ML24173A125
Jump to navigation
Jump to search
ML24173A125 | |
Person / Time | |
---|---|
Site: | Quad Cities |
Issue date: | 01/23/2024 |
From: | Kelley T NRC/RGN-III/DORS/OB |
To: | |
Bryan Bergeon | |
Shared Package | |
ML22251A229 | List: |
References | |
Download: ML24173A125 (1) | |
Text
Form 2.3-1 Examination Outline Quality Checklist
Facility: Quad Cities Date of Examination: 05/28/2024
Item Task Description (Y)es / (N)o a b* c#
- a. The outline was systematically and randomly prepared in accordance with the Y Y instructions in Section B of ES-4.1, and all knowledge and ability ( K/A) categories are appropriately sampled.
- b. The outline does not overemphasize any systems, evolutions, or generic topics. Y Y Y
- c. Justifications for deselected or rejected K/A statements are acceptable. Y Y Y
- a. Using Form 3.4-1, Events and Evolutions Checklist, verify that the proposed scenario Y Y Y set contains the required number of normal evolutions, reactivity evolutions, instrument and component failures, manual control evolutions, technical specifications, and major transients.
- b. There are enough scenarios (and spares) for the projected number and mix of Y Y Y applicants in accordance with the expected crew composition and rotation schedule without compromising exam integrity. Ensure that scenarios will not be repeated on subsequent days.
- c. Ensure that all scenarios are new or significantly modified in accordance with ES-3.4 Y Y Y and that no scenarios are duplicated from the applicants audit test(s).
- d. To the extent possible, assess whether the outline(s) conforms with the qualitative and Y Y Y quantitative simulator set criteria specified on Form 2.3-2.
- a. Verify that the administrative outline meets the criteria specified in the instructions on Y Y Y Form 3.2-1 and that no tasks are duplicated from the applicants audit test(s).
- b. Verify that the control room and in-plant systems outline meets the criteria specified in Y Y Y the instructions on Form 3.2-2 and that no tasks are duplicated from the applicants audit test(s).
- c. Determine whether the number of job performance measures (JPMs) and JPM types is Y Y Y sufficient for the projected number and mix of applicants and ensure that no items are duplicated on subsequent days.
- a. Assess whether the appropriate exam sections cover plant-specific priorities (including Y Y Y probabilistic risk assessment and individual plant examination insights).
- b. Assess whether the 10 CFR 55.41, 10 CFR 55.43, and 10 CFR 55.45 sampling is Y Y Y appropriate.
- c. Check whether K/A importance ratings (except for plant-specific priorities) are greater Y Y Y than or equal to 2.5.
- d. Check for duplication and overlap across the exam and with the last two NRC exams. Y Y Y
- e. Check the entire exam for balance of coverage. Y Y Y
- f. Assess whether the exam fits the appropriate job level (reactor operator or senior Y Y Y reactor operator).
Printed Name/Signature Date
- a. Author _______Travis Kelley_/ Signature on Hard Copy ____12/13/2023_____
- b. Facility Reviewer (*) _____ Josh Roos / Signature on Hard Copy _____________ 12/11/2023_____
- c. NRC Reviewer (#) _______________________________________________________________
NRC Chief Examiner _________________________________________________________________
NRC Supervisor _______________________________________________________________
- The facility licensee signature is not applicable for NRC-developed tests.
- An independent NRC reviewer performs the steps in column c. This may be the NRC Chief Examiner if he/she did not develop the outline under review.