docket Nos. 50-352 and 50-353 Oyster Creek Nuclear Generating Station Renewed Facility Operating License No. DPR-16 NRC Docket Nos, 50-219 Peach Bottom Atomic Power Station, Units 2 and 3 Facility Operating license Nos, DPR-12, (Renewed) DPR-44, and DPR-56 NRC DQck§t NQs, 50-277 and 50-27& Quad Cities Nuclear Power Station, Units 1 and 2 Renewed Facility Operating License Nos. DPR-29 and DPR-30 NRC DQcket Nos. 50-254 and 50-265 Three Mile Island Nuclear Station, Unit Renewed Facility Operating License No. NRC Dock§t No. /") , Z' £1 C./AU' AUG 2 -2010 July 28,2010 U. S. Nuclear Regulatory Commission Page 2 Exelon Generation Company, LLC (EGG) Response to NRC Regulatory Issue Summary 2010-08, "Preparation and Scheduling of Operator Licensing Examinations" NRC Regulatory Issue Summary 2010-08, "Preparation and Scheduling of Operator licenSing Examinations," dated June 28, 2010 The referenced Regulatory Issue Summary (RIS) requested that facility licensees provide a proposed schedule of operator licensing examinations and an estimate of the number of candidates requiring initial operator license examinations for calendar years 2012 through 2015, and the number of candidates requiring Generic Fundamentals Examinations for calendar years 2012 and 2013. Attachments 1 through 10 provide responses to RIS 2010-08 for the EGC plants identified above. The requested information for each facility is provided on a separate NRC Form 536. There are no regulatory commitments contained within this letter. Should you have any questions about this letter, please contact Mitchel Mathews at (630) 657-2819. Attachment 1 -Completed NRC Form 536 for Braidwood Station Attachment 2 -Completed NRC Form 536 for Byron Station Attachment 3 -Completed NRC Form 536 for Clinton Power Station Attachment 4 -Completed NRC Form 536 for Dresden Nuclear Power Station Attachment 5 -Completed NRC Form 536 for LaSalle County Station Attachment 6 -Completed NRC Form 536 for Limerick Generating Station Attachment 7 -Completed NRC Form 536 for Oyster Creek Nuclear Generating Station Attachment 8 -Completed NRC Form 536 for Peach Bottom Atomic Power Station Attachment 9 -Completed NRC Form 536 for Quad Cities Nuclear Power Station Attachment 10 -Completed NRC Form 536 for Three Mile Island Nuclear Station -Unit 1 Attachment 1 Exelon Generation Company, LLC Response to Regulatory Issue Summary 2010-08 Page 1 of 1 NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMS: NO. 3150-0131 EXPIRES: 10131/2011 (10-2006) Estimated burden per to comply with this voluntary Information collection request: 1 hour. hiS Information collection is used to plan budget lind resources for operator examinations. Send comments burde OPERA TOR LICENSING estimate to the Records and FOINPrivacy Services Branch -5 F 3), U.S Nuclear Commission. Washington, DC 20555-000 , or interne EXAMINATION DATA e-mail to in 0 "80'1, and to the Desk Officer, Office of t ormauon and 8-10202. (3150-0131), Office of ManaQement an Budget, Wash! 20503. If a means used to Impose an !nformatlo collection does not display a currently valid OM8 control number, the NRC may not conduct or srconsor. and a person is not required to respond to, the information collect on. d n s n . t FACILITY NRC REGION Braidwood Station, Units J and 2 FacUlty Operating License Nos. NPF-72 and NPF-77 III NRC Docket Nos. STN 50-456 and STN S0-457 II A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2012 CY 2013 CY 2014 --Cy 2015 -ESTIMATED NUMBER OF LICENSEE-PREPARED EXAMINATIONS 0 1 1 0 ESTIMATED NUMBER OF NRC*PREPARED EXAMINATIONS 0 0 0 0 B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER Cy20UCY 2013 -CY 2014 Cy2015-NUMBER OF REACTOR OPERATORS 0 8 6 0 NUMBER OF SENIOR REACTOR OPERATORS -INSTANT 0 12 6 0 NUMBER OF SENIOR REACTOR OPERATORS*UPGRADE 0 0 0 0 NUMBER OF SENIOR REACTOR OPERATORS* LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE N/A 3/25/2013 12/08/2014 N/A ALTERNATE DATE N/A 41812013 115/2015 N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED NUMBER CY 2012 CY 2013 MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF CANDIDATES 0 0 0 0 0 0 12 0 NRC FORM 536 (1()"2008) PRINTED ON RECYCLED PAPER Attachment 2 Exelon Generation Company, LLC Response to Regulatory Issue Summary 2010-08 Page 1 of 1 NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150.()131 EXPIRES: 10131/2011 (10-2008) Estimated burden per to comply with this voluntary informatio collection request: 1 hour. his informal ion collection is used to plan budget and resources for operator examinations. Send comments burde OPERATOR LICENSING estimate to the Records and FOIAIPrivacy Services Branch -5 F 3), U.S Nuclear Commission, Washington, DC 20555-000 , or bf: intema EXAMINATION DATA e-mail to in ocoliects@nrC'gov, and to the Desk Officer, Office of In ormation and Regulatory Affairs, NE B-l0202. (3150'()131). Office of Management and Budget, Washmgton. DC 20503. If a means used to impose an informatio collectlon does not display a currenUy valid OMB control number. llle NRC may not conduct or sponsor. and a person is not required to respond to, the informalion collectiOn. n n n s . t FACll.lTY NRC REGION Byron Station, Units I and 2 Facility Operating License Nos. NPF-37 and NPF-66 III NRC Docket Nos. STN 50-454 and STN 50-455 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2012 --Cy 2013-CY 2014CY 2015 -ESTIMATED NUMBER OF LICENSEE* PREPARED EXAMINATIONS 1 t I J ESTIMATED NUMBER OF NRC-PREPARED EXAMINATIONS 0 0 0 0 B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER Cy 2012 -CY 2013CY 2014-CY 2015-NUMBER OF REACTOR OPERATORS 2 6 6 0 NUMBER OF SENIOR REACTOR OPERATORS* INSTANT 6 6 6 6 NUMBER OF SENIOR REACTOR OPERATORS* UPGRADE 0 0 I 0 NUMBER OF SENIOR REACTOR OPERATORS -LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE 1123/2012 112112013 1/27/2014 111912015 ALTERNATE DATE 1/1612012 1128/2013 1120/2014 1126/2015 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED NUMBER Cy 2012 Cy 2013 MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF CANDIDATES 0 0 12 0 0 0 6 0 NRC FORM 536 (1Q.2008) PRINTED ON RECYCLED PAPER Attachment 3 Exelon Generation Company, LLC Response to Regulatory Issue Summary 2010-08 Page 1 of 1 NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMS: NO. 3150"()131 EXPIRES: 10/3112011 (10-2008) Estimated burden per response to comply with this volunlary informatkln collection request: 1 hour. This InformatJon collectJon is used to plan budgets and resources for operator examinations. Send comments burde OPERATOR LICENSING estimate to the Records and FOINPrlvacy Services Branch \ -5 F 3). U.S Nuclear Commission, Washington, DC 20555..()OO

  • or Interne EXAMINATION DATA a*mail to In ocollec!S@nrcsov.

and to the Desk Officer. Office of In ormation and Regulatory Affalra. NE B-l0202, (3150-0131). Office of Management an Budget. Washington, DC 20503. If a means used to impose an informatio collection does not display a currently valid OMS control number, the NRC may not conduct or seonsor, and a parson is not required to respond to, lhe Information collect on. n n . t d FACILITY Clinton Power Station Facility Operating License No. NPF-62 NRC Docket NO. 50-461 NRC REGION III A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2012-CY 2013 -CY 2014 -CY 2015 -ESTIMATED NUMBER OF LlCENSEE*PREPARED EXAMINATIONS 0 J 0 1 ESTIMATED NUMBER OF NRC*PREPARED EXAMINATIONS 0 0 0 0 B. INITIAL OPERA TOR LICENSE EXAMINATIONS PROPOSED NUMBER Cy20U-Cy2013-CY 2014 -CY 2015 -NUMBER OF REACTOR OPERATORS 0 6 0 6 NUMBER OF SENIOR REACTOR OPERATORS* INSTANT 0 4 0 4 NUMBER OF SENIOR REACTOR OPERATORS* UPGRADE 0 2 0 2 NUMBER OF SENIOR REACTOR OPERATORS* LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE N/A 08119/13 N/A 08117/15 ALTERNATE DATE N/A 08126/13 N/A 08/24/15 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED NUMBER CY 20.12 CY 2013 MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF CANDIDATES 0 10 0 () 0 0 () 0 NRC FORM 536 (10-2008) PRINTED ON RECYCLED PAPER Attachment 4 Exelon Generation Company, LLC Response to Regulatory Issue Summary 2010-08 Page 1 of 1 ""RCFORM534 u.s. NUCLEAR REGULATORY COMMISSION APPROVED BY OM8; NO. 3150-0131 EXPIRES; 10131/2011 1',0-200&) Estlmal80 burden to comply with till. vOluntary In!olmarlon coUec1ion request: hOUf. hie InlormaUon toI!ectiln is U$80 to plan budgets and 1911Oun::es ro, operalor axem!t\a!lon$. Send comment. :e:;.aralnB bUl'den OPERATOR LICENSING eatWnate to Ihtl Records and FOIAIPtivacy Services Branch \ -5 F 3), U.S. NUdear Commluion. Wnhlngton. DC 20555-000

  • Of b7c Inleme EXAMINATION DATA e-lTIlIiI to In and to the Desk Officer, Offlee oJ In ormallon iI/ld ReguIalO:&.;JfIlIti.

NE 8-10202. (315().(l1311. 0ft'Ice or Man.....enl and Budget. Wash ton, DC 2Cl503. If II means used 10 impoae an information con8ction does not d.y a eurrenUY valid OMS control number. the NRC may not conduct or 'pon50r, and

  • pel'1lon Is nol requIred 10 respond 10, thtl Inrotmation toIlldioo.

F....ClLlTY Dresden Nuelear Power Station, Unlts:z aud 3 Renewed Facility Operating License Nos. DPR-I9 and DPR-2! NRC Docket Nos. 5"237 aDd 50-249 NRC REGION III l A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2011 -CY 2013 -CY 2014-CY lOts -ESTIMATED NUMBER OF LlCENSEE-PREPAREO EXAMINATIONS 1 I 0 I ESTIMATED NUMBER OF NRC-PREPAAED EXAMINATIONS 0 0 0 0 B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2012 -CylO13-CY2014-Cy201!-NUMBER OF REACTOR OPERATORS 5 4 0 4 NUMBER OF SENIOR REACTOR OPERATORS* INSTANT 7 7 0 7 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 0 J 0 J NUMBER OF SENIOR REACTOR OPERATORS -LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE 816111 10/14/13 N/A 3/2115 ALTERNATE OATE 8/2on2 101Z8l13 N/A 3/23115 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED NUMBER CY 20U CY 1013 MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF CANDIDATES 0 12 0 0 0 0 0 12 530 Po-20(8) PRINTeO ON RECYCLeO PAPIR Attachment 5 Exelon Generation Company, LLC Response to Regulatory Issue Summary 2010-08 Page 1 of 1 NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMS: NO. 3150.{l131 EXPIRES: 10/3112011 (10.2008) Estimated burden per to comply wilh this voluntary information collection request: 1 hour. his Information callectlan is used to plan budgets and resources far operator examinations. Send comments burde OPERA TOR LICENSING estimate to the Records and FOIAlPrlvacy Services Branch -5 F 3). U.S. Washington. DC 20555-0001, or br, internet EXAMINATION DATA e-mail t and 10 the Desk Officer. Office of In ormation B-l0202. (3150.{l131). Office of Management and 20503. If a means used to impose an Information collection does not display a currently valid OMB control number. the NRC may not conduct or sF-0nsor, and a person is not required to respond to, lhe informallon COllect on. n FACILITY LaSalle County Station, Units 1 and 1 Facility Operating License Nos. NPF*t1 and NPF-18 NRC Docket Nos. STN 50-373 and 8TN 50-374 NRC REGION A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2012 CY 2013 --Cy 2014 --Cy 2015-ESTIMATED NUMBER OF LICENSEE-PREPARED EXAMINATIONS 1 0 I 0 ESTIMATED NUMBER OF NRC-PREPARED EXAMINATIONS 0 0 0 0 B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2012 -Cy2013CY 2014 -CY 2015 -NUMBER OF REACTOR OPERATORS 8 0 6 0 NUMBER OF SENIOR REACTOR OPERATORS -INSTANT S 0 6 0 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 2 0 2 0 NUMBER OF SENIOR REACTOR OPERATORS -LIMITED 0 0 0 It PROPOSED DATES PRIMARY DATE 912412012 N/A 10/13/2014 N/A ALTERNATE DATE 10/112012 N/A 10120/2014 N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED NUMBER CY 2012 CY 2013 MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATEO NUMBER OF CANDIDATES 0 0 0 0 0 12 0 0 NRC fORM 536 (1()'2008) PRINTED ON RECYCLED PAPER Attachment 6 Exelon Generation Company, LLC Response to Regulatory Issue Summary 2010-08 Page 1 of 1 NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO,3150-0131 EXPIRES: 10/31/2011 11O-Z(08) Estimated burden per to comply with this voluntary informalion collection request: 1 hour, his information collection Is used to plan budget and resources for operator examinations, Send comments burde OPERA TOR LICENSING estimate to the Records and FOIA/Prlvacy Services Branch -5 F 3), U.S Nuclear Commission. Washington. DC 20555-000

  • or bl: Interne EXAMINATION DATA e-mail to in oCollectS@nrc.gov, and 10 the Desk Officer. Office of In ormation and Regulatory Affairs. NE B-10202. (3150-0131).

Office of Management an Budget. Washington. DC 20503. If a means used 10 impose an infomtatio collection does not display II currently valid OMB control number. the NRC may not conduct or sponsor. and a person is not required to respond to. the Information collection. n d n s . t FACILJTY Limerick Generating Station, Units 1 and 2 Facility Operating License Nos. NPF-39 and NPF-8S NRC Docket Nos. 50-352 and 50-353 NRC REGION 1 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 20J2 -Cy 2013 --Cy 2014 -Cy 2015 -ESTIMATED NUMBER OF LICENSEE-PREPARED EXAMINATIONS 1 0 1 0 ESTIMATED NUMBER OF NRC-PREPARED EXAMINATIONS 0 0 0 0 B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER Cy20U-CY 2013 -CY 2014 -CY 2015-NUMBER OF REACTOR OPERATORS 8 0 8 0 NUMBER OF SENIOR REACTOR OPERATORS -INSTANT 7 0 6 0 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 2 0 2 0 NUMBER OF SENIOR REACTOR OPERATORS -LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE 10/08/2012 N/A 10/06/2014 N/A ALTERNATE DATE 10llS/20U N/A 10/13/2014 N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED NUMBER CY 2012 CY 2013 MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATEO NUMBER OF CANDIDATES 0 0 0 0 0 14 0 0 NRC FORM 536 (10-200a) PRINTED ON RECYCLED PAPER Attachment 7 Exelon Generation Company, LLC Response to Regulatory Issue Summary 2010*08 Page 1 of 1 NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPRoveo BV OMS: NO. 315Q.0131 EXPIRES: 1013112011 (10.20<18) ESllmated burden per to comply wiln this vc;untery information COIlactIon request: 1 0011/'. his informallon ccllillCbon ill used !o plan budgets OPERA TOR LICENSING and rellOUrceII for operator examinations, Send comments 'rif:l burden esllmal8 to tile Records and FOIAlPrlVillCY SeNic>>. Branch *5 F 3). U,S NudNr Cornmi84lon. Waflninglon, DC 20555-000 . or intllfl14 EXAMINATION DATA e-mail Ie I tec1SQnrc,gt. and to the Ouk Olftcar. Office of In onnatlo and Regula:.r, Affairs. NE 8-10202, (315().()131). Office of Management an SqllC, We nglan, DC 20503, II a means used to 1Illp0s8 an informatio collBCtlon does not II cummtly valid OMS controf nUmber. the NRC may not I;omlucl or sponsor. and II perlOn is nCI reqUired to r**pond to. tne informatlcn collacflOtl, FACll..IiY Oyster Creek Nudear Generating Station Renewed Faelllty Operating License No. DPR*16 NRC Docket No. 50-219 NRC REGION I . ll n d n A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER Cy20U-Cy 2013 -CY 2014-CY 2015-ESTIMATED NUMBER OF LlCENSEE*PREPARED EXAMINATIONS I 0 r 0 ESTIMATED NUMBER OF NRC*PREPARED EXAMINATIONS 0 0 0 0 B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CylOU-CY2013-CY 2014-CY 2015NUMBER OF REACTOR OPERATORS 6 0 6 0 NUMBER OF SENIOR REACTOR OPERATORS* INSTANT 3 0 2 0 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 2 0 5 0 NUMBER OF SENIOR REACTOR OPERATORS* LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE 05/29/2012 N/A 0610211014 N/A AlTERNATE DATE 06/04/2012 N/A 06109/2014 N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINA nON (GFE) SCHEDULE PROPOSED NUMBER CY 20U CY 2013 ' ", MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF CANOIDATES 0 0 0 0 IJ 0 0 0 NRC FORM 536 (1()'20Ga) PRINTEO ON RECYClEO PAPER Attachment 8 Exelon Generation Company, LLC Response to Regulatory Issue Summary 2010-08 Page 1 of 1 NRC FORM 536 U.S, NUCLEAR REGULATORY COMMISSION (1(}-2008) OPERATOR LICENSING EXAMINATION DATA APPROVED BY OMS: NO. 3150-0131 EXPIRES: 10/31/2011 Estimated burden per to comply with this voluntary information collection request: 1 hour. his information oollection is used to plan budget and resources for operator examinations. Send comments rfardlng burde estimate to the Records and FOIAlPrivacy Services Branch -5 F 3), U.S Nuclear Commission. Washington. DC 20555-000

  • or blc inteme e-mail to in ocollects@nrc-g0v.

and to the Desk Officer. OffICe of In ormation and Regulatory Affairs. NE 8-10202. (3150-O131). Office of Management an Budget. Washington. DC 205()3. If a means used to impose an Informatio collection does not display a current'y valid OMS control number. the NRC may not conduct and a person is not required to respond to. th information coli on. n n e s . t d FACILITY NRC REGION Peach Bottom Atomic Power Station, Units 2 and 3 Facility Operating License Nos. OPR-12, (Renewed) OPR-44, and OPR-56 I NRC Docket Nos. 50-277 and 50-278 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER Cy 2012 -Cy 2013 Cy 2014-CY 2015 -ESTIMATED NUMBER OF LICENSEE-PREPARED EXAMINATIONS 0 1 0 1 ESTIMATED NUMBER OF NRC-PREPARED EXAMINATIONS 0 0 0 0 B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER Cy 2012CY2013-CY 2014 CY 2015 -NUMBER OF REACTOR OPERATORS 0 8 0 6 NUMBER OF SENIOR REACTOR OPERATORS -INSTANT 0 10 0 6 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 0 2 0 2 NUMBER OF SENIOR REACTOR OPERATORS -LIMITED

  • SeeLGS
  • See LGS
  • See LGS '" See LGS PROPOSED DATES PRIMARY DATE N/A 211112013 N/A 2/9/2015 ALTERNATE DATE N/A 3/25/2013 N/A 3/23/2015 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED NUMBER CY 2012 CY 2013 MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF CANDIDATES 0 0 0 0 0 0 12 0 NRC FORM 536 (10-2008)

PRINTED ON RECYCLED PAPER Attachment 9 Exelon Generation Company, LLC Response to Regulatory Issue Summary 2010-08 Page 1 of 1 NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APf'ROVED BY OMS; NO. 3150-{)131 EXPIRES: 1013112011 (10.2008) Estimated burden per to comply with this voluntary information collection request: 1 hour. his inrormation collection is used to plan budgets and resources for operator examinations. Send comments reifrding burden OPERA TOR LICENSING estimate to the Recorda and FOIAIPrivacy Services Branch ( *5 F 3). U.S. Nuclear Commission. Washington. DC 20555-0001. or by' Internet EXAMINATION DATA e*mailto in lIects@nrc.gov. and to the Desk Officer. Office of In ormation and Regulatory Affairs. NE B*10202. (3150*0131). Office of Management and Budget. Washington. DC 20503. If a means used to impose an infonmatlon collection does not display a currently valid OMB control number. the NRC may not conduct or and a person is not required to respond to, the Information colle . FACILITY Quad Cities Nuclear Power Station, Units 1 and 2 Renewed Facility Operating License Nos. DPR-19 and DPR-30 NRC Docket Nos. 50-254 and 50-265 NRC REGION A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2012-Cy 2013 CY 2014-CY 2015-ESTIMATED NUMBER OF L1CENSEE*PREPARED EXAMINATIONS 1 1 0 1 ESTIMATED NUMBER OF NRC-PREPARED EXAMINATIONS 0 0 0 0 B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2012-CY 2013-CY 2014-Cy 2015NUMBER OF REACTOR OPERATORS 4 5 0 5 NUMBER OF SENIOR REACTOR OPERATORS -INSTANT 9 5 0 5 NUMBER OF SENIOR REACTOR OPERATORS* UPGRADE 0 1 0 0 NUMBER OF SENIOR REACTOR OPERATORS -LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE 3/2612012 9/2312013 N/A 2/912015 ALTERNATE DATE 4123/2012 10114/2013 N/A 2/2312015 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED NUMBER CY 2012 CY 2013 MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF CANDIDATES 0 10 0 0 0 0 0 10 NRC FORM 536 (10*2008) PRINTED ON RECYCLED PAPER Attachment 10 Exelon Generation Company, LLC Response to Regulatory Issue Summary 2010-08 Page 1 of 1 NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION (10*Z00 8) OPERA TOR LICENSING EXAMINATION DATA APPROVED BY OMB: NO. 3150-{)131 EXPIRES: 10/3112011 Estimated burden per to comply with this voluntary collection request: 1 hour. his information collection is used 10 plan b and resources for operalOr examinations. Send comments estimate to the Records and FOIAIPrivacy Services Branch \ -5 F 3. . Nuclear Commission. Washington. DC 20555-000 ,or bt: internet e-mail 10 in ocollects@nrc'gov. and to the Desk Officer, Office of In ormation and Regulatory Affairs, NE B-10202, (315O-{)131). Office of Management an Budget, WashIngton, DC 20503. If a means used to Impose an informatio collection does not display iii currently valid OMS control number, the NRC may not conduct or sponsor, and a person Is not required to respond 10, the information collection. n . d FACILITY NRC REGION Tbree Mile Island Nuclear Station, Unit 1 Renewed Facility Operating License No. DPR*50 I NRC Docket No. 50-289 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2012-Cy 2013-Cy 2014 -CY 2015-ESTIMATED NUMBER OF LICENSEE-PREPARED EXAMINATIONS 1 1 I I ESTIMATED NUMBER OF NRC-PREPARED EXAMINAnONS 0 0 0 0 B. INITIAL OPERA TOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2012 -CY 2013 -CY 2014-Cy2015-NUMBER OF REACTOR OPERATORS 4 5 4 6 NUMBER OF SENIOR REACTOR OPERATORS -INSTANT 5 5 5 6 NUMBER OF SENIOR REACTOR OPERATORS* UPGRADE 0 0 0 0 NUMBER OF SENIOR REACTOR OPERATORS* LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE 02/612012 6110/2013 6/16/2014 6/15/2015 ALTERNATE DATE 02113/2012 6/17/2013 6/23/2014 612212015 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED NUMBER CY 2012 CY 2013 MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF CANDIDATES 10 0 0 0 9 0 0 0 NRC FORM 536 (10-2008) PRINTED ON RECYCLED PAPER , UNITED STATES NUCLEAR REGULATORY COMMISSION REGION 2443 WARRENVILLE ROAD, SUITE LISLE, IL February 19, 2010 Mr. Charles G. Senior Vice President, Exelon Generation Company, President and Chief Nuclear Officer (CNO), Exelon 4300 Winfield Warrenville IL CONFIRMATION OF REQUESTED INITIAL OPERATOR LICENSE EXAMINATIONS: NRC REGION III EXELON STATIONS

Dear Mr. Pardee:

In a letter dated August 13, 2009 (RS-09-109), your staff responded to Regulatory Issue Summary (RIS) 2009-11, and requested we schedule initial license operator examinations for the Exelon Nuclear Plants. In a separate letter dated March 19, 2009 (U-603882), Clinton Power Station requested an examination be administered in October or November 2010 that was not included in your RIS response letter. That examination has been added to your examination schedule. In a separate letter dated November 18, 2009 (U-603924), Clinton Power Station requested we not schedule the examination requested in December 2011 per your letter, but retain an August 2011 examination scheduled from your response to the 2008 RIS for examination scheduling. In a separate letter dated January 6, 2010 (Byron 2010-0003), Byron Station requested we change the dates of their examinations proposed for 2011,2012, and 2013 to other dates. We were unable to accommodate the April 2013 examination requested for Quad Cities Nuclear Power Station. It is currently listed as uTo Be Determined" as we are currently negotiating a mutually acceptable examination date with Quad Cities training department personnel. This letter confirms scheduling of the requested examinations at the Region III Exelon power plants and incorporates the changes requested by Clinton Power Station and Byron Station. We have tentatively scheduled the requested examinations to occur as follows: Station 2010 2011 2012 2013 2014 Braidwood N/R 06/20 N/R 03/25 I N/R . Byron 9/27 N/R 01/16 01/14 01/27 i Clinton 11/1 i 8122 N/R 8/19 N/R i I Dresden i 03108 03107 3105 3/04 N/R i LaSalle 09/13 N/R 09/24 N/R ! N/R ! Quad Cities N/R 5/30 3/26 TBD ! N/R i N/R -None Requested TBD To Be Determined On-site validation of the examinations is tentatively scheduled to occur approximately three weeks before each scheduled examination. In the unlikely event that we are unable to support the examination during the scheduled weeks, we will inform you and the affected station'S training department immediately upon discovery of such conditions and make arrangements to administer the examination at a mutually acceptable date. C. Pardee We understand that your staff will develop the proposed examinations unless we discover it is necessary for the NRC to develop an examination. If an examination anticipates greater than nine anticipated applicants for the examination, the examination is scheduled for two weeks. Otherwise, the examination is scheduled for one week. Please inform us if the number of candidates declines below ten for any examination as this will impact the examination schedule. Please inform us at your earliest opportunity if you discover a need to change any of the dates of the scheduled examinations. A supplementary letter will be sent to each station's training department director approximately 120 days prior to the initial examination. The letter will provide the director with the chief examiner's name, an outline of examination security expectations, a list of the materials required by the NRC to conduct the examination, and it will reconfirm the examination dates and the number of candidates you have in the training program. If you have any questions concerning this information, please contact Mr. Dell McNeil of my staff at 630-829-9737. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html(the Public Electronic Reading Room}. Sincerely, IRA! Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-456; 50-457 License Nos. NPF-72; NPF-77 Docket Nos. 50-454; 50-455 License Nos. NPF-37; NPF-66 Docket No. 50-461 License No. NPF-62 Docket Nos. 50-237; 50-249 License Nos. DPR-19; DPR-25 Docket Nos. 50-373; 50-374 License Nos. NPF-11; NPF-18 Docket Nos. 50-254; 50-265 License Nos. DPR-29; DPR-30 cc: Distribution via ListServ C. Pardee We understand that your staff will develop the proposed examinations unless we discover it is necessary for the NRC to develop an examination. If an examination anticipates greater than nine anticipated applicants for the examination, the examination is scheduled for two weeks. Otherwise, the examination is scheduled for one week. Please inform us if the number of candidates declines below ten for any examination as this will impact the examination schedule. Please inform us at your earliest opportunity if you discover a need to change any of the dates of the scheduled examinations. A supplementary letter will be sent to each station's training department director approximately 120 days prior to the initial examination. The letter will provide the director with the chief examiner's name, an outline of examination security expectations, a list of the materials required by the NRC to conduct the examination, and it will reconfirm the examination dates and the number of candidates you have in the training program. If you have any questions concerning this information, please contact Mr. Dell McNeil of my staff at 630-829-9737, In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html(the Public Electronic Reading Room). Sincerely, IRA! Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-456; 50-457 License Nos. NPF-72; NPF-77 Docket Nos. 50-454; 50-455 License Nos. NPF-37; NPF-66 Docket No. 50-461 License No. NPF-62 Docket Nos. 50-237; 50-249 License Nos. DPR-19; DPR-25 Docket Nos. 50-373; 50-374 License Nos. NPF-11; NPF-18 Docket Nos. 50-254; 50-265 License Nos. DPR-29; DPR-30 cc: Distribution via ListServ DISTRIBUTION: See next page DOCUMENT NAME: G:\DRS\Work in Progress\Exelon 021910 DRS OLdocT .o receive a cOP3 of tbis doeument, indicate in tbe box "e" = Copy w/o attach/encl "E" =Copy with attach/encl "N" =No copy OFFICE RIII:DRS r RIII:DRS I RIII:DRS I I I NAME JKweiser:co DMcNeil HPeterson DATE 01125/10 02117/10 02/19/10 OFFICIAL RECORD Letter to Mr. Charles G. Pardee from Mr. Hironori Peterson, dated February 19, 2010. CONFIRMATION OF REQUESTED INITIAL OPERATOR LICENSE EXAMINATIONS: NRC REGION III EXELON STATIONS DISTRIBUTION: RidsNrrDorlLpl3-2 Resource Susan Bagley RidsNrrPMBraidwood Resource RidsNrrPMByron Resource RidsNrrPMClinton Resource RidsNrrPMDresden Resource RidsNrrPMLaSalle RidsNrrPMQuad Cities RidsNrrDirslrib Resource Cynthia Pederson Steven Orth Jared Heck Allan Barker DRPIII DRSIII Carole Ariano Linda Linn Patricia Buckley Tammy Tomczak

  • J ear Exelon Nuclear 4300 Winfield Road Warrenvllle,ll 6 osSS August 13, U. S. Nuclear Regulatory ATrN: Document Control Washington, DC Braidwood Station, Units 1 and 2 Facility Operating License Nos. NPF-72 and NPF-77 NRC Docket Nos. STN 50-456 and STN 50-457 Byron Station, Units 1 and 2 Facility Operating License Nos. NPF-37 and NPF-66 NRC Docket Nos. STN 50-454 and STN 50-455 Clinton Power Station, Unit 1 Facility Operating License No. NPF-62 NRC Docket No. 50-461 Dresden Nuclear Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR-19 and DPR-25 NRC Docket Nos. 50-237 and 50-249 LaSalle County Station, Units 1 and 2 Facility Operating License Nos. NPF-11 and NPF-18 NRC Docket Nos. 50-373 and SO-374 Limerick Generating Station, Units 1 and 2 Facility Operating License Nos. NPF-39 and NPF-8S NRC Docket Nos. 50-352 and 50-353 Oyster Creek Nuclear Generating Station Renewed Facility Operating license No. DPR-16 NRC Docket No. 50-219 Peach Bottom Atomic Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR-44 and DPR-56 NRC Docket Nos. 50-277 and 50-278 Quad Cities Nuclear Power Station, Units 1 and 2 'o.d=f'} j.O JRenewed Facility Operating License Nos. DPR-29 and DPR-30 NRC Docket Nos. 50-254 and 50-265 Three Mile Island Nuclear Station, Unit 1 Facility Operating license No. OPR-50 NRC Docket No. 50-289 AUG 1 7 August13,2009 U. S. NUclear Regulatory Page Response to NRC Regulatory Issue Summary 2009-11, "Preparation and Scheduling of Operator Licensing Examinations" NRC Regulatory Issue Summary 2009-11, flPreparation and Scheduling of Operator Licensing Examinations," dated July 16, 2009 The referenced Regulatory Issue Summary (RIS) requested that facility licensees provide a proposed schedule of operator licensing examinations and an estimate of the number of candidates requiring initial operator license examinations for calendar years 2010 through 2013, and the number of candidates requiring Generic Fundamentals Examinations (GFEs) for calendar years 2010 and 2011. Attachments 1 through 10 provide responses to RIS 2009-11 for the Exelon Generation Company, LLC (EGG) plants identified above. The requested information for each facility is provided on a separate NRC Form 536. In calendar year 2010, eight candidates are expected to take the dual-site Limited Senior Reactor Operator (LSRO) initial license examination as indicated on Attachment
6. The schedule for the indicated examination is as follows: the written examination and a portion of the operating examination will be given at Limerick Generating Station (LGS); the remainder of the operating examination will be completed at Peach Bottom Atomic Power Station (PBAPS). Since the LSRO examination is a dual-site examination that involves both LGS and PBAPS, rather than repeating the same information on both attachments, the examination scheduling information is provided on Attachment 6 for LGS. Attachment 8 for PBAPS references Attachment 6 where appropriate.

There are no regulatory commitments contained within this letter. Should you have any questions about this letter, please contact Mitchel Mathews at (630) Je Man ger licensing and Regulatory Affairs Attachment 1 -Completed NRC Form 536 for Braidwood Station Attachment 2 -Completed NRC Form 536 for Byron Station Attachment 3 -Completed NRC Form 536 for Clinton Power Station Attachment 4 Completed NRC Form 536 for Dresden Nuclear Power Station Attachment 5 -Completed NRC Form 536 for LaSalle County Station Attachment 6 -Completed NRC Form 536 for Limerick Generating Station Attachment 7 -Completed NRC Form 536 for Oyster Creek Nuclear Generating Station Attachment 8 -Completed NRC Form 536 for Peach Bottom Atomic Power Station Attachment 9 -Completed NRC Form 536 for Quad Cities Nuclear Power Station Attachment 1 0 Completed NRC Form 536 for Three Mile Island Nuclear Station -Unit 1 Attachment 1 Response to RIS 2009*11 Page 1 of 1 NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION (10.2008) OPERATOR LICENSING EXAMINATION DATA APPROVED BY OMB: NO. 3150-0131 EXPIRES: 1013112011 Estimated burden per to comply with this voluntary information collection request: 1 hour. his information collection is used to plan budgets and resources for operator examinatIons. Send comments burde estimate to the Records and FOIAlPrlvacy Services Branch *5 F 3), U.S. Nuclear Commission, Washington, DC 20555-000

  • or b{, interne a*mail to In oOOllects@nrc'gov, and to the Desk OffICer, Office olin ormaUon and Regulatory Affairs. NE B-l0202, (3150-0131).

Office of Man8Qement and Budget, Washington, DC 20503. If a means used to impose an Information collection does not display a currently valid OMS control number, the NRC may not conduct or sfc0nsor, and a person is not required to respond to, the information coliect on. n t FACILITY Braidwood Station, Units 1 and 1 Facility Operating License Nos. NPF*71 and NPF*77 NRC Docket Nos. STN 50-456 and STN 51)...457 NRCREGtON III A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 1010 --Cy 2011-Cy 2011 -CY 2013-ESTIMATED NUMBER OF LICENSEE-PREPARED EXAMINATIONS 0 1 0 1 ESTIMATED NUMBER OF NRC-PREPARED EXAMINATIONS 0 0 0 0 B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2010-CylOll-Cy2012-CY20J3-NUMBER OF REACTOR OPERATORS 0 7 0 S NUMBER OF SENIOR REACTOR OPERATORS* INSTANT 0 12 0 12 NUMBER OF SENIOR REACTOR OPERATORS* UPGRADE 0 2 0 2 NUMBER OF SENIOR REACTOR OPERATORS -LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE N/A 0612012011 N/A 03/24/2013 ALTERNATE OATE N/A 07/11/2011 N/A 04/08/1013 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED NUMBER CY 2010CY 2011 MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF CANDIDATES 11 0 0 0 0 0 0 19 NRC FORM 536 (10-2008) PRINTED ON RECYCLED PAPER Attachment 2 Response to RIS 2009-11 Page 1 of 1 NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO,3150-0131 EXPIRES: 10/3112011 (10-2008) Estimated burden per to comply with this voluntary Informatio collection request: 1 hour. his .nformation collection is used to plan budget and resources for operator examinations. Send comments burde OPERATOR LICENSING estimate to the Records and FOIAlPrivacy Services Branch *5 F 3), U.S Nuclear Commission. Washington. DC 20555-000 ,or bt: mtem EXAMINATION DATA e-mail to in ocollects@nrc80v, and to the Desk Officer, Office of In ormation and Regulatory Affairs, NE B-10202. (3150..1)131). Office of Management an Budget, Washington, DC 20503. If a means used to impose an information collection does not display a currenUy valid OMB control number, the NRC may not conduct or sponsor, and II person is not required to respond to, the information collection, n et d n s . FACILITY Byron Station, Units 1 and 2 FacUlty Operating License Nos. NPF-37 and NPF-66 NRC Docket Nos. STN 50454 and STN 50-455 NRC REGION III A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2010 CY 2011CY 2012CY 2013 ESTIMATED NUMBER OF L1CENSEE*PREPARED EXAMINATIONS 1 1 1 1 ESTIMATED NUMBER OF NRC-PREPARED EXAMINATIONS 0 0 0 0 B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2010-CY2011-Cy2012CY 2013NUMBER OF REACTOR OPERATORS 8 0 0 6 NUMBER OF SENIOR REACTOR OPERATORS -INSTANT 8 (; 6 6 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 1 1 0 0 NUMBER OF SENIOR REACTOR OPERATORS -LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE 09/27/2010 09/2612011 09/24/2012 09/23/2013 ALTERNATE DATE N/A 10/0312011 10/0112012 10/0712013 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED NUMBER CY 2610 CY 2011 MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF CANDIDATES 0 (; 0 0 0 6 0 0 NRC FORM 536 (10-2008) F'RlNTED ON RECYCLED PAPER Attachment 3 Response to RIS 2009-11 Page 1 of 1 NRC FORM 531 u.s. NUCLEAR REGULATORY COMMISSION APJ'ROVEO BY OMS: NO. 3150-0131 EXPIRES: 08l31J2008 (,,2005) E,lImatlid burd,n!r.' r.... to comply with thl. voluntary Information codedlon requetl: hour. .. Inlonnatloil c::ohdlon ill uaed to plan budgllt.l and retourollll for operator eqmlllllliona. Send co_nil burilen OPERATOR LICENSING eilimate to the Re<:ord, and FOIAlPriv: SIlYlceto Branch -6 F 3). U.S. NueI_ Commillion. Wuhlno n. DC 20555-000

  • Of EXAMINATION DATA IIMY1&H to In ocoOect.Onrcsr' and to the Delk Ot'lloet'.

0fIIat 011 atlon and Regul: AffaIrS. NE .10202. (3150-0131). 0I!Ice of M_gementanct Budget. Wa'" gton. OC 2050:3. If a mealll used to Impoae an Inforrn8llon COIIICIIon doel nol dlllpflly

  • cumlnUV valid OMS oonllOl number. the NRC may nol conduct and a peraon I. not required 10 r**pond to. Ihe Inronn.tJon COl n. FACIUTY NRCREGIOH Clinton Power Station, Unit 1 Facility Operating Ucense No. NPF-62 III NRC Docket No. 50-461 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2010 CY2011 CY2012 CY2013----ESTIMATED NUMBER OF LICENsee-PREPAREO 1 1 0 1 EXAMINATIONS ESTlMATEO NUMBER OF NRc.PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERA TOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2010 CY2011 CY2012 CY2013--NUMBER OF REACTOR 6 6 0 6 OPERATORS NUMBER OF SENIOR REACTOR 0 4 0 4 OPERATORS*

INSTANT NUMBER OF SENIOR REACTOR 0 2 0 2 OPERATORS* UPGRADE NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS* LIMITED PROPOSED DATES PRIMARY DATE 1012512010 1210512011 MIA 08/19/2013 ALTERNATE DATE 1110112010 12111/2011 MIA 08l26I2013 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2010 CY 2011 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBEf; DECEMBER ESTIMATED NUMBER OF 0 0 9 0 0 0 0 0 CANDIDATES Attachment Response to RIS 2009*11 Page 1 of NRC FORM 536 u.s. NUCLEAR REGULATORY COMMISSION APPROVED BY OMS: NO. 3150-0131 EXPIRES: 10/3112011 (1 ()'ZOOS) Estimated burden per to comply with this voluntary information collection request: 1 hour, his information collection is used to plan budgets and resources for operator examinations, Send comments refrdlng burden OPERATOR LICENSING estimate to the Records and FOIA/Privacy Services Branch -5 F 3), U.S. Nuclear Re?,Ulatory CommiSSion. Washington. DC 20555-000

  • or bYt Internet EXAMINATION DATA lHTIaillo in oCOliects@nrc'gov.

and to the Desk Officer. Office of In ormation and Regulatory Affairs, NE B-10202. (3150-0131). Office of Management and Budget, Washington. DC 20503. If a means used to Impose an information collection does not display a currently valid OMS control number. the NRC msy not conduct or sponsor. and a person Is not required to respond to. the information collecllon. FACILITY NRCREOION Dresden Nuclear Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR-19 and DPR-25 III NRC Docket Nos. 50-237 and 50-249 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2010 CY 2011 Cy 2012 Cy 2013 -ESTIMATED NUMBER OF LlCENSEE*PREPARED 1 1 I I EXAMINATIONS ESTIMATED NUMBER OF NRC*PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERA TOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2010 Cy2011 CY 2012 CY 2013 ----NUMBER OF REACTOR 2 3 3 3 OPERATORS NUMBER OF SENIOR REACTOR 6 OPERATORS -INSTANT 4) 9 4) NUMBER OF SENIOR REACTOR 1 1 1 1 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS

  • LIMITED PROPOSED DATES PRIMARY DATE 03/08/2010 03/0712011 03/05/2012 03/04/2013 AL TERNA TE DATE 04/05/2010 04104/2011 04/02/2012 0410112013 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2010 CY 2011 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 0 0 12 0 0 0 12 CANDIDATES NRC FORM 536 (t()'2008)

PRINTEO ON RECYCLEO PAPER Attachment 5 Response to RIS 2009-11 Page 1 of 1 NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMS: NO. 3150..0131 EXPIRES: 10/31/2011 (10*2008) Estimated hurden per to comply with this voluntary informatio collection request: I hour. his Information collection is used to plan budget and resources for operator examinations. Send comments burae OPERATOR LICENSING estimate to the Records and FOIA/Prlvacy Services Branch *5 F 3). U.S Nuclear Re?culatory Commission. Washington, DC 20555*000 ,or Intern EXAMINATION DATA &omail to in ocollects@nrc-g0v, and to the Desk OffICer. Office of In ormation and Affairs, NE 9*10202. (3150..0131). OffiC8 01 an Budget. Wash nglon. DC 20503. If a means used to impose an "formatio collection does not display a currently valid OMS control number, the NRC may not conduct or sponsor. and a person Is not required to respond to. the Information collection. et n n s n . d FACILITY LaSalle County Station, Units 1 and 2 Facility Operating License Nos. NPF-ll and NPF-tS NRC Docket Nos. STN 50*373 and STN 50-374 NRC REGION III A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2010 Cy 2011---Cy 2012-Cy 2013-ESTIMATED NUMBER OF LlCENSEE*PREPARED EXAMINATIONS 1 0 1 0 ESTIMATED NUMBER OF NRC-PREPARED EXAMINATIONS 0 0 0 0 B. INITIAL OPERA TOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2010 -CY2011-CY2012 -CY 2013 -NUMBER OF REACTOR OPERATORS 3 0 6 0 NUMBER OF SENIOR REACTOR OPERATORS* INSTANT 11 0 8 0 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 0 0 2 0 NUMBER OF SENIOR REACTOR OPERATORS -LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE 09114/2010 N/A 09/24/2012 N/A ALTERNATE DATE 0912112010 N/A 10/01/2012 N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED NUMBER Cy 2010 CY 20ll MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF CANDIDATES 0 0 0 0 0 14 0 0 NRC FORM 536 (10-2OOa) PRINTED ON RECYCLED PAPER Attachment 6 Response to RIS 2009-11 Page 1 of 2 U". NUCLEAR REGULATORY cotn_1ION APPAOIIeO BY OMS: NO. 3115C).()131 EXPIRES: 1013112011 tOo:llOClll e.tnbMI burden.f: to wll/l1IIhI wIuIUy infonnado CGIIecdon I'IIPI'It lieu. InbmIiIcIiI coII<tcIIcIft It UMd D .., _ tilt' .. s.nd OPERATOR UCENSING ....... 10 ltIe RecionIIIMCI SeMcw 8I.a oe F ). u.s NucIIIIIr ComInIIoIIon. DC * << EXAMINATION DATA HIIIII D .., D 1M OM 0IIIcIr. 0Ib" I .., 'F;(3115C).()131), 0IIIce "-:c=:.'"w 20lI03.. UMd D IIIIp!:JM _ Ib ooIIiCIIDn doeI nat

  • CUMrIIIy VIIIId ot.e CICIr*aI nurnt....HAC f".IIMel
  • penlClIII_

not flICIUnd to ..._pond to. 1Y M n . I FI'I::UfY Umerlck GeIleR" Statio.. u.1ts 1 ..<<11 FHUIty Oper_..Licea" NOlo NPF-39 ..d NPF-85 NRC Docket NOI. so.351 ... so.353 I A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER cy 181'-Cyl.11-CylOll-Cyll13-ESTIMATED NUMBER OF UCENSEE.fIREPARED EXAMINATIONS 1 0 1 0 ESTIMATED NUMBER OF NRC-PREPARED EXAMINATIONS 0

  • 0
  • B. INITIAL OPERATOR UCENSE EXAMINATIONS PROPOSED NUMBER CylOl.-CylOU-Cy18U-CylO13-NUMBER OF REACTOR OPERATORS 6 8 11 , NUMBER OF SENIOR REACTOR OPERATORS
  • INSTANT 7 0 5
  • NUMBER OF SENIOR REACTOR OPeRATORS*

UPGRADE 5

  • 2
  • OPERATORS*

UMITED *

  • 0 0 PROPOSED DATES PftIUARY DATE 1010411018 N/A 1010112012 N/A AlTERNATE DATE 101181201' N/A otl24l2OU N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED NUMBER CY 2ft.CY 2011MARCH JUNE DECEMBER MARCH JUNE !sEPTEMBER DECEMBER ESTIMATED NUMBER OF CANOIDATES
  • 0 0 0
  • 16 ..
  • NRC FOIW UI (111-21lO1)

Attachment 6 Response to RIS 2009-11 Page 2 of2 NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMS: NO,3150-0131 EXPIRES: 10/3112011 (10*2008) Estimated burden per to comply with thiS voluntary information collection request: 1 hour. his information collection Is used to plan budget and resources for operator examinations, Send comments burde OPERA TOR LICENSING estimate to the Records and FOIAIPrivacy Services Branch *5 F 3), U.S Nuclear Commission. Washington. DC 20555-000 ,or Intern EXAMINATION DATA e*malito in ocoliects@nrc,gov. and to the Desk Officer. Office of In orm.Uoo and Alfalrs. NE 8*10202. (3150-0131), Office 01 Management an Budget, Washington. DC 20503, II a means used to impose an Informatio collection does not display a currenUy valid OMS control number. the NRC may not conduct or sponsor. and a person Is not required to respond to. the inforrnaUon caliecHon. et n s n . d FACILITY Limerick Generating Station, Units 1 and 2 Facility Operating License Nos. NPF-39 and NPF-85 NRC Docket Nos. 50-352 and 50-353 NRC REGION I A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2010 -CY 2011-CY 2012 -Cy 2013-ESTIMATED NUMBER OF LICENSEE-PREPARED EXAMINATIONS I 0 0 0 ESTIMATED NUMBER OF NRC-PREPARED EXAMINATIONS 0 0 0 0 B. INITIAL OPERA TOR LICENSE EXAMINATIONS PROPOSED NUMBER Cy 20to-Cy2011CY2012-Cy2013-NUMBER OF REACTOR OPERATORS 0 0 0 0 NUMBER OF SENIOR REACTOR OPERATORS -INSTANT 0 0 0 0 NUMBER OF SENIOR REACTOR OPERATORS*UPGRADE 0 0 0 0 NUMBER OF SENIOR REACTOR OPERATORS -LIMITED 8 0 0 0 PROPOSED DATES PRIMARY DATE 06/14/2010 N/A N/A N/A ALTERNATE DATE 06/07/2010 N/A N/A N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED NUMBER CY 2010 CY 2011 MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF CANDIDATES 0 0 0 0 0 0 0 0 NRC FORM 536 (10-2008) PRINTED ON RECYCLED PAPER Attachment 7 Response to RIS 2009-11 Page 1 of 1 NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED SY OMS: NO. 3150.0131 EXPIRES: 10/3112011 (10-20081 Estimated burden per to comply with this voluntary information coilectiOn request: 1 hour. his Information collection is used to plan budget and resources for operator examinations. Send comments burde OPERA TOR LICENSING estimate 10 the Records and FOIAIPrivscy Services Branch -5 F 3). U.S. Nuclear Re?,Ulatory Commission, WaShington. DC 20555-000

  • or brc interne EXAMINATION DATA e-mail to in ocollects@nrc.gov.

and to tha Desk Officer. Office of In ormation and Affairs. NE S*10202. (3150.0131). Office of Management and Budget. Wash ngton. DC 20503. If a means used to impose an Informatio collection does not display a currently valid OMS control number. the NRC may not conduct or se;;,nsor. and a person Is not required to respond to. the information collect . n n s t FACILITY Oyster Creek Nuclear Generating Station Renewed Facility Operating License No. DPR-16 NRC Docket No. 50-219 NACREGION I A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2010 -CY 2011 -Cy 2012-Cy 2013-ESTIMATED NUMBER OF LICENSEE-PREPARED EXAMINATIONS 1 1 1 0 ESTIMATED NUMBER OF NRC-PREPARED EXAMINATIONS 0 0 0 0 B. INITIAL OPERA TOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2010-CY2011-CY2012-CY 2013-NUMBER OF REACTOR OPERATORS 6 6 6 0 NUMBER OF SENIOR REACTOR OPERATORS -INSTANT 7 7 8 0 NUMBER OF SENIOR REACTOR OPERATORS* UPGRADE 2 1 2 0 NUMBER OF SENIOR REACTOR OPERATORS -LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE 05/1712010 0711112011 05/2812011 N/A ALTERNATE DATE 05/24/2010 0711812011 0610412012 N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED NUMBER CY 2010 CY 2011 MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF CANDIDATES 13 0 0 0 14 0 0 0 NRC FORM 536 (10-2008) PRINTED ON RECYCLEO PAPER Attachment 8 Response to RIS 2009-11 Page 1 of 1 NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 315O'()131 EXPIRES: 1013112011 (10.2008) Esllmated burden per to comply with this voluntary information collection request: 1 hour. his information collection is used to plan budget and resources for operator examinations. Send comments burde OPERA TOR LICENSING estimate to the Records and FOIA/Prlvacy Services Branch *5 F 3). U.S Nuclear Ref,ulatory CommiSsion. Washington. DC 20555-000

  • or blt intame EXAMINATION DATA a*mall to in OCOliects@nrc-S0v.

and to the Desk Officer, Office of In ormation and Affairs. NE B*l0202, (315O'()131), Office of Management an Budget, Wash nglon, DC 20503. If a means used to Impose an informatio collection does not display a currently valid OMS control number. the NRC may not conduct or and a person Is not required to respond to, the InformaUon colle on. n n s . t d FACILITY Peach Bottom Atom Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR-44 and DPR-56 NRC Docket Nos. 50-277 and 50-278 NRC REGION I A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2010 -CY 2011 -CY 20ll CY 2013 -ESTIMATED NUMBER OF LlCENSEE*PREPARED EXAMINATIONS 0 1 0 1 ESTIMATED NUMBER OF NRC*PREPARED EXAMINATIONS 0 0 0 0 B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER Cy 2010-CY2011 -Cy20ll-CY2013-NUMBER OF REACTOR OPERATORS 0 6 0 8 NUMBER OF SENIOR REACTOR OPERATORS* INSTANT 0 8 0 10 NUMBER OF SENIOR REACTOR OPERATORS* UPGRADE 0 3 0 2 NUMBER OF SENIOR REACTOR OPERATORS* LIMITED

  • 0 0 0 PROPOSED DATES PRIMARY DATE
  • 01131/2011 N/A 02/11/2013 ALTERNATE DATE
  • 03/21/2011 N/A 02/04/2013 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED NUMBER CY 2010 CY 2011 MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF CANDIDATES 0 0 0 0 0 0 18 0 NRC FORM 536 (10-200S)

PRINTED ON RECYCLED PAPER *See Attachment 6 (Limerick Generating Station) for Limited SRO numbers and exam dates Attachment 9 Response to RIS 2009-11 Page 1 of 1 NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10/3112011 (1()'2008) Estimated burden per to comply with this voluntary Informatio collection request: 1 hour. his ,nformatlon collection is used 10 plan budget and resources for operalor examinations. Send comments burde OPERA TOR LICENSING estimate 10 the Records and FOiNPrlvacy Services Branch *5 F 3), U.S Nuclear Commission, Washington, DC 20555-000 , or bl: interne EXAMINATION DATA e-mail 10 in ocollects@nrc'goll, and to Ihe Desk Officer, Office of In ormation and Regulatory Affairs, NE B*l0202, (3150-0131), OffiCe of Management an Budget, Washington. DC 20503. If a means used 10 impose an Informatio Collection does nol display a currenlly valid OMS control number, the NRC may not conduct or sponsor. and a person is no! required to respond to, the information collection. n d n n s . t FACILITY Quad Cities Nuclear Power Station, Units t and 2 Renewed FaciUty Operating License Nos. DPR-29 and DPR-30 NRC Docket Nos. 50-254 and 50-265 NRC REGION III A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2010 -Cy 2011 -CY 2011 --Cy 2013 ESTIMATED NUMBER OF LlCENSEE*PREPARED EXAMINATIONS 0 1 I 1 ESTIMATED NUMBER OF NRC-PREPARED EXAMINATIONS 0 0 0 0 B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER Cy 2010--Cy 20tl CY2012-CY1013-NUMBER OF REACTOR OPERATORS 0 6 4 3 NUMBER OF SENIOR REACTOR OPERATORS* INSTANT 0 tl 10 10 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 0 0 1 1 NUMBER OF SENIOR REACTOR OPERATORS -LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE N/A 05/30/2011 03/1212012 04/15/2013 ALTERNATE DATE N/A 06/1312011 03/2612012 0411912013 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED NUMBER CY 2010 CY 2011 MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF CANDIDATES 0 0 0 14 0 0 0 0 NRC FORM 535 (10-2008) PRINTED ON RECYCLED PAPER Attachment 10 Response to RIS 2009*11 Page 1 of 1 NRC FORM 538 U.S. NUClEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3160*1)131 EXPIRES; 1013112011 (10-2001) etUmal4ld burtten p41r to comply with Ihlt volunlllY InformatIO c:oIIedlon nlqlle81: 1 hour. I1Ilnfom1allon coft8Cllon Is used 10 plan budUe and rnourcea for operator examination.. Send commomll bll'de OPERATOR LICENSING eallmale to tn. Record. and FOllIIPrivacy ServIc:M Branch .fi" 3). U.Nudea, 1'1:1011' Commlulon. Waahlngton, DC 20566-000

  • 01' IiIIem EXAMINATION DATA e-mail 10 In and 10 the Dellk Olftcotr.

0fII0e of I rmllllo and AeaUIa:r, Alfari. NE 10202, (3150-0131), Omc. of Wa lIQIon, DC 20503. If a uMd 10 Impoee an forrn<<tIO coIleCtton doel nol dillpllly a curranUy \IIIIid OMS oontrol number. Itte NRC ma not conduct and a parlon I, not required to ,e.pond 10, Ih information col

  • la S. eI n n n n y l FAClUlY Three MOe Islaad Nudear Station, Ualt 1 FaeWty OperadDI License no. DPR*!O NRC Docket No. 50.289 NRCREOION I A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2010-CylOllCy2011-CylO13-ESTIMATED NUMBER OF LICENSEE-PREPARED EXAMINATIONS 1 I 0 1 ESTIMATED NUMBER OF NRC-PREPARED EXAMINATIONS 0 0 0 0 B. INlnAL OPERATOR LlC!NS! EXAMINATIONS PROPOSED NUMBER Cy 1010-Cy2011-CylOll-Cy1013-NUMBER OF REACTOR OPERATORS I 10 0 9 NUMBER OF SENIOR REACTOR OPERATORS
  • INSTANT 1 10 0 8 NUMBER OF SENIOR REACTOR OPERATORS

-UPGRADE 0 1 0 1 NUMBER OF SENIOR REACTOR -LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE 011111l0l0 09JIlllOll N/A 09/0912013 AlTERNATE DATE 011%812010 09/l'/lOU N/A 0911612013 C. PROPOSED GENERIC FUNDAMENTALS !XAMINATION (GF!) SCHEDULE PROPOSED NUMBER Cy 2010 CY lOll MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE DECEMBER ESTIMATED NUMBER OF CANDIDATES 11 0 0 0 18 0 0 0 NRC FORM 538 (10.:z001) PRINTED Of! RECYClEO PAPeR October 7, 2008 Mr. Charles G. Pardee Chief Nuclear Officer and Senior Vice President Exelon Generation Company, LLC 4300 Winfield Road Warrenville IL60555 CONFIRMATION OF REQUESTED INITIAL OPERATOR LICENSE EXAMINATIONS: NRC REGION III EXELON STATIONS

Dear Mr. Pardee:

In a letter dated July 22, 2008, (RS-08-092) your staff responded to Regulatory Issue Summary 2008-16 and requested we schedule initial license operator examinations for the Exelon Nuclear Plants. In a separate letter dated July 11, 2008, (KKM-08-001) the Quad Cities Nuclear Power Station Training Manager requested a change to the start date of the Station's 2009 examination. This letter confirms scheduling of the requested examinations at the Region III power plants and the change requested for the Quad Cities Nuclear Power Station 2009 examination. We have tentatively scheduled the requested examinations to occur as follows: Station Braidwood Byron Clinton Dresden LaSalle Quad Cities 2009 10105 N/R 8/24 03/09 N/R 11/30 2010 N/R 9/27 N/R 03/08 09/13 N/R 2011 6/20 9/12 8/22 3107 N/R 5/30 I 2012 N/R 9/10 N/R 3/05 9/17 3/26 N/R -None Requested On-site validation of the examinations is tentatively scheduled to occur approximately three weeks before each scheduled examination. In the unlikely event that we are unable to support the examination during the scheduled weeks, we will inform you and the affected station's training department immediately upon discovery of such conditions and make arrangements to administer the examination at a mutually acceptable date. We understand that your staff will develop the proposed examinations unless we discover it is necessary for the NRC to develop an examination. Because the examinations have greater than nine anticipated applicants, each examination is scheduled for two weeks. Please inform us if the number of candidates declines below ten for any examination as this will impact the examination schedule. Please inform us at your earliest opportunity if you discover a need to change any of the dates of the scheduled examinations. C. A supplementary letter will be sent to each station's training department director approximately 120 days prior to the initial examination. The letter will provide the director with the chief examiner's name, an outline of examination security expectations, a list of the materials required by the NRC to conduct the examination, and it will reconfirm the examination dates and the number of candidates you have in the training program. If you have any questions concerning this information, please contact Mr. Dell McNeil of my staff at 630-829-9737. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page of the NRC's public Web site at http://www.nrc.gov/reading-rmladams.html. Sincerely, IRA! Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-456; 50-457 License Nos. NPF-72; NPF-77 Site Vice President -Braidwood Station Plant Manager -Braidwood Station Regulatory Assurance Manager -Braidwood Station Chief Operating Officer and Senior Vice President Senior Vice President -Midwest Operations Senior Vice President -Operations Support Vice President -Licensing and Regulatory Affairs Director -Licensing and Regulatory Affairs Manager licenSing -Braidwood, Byron and LaSalle Associate General Counsel Document Control Desk -Licensing Assistant Attorney General J. Klinger, State Liaison Officer, Illinois Emergency Management Chairman, Illinois Commerce Site Training Director -Braidwood C. A supplementary letter will be sent to each station's training department director approximately 120 days prior to the initial examination. The letter will provide the director with the chief examiner's name, an outline of examination security expectations, a list of the materials required by the NRC to conduct the examination, and it will reconfirm the examination dates and the number of candidates you have in the training program. If you have any questions concerning this information, please contact Mr. Dell McNeil of my staff at 630-829-9737. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page of the NRC's public Web site at http://www.nrc.gov/reading-rm/adams.html. Sincerely, IRA! Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-456; 50-457 License Nos. NPF-72; NPF-77 Site Vice President -Braidwood Station Plant Manager -Braidwood Station Regulatory Assurance Manager -Braidwood Station Chief Operating Officer and Senior Vice President Senior Vice President -Midwest Operations Senior Vice President -Operations Support Vice President -Licensing and Regulatory Affairs Director -Licensing and Regulatory Affairs Manager Licensing -Braidwood, Byron and LaSalle Associate General Counsel Document Control Desk -Licensing Assistant Attorney General J, Klinger, State Liaison Officer, Illinois Emergency Management Chairman, Illinois Commerce Site Training Director -Braidwood See Attached Distributions DOCUMENT NAME: G:\DRS\WORK IN PROGRESS\EXELON 100708 DRS OL.DOC o Publicly Available 0 Non-Publicly Available 0 Sensitive 0 Non-Sensitive T'o receIve a COP) 0 f t b'IS d ocument, In'd" lcate ID t b e b ox "C" =C opy W 0 attac ! hi enc I "E" = C OPYWI°th attac hi ene'I 'N" =NocoPY OFFICE RIII:DRS I RIII:DRS J RIII:DRS I I NAME JKweiser:co DMcNeil HPeterson DATE 10/02/08 10/02/08 10/07/08 OFFICIAL RECORD C. Docket Nos. 50-454; 50-455 license Nos. NPF-37; NPF-66 Site Vice President -Byron Station Plant Manager -Byron Station Regulatory Assurance Manager -Byron Station P. Schmidt, State liaison Officer, State of Wisconsin Chairman, Illinois Commerce Commission Site Training Director -Byron Station B. Quigley, Byron Station Docket No. 50-461 license No. NPF-62 Site Vice President -Clinton Power Station Plant Manager -Clinton Power Station Regulatory Assurance Manager -Clinton Power Station Manager licensing -Clinton, Dresden and Quad Cities Site Training Director -Clinton Power Station Docket Nos. 50-237; 50-249 license Nos. DPR-19; DPR-25 Site Vice President -Dresden Nuclear Power Station Plant Manager -Dresden Nuclear Power Station Regulatory Assurance Manager -Dresden Nuclear Power Station Site Training Director -Dresden Nuclear Power Station Docket Nos. 50-373; 50-374 License Nos. NPF-11; NPF-18 Site Vice President -LaSalle County Station Plant Manager -LaSalle County Station Regulatory Assurance Manager -LaSa"e County Station Site Training Director -LaSalle County Station Docket Nos. 50-254; 50-265 License Nos. DPR-29; DPR-30 Site Vice President -Quad Cities Nuclear Power Station Plant Manager -Quad Cities Nuclear Power Station Regulatory Assurance Manager Quad Cities Nuclear Power Vice President -Law and Regulatory D. Tubbs, Manager of Associate General M. Rasmusson, State Liaison Officer, State of Iowa Chief Radiological Emergency Preparedness Section, Dept. of Homeland Security Site Training Director -Quad Cities Nuclear Power Station Letter to Charles G. Pardee from Hironori Peterson dated October 7,2008 CONFIRMATION OF REQUESTED INITIAL OPERATOR LICENSE EXAMINATIONS: NRC REGION III EXELON STATIONS DISTRIBUTION: Russell Gibbs Tamara Bloomer Meghan Thorpe-Kavanaugh Joel Wiebe Stephen Sands Christopher Gratton RidsNrrDirslrib Resource Mark Satorius Kenneth OBrien Jared Heck Roland Lickus Carole Ariano Linda Linn Patricia Buckley DRPIII DRS III Patricia Buckley Tammy Tomczak Janet Kweiser From: Carmen Olteanu Sent: Tuesday, October 21, 2008 11 :22 AM To: Russell Gibbs; Tamara Bloomer; Meghan Thorpe-Kavanaugh; Joel Wiebe; Stephen Sands; Christopher Gratton; RidsNrrOirslrib Resource; Mark Satorius; Kenneth OBrien; Jared Heck; Carole Ariano; Linda Linn; Patricia Buckley; ORPIII; ORSIII; Patricia Buckley; Tammy Tomczak

Subject:

Exelon Letter Re Confirmation of Initial Exam Attachments: Exelon 100708 DRS OL.doc The subject document has been completed and has been submitted to DPe to be declared in ADAMS. A Word copy of the document has been attached and the document has been assigned Accession

  1. ML082880559.

1

Exelcn An Exelon Company www.exeloncorp.COIn Nuclear AmerCen Energy Company, LLC 4300 W:nficld Road Exelon WarrenvIlle. Il 4300 Wmfield Road W3rrenvlllc.ll6oS55 July 22, U. S. Nuclear Regulatory ATTN: Document Control Washington, DC Braidwood Station, Units 1 and Facility Operating License Nos. NPF-72 and NRC Docket Nos. STN 50-456 and STN Byron Station, Units 1 and Facility Operating License Nos. NPF*37 and NRC Docket Nos.STN 50-454 and STN Clinton Power Station, Unit Facility Operating License No. NRC Docket No. Dresden Nuclear Power Station, Units 2 and Renewed Facility Operating License Nos. DPR*19 and DPR-25 NRC Docket Nos. 50-237 and 50-249 . LaSalle County Station, Units 1 and Facility Operating License Nos. NPF-11 and NRC Docket NOi. 50-373 and Limerick Generating Station, Units 1 and Facility Operating License Nos. NPF-39 and NRC Docket Nos. 50-352 and Oyster Creek Nuclear Generating Facility Operating License No. NRC Docket No. Peach Bottom Atomic Power Station, Units 2 and Renewed Facility Operating License Nos. DPR-44 and NRC Docket NOi, 50-277 and July 22, 2008 U. S. Nuclear Regulatory Page Quad Cities Nuclear Power Station, Units 1 and 2 Renewed Facility Operating License Nos. DPR-29 and DPR-30 NRC Docket Nos. 50-254 and 50-265 Three Mile Island Nuclear Station, Unit Facility Operating License No. NRC Docket No. Response to NRC Regulatory Issue Summary 2008-16, "Preparation and Scheduling of Operator Licensing Examinations" NRC Regulatory Issue Summary 2008-16. "Preparation and Scheduling of Operator Licensing Examinations," dated June 27,2008 The referenced Regulatory Issue Summary requested that facility licensees provide a proposed schedule of operator licensing examinations and an estimate of the number of candidates requiring initial operator license examinations for calendar years 2009 through 2012, and the number of candidates requiring Generic Fundamentals Examinations for calendar years 2009 and 2010. Attachments 1 through 10 provide responses for the Exelon Generation Company, LLC and AmerGen Energy Company, LLC plants identified above. The requested information for each facility is provided on a separate NRC Form 536. In calendar year 2009, six candidates are expected to take the dual-site Limited Senior Reactor Operator (LSRO) initial license examination as indicated on Attachment

8. The schedule for the indicated examination is as follows: the written examination and a portion of the operating examination will be given at Limerick Generating Station (LGS); the remainder of the operating examination will be completed at Peach Bottom Atomic Power Station (PBAPS).

Since the LSRO examination is a dual-site examination that involves both LGS and PBAPS, rather than repeating the same information on both attachments, the examination scheduling information is provided on Attachment 8 for PBAPS. Attachment 6 for LGS references Attachment 8 where appropriate. There are no regulatory commitments contalned within this letter. Should you have any questions about this letter, please contact Mitchel Mathews at (630) 657-2819. Respectfully, Darin M. Director -Licensing and Regulatory July 22, 2008 U. S. Nuclear Regulatory Commission Page 3 Attachment 1 -Completed NRC Form 536 for Braidwood Station Attachment 2 -Completed NRC Form 536 for Byron Station Attachment 3 -Completed NRC Form 536 for Clinton Power Station Attachment 4 -Completed NRC Form 536 for Dresden Nuclear Power Station Attachment 5 -Completed NRC Form 536 for laSalle County Station Attachment 6 -Completed NRC Form 536 for Limerick Generating Station Attachment 7 -Completed NRC Form 536 for Oyster Creek Nuclear Generating Station Attachment 8 -Completed NRC Form 536 for Peach Bottom Atomic Power Station Attachment 9 -Completed NRC Form 536 for Quad Cities Nuclear Power Station Attachment 10 -Completed NRC Form 536 for Three Mile Island Nuclear Station -Unit 1 Response to RIS 2008-16 Attachment 1 Page 1 of 1 NRC FORM S36 li.S NUCI.EAR REGl'LtTORY COMMISSION ,H*lOO5) OPERATOR LICENSING EXAMINATION DATA APPROVED BY OMS: NO. .1 I 5il*0I.l1 F.XPIRF.s: lltV)II2(MJ!! burden per to t.'umply wilh thi. .. \/1,l!umary information I . .'olled klO I hour, The; (ullectiufl is (u pian budgets RegubtOl'), (,:'nmmi....k'ln. DC 2O'SS*(MXlI. ,l( ,memet e*m,ul to Inf'tt:Htft!I.'I ... @orc'f)v * .').M to De\li. Officer, Otlit't' 1)1 in .rmatloll .,1<1 Affair.. NE

  • . Off"" of and DC .!O503. ff 3

... u:.td In an IMfurmahtHi not a vJ.lJd OMS CHolml number. the NRC may fin! t.:llnduct ur oJitd a per.....Hl nut required to to. the mti.lrmatilln ruHect.m. F",CILITY Braidwood Station, Units 1 and 2 Facility Operating License Nos. and NPF-77 NRC Docket Nos. STN 50-456 and STN 50-457 NRC REGION III A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2009 CY2010 CY2011 CY 2012 ESTIMATED NUMBER OF LICENSEE*PREPARED EXAMINATIONS 1 0 1 0 ESTIMATED NUMBER OF NRC*PREPARED EXAM INATIONS 0 0 0 0 B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2009 CY2010 CY 2011 CY 2012 NUMBER OF REACTOR OPERATORS 1 0 7 0 NUMBER OF SENIOR REACfOR OPERATORS* INSTANT 12 0 12 0 NUMBER OF SENIOR REAcroR OPERATORS-UPGRADE 1 0 2 0 NUMBER OF SENIOR REAcroR OPERATORS-LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE 10/05/2009 NlA 6120/2011 N/A ALTERNATE DATE 10119/2009 NlA 711112011 NlA C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED NUMBER cv2009 cv2010 MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF CANDIDATES 0 0 0 0 21 0 0 0 Response to RIS 2008-16 Attachment 2 Page 1 of 1 NRC FORM S36 u.s NUCLEAR REGULATORY COMMISSION APPROVED BY OMS: NO. EXI'IRE5: OlV.1I,cIXlII 111-21105) burden ttl wIth thil' mluntary infurmatkln i,'oUe.:tttm noquesl: I information (ll Iltct inn is u:-.ed til plan budgets and resoun:ts for eJ.tlmin.ltKlns. Send 9ntunents burden OPERATOR LICENSING .st'male'o the Re.:urd. and FOIAlPrivacy ServICe. Br:m<h (T*5 31. U.S. Cnmmi.l-1t.tun. Wa.l,hingtoo. DC' or EXAMINATION DATA ISO*1)131 t., Oftk. "I M.nal!<meOl and IDe'ans lJSC!d tu Irnp.)!\e an mfnrmafJun .:o1l;>.;tK'" '!'le' no, display a currently v,lid OMB "!lOIml number, the NRC may J pen..on ill !\ttl required w U'. Ute FACILITY NRC REGION Byron Station, Units 1 and 2 III Facility Operating License Nos. NPF-37 and NPF-66 NRC Docket Nos. STN 50-454 and STN 50-455 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2009 CY2010 CY2011 CY2012 ESTIMATED NUMBER OF LlCENSEE*PREPARED 0 1 1 1 EXAMINATIONS ESTIMATED NUMBER OF NRC*PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2009 CY 2010 CY2011 CY2012 NUMBER OF REACTOR 0 9 0 7 OPERATORS NUMBER OF SENIOR REACTOR 0 8 12 6 OPERATORS*INSTANT NUMBER OF SENIOR REACTOR 0 1 1 2 OPERA TORS*UPGRADE NUMBER OF SENIOR REACTOR 0 0 0 0 OPERA TORS* LIMITED PROPOSED DATES PRIMARY DATE NlA 9127/2010 9/12/2011 9/10/2012 ALTERNATE DATE NlA 10104/2010 9/2612011 9/24/2012 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED cv2010 NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEYrEMBER DECEMBER ESTIMATED 0 NUMBER OF 17 0 0 0 12 0 0 CANDIDATES Response to RIS 2008*16 Attachment 3 Page 1 of 1 NRCFORM5.l1i ll,S SUCLF.AR !U:(;ULATORY COMMISSION ,3*2005) OPERATOR LICENSING EXAMINATION DATA APPROVED BY OMS: NO. .1150-0131 EXPIRES,OlV31f.!(JOH l:."imJteC hurden per J"e"pon-.e 10 lJJmply with ibis vulunt.1ry infimna.inn \'"!dlecllOn requcst: I h!:)ur, Itlltlrmatl4'ln C\)lIet1ion u!-ot!d tu plan budgett>> Nudc;ar ReJUlafUry Cnmmis.l\K)n. Washrn,tnn. OC ur bl lnttrnet to In

  • ..md h) the Otlicer, OffJCe vi In ormation and Regul.101)'

!\lfa' NE 8*10202, ,J 150*1)131). om". or M.ruI8tmtnt and Budget. DC (fa meant. u!lCd tn tmp:>:'<ie an inform:nk}" 1.'0iltelion d\)e$ not d t;'urremly v"hd OMS cOI.m) number. the NRC may not luod.uct m spomor, and a persoll is not requirc:d to res:pond tn. 100 infnrmatKln c{)11et.1ioll. FACILITY Clinton Power Station, Unit 1 Facility Operating License No. NPF-62 NRC Docket No. 50-461 NRC REGION 11\ A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2010 CY 2011 CY2012 ESTIMATED NUMBER OF LICENSEE-PREPARED EXAMINATIONS 1 0 1 0 ESTIMATED NUMBER OF NRC-PREPARED EXAMINATIONS 0 0 0 0 B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2010 CY2011 CY2012 NUMBER OF REACTOR OPERATORS 6 0 6 0 NUMBER OF SENIOR REACTOR OPERATORS-INSTANT 6 0 3 0 NUMBER OF SEN lOR REACTOR OPERATORS-UPGRADE 2 0 3 0 NUMBER OF SENIOR REACTOR OPERATORS-LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE 8/24/2009 NJA 8/2212011 NJA ALTERNATE DATE 8/17/2009 NJA 8/29/2011 N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (G.FE) SCHEDULE PROPOSED NUMBER cv2009 cv2010 MARCH JUNE SEPTEMBER DECE1vlBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF CANDIDATES 0 0 0 0 0 9 0 0 Response to RIS 2008*16 Attachment 4 Page 1 of 1 NR('mRMS.16 I;,S NIJCLEAR REGlJI.ATORY COI'otMISSION .8*2005) OPERATOR LICENSING EXMUNATION DATA APPROVED BY OMS: NO, 1150-0131 EXPIRES; flHl3IIZIXlil EM:imated burden per re:\ponse ttl (\lInpfy with rhis \<nluntary infnnn:J(inn (nllection rcquel4: I htlur. Thi ... intt)rmallon 1,.'l}lteclH'm i:-. to pian Regulatory

2. {) 15()"H131
f. Office t1f Man.llfemenl and Booijtl.
  • . DC ::!O used h"l impnse an m(ormauon

\."oliection doe" iiI"It dl...play a l'urrently vatld OMS I."onuul number. the NRC m3)'ml' (ondw.,:' fIT ,"pnn:-.lJr, 300 J L't nI)l required to re:-pond to. the ,nfnrrrutftOn \.'{IU¢\.'(lt)n. FACIUTV Dresden Nuclear Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR*19 and DPR-25 NRC Docket Nos. 50-237 and 50-249 NRC REGION III A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2009 CY2010 CY2011 CY2012 ESTIMATED NUMBER OF LICENSEE*PREPARED EXAMINATIONS 1 1 1 1 ESTIMATED NUMBER OF NRC*PREPARED EXAMINATIONS 0 0 0 0 B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2009 CY2010 CY 2011 CY2012 :-.lUMBER OF REACTOR OPERATORS 6 4 4 4 NUMBER OF SENIOR REACTOR OPERATORS*INSTANT 4 10 8 8 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 0 1 1 1 NUMBER OF SENIOR REACfOR OPERATORS-LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE 3/09/2009 3/08/2010 310712011 3105/2012 ALTERNATE DATE 4/06/2009 4/05/2010 4/0412011 4/0212012 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED NUMBER CY2009 Cy2010 MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF CANDIDATES 0 0 12 0 0 0 14 0 Response to RIS 2008-16 Attachment 5 Page 1 of 1 APPRovED BY 011.18: NO. lIS!}'!)f31 EXPIRES: OIV3111((1II NReFORM SJ6 u.s NllCLEAR REGULA TORY COMMISSION (11-21105) burden Jl('r Ie) lOotmpl'f with {hi." voluruary inl(Urn.:ulon I hUUf. 'nWi mll)r"l"Ilaltfln ...:uUecttnn IS used to pl;1n OPERATOR LICENSING Nudear W.\.lJtmgton. DC tlf EXAMINATION DATA e--m,lIl W II'! and tt, fhe Officer. Ofiit.:e \)f In

md Reg"I",,,,}, Afr.",,, NE P*IO
!01.

!JI5{)-(JlJII. Oflicc "r Budget. DC 3 ustd to unpo!te an information <<lII<CllOo due< "'>> di;pl.y" valid 011.18 ".llInll numll<!r.lht NRC may OcJt i.'nod!lCf or and a penon nnt required to re."-pond to. the lofnrmatRln t'olfttnun. FA<.:ILlTY NRC REGION LaSalle County Station, Units 1 and 2 III Facility Operating License Nos. NPF*l1 and NPF-18 NRC Docket Nos. 50-373 and 50*374 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED i'l1JMBER CY2009 CY2010 CY 2011 CY2012 ESTIMATED NUMBER OF LICENSEE-PREPARED 0 1 0 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2009 CY2010 CY 2011 CY2012 NUMBER OF REACTOR 0 4 0 4 OPERATORS NUMBER OF SENIOR REACfOR 0 8 0 8 OPERA TORS*INST ANT NUMBER OF SENIOR REACTOR 0 2 0 2 OPERATORS-UPGRADE NUMBER OF SENIOR REACfOR 0 0 0 0 OPERATORS* LIMITED PROPOSED DATES PRIMARY DATE NlA 9/14/2010 NlA 9/1812012 ALTERNATE DATE NlA 9/21/2010 NlA 9/25/2012 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED CY2009 Cy 2010 NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DeCEMBER ESTIMATED 0 12 0 NUMBER OF 0 0 0 0 0 CANDIDATES Response to R!S 2008-16 Attachment 6 Page 1 of 1

  • See Attachment 8 (Peach Bottom Atomic Power StatIon) for LSRO numbers and exam dates NRC .'ORM SJ6 U.S NUCLEAR REG!JlATORY COMMISSION APPROVCD BY OMB: :-;0. 3151).1)131 EXPIRES: filii)

IK*20051 tmated burdtn per II t t."pmply wkh this vuluntary infnrmar Ion I hour, infnrmatK'fJ !':ull<<ltm'l I", w pbn budgets OPERATOR LICENSING Nm:ltar Comm.)i.,Wlf1, DC or bl internet EXAMINATION DATA e-mail tu It'! (X;nlJei,"l!o.@nREtlv

  • ."Hi to the oe... k OflICt:'T.

uf In ,)rmatiun and Aff.,,,, N B* W2U2. {3 1S(l..lllJ I I. om.." "f M.,wgement and Bud,er. Wa:o.hmgtnn. DC ':0503. If a used IH aft mfnrmauno c"IIe..:li"n oo"s dISplay. currently "alld OMB ",,"n,1 number, tile NRC may!ltll or spunsor. and 3: pers)n is. not required to 1u. lhe InfOrm3UOn FACILITY Limerick Generating Station, Units 1 and 2 Facility Operating License Nos. NPF-39 and NPF-85 NRC Docket Nos. 50-352 and 50-353 NRC REGION I A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2009 CY2010 CY2011 CY 2012 ESTIMATED NUMBER OF LICENSEE-PREPARED EXAMINATIONS .. 1 0 1 ESTIMATED NUMBER OF NRC-PREPARED EXAMINATIONS 0 0 0 0 B. INITIAL OPERATOR LICENSE EXAMlNATIONS PROPOSED NUMBER CY2009 CY2010 CY2011 CY 2012 NUMBER OF REACTOR OPERATORS 0 6 0 4 NUMBER OF SENIOR REACTOR OPERATORS-INSTANT 0 10 0 6 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 0 2 0 3 NUMBER OF SENIOR REACTOR OPERATORS-LIM I'TED " 0 0 0 PROPOSED DATES PRIMARY DATE .. 10/04/2010 NlA 10/08/2012 ALTERNATE DATE " 10/18/2010 NIA 10/15/2012 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED NUMBER cv2009 cv2010 MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF CANDIDATES 0 16 0 0 0 0 0 0 Response to RIS 2008-16 Attachment 7 . Page 1 of 1 APPROVED BY OMB; NO. JISO*lllJl EXPIRES; tWJU:;OOlI NRCfORM5J6 u.s SlICLEA R REGULA TORY COMMISSION .JI..lOO51 ['>limatltd burden per to cOInply with rh *.\ yoluntary mhltmalitm 1.:ulle'\linn request: I htlur. This tnforma1.!on \,oUo:llon I.... used to pian hudg","s OPERATOR LICENSING ) I). orr",. of M.nagemefll and EXAMINATION DATA w impnse In informal" 1.:uUa1itm \Jot!.\!lOlI displaY:t currently valKl OMS COnfRlj number, the NRC may not M "ponsur. and a penon IS not requtrtd tu rt.*..pnnd rn. the InfilrTrullMtn collectJ()fl. NRC REGION FACILITY Oyster Creek Nuclear Generating Station I Facility Operating License No. DPR-16 NRC Docket No. 50-219 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CYgQ1Q CY 2011 CY 2012 CY2009 ESTIMATED NUMBER 1 1 1 0 EXAMINATIONS ESTIMATED NUMBER 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CYgQ1Q CY 2011 CY2009 CY2012 NUMBER OF REACTOR 6 6 6 0 OPERATORS NUMBER OF SENIOR REACTOR 10 8 10 0 OPERATORS-INSTANT NUMBER OF SENIOR REACTOR 2 2 0 0 NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS* LIMITED PROPOSED DATES PRIMARY DATE 5/04/2009 5/17/2010 5/1612011 N/A ALTERNATE DATE 5/11/2009 5/24/2010 5/23/2011 N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE cv2009 cv2010 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER NUMBER 16 14 0 0 0 0 0 0 CANDIDATES Response to RIS 2008-16 Attachment 8 Page 1 of 1 NRl' fORM 536 (I.S NUClL\R REGULATORY COMMISSION l"'lllOSl OPERATOR LICENSING EXAMINATION DATA FACILITY APPROVED BY OMB: NO. J 150*0 1:\ 1 EXPIRES,1l1V31/}IlOIi burden per f(>l'punr.t' to \-x)tnply wirh thIs ...,lIunCafY irtlt)!malton cnllel:ttun requesl: I tlI;)ur, This i.nfurrnaoon ('uHel'tlOn t,\ llsed Itl plan budgers , 13150*0131). Otf""'<lfMa.'ge"",m and Budget. W3.."tungtllf'l. DC ';0503, If a .. u!C.Cd to lmpt)'iC an inthrmatK1R cull<<1lOndoes "'I d;.pl.y. valid OMS ,v",lUl nunw.r. lhe NRC may condoct or 'pomor, and a pe'f'\(Jn .:,. nut r(:Quired to to, rhe mlonruuion cllllet'tiuo. NRC REGION Peach Bottom Atomic Power Station, Units 2 and 3 I Renewed Facility Operating License Nos. DPR-44 and NRC Docket Nos. and 50-278 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2009 CY2010 CY 2011 CYZQ1g ESTIMATED NUMBER OF LICENSEE-PREPARED 1 and 1 LSRO 1 0 1 EXAMINATIONS ESTIMATED NUMBER OF NRC,PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2009 CY2010 CY2011 CY 2012 NUMBER OF REACTOR 2 6 0 6 OPERATORS NUMBER OF SENIOR REACTOR 9 10 0 10 OPERA TORS-INSTANT NUMBER OF SENIOR REACTOR 1 2 0 2 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 6 0 0 0 OPERATORS-LIMITED PROPOSED DATES 12107/2009 PRIMARY DATE 8/03/2009 -LSRO 1210612010 NlA 12103/2012 12114/2009 ALTERNATE DATE 12113/2010 N/A 12110/2012 8/10/2009 -LSRO C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED Cy 2009 CY2010 NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED 0 0 16 0 0 0 0 0 NUMBER OF CANDIDATES Response to RIS 2008-16 Attachment 9 Page 1 of 1 NRC FORM 5.16 u.s NUCLEAR RE(;UI.ATORY <?OMMISSION IH*ZUIIS, OPERATOR LICENSING EXAl\1INATION DATA FACILITY APPROVED BY 01'.18: NO. J151l-illJl EXPiRES: IllWlI:!OOa Et-tlm.1l:ed punkn per W (.'Omply with Ihis inform.1tJ:Jo (ofla:tiun I huur. l,'HIIt\:11t1U III plan Nudea!' Cnmmhs)un, oc* '))55.5:-tOOl, or bl intemtt e-m::ui If\ In fK.<ouecrsfitnn:'i),v,;tOO It! rhe De,,, Offtt:tT. Off<<:e ilf In i.lrmation "00 Mf."" NE 8*10202. [Ji.lll-0I31). Oifi,,, 01 Manasement .nd WiI:.l'unghill.; DC It a ml.!-ilns tll impo,.:;e an InthrmatRIR ,'0110<:1;"" dI"" "0' dll'pl.y a cUlTClltly vaha OMS _",llmln.mber.!he NRC may 11111 m "p.Jtl.Jr

  • ..tI'ld a person 11111 required tH re:-.p.U1d ttl. the mformiJltnn ,nlk'\.'1ion.

NRCREGJON Quad Cities Nuclear Power Station, Units 1 and 2 III Renewed Facility Operating License Nos. DPR-29 and DPR-30 NRC Docket Nos. 50-254 and 50-265 A. PROPOSED EXAl\1INATION PREPARATION SCHEDULE PROPOSED NUMBER CY2oo9 CY2010 CY2011 CY2012 ESTIMATED NUMBER OF LICENSEE-PREPARED 1 0 1 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2010 CY 2011 CY2012 NUMBER OF REAcroR 6 0 6 4 OPERATORS NUMBER OF SENIOR REACTOR 10 0 10 10 OPERATORS-INSTANT NUMBER OF SENIOR REACTOR 0 0 1 1 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS-LIMITED PROPOSED DATES PRIMARY DATE 11/30/2009 NlA 5129/2011 3/1212012 ALTERNATE DATE 1210712009 NlA 611212011 312612012 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED Cy2oo9 CY 2010 NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED 0 0 0 NUMBER OF 16 0 0 0 14 CANDIDATES Response to RIS 2008-16 Attachment 10 Page 1 of 1 NRC fORM SJI> u.s NUCLEAR REGULATORY COMMISSION APPROVED 8Y OMS; NO. 3(51).0111 EXPIRES: 111-1085) EM:jm.ued burden per ltll'OmpJy with c!,ltectiun reque:r.t: I hI,ur, Thb t,;ulla:tlon is useu to plan OPERATOR LICENSING Cnmmlso,;VH1. Wa,hlOghm. DC' .;osss*(n)}. Itf bl EXAMINATION DATA e*mJII ttl in t'k,;ollecfr.@orc'stV<and to the OffICer, OO'ke nl In tmnahJfl Jnd Resulutory Afl.,,;. NE B* HI2ill. (l150*013 I). Offi<:e of Managemenl and Budget. DC 1{1503. If" mean>;;. used III impose an Inttlnttah(Hl l.'olJe\!tJOn nul dbplay a valJiJ OMB \:1)01"11 number. (he NRC may Ollt (noouct or sJXm:.or. and a i.. Rot required hi

10. U,e mthrma.itln C'uUe\.'Tj.on.

FACILITY Three Mile Island Nuclear Station, Unit 1 Facility Operating License No. DPR-50 NRC Docket No. 50-289 NRC REGION I A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2009 CY2010 CY2011 CY 2012 ESTIMATED NUMBER OF LICENSEE-PREPARED EXAMINATIONS 1 0 1 0 ESTIMATED NUMBER OF NRC*PREPARED EXAMINATIONS 0 0 0 0 B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2009 CY2010 CY 2011 CY2012 NUMBER OF REACTOR OPERATORS 8 0 8 0 NUMBER OF SENIOR REACTOR OPERA TORS*INST ANT 6 0 7 0 NUMBER OF SENIOR REACTOR OPERATORS* UPGRADE 0 0 2 0 NUMBER OF SENIOR REACTOR OPERATORS* LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE 5/25/2009 N/A 5/3012011 NlA ALTERNATE DATE 6/01/2009 NlA 6/0612011 NlA C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED NUMBER cv gQQ2 cv2010 MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF CANDIDATES 0 0 0 0 15 0 0 0}}